EMA Transmission Code modifications for domestic solar PV

EMA Transmission Code modifications for domestic solar PV

Status: final

Record details

Value
Effective 9 September 2026: aggregated 1 MWac connection-scheme threshold; new grid-connected units require grid-forming inverters with 0.9 leading to 0.9 lagging power-factor capability; solar-specific reserve and monitoring clarifications apply
Unit
regulatory requirements and effective date
Value type
observation
Population
Solar PV generation facilities installed in Singapore that connect to or operate on the transmission system
Denominator
Aggregated installed AC nameplate capacity at the relevant connection point for the 1 MWac threshold; inverter requirement applies to new grid-connected units from the effective date
Reference period
9 September 2026 onward
Retrieved
2026-09-01
Published
2026-08-26
Geography
sg.geo.country.singapore
Notes
Domestic means installed in Singapore, not limited to residential premises; existing systems are generally outside the new inverter requirement unless recommissioned or materially modified.