id: sgkb.geography-urban-planning.community-sports-facilities-scheme-2026
kind: article
title: "Community/Sports Facilities Scheme Guidelines 2026"
url: https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.community-sports-facilities-scheme-2026
language: en
evidence_status: verified
last_verified: 2026-09-01
collection_as_of: 2026-11-22
---

# Community/Sports Facilities Scheme Guidelines 2026

URA's revised Community/Sports Facilities Scheme guidelines allow qualifying non-profit community and sports uses in accessible commercial developments, formalise endorsed arts uses, and stop support for new childcare centres.

# Community/Sports Facilities Scheme Guidelines 2026

The **Community/Sports Facilities Scheme (CSFS)** allows qualifying community and sports uses to co-locate with highly accessible commercial developments, using bonus Gross Floor Area (GFA) above the Master Plan maximum. URA's revised circular is dated **1 September 2026**, takes effect immediately from **21 August 2026**, and applies to new community/sports-use applications submitted on or after that effective date; the guidelines remain valid until **21 August 2029** ([URA, 1 September 2026](https://www.ura.gov.sg/guidelines/circulars/dc26-10/)).

## Qualifying use and planning boundary

The proposed use must be primarily for public or community use, non-profit in nature, predominantly outreach-oriented, and endorsed by the relevant championing government agency. Bonus CSFS space is capped at **10% of the site's maximum permissible GFA under the Master Plan or 2,000 square metres, whichever is lower**; ancillary uses such as offices are limited to 40% of the CSFS space ([URA, 1 September 2026](https://www.ura.gov.sg/guidelines/circulars/dc26-10/)). A qualifying proposal therefore needs both an eligible use and the relevant endorsement; the scheme is not a general commercial-floor-area entitlement.

## 2026 changes: childcare and arts

ECDA will no longer endorse **new childcare centres** as an allowable community use under the CSFS because government-supported childcare availability and accessibility have increased. Existing childcare centres previously approved under the scheme continue to be supported if they remain compliant, but requests to expand their premises or increase GFA are not supported by ECDA under the CSFS ([URA, 1 September 2026](https://www.ura.gov.sg/guidelines/circulars/dc26-10/)). Separately, the revision formalises non-profit arts uses with strong community outreach that are endorsed by MCCY/NAC as an allowable community use; this does not make every arts or cultural business eligible.

## Application and continuing obligations

Applicants submit a formal application to URA for Provisional Permission with a letter of undertaking and an endorsement letter from the relevant championing ministry or agency. The approved space must continue to be used for the approved purpose, and a replacement community or sports user must meet the same endorsement and guideline requirements if the original user leaves. The CSFS is therefore a planning approval route with continuing use conditions, not a direct operating grant or an automatic approval for a proposed facility ([URA, 1 September 2026](https://www.ura.gov.sg/guidelines/circulars/dc26-10/)).

## Sources

- [URA — Guidelines for the Community/Sports Facilities Scheme](https://www.ura.gov.sg/guidelines/circulars/dc26-10/) — Accessed 2026-09-01

## Explore connections

- Articles: [Arts Policy](https://ik.sg/en/knowledge/article/sgkb.arts-culture-media.arts-policy)
- Articles: [Companion Guide to Code on Accessibility 2025](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.accessibility-companion-guide-2025)
- Articles: [HDB System Overview](https://ik.sg/en/knowledge/article/sgkb.housing.hdb-system-overview)
- Articles: [Last-mile Delivery Guide for Developments 2026](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.last-mile-delivery-guide-for-developments-2026)
- Articles: [Sports Facilities and Venues](https://ik.sg/en/knowledge/article/sgkb.sports.sports-facilities-and-venues)
- Articles: [URA SPACE New Layers 2026](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.ura-space-new-layers-2026)
- Topics: [Community/Sports Facilities Scheme Guidelines 2026](https://ik.sg/en/knowledge/topic/sgtopic.geography-urban-planning.community-sports-facilities-scheme-2026)
- Topics: [Geography and urban planning](https://ik.sg/en/knowledge/topic/sgtopic.geography)
- People & organisations: [Urban Redevelopment Authority](https://ik.sg/en/knowledge/entity/sg.agency.ura)

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force. An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.