---
id: sgjourney.reporting-defects-in-a-new-hdb-flat-in-singapore
kind: journey
title: "Reporting defects in a new HDB flat in Singapore"
url: https://ik.sg/en/knowledge/journey/sgjourney.reporting-defects-in-a-new-hdb-flat-in-singapore
language: en
evidence_status: verified
last_verified: 2026-11-15
collection_as_of: 2026-11-18
---

# Reporting defects in a new HDB flat in Singapore

This Singapore journey starts after an owner collects the keys to a new HDB flat and finds a defect. It routes the owner to report the issue to the Building Service Centre during the defect rectification period, coordinate repairs with planned renovation or move-in, attend the inspections, or arrange a repair after the period ends.

> A journey routes; it does not explain. It orders the steps and choices and links the pages that state the rules, amounts and deadlines. Check those pages, not this route, before relying on a detail.

**Also known as:** new HDB flat defects · report defects in a BTO flat · HDB new-flat rectification · 新组屋缺陷报修 · 预购组屋交屋后发现瑕疵 · HDB 新组屋装修前报修

**Situations this covers:** I collected my new HDB flat keys and found defects · How do I report defects in my BTO flat before renovation? · What happens after HDB inspects defects in a new flat? · My new HDB flat is past its defects liability period; who can repair it? · 新组屋交屋后发现缺陷，应该怎样报修？ · 装修前如何向 HDB 申报组屋瑕疵？ · HDB 检查新组屋缺陷后会怎样处理？ · 新组屋保修期过后发现问题怎么办？

## Questions that change your route

- Is the flat still within HDB's Defects Liability Period that starts at key collection? Within the period / The period has ended
- Have renovation works started, or has the household moved into the flat? Renovation has not started / Renovation is underway / The household has moved in

## The route, step by step

### Step 1 · Stage: Check the flat's defect rectification period

An owner of a new HDB flat checks whether the defect was found during HDB's Defects Liability Period, which starts at key collection. During that period, HDB handles reported items through the precinct Building Service Centre; after it ends, the owner arranges repair separately.

Read at this step:
  - eligibility: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 2 — Record the defect and prepare to report it; Step 3 — Arrange repairs after HDB's rectification period

### Step 2 · Stage: Record the defect and prepare to report it

During the HDB defect rectification period, record the item and submit it before renovation begins where possible. HDB recommends early reporting so it can assess whether the item came from construction or renovation work.

To do at this step:
- Report the item before renovation begins [Applies when: Renovation and move-in status: Renovation has not started]
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat
- Tell the Building Service Centre if renovation is already underway [Applies when: Renovation and move-in status: Renovation is underway]
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat
- Report any minor issue that can be rectified after move-in if living conditions are not affected [Applies when: Renovation and move-in status: The household has moved in]
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 4 — Submit the rectification request to HDB

### Step 3 · Stage: Arrange repairs after HDB's rectification period

After HDB's Defects Liability Period has ended, the owner engages a repair contractor for the issue. The owner may also approach the HDB Branch for further assistance.

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 5 — Repair arranged outside HDB's defect rectification period

### Step 4 · Stage: Submit the rectification request to HDB

An owner within HDB's Defects Liability Period submits a rectification request using the QR code in the Welcome Kit or notice in the flat, through the online service, or at the precinct Building Service Centre.

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 6 — Attend the joint inspection with the Building Service Centre

### Step 5 · Outcome: Repair arranged outside HDB's defect rectification period

The owner has moved to the post-period route and arranged a private repair or sought further assistance from the HDB Branch.

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

### Step 6 · Stage: Attend the joint inspection with the Building Service Centre

After a report, the Building Service Centre arranges a joint inspection to verify the reported item and assigns contractor or contractors to carry out rectification.

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 7 — Coordinate the contractor's rectification work

### Step 7 · Stage: Coordinate the contractor's rectification work

Follow the Building Service Centre's arrangement for rectification. HDB advises owners not to hand flat keys to the contractor and recommends bringing a lock to secure the flat.

To do at this step:
- Keep control of the flat keys and secure the flat during the work
  - checklist: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Read at this step:
  - checklist: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 8 — Attend HDB's closing inspection

### Step 8 · Stage: Attend HDB's closing inspection

After rectification is completed, the Building Service Centre arranges a closing inspection with the owner.

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

Next: Step 9 — HDB defect rectification completed

### Step 9 · Outcome: HDB defect rectification completed

The Building Service Centre has completed the closing inspection after rectification of the reported new-flat item.

Read at this step:
  - process: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system#reporting-defects-in-a-new-hdb-flat) › Reporting defects in a new HDB flat

## Explore connections

- Articles: [BTO System](https://ik.sg/en/knowledge/article/sgkb.housing.bto-system)
- Topics: [Buying new HDB flats](https://ik.sg/en/knowledge/topic/sgtopic.housing.buying-new-flats)

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force. An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.
