# Mandatory Energy Improvement Regime

Singapore's Mandatory Energy Improvement regime requires owners of covered energy-intensive buildings of at least 5,000 m² GFA to audit energy use, submit an improvement plan, reduce energy consumption by 10%, and maintain the improvement under the Building Control framework.

# Mandatory Energy Improvement Regime

Singapore's **Mandatory Energy Improvement (MEI) regime** is a Building Control framework for energy-intensive existing buildings. The Building Control (Amendment) Act 2024 and related regulations took effect on **30 September 2025**; BCA's current guidance explains the audit, improvement-plan, reduction and maintenance duties ([BCA, page rechecked 24 October 2026; last updated 23 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)).

## Buildings covered

The regime applies to **energy-intensive buildings with at least 5,000 m² of Gross Floor Area (GFA)**. BCA lists commercial buildings such as offices, hotels and retail buildings, healthcare facilities, institutional buildings including educational, civic, community and cultural institutions, sports and recreation centres, and mixed developments comprising those categories ([BCA, page rechecked 24 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)). The 5,000 m² threshold alone does not establish that a building has received an MEI audit notice; coverage also depends on the regime's energy-intensive-building criteria and BCA administration.

The category list is therefore a scope indicator, not a self-issued compliance determination. An owner considering a large office, hotel, healthcare facility, school or mixed development must still distinguish the building's GFA and use from the separate question of whether BCA has issued an MEI audit notice and which records establish the baseline ([BCA, page rechecked 24 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)).

## Audit and improvement-plan duties

After an MEI audit notice, the building owner must engage a qualified **Specified Individual** within **90 days** to conduct an energy audit. The Specified Individual develops an Energy Efficiency Improvement Plan (EEIP), and the completed audit report including the EEIP must be submitted to BCA within **one year from the notice** ([BCA, page rechecked 24 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)). BCA identifies a registered Energy Auditor or an appropriately qualified Professional Engineer as possible routes for the specified role.

The audit is thus not merely an internal checklist: it produces an EEIP and a report for submission to BCA. The 90-day appointment deadline and one-year submission deadline are different clocks, both triggered by the notice, while the professional's qualification is a defined part of the regime rather than an optional sustainability-consulting credential ([BCA, updated 2 September 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)).

## Reduction, maintenance and boundaries

The owner must implement measures within **three years from EEIP submission** to reduce the building's energy consumption by **10% from the average energy-use intensity (EUI) over the three years before the notice**. The owner must then maintain the improved performance for one year from the completion-submission date and submit a maintenance report within three months after the maintenance period ends ([BCA, page rechecked 24 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)). The 10% figure is a reduction target against the specified **pre-notice three-year EUI baseline**, not a 10% reduction in floor area, a universal reduction for every building, or a cash incentive. The audit-notice baseline and maintenance duties are part of the compliance chain.

## Notice-triggered compliance chain

The regime operates through an MEI audit notice and a sequence of dated obligations. BCA identifies the applicable regulatory requirements as the Building Control (Amendment) Act 2024 and the Building Control (Environmental Sustainability Measures for Existing Buildings) (Amendment) Regulations 2025, both effective **30 September 2025**, together with the Code on Mandatory Energy Improvement for Existing Buildings ([BCA, page rechecked 24 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)). The 5,000 m² GFA threshold and building type identify the regime's potential scope, but the owner-facing deadlines run from the notice, EEIP submission and completion-submission dates. A building owner should therefore not calculate the 10% target or the 90-day appointment period from the building's completion date, the regulation's effective date or a generic annual energy bill.

The **Specified Individual** is also a defined professional role rather than any person who performs an energy review. BCA points to a BCA-registered Energy Auditor or an appropriately qualified Professional Engineer, and the appointed professional develops the EEIP included in the audit report ([BCA, page rechecked 24 October 2026](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/)). The regime consequently links building-owner duties to qualified professional engagement, BCA submissions, a measured EUI baseline and later maintenance reporting; it is not a voluntary sustainability label or a general subsidy programme.

## Sources

- [BCA — Mandatory Energy Improvement (MEI) Regime](https://www1.bca.gov.sg/sustainability/legislation-on-environmental-sustainability-for-buildings/existing-buildings/mandatory-energy-improvement-mei-regime/) — Accessed 2026-10-24
- [Singapore Statutes Online — Building Control Act 1989](https://sso.agc.gov.sg/Act/BCA1989) — Accessed 2026-10-24

## Explore connections

- Articles: [Decarbonisation technology and Singapore's SPEED programme](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.decarbonisation-technology-and-speed)
- Articles: [Energy and Power Grid](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.energy-and-power-grid)
- Articles: [EPMA Regulated Chiller and GHG Entity Fees 2026](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.epma-regulated-chiller-ghg-entity-fees-2026)
- Articles: [Higher Green Mark Standard for Government Land Sales](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026)
- Articles: [Proactive Façade Maintenance Guidance](https://ik.sg/en/knowledge/article/sgkb.geography-urban-planning.proactive-facade-maintenance)
- Articles: [Singapore Certified Energy Manager Programme](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.singapore-certified-energy-manager-programme)
- Articles: [Singapore Green Plan 2030](https://ik.sg/en/knowledge/article/sgkb.environment-sustainability.green-plan-2030)
- Topics: [Environment and sustainability](https://ik.sg/en/knowledge/topic/sgtopic.environment)
- Topics: [Mandatory Energy Improvement Regime](https://ik.sg/en/knowledge/topic/sgtopic.environment.mandatory-energy-improvement-regime)
- People & organisations: [Building and Construction Authority](https://ik.sg/en/knowledge/entity/sg.agency.bca)

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force. An expanding collection. Published counts show available knowledge, not complete coverage of Singapore.