---
id: sgkb.geography-urban-planning.master-plan-2025-amendments-september-2026
kind: article
title: "Master Plan 2025 Amendments: South Bridge and North Canal Road Hotel Rezoning"
url: https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.master-plan-2025-amendments-september-2026
language: en
evidence_status: verified
last_verified: 2026-11-02
collection_as_of: 2026-11-22
---

# Master Plan 2025 Amendments: South Bridge and North Canal Road Hotel Rezoning

URA approved and brought into effect two Master Plan 2025 amendments on 12 October 2026, rezoning sites at South Bridge Road and North Canal Road from Commercial to Hotel use while retaining a maximum gross plot ratio of 4.2.

# Master Plan 2025 Amendments: South Bridge and North Canal Road Hotel Rezoning

The Urban Redevelopment Authority (URA) published two proposed amendments to Singapore’s **Master Plan 2025** on **4 September 2026**. Both were subsequently approved by the Minister for National Development on **12 October 2026** and took effect on that date. They rezone Lots **TS07-00160N** and **TS07-00164M** at South Bridge Road, and Lot **TS07-00458C** at North Canal Road, from **Commercial** to **Hotel** while retaining a maximum permissible gross plot ratio of **4.2**. The approved amendments appeared in URA’s Rule 7(a) notice dated **30 October 2026** ([URA approved-amendments notice](https://www.ura.gov.sg/land-planning/master-plan/amendments-to-master-plan/2025/list-of-gazetted-approved-amendments-to-master-plan-2025/r7-30oct26/)).

## From proposal to approved amendment

The September notice invited objections or representations under Rule 5 of the Planning (Master Plan) Rules (R1), with a deadline of **3 October 2026**. That period has closed. The later approval notice records the ministerial decision, approval date and effective date; readers should use this later notice rather than describing the sites as still under proposal. Certified copies of the approved amendments were listed for inspection at The URA Centre from **30 October to 14 November 2026**, and the amendment plans are viewable online ([URA proposed notice, 4 September 2026](https://www.ura.gov.sg/land-planning/master-plan/amendments-to-master-plan/2025/list-of-gazetted-proposed-amendments-to-master-plan-2025/r4-4sep26/); [URA approved notice, 30 October 2026](https://www.ura.gov.sg/land-planning/master-plan/amendments-to-master-plan/2025/list-of-gazetted-approved-amendments-to-master-plan-2025/r7-30oct26/)).

The two approved amendment plans identify the sites separately as **MPA20260074** (South Bridge Road) and **MPA20260075** (North Canal Road). The South Bridge Road plan notes that its site contains a conserved building. That is a site-specific conservation designation; the rezoning notice does not mean the building loses conservation status ([URA approved amendment plans for South Bridge Road](https://isomer-user-content.by.gov.sg/467/e326b571-af33-437b-b167-124f92188171/R7_MPA20260074.pdf) and [North Canal Road](https://isomer-user-content.by.gov.sg/467/4246a474-9094-48a5-93da-c77c4e9c0fc0/R7_MPA20260075.pdf)).

## What the zoning and plot ratio change means

The amendments change the Master Plan land-use designation to Hotel and preserve the stated maximum gross plot ratio at **4.2**; they do not approve a particular building design or guarantee that a site can realise that full intensity. URA describes gross plot ratio as an upper bound that may be constrained by site shape, topography or ground conditions, setbacks, building height and other agencies’ technical requirements. The approved amendment plans also say actual permitted intensity may be below the maximum ([URA, Gross Plot Ratio for Hotels](https://www.ura.gov.sg/guidelines/development-control/development-control-handbooks/non-residential/hotel/gross-plot-ratio/); [approved amendment plans](https://www.ura.gov.sg/land-planning/master-plan/amendments-to-master-plan/2025/list-of-gazetted-approved-amendments-to-master-plan-2025/r7-30oct26/)).

Hotel zoning establishes the planning use framework, not a project-specific planning permission, building approval or hotel operating licence. URA’s hotel guidance says hotel developments are allowed on land zoned Hotel, while proposals on other zones may be considered individually against planning intention and compatibility; a specific development remains subject to its applicable planning and technical controls ([URA, Hotel Location Guidelines](https://www.ura.gov.sg/guidelines/development-control/development-control-handbooks/non-residential/hotel/location/)).

## Status and interpretation

The accurate status as of 2 November 2026 is **approved and effective**, not merely proposed. The available notices establish the land-use and plot-ratio changes, but do not establish construction progress, approval of a development application, or a hotel licence or opening. The September objection deadline is historical; use URA’s current approved-amendments notice and site-specific amendment plans for the operative planning status.

## Sources

- [URA — Amendments to Master Plan 2025: 4 September 2026 proposals](https://www.ura.gov.sg/land-planning/master-plan/amendments-to-master-plan/2025/list-of-gazetted-proposed-amendments-to-master-plan-2025/r4-4sep26/) — Accessed 2026-11-02
- [URA — Approved Amendments to Master Plan 2025: 30 October 2026 notice](https://www.ura.gov.sg/land-planning/master-plan/amendments-to-master-plan/2025/list-of-gazetted-approved-amendments-to-master-plan-2025/r7-30oct26/) — Accessed 2026-11-02
- [URA — Gross Plot Ratio for Hotels](https://www.ura.gov.sg/guidelines/development-control/development-control-handbooks/non-residential/hotel/gross-plot-ratio/) — Accessed 2026-11-02
- [URA — Hotel Location Guidelines](https://www.ura.gov.sg/guidelines/development-control/development-control-handbooks/non-residential/hotel/location/) — Accessed 2026-11-02
- [URA — Approved Amendment MPA20260074: South Bridge Road](https://isomer-user-content.by.gov.sg/467/e326b571-af33-437b-b167-124f92188171/R7_MPA20260074.pdf) — Accessed 2026-11-02
- [URA — Approved Amendment MPA20260075: North Canal Road](https://isomer-user-content.by.gov.sg/467/4246a474-9094-48a5-93da-c77c4e9c0fc0/R7_MPA20260075.pdf) — Accessed 2026-11-02

## Explore connections

- Articles: [Geography and Urban Planning Overview](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.geography-system-overview)
- Articles: [URA and the Master Plan](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.ura-and-master-plan)
- Topics: [Geography and urban planning](https://ik.sg/en/knowledge/topic/sgtopic.geography)
- Topics: [Master Plan 2025 Amendments: September 2026 Rezoning Proposals](https://ik.sg/en/knowledge/topic/sgtopic.geography-urban-planning.master-plan-2025-amendments-september-2026)
- People & organisations: [Urban Redevelopment Authority](https://ik.sg/en/knowledge/entity/sg.agency.ura)

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force. An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.
