Dated Singapore electricity fuel-mix shares, generation output and capacity, grid emission factor, solar deployment milestones, and regional import targets — each with an explicit reference period.

Last verified: 2026-08-10 Status: verified

Energy and Power Grid Anchors

Use each row with its reference period (full year versus half-year) and whether shares are of gross generation or registered capacity. Narrative lives in energy and power grid.

Electricity fuel mix — gross generation shares

Fuel / source Share Reference period As of
Natural gas 94.0% Gross electricity generation Full year 2024
Natural gas 93.1% Gross electricity generation 1H 2025
Solar photovoltaic 2.1% Gross electricity generation Full year 2024
Solar photovoltaic 2.5% Gross electricity generation 1H 2025
Other (waste, biomass, imports) 2.7% Gross electricity generation Full year 2024
Other (waste, biomass, imports) 3.0% Gross electricity generation 1H 2025

Sources: EMA SES Chapter 2; EMA fuel-mix table, accessed 9 August 2026. EMA also states about 95% of electricity is generated using imported natural gas as a rounded narrative figure (EMA Natural Gas).

Output, capacity, and emissions intensity

Metric Value Denominator / notes As of
Gross electricity output About 60 TWh +2.5% from 2023 Full year 2024
Registered generation capacity 13,261 MW All fuel types 1H 2025
Solar registered capacity 1,367 MWac (9.7% of capacity mix in 2024) Capacity registration 1H 2025 / 2024 mix
Average grid emission factor 0.402 kg CO₂/kWh Net generation basis; down from 0.412 in 2023 Full year 2024

Source: EMA SES Chapter 2, accessed 9 August 2026.

Solar deployment and import targets

Anchor Value Notes As of
Installed solar capacity milestone 2 GWp reached Met earlier 2030 target early 2025
Revised 2030 solar target 3 GWp Could generate ~2,800 GWh/year Announced 2 Mar 2026
Low-carbon electricity import target Around 6 GW by 2035 About one-third of projected demand then; supersedes earlier 4 GW framing EMA Oct 2025 page
Solar realistic share by 2050 Around 10% of projected energy needs Domestic constraint; complements imports EMA Mar 2026

Sources: EMA solar release Mar 2026; EMA Regional Power Grids, accessed 9 August 2026.

Record details

Also known as
["Singapore electricity fuel mix","natural gas share electricity","3 GWp solar","6 GW import target"]
Jurisdiction
SG
What each row represents
one dated anchor in energy-power-grid-anchors
Update cadence
when primary sources revise anchored facts
Source format
markdown

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force.

Sources

Collection as of 2026-10-07 · An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.