{"release_id":19,"data":{"id":89959,"release_id":19,"source_id":"sgkb.data.energy-power-grid-anchors","kind":"dataset","fingerprint":"b4160dc53b2b3e43a10fe9d0f42a463982491e6fbaa66122ea4fe72f0876e1ed","title_en":"Energy and Power Grid Anchors","title_zh":"\u80fd\u6e90\u4e0e\u7535\u7f51\u5173\u952e\u6570\u636e","domain":"data","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-08-10","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["Singapore electricity fuel mix","natural gas share electricity","3 GWp solar","6 GW import target"],"aliases_i18n":[],"canonical_format":"markdown","classification_confidence":"high","classification_source":"curated","document_id":"sgkb.data.energy-power-grid-anchors","document_sha256":"5ab03f9d5c4098bdb0b4c38cf960527407ee3c17005d1447ab61574f6dacd2ef","document_type":"dataset","domain":"data","entities":["sg.agency.ema"],"facets":["current","infrastructure","policy","statistics"],"geographic_scope":["national"],"grain":"one dated anchor in energy-power-grid-anchors","id":"sgkb.data.energy-power-grid-anchors","jurisdiction":"SG","language":"en","last_verified":"2026-08-10","path":"data\/energy-power-grid-anchors.md","related":["energy-and-power-grid","green-plan-anchors","annual-rates"],"sources":[{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Singapore Energy Statistics Chapter 2","url":"https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2"},{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Fuel Mix for Electricity Generation (yearly table)","url":"https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf"},{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Natural Gas","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas"},{"accessed":"2026-08-09","published":"2026-03-02","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Solar target raised to 3 GWp by 2030","url":"https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030"},{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Regional Power Grids","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"}],"status":"verified","summary":"Dated Singapore electricity fuel-mix shares, generation output and capacity, grid emission factor, solar deployment milestones, and regional import targets \u2014 each with an explicit reference period.","tags":["energy","statistics","utilities","climate"],"temporal_scope":"current","title":"Energy and Power Grid Anchors","topics":["sgtopic.environment.energy"],"update_cadence":"when primary sources revise anchored facts","volatility":"fast"},"date":"2026-08-10","domain":"data","evidence_paths":["source\/data\/energy-power-grid-anchors.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":0,"input_hash":"d87ed12ce8d80e01102cfcc25eaf9c243600a1757b44d912e1f04efa568c4acc","kind":"dataset","lineage":[{"chunk_id":"sgkb.data.energy-power-grid-anchors#overview","citation_urls":[],"content_sha256":"42ad3f57c0822d581454c20136f8d0d388a4c8a01aaf52623bf3dcd043165cf0","document_id":"sgkb.data.energy-power-grid-anchors","document_sha256":"5ab03f9d5c4098bdb0b4c38cf960527407ee3c17005d1447ab61574f6dacd2ef","section_sources":[]},{"chunk_id":"sgkb.data.energy-power-grid-anchors#electricity-fuel-mix-gross-generation-shares","citation_urls":["https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2","https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf","https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas"],"content_sha256":"9da6891b51bd2810d217ddf10599f22af8daffb89486700e756a49b128a46196","document_id":"sgkb.data.energy-power-grid-anchors","document_sha256":"5ab03f9d5c4098bdb0b4c38cf960527407ee3c17005d1447ab61574f6dacd2ef","section_sources":[{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Singapore Energy Statistics Chapter 2","url":"https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2"},{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Fuel Mix for Electricity Generation (yearly table)","url":"https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf"},{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Natural Gas","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas"}]},{"chunk_id":"sgkb.data.energy-power-grid-anchors#output-capacity-and-emissions-intensity","citation_urls":["https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2"],"content_sha256":"ed79c76f275c16ece773be938430da55158c177c3367204bebfca7bf94bf93fe","document_id":"sgkb.data.energy-power-grid-anchors","document_sha256":"5ab03f9d5c4098bdb0b4c38cf960527407ee3c17005d1447ab61574f6dacd2ef","section_sources":[{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Singapore Energy Statistics Chapter 2","url":"https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2"}]},{"chunk_id":"sgkb.data.energy-power-grid-anchors#solar-deployment-and-import-targets","citation_urls":["https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030","https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"],"content_sha256":"9eafd1dcb7206c4002d9025cf132d0f2d0b98760760519f00ef6b530384e34f8","document_id":"sgkb.data.energy-power-grid-anchors","document_sha256":"5ab03f9d5c4098bdb0b4c38cf960527407ee3c17005d1447ab61574f6dacd2ef","section_sources":[{"accessed":"2026-08-09","published":"2026-03-02","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Solar target raised to 3 GWp by 2030","url":"https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030"},{"accessed":"2026-08-09","publisher":"Energy Market Authority","tier":1,"title":"EMA \u2014 Regional Power Grids","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"}]}],"links":[{"relation":"related","target_id":"sgkb.environment-sustainability.energy-and-power-grid"},{"relation":"related","target_id":"sgkb.data.green-plan-anchors"},{"relation":"related","target_id":"sgkb.data.annual-rates"},{"relation":"topics","target_id":"sgtopic.environment.energy"},{"relation":"entities","target_id":"sg.agency.ema"}],"locales":{"en":{"markdown":"# Energy and Power Grid Anchors\n\nUse each row with its reference period (full year versus half-year) and whether shares are of gross generation or registered capacity. Narrative lives in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid).\n\n## Electricity fuel mix \u2014 gross generation shares\n\n| Fuel \/ source | Share | Reference period | As of |\n|---|---:|---|---|\n| Natural gas | 94.0% | Gross electricity generation | Full year 2024 |\n| Natural gas | 93.1% | Gross electricity generation | 1H 2025 |\n| Solar photovoltaic | 2.1% | Gross electricity generation | Full year 2024 |\n| Solar photovoltaic | 2.5% | Gross electricity generation | 1H 2025 |\n| Other (waste, biomass, imports) | 2.7% | Gross electricity generation | Full year 2024 |\n| Other (waste, biomass, imports) | 3.0% | Gross electricity generation | 1H 2025 |\n\nSources: [EMA SES Chapter 2](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2); [EMA fuel-mix table](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf), accessed 9 August 2026. EMA also states about 95% of electricity is generated using imported natural gas as a rounded narrative figure ([EMA Natural Gas](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas)).\n\n## Output, capacity, and emissions intensity\n\n| Metric | Value | Denominator \/ notes | As of |\n|---|---:|---|---|\n| Gross electricity output | About 60 TWh | +2.5% from 2023 | Full year 2024 |\n| Registered generation capacity | 13,261 MW | All fuel types | 1H 2025 |\n| Solar registered capacity | 1,367 MWac (9.7% of capacity mix in 2024) | Capacity registration | 1H 2025 \/ 2024 mix |\n| Average grid emission factor | 0.402 kg CO\u2082\/kWh | Net generation basis; down from 0.412 in 2023 | Full year 2024 |\n\nSource: [EMA SES Chapter 2](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2), accessed 9 August 2026.\n\n## Solar deployment and import targets\n\n| Anchor | Value | Notes | As of |\n|---|---:|---|---|\n| Installed solar capacity milestone | 2 GWp reached | Met earlier 2030 target early | 2025 |\n| Revised 2030 solar target | 3 GWp | Could generate ~2,800 GWh\/year | Announced 2 Mar 2026 |\n| Low-carbon electricity import target | Around 6 GW by 2035 | About one-third of projected demand then; supersedes earlier 4 GW framing | EMA Oct 2025 page |\n| Solar realistic share by 2050 | Around 10% of projected energy needs | Domestic constraint; complements imports | EMA Mar 2026 |\n\nSources: [EMA solar release Mar 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030); [EMA Regional Power Grids](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids), accessed 9 August 2026.","summary":"Dated Singapore electricity fuel-mix shares, generation output and capacity, grid emission factor, solar deployment milestones, and regional import targets \u2014 each with an explicit reference period.","title":"Energy and Power Grid Anchors"},"zh":{"markdown":"# \u80fd\u6e90\u4e0e\u7535\u7f51\u5173\u952e\u6570\u636e\n\n\u4f7f\u7528\u6bcf\u884c\u6570\u636e\u65f6\uff0c\u8bf7\u6ce8\u660e\u5176\u53c2\u8003\u671f\uff08\u5168\u5e74\u6216\u534a\u5e74\uff09\u4ee5\u53ca\u5360\u6bd4\u662f\u6309\u603b\u53d1\u7535\u91cf\u8fd8\u662f\u6ce8\u518c\u5bb9\u91cf\u8ba1\u7b97\u3002\u80cc\u666f\u4ecb\u7ecd\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u3002\n\n## \u7535\u529b\u71c3\u6599\u7ed3\u6784\u2014\u2014\u603b\u53d1\u7535\u91cf\u5360\u6bd4\n\n| \u71c3\u6599 \/ \u6765\u6e90 | \u5360\u6bd4 | \u53c2\u8003\u671f | \u622a\u81f3 |\n|---|---:|---|---|\n| \u5929\u7136\u6c14 | 94.0% | \u603b\u53d1\u7535\u91cf | 2024 \u5168\u5e74 |\n| \u5929\u7136\u6c14 | 93.1% | \u603b\u53d1\u7535\u91cf | 2025 \u5e74\u4e0a\u534a\u5e74 |\n| \u592a\u9633\u80fd\u5149\u4f0f | 2.1% | \u603b\u53d1\u7535\u91cf | 2024 \u5168\u5e74 |\n| \u592a\u9633\u80fd\u5149\u4f0f | 2.5% | \u603b\u53d1\u7535\u91cf | 2025 \u5e74\u4e0a\u534a\u5e74 |\n| \u5176\u4ed6\uff08\u5e9f\u5f03\u7269\u3001\u751f\u7269\u8d28\u3001\u8fdb\u53e3\u7535\u529b\uff09 | 2.7% | \u603b\u53d1\u7535\u91cf | 2024 \u5168\u5e74 |\n| \u5176\u4ed6\uff08\u5e9f\u5f03\u7269\u3001\u751f\u7269\u8d28\u3001\u8fdb\u53e3\u7535\u529b\uff09 | 3.0% | \u603b\u53d1\u7535\u91cf | 2025 \u5e74\u4e0a\u534a\u5e74 |\n\n\u6765\u6e90\uff1a[EMA SES \u7b2c 2 \u7ae0](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2)\uff1b[EMA \u71c3\u6599\u7ed3\u6784\u8868](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 9 \u65e5\u3002EMA \u8fd8\u4ee5\u6982\u62ec\u6027\u8868\u8ff0\u6307\u51fa\uff0c\u7ea6 95% \u7684\u7535\u529b\u4f7f\u7528\u8fdb\u53e3\u5929\u7136\u6c14\u53d1\u7535\uff08[EMA \u5929\u7136\u6c14](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas)\uff09\u3002\n\n## \u53d1\u7535\u91cf\u3001\u88c5\u673a\u5bb9\u91cf\u4e0e\u6392\u653e\u5f3a\u5ea6\n\n| \u6307\u6807 | \u6570\u503c | \u5206\u6bcd \/ \u5907\u6ce8 | \u622a\u81f3 |\n|---|---:|---|---|\n| \u603b\u53d1\u7535\u91cf | \u7ea6 60 TWh | \u8f83 2023 \u5e74\u589e\u957f +2.5% | 2024 \u5168\u5e74 |\n| \u6ce8\u518c\u53d1\u7535\u5bb9\u91cf | 13,261 MW | \u6240\u6709\u71c3\u6599\u7c7b\u578b | 2025 \u5e74\u4e0a\u534a\u5e74 |\n| \u592a\u9633\u80fd\u6ce8\u518c\u5bb9\u91cf | 1,367 MWac\uff08\u5360 2024 \u5e74\u5bb9\u91cf\u7ed3\u6784\u7684 9.7%\uff09 | \u5bb9\u91cf\u6ce8\u518c | 2025 \u5e74\u4e0a\u534a\u5e74 \/ 2024 \u5e74\u7ed3\u6784 |\n| \u5e73\u5747\u7535\u7f51\u6392\u653e\u56e0\u5b50 | 0.402 kg CO\u2082\/kWh | \u6309\u51c0\u53d1\u7535\u91cf\u8ba1\u7b97\uff1b\u4f4e\u4e8e 2023 \u5e74\u7684 0.412 | 2024 \u5168\u5e74 |\n\n\u6765\u6e90\uff1a[EMA SES \u7b2c 2 \u7ae0](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 9 \u65e5\u3002\n\n## \u592a\u9633\u80fd\u90e8\u7f72\u4e0e\u8fdb\u53e3\u76ee\u6807\n\n| \u5173\u952e\u6570\u636e | \u6570\u503c | \u5907\u6ce8 | \u622a\u81f3 |\n|---|---:|---|---|\n| \u592a\u9633\u80fd\u88c5\u673a\u5bb9\u91cf\u91cc\u7a0b\u7891 | \u8fbe\u5230 2 GWp | \u63d0\u524d\u8fbe\u6210\u539f\u5b9a 2030 \u5e74\u76ee\u6807 | 2025 \u5e74 |\n| \u4fee\u8ba2\u540e\u7684 2030 \u5e74\u592a\u9633\u80fd\u76ee\u6807 | 3 GWp | \u6bcf\u5e74\u53ef\u53d1\u7535\u7ea6 2,800 GWh | 2026 \u5e74\u4e09\u6708 2 \u65e5\u516c\u5e03 |\n| \u4f4e\u78b3\u7535\u529b\u8fdb\u53e3\u76ee\u6807 | \u5230 2035 \u5e74\u7ea6 6 GW | \u7ea6\u5360\u5c4a\u65f6\u9884\u6d4b\u9700\u6c42\u7684\u4e09\u5206\u4e4b\u4e00\uff1b\u53d6\u4ee3\u6b64\u524d 4 GW \u7684\u8868\u8ff0 | EMA 2025 \u5e74\u5341\u6708\u9875\u9762 |\n| 2050 \u5e74\u592a\u9633\u80fd\u73b0\u5b9e\u53ef\u8fbe\u5360\u6bd4 | \u7ea6\u5360\u9884\u6d4b\u80fd\u6e90\u9700\u6c42\u7684 10% | \u53d7\u56fd\u5185\u6761\u4ef6\u9650\u5236\uff1b\u4e0e\u8fdb\u53e3\u7535\u529b\u4e92\u8865 | EMA 2026 \u5e74\u4e09\u6708 |\n\n\u6765\u6e90\uff1a[EMA 2026 \u5e74\u4e09\u6708\u592a\u9633\u80fd\u65b0\u95fb\u7a3f](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff1b[EMA \u533a\u57df\u7535\u7f51](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 9 \u65e5\u3002","summary":"\u65b0\u52a0\u5761\u7535\u529b\u71c3\u6599\u7ed3\u6784\u5360\u6bd4\u3001\u53d1\u7535\u91cf\u4e0e\u88c5\u673a\u5bb9\u91cf\u3001\u7535\u7f51\u6392\u653e\u56e0\u5b50\u3001\u592a\u9633\u80fd\u90e8\u7f72\u91cc\u7a0b\u7891\u548c\u533a\u57df\u8fdb\u53e3\u76ee\u6807\u7684\u5e26\u65e5\u671f\u6570\u636e\u2014\u2014\u6bcf\u9879\u5747\u6ce8\u660e\u660e\u786e\u7684\u53c2\u8003\u671f\u3002","title":"\u80fd\u6e90\u4e0e\u7535\u7f51\u5173\u952e\u6570\u636e"}},"source_id":"sgkb.data.energy-power-grid-anchors","status":"verified","summary_en":"Dated Singapore electricity fuel-mix shares, generation output and capacity, grid emission factor, solar deployment milestones, and regional import targets \u2014 each with an explicit reference period.","summary_zh":"\u65b0\u52a0\u5761\u7535\u529b\u71c3\u6599\u7ed3\u6784\u5360\u6bd4\u3001\u53d1\u7535\u91cf\u4e0e\u88c5\u673a\u5bb9\u91cf\u3001\u7535\u7f51\u6392\u653e\u56e0\u5b50\u3001\u592a\u9633\u80fd\u90e8\u7f72\u91cc\u7a0b\u7891\u548c\u533a\u57df\u8fdb\u53e3\u76ee\u6807\u7684\u5e26\u65e5\u671f\u6570\u636e\u2014\u2014\u6bcf\u9879\u5747\u6ce8\u660e\u660e\u786e\u7684\u53c2\u8003\u671f\u3002","title_en":"Energy and Power Grid Anchors","title_zh":"\u80fd\u6e90\u4e0e\u7535\u7f51\u5173\u952e\u6570\u636e"},"search_text":"Energy and Power Grid Anchors\n\u80fd\u6e90\u4e0e\u7535\u7f51\u5173\u952e\u6570\u636e\nDated Singapore electricity fuel-mix shares, generation output and capacity, grid emission factor, solar deployment milestones, and regional import targets \u2014 each with an explicit reference period.\n\u65b0\u52a0\u5761\u7535\u529b\u71c3\u6599\u7ed3\u6784\u5360\u6bd4\u3001\u53d1\u7535\u91cf\u4e0e\u88c5\u673a\u5bb9\u91cf\u3001\u7535\u7f51\u6392\u653e\u56e0\u5b50\u3001\u592a\u9633\u80fd\u90e8\u7f72\u91cc\u7a0b\u7891\u548c\u533a\u57df\u8fdb\u53e3\u76ee\u6807\u7684\u5e26\u65e5\u671f\u6570\u636e\u2014\u2014\u6bcf\u9879\u5747\u6ce8\u660e\u660e\u786e\u7684\u53c2\u8003\u671f\u3002\n{\"aliases\":[\"Singapore electricity fuel mix\",\"natural gas share electricity\",\"3 GWp solar\",\"6 GW import target\"],\"aliases_i18n\":[],\"canonical_format\":\"markdown\",\"classification_confidence\":\"high\",\"classification_source\":\"curated\",\"document_id\":\"sgkb.data.energy-power-grid-anchors\",\"document_sha256\":\"5ab03f9d5c4098bdb0b4c38cf960527407ee3c17005d1447ab61574f6dacd2ef\",\"document_type\":\"dataset\",\"domain\":\"data\",\"entities\":[\"sg.agency.ema\"],\"facets\":[\"current\",\"infrastructure\",\"policy\",\"statistics\"],\"geographic_scope\":[\"national\"],\"grain\":\"one dated anchor in energy-power-grid-anchors\",\"id\":\"sgkb.data.energy-power-grid-anchors\",\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-08-10\",\"path\":\"data\\\/energy-power-grid-anchors.md\",\"related\":[\"energy-and-power-grid\",\"green-plan-anchors\",\"annual-rates\"],\"sources\":[{\"accessed\":\"2026-08-09\",\"publisher\":\"Energy Market Authority\",\"tier\":1,\"title\":\"EMA \u2014 Singapore Energy Statistics Chapter 2\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/resources\\\/singapore-energy-statistics\\\/chapter2\"},{\"accessed\":\"2026-08-09\",\"publisher\":\"Energy Market Authority\",\"tier\":1,\"title\":\"EMA \u2014 Fuel Mix for Electricity Generation (yearly table)\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/content\\\/dam\\\/corporate\\\/resources\\\/statistics\\\/files\\\/pdf\\\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf\"},{\"accessed\":\"2026-08-09\",\"publisher\":\"Energy Market Authority\",\"tier\":1,\"title\":\"EMA \u2014 Natural Gas\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/our-energy-story\\\/energy-supply\\\/natural-gas\"},{\"accessed\":\"2026-08-09\",\"published\":\"2026-03-02\",\"publisher\":\"Energy Market Authority\",\"tier\":1,\"title\":\"EMA \u2014 Solar target raised to 3 GWp by 2030\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/news-events\\\/news\\\/media-releases\\\/2026\\\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030\"},{\"accessed\":\"2026-08-09\",\"publisher\":\"Energy Market Authority\",\"tier\":1,\"title\":\"EMA \u2014 Regional Power Grids\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/our-energy-story\\\/energy-supply\\\/regional-power-grids\"}],\"status\":\"verified\",\"summary\":\"Dated Singapore electricity fuel-mix shares, generation output and capacity, grid emission factor, solar deployment milestones, and regional import targets \u2014 each with an explicit reference period.\",\"tags\":[\"energy\",\"statistics\",\"utilities\",\"climate\"],\"temporal_scope\":\"current\",\"title\":\"Energy and Power Grid Anchors\",\"topics\":[\"sgtopic.environment.energy\"],\"update_cadence\":\"when primary sources revise anchored facts\",\"volatility\":\"fast\"}\n# Energy and Power Grid Anchors\n\nUse each row with its reference period (full year versus half-year) and whether shares are of gross generation or registered capacity. Narrative lives in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid).\n\n## Electricity fuel mix \u2014 gross generation shares\n\n| Fuel \/ source | Share | Reference period | As of |\n|---|---:|---|---|\n| Natural gas | 94.0% | Gross electricity generation | Full year 2024 |\n| Natural gas | 93.1% | Gross electricity generation | 1H 2025 |\n| Solar photovoltaic | 2.1% | Gross electricity generation | Full year 2024 |\n| Solar photovoltaic | 2.5% | Gross electricity generation | 1H 2025 |\n| Other (waste, biomass, imports) | 2.7% | Gross electricity generation | Full year 2024 |\n| Other (waste, biomass, imports) | 3.0% | Gross electricity generation | 1H 2025 |\n\nSources: [EMA SES Chapter 2](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2); [EMA fuel-mix table](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf), accessed 9 August 2026. EMA also states about 95% of electricity is generated using imported natural gas as a rounded narrative figure ([EMA Natural Gas](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas)).\n\n## Output, capacity, and emissions intensity\n\n| Metric | Value | Denominator \/ notes | As of |\n|---|---:|---|---|\n| Gross electricity output | About 60 TWh | +2.5% from 2023 | Full year 2024 |\n| Registered generation capacity | 13,261 MW | All fuel types | 1H 2025 |\n| Solar registered capacity | 1,367 MWac (9.7% of capacity mix in 2024) | Capacity registration | 1H 2025 \/ 2024 mix |\n| Average grid emission factor | 0.402 kg CO\u2082\/kWh | Net generation basis; down from 0.412 in 2023 | Full year 2024 |\n\nSource: [EMA SES Chapter 2](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2), accessed 9 August 2026.\n\n## Solar deployment and import targets\n\n| Anchor | Value | Notes | As of |\n|---|---:|---|---|\n| Installed solar capacity milestone | 2 GWp reached | Met earlier 2030 target early | 2025 |\n| Revised 2030 solar target | 3 GWp | Could generate ~2,800 GWh\/year | Announced 2 Mar 2026 |\n| Low-carbon electricity import target | Around 6 GW by 2035 | About one-third of projected demand then; supersedes earlier 4 GW framing | EMA Oct 2025 page |\n| Solar realistic share by 2050 | Around 10% of projected energy needs | Domestic constraint; complements imports | EMA Mar 2026 |\n\nSources: [EMA solar release Mar 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030); [EMA Regional Power Grids](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids), accessed 9 August 2026.\n# \u80fd\u6e90\u4e0e\u7535\u7f51\u5173\u952e\u6570\u636e\n\n\u4f7f\u7528\u6bcf\u884c\u6570\u636e\u65f6\uff0c\u8bf7\u6ce8\u660e\u5176\u53c2\u8003\u671f\uff08\u5168\u5e74\u6216\u534a\u5e74\uff09\u4ee5\u53ca\u5360\u6bd4\u662f\u6309\u603b\u53d1\u7535\u91cf\u8fd8\u662f\u6ce8\u518c\u5bb9\u91cf\u8ba1\u7b97\u3002\u80cc\u666f\u4ecb\u7ecd\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u3002\n\n## \u7535\u529b\u71c3\u6599\u7ed3\u6784\u2014\u2014\u603b\u53d1\u7535\u91cf\u5360\u6bd4\n\n| \u71c3\u6599 \/ \u6765\u6e90 | \u5360\u6bd4 | \u53c2\u8003\u671f | \u622a\u81f3 |\n|---|---:|---|---|\n| \u5929\u7136\u6c14 | 94.0% | \u603b\u53d1\u7535\u91cf | 2024 \u5168\u5e74 |\n| \u5929\u7136\u6c14 | 93.1% | \u603b\u53d1\u7535\u91cf | 2025 \u5e74\u4e0a\u534a\u5e74 |\n| \u592a\u9633\u80fd\u5149\u4f0f | 2.1% | \u603b\u53d1\u7535\u91cf | 2024 \u5168\u5e74 |\n| \u592a\u9633\u80fd\u5149\u4f0f | 2.5% | \u603b\u53d1\u7535\u91cf | 2025 \u5e74\u4e0a\u534a\u5e74 |\n| \u5176\u4ed6\uff08\u5e9f\u5f03\u7269\u3001\u751f\u7269\u8d28\u3001\u8fdb\u53e3\u7535\u529b\uff09 | 2.7% | \u603b\u53d1\u7535\u91cf | 2024 \u5168\u5e74 |\n| \u5176\u4ed6\uff08\u5e9f\u5f03\u7269\u3001\u751f\u7269\u8d28\u3001\u8fdb\u53e3\u7535\u529b\uff09 | 3.0% | \u603b\u53d1\u7535\u91cf | 2025 \u5e74\u4e0a\u534a\u5e74 |\n\n\u6765\u6e90\uff1a[EMA SES \u7b2c 2 \u7ae0](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2)\uff1b[EMA \u71c3\u6599\u7ed3\u6784\u8868](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/resources\/statistics\/files\/pdf\/Fuel-Mix-for-Electricity-Generation-Yearly.pdf.coredownload.pdf)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 9 \u65e5\u3002EMA \u8fd8\u4ee5\u6982\u62ec\u6027\u8868\u8ff0\u6307\u51fa\uff0c\u7ea6 95% \u7684\u7535\u529b\u4f7f\u7528\u8fdb\u53e3\u5929\u7136\u6c14\u53d1\u7535\uff08[EMA \u5929\u7136\u6c14](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/natural-gas)\uff09\u3002\n\n## \u53d1\u7535\u91cf\u3001\u88c5\u673a\u5bb9\u91cf\u4e0e\u6392\u653e\u5f3a\u5ea6\n\n| \u6307\u6807 | \u6570\u503c | \u5206\u6bcd \/ \u5907\u6ce8 | \u622a\u81f3 |\n|---|---:|---|---|\n| \u603b\u53d1\u7535\u91cf | \u7ea6 60 TWh | \u8f83 2023 \u5e74\u589e\u957f +2.5% | 2024 \u5168\u5e74 |\n| \u6ce8\u518c\u53d1\u7535\u5bb9\u91cf | 13,261 MW | \u6240\u6709\u71c3\u6599\u7c7b\u578b | 2025 \u5e74\u4e0a\u534a\u5e74 |\n| \u592a\u9633\u80fd\u6ce8\u518c\u5bb9\u91cf | 1,367 MWac\uff08\u5360 2024 \u5e74\u5bb9\u91cf\u7ed3\u6784\u7684 9.7%\uff09 | \u5bb9\u91cf\u6ce8\u518c | 2025 \u5e74\u4e0a\u534a\u5e74 \/ 2024 \u5e74\u7ed3\u6784 |\n| \u5e73\u5747\u7535\u7f51\u6392\u653e\u56e0\u5b50 | 0.402 kg CO\u2082\/kWh | \u6309\u51c0\u53d1\u7535\u91cf\u8ba1\u7b97\uff1b\u4f4e\u4e8e 2023 \u5e74\u7684 0.412 | 2024 \u5168\u5e74 |\n\n\u6765\u6e90\uff1a[EMA SES \u7b2c 2 \u7ae0](https:\/\/www.ema.gov.sg\/resources\/singapore-energy-statistics\/chapter2)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 9 \u65e5\u3002\n\n## \u592a\u9633\u80fd\u90e8\u7f72\u4e0e\u8fdb\u53e3\u76ee\u6807\n\n| \u5173\u952e\u6570\u636e | \u6570\u503c | \u5907\u6ce8 | \u622a\u81f3 |\n|---|---:|---|---|\n| \u592a\u9633\u80fd\u88c5\u673a\u5bb9\u91cf\u91cc\u7a0b\u7891 | \u8fbe\u5230 2 GWp | \u63d0\u524d\u8fbe\u6210\u539f\u5b9a 2030 \u5e74\u76ee\u6807 | 2025 \u5e74 |\n| \u4fee\u8ba2\u540e\u7684 2030 \u5e74\u592a\u9633\u80fd\u76ee\u6807 | 3 GWp | \u6bcf\u5e74\u53ef\u53d1\u7535\u7ea6 2,800 GWh | 2026 \u5e74\u4e09\u6708 2 \u65e5\u516c\u5e03 |\n| \u4f4e\u78b3\u7535\u529b\u8fdb\u53e3\u76ee\u6807 | \u5230 2035 \u5e74\u7ea6 6 GW | \u7ea6\u5360\u5c4a\u65f6\u9884\u6d4b\u9700\u6c42\u7684\u4e09\u5206\u4e4b\u4e00\uff1b\u53d6\u4ee3\u6b64\u524d 4 GW \u7684\u8868\u8ff0 | EMA 2025 \u5e74\u5341\u6708\u9875\u9762 |\n| 2050 \u5e74\u592a\u9633\u80fd\u73b0\u5b9e\u53ef\u8fbe\u5360\u6bd4 | \u7ea6\u5360\u9884\u6d4b\u80fd\u6e90\u9700\u6c42\u7684 10% | \u53d7\u56fd\u5185\u6761\u4ef6\u9650\u5236\uff1b\u4e0e\u8fdb\u53e3\u7535\u529b\u4e92\u8865 | EMA 2026 \u5e74\u4e09\u6708 |\n\n\u6765\u6e90\uff1a[EMA 2026 \u5e74\u4e09\u6708\u592a\u9633\u80fd\u65b0\u95fb\u7a3f](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff1b[EMA \u533a\u57df\u7535\u7f51](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 9 \u65e5\u3002"},"related":[{"id":90250,"source_id":"sgkb.environment-sustainability.energy-and-power-grid","kind":"article","title_en":"Energy and Power Grid","title_zh":"\u80fd\u6e90\u4e0e\u7535\u7f51","assurance":null,"subtype":null},{"id":89907,"source_id":"sgkb.data.annual-rates","kind":"dataset","title_en":"Annual Rates","title_zh":"\u5e74\u5ea6\u8d39\u7387","assurance":null,"subtype":null},{"id":89961,"source_id":"sgkb.data.environment-system-anchors","kind":"dataset","title_en":"Environment System Anchors","title_zh":"\u73af\u5883\u7cfb\u7edf\u5173\u952e\u6570\u636e","assurance":null,"subtype":null},{"id":89980,"source_id":"sgkb.data.green-plan-anchors","kind":"dataset","title_en":"Green Plan 2030 Programme Anchors","title_zh":"\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030 \u8ba1\u5212\u652f\u67f1","assurance":null,"subtype":null},{"id":79802,"source_id":"sg.agency.ema","kind":"entity","title_en":"Energy Market Authority","title_zh":"\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40","assurance":null,"subtype":"government-agency"},{"id":92458,"source_id":"sgtopic.environment.energy","kind":"topic","title_en":"Energy system","title_zh":"\u80fd\u6e90\u7cfb\u7edf","assurance":null,"subtype":null}]}