# Data Centre Industry Anchors

Dated Singapore data-centre capacity, DC-CFA allocation rounds, and DC-CFA2 PUE/green-energy thresholds — not a permanent ban on new centres.

# Data Centre Industry Anchors

New greenfield capacity requires the CFA as the allocation mechanism. The 2019 pause was temporary, not a permanent ban ([EDB/IMDA DC-CFA2 factsheet](https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026). Narrative lives in [data centre industry](/en/knowledge/article/sgkb.business-industry.data-centre-industry).

## Capacity and policy timeline

| Anchor | Value | Notes | As of |
|---|---|---|---|
| Operational capacity | Exceeding 1.4 GW | Operational IT/power capacity framing | 2024 |
| Digital economy share of GDP | Roughly 17% | Broader digital economy, not DC-only | 2022 |
| Moratorium / pause | Temporary pause on new DC developments | Pre-authorised projects could proceed | From 2019 |
| Pilot DC-CFA launch | Jul 2022 | EDB + IMDA allocation model | 2022 |
| Pilot award | About 80 MW critical IT load (pilot 80MW in 2023) | Four winners; >20 proposals | Jul 2023 |
| DC-CFA2 launch | At least 200 MW new capacity (DC-CFA2 200MW) | More possible via green pathways | 1 Dec 2025 |
| DC-CFA2 provisional allocation | 200 MW provisionally allocated to four data-centre operators | Allocation outcome, not completed operational capacity | 21 Aug 2026 |

Sources: [IMDA Green DC Roadmap](https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf); [EDB pilot winners](https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [DC-CFA2 factsheet](https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026.

## DC-CFA2 sustainability thresholds

| Requirement | Threshold | Population / applicability | As of |
|---|---|---|---|
| Power Usage Effectiveness (PUE) | ≤ 1.25 at 100% IT load | DC-CFA2 applicants | Dec 2025 launch |
| Green Mark | BCA–IMDA Green Mark for Data Centres 2024 Platinum | DC-CFA2 applicants | Dec 2025 |
| Green energy share | ≥ 50% of facility power (fifty percent green energy) from eligible pathways | Biomethane, low-carbon ammonia/hydrogen, novel fuel cells with CCS, BIPV, etc. | Dec 2025 |

Source: [DC-CFA2 factsheet](https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026. Do not cite the broader roadmap’s older PUE 1.3 target as the CFA2 gate.

## Record details

- **Also known as:** DC-CFA; DC-CFA2; data centre moratorium; PUE
- **Source format:** markdown
- **Classification confidence:** high
- **Classification source:** curated
- **All domains:** data
- **Entities:** [Singapore Economic Development Board](https://ik.sg/en/knowledge/entity/sg.agency.edb); [Infocomm Media Development Authority](https://ik.sg/en/knowledge/entity/sg.agency.imda)
- **Facets:** business; current; infrastructure; policy; statistics
- **Geographic scope:** national
- **What each row represents:** one dated capacity, CFA allocation, or PUE/green threshold anchor
- **Jurisdiction:** SG
- **Language:** en
- **Last verified:** 2026-08-21
- **Explore connections:** data-centre-industry; energy-and-power-grid; green-plan-2030
- **Status:** verified
- **Tags:** tech; energy; policy; statistics
- **Temporal scope:** current
- **All topics:** [Data centres](https://ik.sg/en/knowledge/topic/sgtopic.business.data-centres)
- **Update cadence:** after EDB/IMDA CFA rounds or Green DC Roadmap updates
- **Volatility:** fast

## Sources

- [IMDA — Green Data Centre Roadmap (May 2024)](https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf) — Accessed 2026-08-09
- [EDB — Four DC-CFA pilot winners](https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html) — Accessed 2026-08-09
- [EDB/IMDA — DC-CFA2 launch factsheet](https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf) — Accessed 2026-08-09
- [EDB — Four data centre proposals selected under DC-CFA2](https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html) — Accessed 2026-08-21

## Explore connections

- Articles: [Data Centre Industry](https://ik.sg/en/knowledge/article/sgkb.business-industry.data-centre-industry)
- Articles: [Energy and Power Grid](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.energy-and-power-grid)
- Articles: [Singapore Green Plan 2030](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.green-plan-2030)
- Topics: [Data centres](https://ik.sg/en/knowledge/topic/sgtopic.business.data-centres)
- People & organisations: [Infocomm Media Development Authority](https://ik.sg/en/knowledge/entity/sg.agency.imda)
- People & organisations: [Singapore Economic Development Board](https://ik.sg/en/knowledge/entity/sg.agency.edb)

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force. An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.