LTA planning targets for future rail projects, distinguishing the completed CCL6 opening from still-pending project targets.
These rows are announced planning targets. Opening years have slipped before; always attribute the as-of announcement and do not present a single year as settled fact without that caveat. Narrative context lives in future rail projects; current network scale lives in public transport network.
Population bases
| Term | Meaning in this dataset | Do not confuse with |
|---|---|---|
| Planning target | LTA announced opening or construction milestone; subject to delay | Fixed calendar guarantee or past opening date |
| LTMP household access | 8 in 10 households within a 10-minute walk of a train station by the 2030s | Current household coverage or bus-only access |
| Project / stage | Named rail line stage (CCL6, TEL5, JRL Stage 1, CRL Phase 1, etc.) | Entire line or unrelated stage |
| RTS peak capacity | Passengers per hour per direction on the bilateral LRT link | Daily ridership or Causeway vehicle counts |
| Bilateral project | Singapore–Malaysia RTS Link scope | Domestic MRT/LRT lines only |
The system target below is from LTA’s LTMP 2040 framing; dated project targets are sourced per row and were rechecked on 21 October 2026.
System target
| Target | Statement | Population / denominator | As of |
|---|---|---|---|
| Station access | 8 in 10 households within a 10-minute walk of a train station by the 2030s (LTMP 2040) | Households in Singapore; LTMP 2040 walk-to-station target | 2026-03 |
2026 opening status (checked 21 October 2026)
| Project | Planning target | Population / denominator | As of |
|---|---|---|---|
| Circle Line Stage 6 (CCL6) | Passenger service began 12 July 2026, after public preview on 4 July | CCL6 stage (HarbourFront–Marina Bay gap closure), three new stations | 2026-10; LTA project page and 14 May release |
| TEL Stage 5 + Downtown Line 3 extension | Target remains 2026 / second half of 2026; LTA project pages state no exact passenger-service date | TEL5 stations Bedok South and Sungei Bedok; DTL3e stations Xilin and Sungei Bedok | 2026-10 project pages; 2026-03 COS factsheet |
Major expansion lines
| Project / stage | Planning target | Population / denominator | As of |
|---|---|---|---|
| Jurong Region Line Stage 1 | 2028 | Stage 1 stations JS1–JS8 (excluding JS2A) and JW1–JW2 | LTA project page, checked 2026-10-21 |
| JRL Stage 2 | 2028 | Stage 2 stations JE1–JE7 | LTA project page, checked 2026-10-21 |
| JRL Stage 3 | 2029 | Stage 3 stations JS9–JS12 and JW3–JW5 | LTA project page, checked 2026-10-21 |
| JRL in-fill station JS2A | Mid-2030s with surrounding developments | JRL JS2A in-fill station (between JS2 and JS3) | LTA project page, checked 2026-10-21 |
| Cross Island Line Phase 1 | By 2030 | CRL Phase 1 (12 stations, CR2–CR13/Bright Hill) | LTA project page, checked 2026-10-21 |
| CRL Phase 2 and Punggol Extension | By 2032 | CRL Phase 2 (six stations) and CRL–Punggol Extension | LTA project page, checked 2026-10-21 |
| CRL Phase 3 construction start | 2027 | CRL Phase 3 civil works commencement | LTA project page, checked 2026-10-21 |
| CRL Phase 3 opening | Late 2030s | CRL Phase 3 (Jurong Lake District to Gul Circle) | LTA project page, checked 2026-10-21 |
Sources: LTA Jurong Region Line and LTA Cross Island Line, checked 21 October 2026. The March 2026 COS factsheet is retained above for announced 2026 targets, not used to override newer stage-level project pages.
RTS Link (bilateral)
| Element | Current LTA statement | Population / denominator | As of |
|---|---|---|---|
| Nature | Bilateral Singapore–Malaysia standalone LRT project | Cross-border RTS Link scope | 2026-10 |
| Operator | RTS Operations Pte Ltd — joint venture of SMRT and Prasarana | RTS Link operating entity | 2026-10 |
| Alignment | Woodlands North (Singapore) ↔ Bukit Chagar (Johor Bahru) | RTS Link termini pair | 2026-10 |
| Peak capacity cited | Up to 10,000 passengers per hour per direction | Peak-hour passengers per direction on RTS Link | 2026-10 |
| Passenger-service target | End of 2026 (LTA project page; target can slip) | RTS Link passenger-service commencement | 2026-10 |
| Border control | Co-located CIQ; clear both countries at departure | RTS Link passenger clearance model | 2026-10 |
Source: LTA RTS Link, checked 21 October 2026. LTA still gives an end-of-2026 passenger-service target; prefer this wording over press dates that name a single calendar day.
Record details
- Also known as
- CRL opening dates, JRL opening dates, RTS Link opening, LTMP station access
- Jurisdiction
- SG
- What each row represents
- one dated rail-project planning milestone or bilateral RTS identity fact with announcement as-of
- Update cadence
- after each LTA rail COS update or major opening-target revision
- Source format
- markdown
Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force.
Sources
- LTA — Factsheet: The Next Phase of Rail Development Accessed
- LTA — Johor Bahru – Singapore Rapid Transit System Link Accessed
- LTA — Cross Island Line Accessed
- LTA — Jurong Region Line Accessed
- LTA — CCL6 public preview and passenger-service dates Accessed
- LTA — Circle Line 6 latest project status Accessed
- LTA — Thomson-East Coast Line project status Accessed
- LTA — Downtown Line extensions project status Accessed
Collection as of 2026-11-22 · An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.
Machine-readable: JSON · sgkb.data.future-rail-milestones