{"release_id":19,"data":{"id":91812,"release_id":19,"source_id":"sgobs.society.dormitory-transition-scheme-2026.standards","kind":"observation","fingerprint":"ab6d591babed0dba238efc0aed5cc5c2fa167b3a38c6e624eb68b17dbec62a4b","title_en":"Dormitory Transition Scheme interim standard timeline and core benchmarks","title_zh":"\u5bbf\u820d\u8fc7\u6e21\u8ba1\u5212\u4e34\u65f6\u6807\u51c6\u65f6\u95f4\u8868\u53ca\u6838\u5fc3\u57fa\u51c6","domain":null,"status":"final","assurance":null,"subtype":null,"lat":null,"lon":null,"date":null,"payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"translation":"passed"},"data":{"denominator":"NDS applies by 2040 to existing dormitories undergoing DTS; eligibility and exemptions are separately defined by MOM","geography_id":"sg.geo.country.singapore","id":"sgobs.society.dormitory-transition-scheme-2026.standards","kind":"observation","label":"Dormitory Transition Scheme interim standard timeline and core benchmarks","metric_id":"sgmetric.society.dormitory-transition-scheme-2026-standards","note":"New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.","population":"Existing migrant-worker dormitories required to transition under DTS","published_at":"2026-01-17","record_type":"observation","reference_period":"MOM Dormitory Transition Scheme page last updated 3 August 2026","retrieved_at":"2026-09-02","revision":"Dormitory Transition Scheme and grant","source_url":"https:\/\/www.mom.gov.sg\/passes-and-permits\/work-permit-for-foreign-worker\/housing\/requirements-for-dormitory-operators\/dormitory-transition-scheme","status":"final","summary":"New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.","title":"Dormitory Transition Scheme interim standard timeline and core benchmarks","unit":"standards and deadline","value":"By 2030: no more than 12 residents per room; at least 3.6 square metres living space per resident; ensuite toilet, shower and hand-wash basin at least one set per 6 residents"},"date":null,"domain":null,"evidence_paths":["artefacts\/knowledge-graph.jsonl","artefacts\/knowledge-records.jsonl"],"kind":"observation","links":[{"relation":"geography_id","target_id":"sg.geo.country.singapore"},{"relation":"topics","target_id":"sgtopic.society.dormitory-transition-scheme-2026"}],"source_id":"sgobs.society.dormitory-transition-scheme-2026.standards","status":"final","summary_en":"New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.","summary_zh":"2021 \u5e74\u4e5d\u6708 18 \u65e5\u4e4b\u540e\u8bbe\u7acb\u7684\u65b0\u5bbf\u820d\u81ea\u6295\u5165\u8fd0\u8425\u8d77\u5fc5\u987b\u7b26\u5408 NDS\uff1bDTS \u8d44\u52a9\u5219\u652f\u6301\u7b26\u5408\u6761\u4ef6\u7684\u73b0\u6709\u5bbf\u820d\u8fdb\u884c\u6307\u5b9a\u6539\u9020\u5de5\u7a0b\u3002","title_en":"Dormitory Transition Scheme interim standard timeline and core benchmarks","title_zh":"\u5bbf\u820d\u8fc7\u6e21\u8ba1\u5212\u4e34\u65f6\u6807\u51c6\u65f6\u95f4\u8868\u53ca\u6838\u5fc3\u57fa\u51c6","translation_work":[{"field":"title_zh","fingerprint":"8466523b72615bbff8f99cfc3f5c68e01d63e0517e5a72c0b0132bf2144e6665","source_en":"Dormitory Transition Scheme interim standard timeline and core benchmarks","status":"reused"},{"field":"summary_zh","fingerprint":"3974ff616a29d5b2dc6d0010530282a23ce448401fcfeb76d61aacae0cf54728","source_en":"New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.","status":"reused"}]},"search_text":"Dormitory Transition Scheme interim standard timeline and core benchmarks\n\u5bbf\u820d\u8fc7\u6e21\u8ba1\u5212\u4e34\u65f6\u6807\u51c6\u65f6\u95f4\u8868\u53ca\u6838\u5fc3\u57fa\u51c6\nNew dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.\n2021 \u5e74\u4e5d\u6708 18 \u65e5\u4e4b\u540e\u8bbe\u7acb\u7684\u65b0\u5bbf\u820d\u81ea\u6295\u5165\u8fd0\u8425\u8d77\u5fc5\u987b\u7b26\u5408 NDS\uff1bDTS \u8d44\u52a9\u5219\u652f\u6301\u7b26\u5408\u6761\u4ef6\u7684\u73b0\u6709\u5bbf\u820d\u8fdb\u884c\u6307\u5b9a\u6539\u9020\u5de5\u7a0b\u3002\n{\"denominator\":\"NDS applies by 2040 to existing dormitories undergoing DTS; eligibility and exemptions are separately defined by MOM\",\"geography_id\":\"sg.geo.country.singapore\",\"id\":\"sgobs.society.dormitory-transition-scheme-2026.standards\",\"kind\":\"observation\",\"label\":\"Dormitory Transition Scheme interim standard timeline and core benchmarks\",\"metric_id\":\"sgmetric.society.dormitory-transition-scheme-2026-standards\",\"note\":\"New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.\",\"population\":\"Existing migrant-worker dormitories required to transition under DTS\",\"published_at\":\"2026-01-17\",\"record_type\":\"observation\",\"reference_period\":\"MOM Dormitory Transition Scheme page last updated 3 August 2026\",\"retrieved_at\":\"2026-09-02\",\"revision\":\"Dormitory Transition Scheme and grant\",\"source_url\":\"https:\\\/\\\/www.mom.gov.sg\\\/passes-and-permits\\\/work-permit-for-foreign-worker\\\/housing\\\/requirements-for-dormitory-operators\\\/dormitory-transition-scheme\",\"status\":\"final\",\"summary\":\"New dormitories established after 18 September 2021 must meet NDS from operations; the DTS grant supports specified retrofit works for eligible existing dormitories.\",\"title\":\"Dormitory Transition Scheme interim standard timeline and core benchmarks\",\"unit\":\"standards and deadline\",\"value\":\"By 2030: no more than 12 residents per room; at least 3.6 square metres living space per resident; ensuite toilet, shower and hand-wash basin at least one set per 6 residents\"}\n"},"related":[{"id":80313,"source_id":"sg.geo.country.singapore","kind":"geography","title_en":"Singapore","title_zh":"\u65b0\u52a0\u5761","assurance":null,"subtype":"country"},{"id":92955,"source_id":"sgtopic.society.dormitory-transition-scheme-2026","kind":"topic","title_en":"Dormitory Transition Scheme and Grant","title_zh":"\u5bbf\u820d\u8fc7\u6e21\u8ba1\u5212\u4e0e\u6d25\u8d34","assurance":null,"subtype":null}]}