---
id: sgkb.data.ura-planning-anchors
kind: dataset
title: "URA Planning System and Master Plan Anchors"
url: https://ik.sg/en/knowledge/dataset/sgkb.data.ura-planning-anchors
language: en
evidence_status: verified
last_verified: 2026-08-10
collection_as_of: 2026-11-22
---

# URA Planning System and Master Plan Anchors

Dated Long-Term Plan versus Master Plan horizons, MP2025 gazettement, engagement scale, and planning-instrument identity anchors for URA answers.

# URA Planning System and Master Plan Anchors

Narrative: [ura and master plan](/en/knowledge/article/sgkb.geography-urban-planning.ura-and-master-plan). **Planning areas** are URA statistical/land-use units; they are not the same as HDB town, CDC district, or electoral boundaries.

## Two planning horizons

| Instrument | Horizon | Review cadence | Legal status |
|---|---|---|---|
| Long-Term Plan | **50+ years** | About **once a decade**; LTP Review concluded **2022** | Strategic reserve of land uses |
| Master Plan | **~10–15 years** | About **every five years** | Statutory under Planning Act |

Source: [URA Long-Term Plan](https://www.ura.gov.sg/land-planning/long-term-plan/); [URA Master Plan](https://www.ura.gov.sg/land-planning/master-plan/), accessed 9 August 2026. Long-term proposals are **not** construction schedules.

## Master Plan 2025 anchors

| Field | Value | As of |
|---|---|---|
| Gazettement date | **1 Dec 2025** | Current statutory plan Aug 2026 |
| Public engagement participants | **~220,000** | Oct 2023 – Jun 2025 |
| Official themes (count) | **4** | Happy/healthy city; sustainable growth; urban resilience; nature/heritage stewardship |

Source: [URA MP2025 gazette release](https://www.ura.gov.sg/news/media/pr25-64/); [URA draft engagement release](https://www.ura.gov.sg/news/media/pr25-32/), accessed 9 August 2026.

## Common zone types (identity)

Residential, commercial, business, industrial, park, waterbody, place of worship, transport facilities, reserve sites — each parcel also carries plot ratio and detailed controls in the Written Statement.

Source: [URA Master Plan](https://www.ura.gov.sg/land-planning/master-plan/), accessed 8 August 2026. URA SPACE is the authoritative map interface.

## Retrieval guardrails

| Confusion | Correct handling |
|---|---|
| Concept Plan / Long-Term Plan vs Master Plan | Long-term safeguards options; Master Plan controls near-term development |
| Draft MP2025 vs gazetted MP2025 | Gazette date **1 Dec 2025** controls current answers |
| Planning area vs town vs constituency | Name the boundary type the source uses |
| Zoning vs approved project | Master Plan shows permissibility, not funding or completion |

Source: [ura and master plan](/en/knowledge/article/sgkb.geography-urban-planning.ura-and-master-plan), accessed 8 August 2026.

## Record details

- **Also known as:** Master Plan 2025; MP2025; Long-Term Plan Review 2022; URA planning areas
- **Source format:** markdown
- **Classification confidence:** high
- **Classification source:** curated
- **All domains:** data
- **Entities:** [Urban Redevelopment Authority](https://ik.sg/en/knowledge/entity/sg.agency.ura)
- **Facets:** geography; law; policy
- **Geographic scope:** national; planning-area
- **What each row represents:** one dated anchor in ura-planning-anchors
- **Jurisdiction:** SG
- **Language:** en
- **Last verified:** 2026-08-10
- **Explore connections:** ura-and-master-plan; new-towns; land-reclamation
- **Status:** verified
- **Tags:** policy; regulation; planning-area
- **Temporal scope:** current
- **All topics:** [URA planning system](https://ik.sg/en/knowledge/topic/sgtopic.geography.planning-system); [Regions and planning areas](https://ik.sg/en/knowledge/topic/sgtopic.geography.regions-planning-areas)
- **Update cadence:** when primary sources revise anchored facts
- **Volatility:** slow

## Sources

- [URA — Long-Term Plan](https://www.ura.gov.sg/land-planning/long-term-plan/) — Accessed 2026-08-09
- [URA — Master Plan](https://www.ura.gov.sg/land-planning/master-plan/) — Accessed 2026-08-13
- [URA — Gazette of Master Plan 2025](https://www.ura.gov.sg/news/media/pr25-64/) — Accessed 2026-08-09
- [URA — Draft Master Plan 2025 engagement](https://www.ura.gov.sg/news/media/pr25-32/) — Accessed 2026-08-09

## Explore connections

- Articles: [Land Reclamation](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.land-reclamation)
- Articles: [New Towns](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.new-towns)
- Articles: [URA and the Master Plan](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.ura-and-master-plan)
- Topics: [Regions and planning areas](https://ik.sg/en/knowledge/topic/sgtopic.geography.regions-planning-areas)
- Topics: [URA planning system](https://ik.sg/en/knowledge/topic/sgtopic.geography.planning-system)
- People & organisations: [Urban Redevelopment Authority](https://ik.sg/en/knowledge/entity/sg.agency.ura)

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force. An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.
