{"release_id":19,"data":{"id":91051,"release_id":19,"source_id":"sgobs.business.singtel.nxera-tuas-2026","kind":"observation","fingerprint":"8660697da1e1c85bfff636302807a5e870a5fbb26d8e46032d62c96bc339f4f6","title_en":"Nxera Tuas data-centre operational milestone","title_zh":"Nxera \u5927\u58eb\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u91cc\u7a0b\u7891","domain":null,"status":"final","assurance":null,"subtype":null,"lat":null,"lon":null,"date":null,"payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"translation":"passed"},"data":{"denominator":"Facility design\/operational capacity; not Singtel Group or nationwide capacity, and not a measure of utilisation. Nxera's 9 February 2026 opening release separately stated that more than 90% was committed before launch; that launch-time commitment is not current occupancy.","geography_id":"sg.geo.country.singapore","id":"sgobs.business.singtel.nxera-tuas-2026","kind":"observation","label":"Nxera Tuas data-centre operational milestone","metric_id":"sgmetric.business.singtel.nxera-tuas-2026","note":"Singtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.","population":"Nxera DC Tuas facility in Singapore, reported by Singtel","published_at":"2026-05-21","record_type":"observation","reference_period":"Operational commencement in January 2026; reported in Singtel FY2026 results published 21 May 2026","retrieved_at":"2026-10-23","revision":"Singtel FY2026 results, rechecked 23 October 2026","source_url":"https:\/\/www.singtel.com\/about-us\/media-centre\/news-releases\/singtel-posts-fy26-net-profit","status":"final","summary":"Singtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.","title":"Nxera Tuas data-centre operational milestone","unit":"megawatts of data-centre capacity","value":"58"},"date":null,"domain":null,"evidence_paths":["artefacts\/knowledge-graph.jsonl","artefacts\/knowledge-records.jsonl"],"kind":"observation","links":[{"relation":"geography_id","target_id":"sg.geo.country.singapore"},{"relation":"topics","target_id":"sgtopic.business.singtel"}],"source_id":"sgobs.business.singtel.nxera-tuas-2026","status":"final","summary_en":"Singtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.","summary_zh":"\u65b0\u7535\u4fe1\u62a5\u544a\u79f0\uff0cNxera \u7684 58MW DC Tuas \u4e8e 2026 \u5e74\u4e00\u6708\u5728\u65b0\u52a0\u5761\u5f00\u59cb\u8fd0\u8425\u3002\u8be5\u5bb9\u91cf\u4ec5\u9488\u5bf9\u8fd9\u5904\u8bbe\u65bd\uff0c\u4e0d\u80fd\u8bc1\u660e\u5176\u5f53\u524d\u5229\u7528\u7387\u6216\u6240\u6709\u5ba2\u6237\u5747\u53ef\u4f7f\u7528\u3002","title_en":"Nxera Tuas data-centre operational milestone","title_zh":"Nxera \u5927\u58eb\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u91cc\u7a0b\u7891","translation_work":[{"field":"title_zh","fingerprint":"876da68928192e51c0fb594bb22401d201029aeb3b19ad1503d18a83faca23e5","source_en":"Nxera Tuas data-centre operational milestone","status":"reused"},{"field":"summary_zh","fingerprint":"8d168a8e84d9ab106997f14a031613c297a1ab56b7efd8383a2a6d506edf81bd","source_en":"Singtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.","status":"reused"}]},"search_text":"Nxera Tuas data-centre operational milestone\nNxera \u5927\u58eb\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u91cc\u7a0b\u7891\nSingtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.\n\u65b0\u7535\u4fe1\u62a5\u544a\u79f0\uff0cNxera \u7684 58MW DC Tuas \u4e8e 2026 \u5e74\u4e00\u6708\u5728\u65b0\u52a0\u5761\u5f00\u59cb\u8fd0\u8425\u3002\u8be5\u5bb9\u91cf\u4ec5\u9488\u5bf9\u8fd9\u5904\u8bbe\u65bd\uff0c\u4e0d\u80fd\u8bc1\u660e\u5176\u5f53\u524d\u5229\u7528\u7387\u6216\u6240\u6709\u5ba2\u6237\u5747\u53ef\u4f7f\u7528\u3002\n{\"denominator\":\"Facility design\\\/operational capacity; not Singtel Group or nationwide capacity, and not a measure of utilisation. Nxera's 9 February 2026 opening release separately stated that more than 90% was committed before launch; that launch-time commitment is not current occupancy.\",\"geography_id\":\"sg.geo.country.singapore\",\"id\":\"sgobs.business.singtel.nxera-tuas-2026\",\"kind\":\"observation\",\"label\":\"Nxera Tuas data-centre operational milestone\",\"metric_id\":\"sgmetric.business.singtel.nxera-tuas-2026\",\"note\":\"Singtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.\",\"population\":\"Nxera DC Tuas facility in Singapore, reported by Singtel\",\"published_at\":\"2026-05-21\",\"record_type\":\"observation\",\"reference_period\":\"Operational commencement in January 2026; reported in Singtel FY2026 results published 21 May 2026\",\"retrieved_at\":\"2026-10-23\",\"revision\":\"Singtel FY2026 results, rechecked 23 October 2026\",\"source_url\":\"https:\\\/\\\/www.singtel.com\\\/about-us\\\/media-centre\\\/news-releases\\\/singtel-posts-fy26-net-profit\",\"status\":\"final\",\"summary\":\"Singtel reported that Nxera's 58MW DC Tuas commenced operations in Singapore in January 2026. The capacity is facility-specific and does not establish present utilisation or availability to every customer.\",\"title\":\"Nxera Tuas data-centre operational milestone\",\"unit\":\"megawatts of data-centre capacity\",\"value\":\"58\"}\n"},"related":[{"id":80313,"source_id":"sg.geo.country.singapore","kind":"geography","title_en":"Singapore","title_zh":"\u65b0\u52a0\u5761","assurance":null,"subtype":"country"},{"id":92079,"source_id":"sgtopic.business.singtel","kind":"topic","title_en":"Singtel","title_zh":"\u65b0\u7535\u4fe1","assurance":null,"subtype":null}]}