Life journeys · housing

Markdown

Reporting defects in a new HDB flat in Singapore

This Singapore journey starts after an owner collects the keys to a new HDB flat and finds a defect. It routes the owner to report the issue to the Building Service Centre during the defect rectification period, coordinate repairs with planned renovation or move-in, attend the inspections, or arrange a repair after the period ends.

Last verified: Verified

A journey routes; it does not explain. It orders the steps and choices and links the pages that state the rules, amounts and deadlines. Check those pages, not this route, before relying on a detail.

Also known as
new HDB flat defects · report defects in a BTO flat · HDB new-flat rectification
Situations this covers
I collected my new HDB flat keys and found defects · How do I report defects in my BTO flat before renovation? · What happens after HDB inspects defects in a new flat? · My new HDB flat is past its defects liability period; who can repair it?

Questions that change your route

Your answers decide which options and tasks apply. Steps and options say when they apply to only some answers.

Is the flat still within HDB's Defects Liability Period that starts at key collection?
Within the period / The period has ended
Have renovation works started, or has the household moved into the flat?
Renovation has not started / Renovation is underway / The household has moved in

The route, step by step

  1. Step 1 · Stage

    Check the flat's defect rectification period

    An owner of a new HDB flat checks whether the defect was found during HDB's Defects Liability Period, which starts at key collection. During that period, HDB handles reported items through the precinct Building Service Centre; after it ends, the owner arranges repair separately.

    Read at this step

    Next: Step 2 — Record the defect and prepare to report it; Step 3 — Arrange repairs after HDB's rectification period

  2. Step 2 · Stage

    Record the defect and prepare to report it

    During the HDB defect rectification period, record the item and submit it before renovation begins where possible. HDB recommends early reporting so it can assess whether the item came from construction or renovation work.

    To do at this step

    • Report the item before renovation begins
      Applies when: Renovation and move-in status: Renovation has not started

      Read at this step

    • Tell the Building Service Centre if renovation is already underway
      Applies when: Renovation and move-in status: Renovation is underway

      Read at this step

    • Report any minor issue that can be rectified after move-in if living conditions are not affected
      Applies when: Renovation and move-in status: The household has moved in

      Read at this step

    Read at this step

    Next: Step 4 — Submit the rectification request to HDB

  3. Step 3 · Stage

    Arrange repairs after HDB's rectification period

    After HDB's Defects Liability Period has ended, the owner engages a repair contractor for the issue. The owner may also approach the HDB Branch for further assistance.

    Read at this step

    Next: Step 5 — Repair arranged outside HDB's defect rectification period

  4. Step 4 · Stage

    Submit the rectification request to HDB

    An owner within HDB's Defects Liability Period submits a rectification request using the QR code in the Welcome Kit or notice in the flat, through the online service, or at the precinct Building Service Centre.

    Read at this step

    Next: Step 6 — Attend the joint inspection with the Building Service Centre

  5. Step 5 · Outcome

    Repair arranged outside HDB's defect rectification period

    The owner has moved to the post-period route and arranged a private repair or sought further assistance from the HDB Branch.

    Read at this step

  6. Step 6 · Stage

    Attend the joint inspection with the Building Service Centre

    After a report, the Building Service Centre arranges a joint inspection to verify the reported item and assigns contractor or contractors to carry out rectification.

    Read at this step

    Next: Step 7 — Coordinate the contractor's rectification work

  7. Step 7 · Stage

    Coordinate the contractor's rectification work

    Follow the Building Service Centre's arrangement for rectification. HDB advises owners not to hand flat keys to the contractor and recommends bringing a lock to secure the flat.

    To do at this step

    • Keep control of the flat keys and secure the flat during the work

      Read at this step

    Read at this step

    Next: Step 8 — Attend HDB's closing inspection

  8. Step 8 · Stage

    Attend HDB's closing inspection

    After rectification is completed, the Building Service Centre arranges a closing inspection with the owner.

    Read at this step

    Next: Step 9 — HDB defect rectification completed

  9. Step 9 · Outcome

    HDB defect rectification completed

    The Building Service Centre has completed the closing inspection after rectification of the reported new-flat item.

    Read at this step

Collection as of 2026-11-18 · An expanding collection. Published counts show available knowledge, not complete coverage of Singapore. Machine-readable: JSON · sgjourney.reporting-defects-in-a-new-hdb-flat-in-singapore