MarkdownBCA 结构工程现场监督框架
建筑工程价值在申请时估算,并包括指定的工程组成部分;基于风险的检查是对任命和认可要求的补充,不会取消这些要求。
QP appoints structural-works site supervisors during permit application; qualified supervisors require JAC accreditation; immediate supervision applies to small-scale works up to S$7.5 million, while larger works use value- and stage-based RE/RTO combinations; risk-based inspection classifies work risk and matches supervision to the risk level appointment, accreditation, staffing and inspection framework
- 统计期间
- BCA page last updated 12 March 2026; accessed 2 September 2026
- 适用人群
- Qualified Persons, Resident Engineers, Resident Technical Officers and structural-work project teams in Singapore
- 分母口径
- BCA Site Supervisor Requirements and Framework for Risk-based Inspection page
- 地理范围
- 新加坡
记录详情
- 指标
- framework
- 来源版本
- BCA Site Supervisor Requirements and Framework for Risk-based Inspection
日期表示本记录的统计期间与适用范围。核验日期并不代表规则目前已经生效。