{"release_id":19,"data":{"id":91352,"release_id":19,"source_id":"sgobs.environment.green-mark-v7-2026.pathways-transition","kind":"observation","fingerprint":"6cb1b36c12d29ef4f425b8a2d0a516796457757010cce0014712583e697c6e63","title_en":"Green Mark v7.0 energy pathways and transition dates","title_zh":"Green Mark v7.0 \u80fd\u6e90\u9014\u5f84\u53ca\u8fc7\u6e21\u65e5\u671f","domain":null,"status":"final","assurance":null,"subtype":null,"lat":null,"lon":null,"date":null,"payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"translation":"passed"},"data":{"denominator":"Published Green Mark v7.0 pathway levels and roadmap boundary; not a pass rate or claim that all buildings qualify for every rating","geography_id":"sg.geo.country.singapore","id":"sgobs.environment.green-mark-v7-2026.pathways-transition","kind":"observation","label":"Green Mark v7.0 energy pathways and transition dates","metric_id":"sgmetric.environment.green-mark-v7-2026-pathways-transition","note":"The 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.","population":"Buildings and projects using or transitioning between Green Mark certification versions","published_at":"2026-09-02","record_type":"observation","reference_period":"Green Mark v7.0 roadmap updated 2 September 2026","retrieved_at":"2026-09-02","revision":"BCA Green Mark Version 7.0 page","source_url":"https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/","status":"final","summary":"The 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.","title":"Green Mark v7.0 energy pathways and transition dates","unit":"certification thresholds and roadmap dates","value":"Energy savings levels 45%, 50%, 55%, 60%, 70% and 100%; new Green Mark 2021 applications stop 1 April 2027; ongoing Green Mark 2021 projects complete by end-2027"},"date":null,"domain":null,"evidence_paths":["artefacts\/knowledge-graph.jsonl","artefacts\/knowledge-records.jsonl"],"kind":"observation","links":[{"relation":"geography_id","target_id":"sg.geo.country.singapore"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.green-mark-version-7-2026"}],"source_id":"sgobs.environment.green-mark-v7-2026.pathways-transition","status":"final","summary_en":"The 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.","summary_zh":"70% \u8def\u5f84\u4e3a SLE70\uff1b100% \u7ea7\u522b\u6807\u793a\u4e3a ZE\uff0c\u5e76\u901a\u8fc7\u73b0\u573a\u53ef\u518d\u751f\u80fd\u6e90\u53d1\u7535\u8fdb\u884c\u62b5\u6d88\u3002","title_en":"Green Mark v7.0 energy pathways and transition dates","title_zh":"Green Mark v7.0 \u80fd\u6e90\u9014\u5f84\u53ca\u8fc7\u6e21\u65e5\u671f","translation_work":[{"field":"title_zh","fingerprint":"7e6eac669c37372e697f94513bc08f71dcabbd27483efeb12b55fda38cc47e19","source_en":"Green Mark v7.0 energy pathways and transition dates","status":"reused"},{"field":"summary_zh","fingerprint":"99b955ed6752c9809c407a699b50c55a1c07bce241720911b1b42d64852d4bf8","source_en":"The 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.","status":"reused"}]},"search_text":"Green Mark v7.0 energy pathways and transition dates\nGreen Mark v7.0 \u80fd\u6e90\u9014\u5f84\u53ca\u8fc7\u6e21\u65e5\u671f\nThe 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.\n70% \u8def\u5f84\u4e3a SLE70\uff1b100% \u7ea7\u522b\u6807\u793a\u4e3a ZE\uff0c\u5e76\u901a\u8fc7\u73b0\u573a\u53ef\u518d\u751f\u80fd\u6e90\u53d1\u7535\u8fdb\u884c\u62b5\u6d88\u3002\n{\"denominator\":\"Published Green Mark v7.0 pathway levels and roadmap boundary; not a pass rate or claim that all buildings qualify for every rating\",\"geography_id\":\"sg.geo.country.singapore\",\"id\":\"sgobs.environment.green-mark-v7-2026.pathways-transition\",\"kind\":\"observation\",\"label\":\"Green Mark v7.0 energy pathways and transition dates\",\"metric_id\":\"sgmetric.environment.green-mark-v7-2026-pathways-transition\",\"note\":\"The 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.\",\"population\":\"Buildings and projects using or transitioning between Green Mark certification versions\",\"published_at\":\"2026-09-02\",\"record_type\":\"observation\",\"reference_period\":\"Green Mark v7.0 roadmap updated 2 September 2026\",\"retrieved_at\":\"2026-09-02\",\"revision\":\"BCA Green Mark Version 7.0 page\",\"source_url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/sustainability\\\/greenmark\\\/green-mark-v7\\\/\",\"status\":\"final\",\"summary\":\"The 70% pathway is SLE70; the 100% level is identified as ZE and is offset by on-site renewable generation.\",\"title\":\"Green Mark v7.0 energy pathways and transition dates\",\"unit\":\"certification thresholds and roadmap dates\",\"value\":\"Energy savings levels 45%, 50%, 55%, 60%, 70% and 100%; new Green Mark 2021 applications stop 1 April 2027; ongoing Green Mark 2021 projects complete by end-2027\"}\n"},"related":[{"id":80313,"source_id":"sg.geo.country.singapore","kind":"geography","title_en":"Singapore","title_zh":"\u65b0\u52a0\u5761","assurance":null,"subtype":"country"},{"id":92616,"source_id":"sgtopic.geography-urban-planning.green-mark-version-7-2026","kind":"topic","title_en":"Green Mark Version 7.0","title_zh":"\u7eff\u8272\u6807\u5fd7\u7b2c 7.0 \u7248","assurance":null,"subtype":null}]}