BCA minimum pre-construction survey zones

BCA minimum pre-construction survey zones

状态: final

记录详情

数值
Minimum zone is 15 m for landed development; for non-landed development with basement or underground space it is 30 m or 3H for good soils, 60 m or 6H for soft soils without fluvial sand/peat/peaty clay, and 90 m or 9H for soft soils with fluvial sand/peat/peaty clay; the larger paired value applies and H is maximum excavation depth including localised pits
单位
minimum survey zone and calculation rule
数值类型
observation
适用人群
Building works involving demolition, piling, foundation, tunnelling or site formation in Singapore
分母口径
BCA Guidelines on Preconstruction Survey
统计期间
BCA guideline accessed 2 September 2026; current page last updated 26 January 2026
检索日期
2026-09-02
地理范围
sg.geo.country.singapore
备注
Landed developments also have neighbour-notification and communication-plan requirements; survey zones and communication duties do not replace permits, design, impact assessment or monitoring.