Dated values
Dormitory Transition Scheme interim standard timeline and core benchmarks
Dormitory Transition Scheme interim standard timeline and core benchmarks
Record details
- Value
- By 2030: no more than 12 residents per room; at least 3.6 square metres living space per resident; ensuite toilet, shower and hand-wash basin at least one set per 6 residents
- Unit
- standards and deadline
- Value type
- observation
- Population
- Existing migrant-worker dormitories required to transition under DTS
- Denominator
- NDS applies by 2040 to existing dormitories undergoing DTS; eligibility and exemptions are separately defined by MOM
- Reference period
- MOM Dormitory Transition Scheme page last updated 3 August 2026
- Retrieved
- 2026-09-02
- Published
- 2026-01-17
- Geography
- sg.geo.country.singapore
- Notes
- New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.
Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force.
Sources
Collection as of 2026-10-07 · An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.