{"release_id":19,"data":{"id":89945,"release_id":19,"source_id":"sgkb.data.data-centre-industry-anchors","kind":"dataset","fingerprint":"05c5a5eccac0b2a149e238edcb30cbb3a992ec108a4e9c5e075eb1072bbbec49","title_en":"Data Centre Industry Anchors","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e","domain":"data","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-08-21","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["DC-CFA","DC-CFA2","data centre moratorium","PUE"],"aliases_i18n":[],"canonical_format":"markdown","classification_confidence":"high","classification_source":"curated","document_id":"sgkb.data.data-centre-industry-anchors","document_sha256":"c369e828e6671cc4c1bc3e07423c626918726a5126869b7e07bfdd15003558e7","document_type":"dataset","domain":"data","entities":["sg.agency.edb","sg.agency.imda"],"facets":["business","current","infrastructure","policy","statistics"],"geographic_scope":["national"],"grain":"one dated capacity, CFA allocation, or PUE\/green threshold anchor","id":"sgkb.data.data-centre-industry-anchors","jurisdiction":"SG","language":"en","last_verified":"2026-08-21","path":"data\/data-centre-industry-anchors.md","related":["data-centre-industry","energy-and-power-grid","green-plan-2030"],"sources":[{"accessed":"2026-08-09","publisher":"IMDA","tier":1,"title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-09","publisher":"EDB","tier":1,"title":"EDB \u2014 Four DC-CFA pilot winners","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"accessed":"2026-08-09","published":"2025-12-01","publisher":"EDB \/ IMDA","tier":1,"title":"EDB\/IMDA \u2014 DC-CFA2 launch factsheet","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"},{"accessed":"2026-08-21","published":"2026-08-21","publisher":"Economic Development Board","tier":1,"title":"EDB \u2014 Four data centre proposals selected under DC-CFA2","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html"}],"status":"verified","summary":"Dated Singapore data-centre capacity, DC-CFA allocation rounds, and DC-CFA2 PUE\/green-energy thresholds \u2014 not a permanent ban on new centres.","tags":["tech","energy","policy","statistics"],"temporal_scope":"current","title":"Data Centre Industry Anchors","topics":["sgtopic.business.data-centres"],"update_cadence":"after EDB\/IMDA CFA rounds or Green DC Roadmap updates","volatility":"fast"},"date":"2026-08-21","domain":"data","evidence_paths":["source\/data\/data-centre-industry-anchors.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":0,"input_hash":"e4d3e006f80d32302fb37164a589bc85f0fb39c225347d9e7f4a9869c265afc0","kind":"dataset","lineage":[{"chunk_id":"sgkb.data.data-centre-industry-anchors#overview","citation_urls":["https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"],"content_sha256":"777bfa51194bc5bd768febffc7635ca384f030d3d384811fc329295f3f3e6df9","document_id":"sgkb.data.data-centre-industry-anchors","document_sha256":"c369e828e6671cc4c1bc3e07423c626918726a5126869b7e07bfdd15003558e7","section_sources":[{"accessed":"2026-08-09","published":"2025-12-01","publisher":"EDB \/ IMDA","tier":1,"title":"EDB\/IMDA \u2014 DC-CFA2 launch factsheet","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"}]},{"chunk_id":"sgkb.data.data-centre-industry-anchors#capacity-and-policy-timeline","citation_urls":["https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html","https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"],"content_sha256":"1c2c5793fc72d44462a9d1d9081594d15e7fcaa03784579dc70acdecfe1f33d5","document_id":"sgkb.data.data-centre-industry-anchors","document_sha256":"c369e828e6671cc4c1bc3e07423c626918726a5126869b7e07bfdd15003558e7","section_sources":[{"accessed":"2026-08-09","publisher":"IMDA","tier":1,"title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-09","publisher":"EDB","tier":1,"title":"EDB \u2014 Four DC-CFA pilot winners","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"accessed":"2026-08-09","published":"2025-12-01","publisher":"EDB \/ IMDA","tier":1,"title":"EDB\/IMDA \u2014 DC-CFA2 launch factsheet","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"}]},{"chunk_id":"sgkb.data.data-centre-industry-anchors#dc-cfa2-sustainability-thresholds","citation_urls":["https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"],"content_sha256":"9f906296470e35f6cf24fd5de36a40aa9b1378c1261a66a3313086b93d4fd16a","document_id":"sgkb.data.data-centre-industry-anchors","document_sha256":"c369e828e6671cc4c1bc3e07423c626918726a5126869b7e07bfdd15003558e7","section_sources":[{"accessed":"2026-08-09","published":"2025-12-01","publisher":"EDB \/ IMDA","tier":1,"title":"EDB\/IMDA \u2014 DC-CFA2 launch factsheet","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"}]}],"links":[{"relation":"related","target_id":"sgkb.business-industry.data-centre-industry"},{"relation":"related","target_id":"sgkb.environment-sustainability.energy-and-power-grid"},{"relation":"related","target_id":"sgkb.environment-sustainability.green-plan-2030"},{"relation":"topics","target_id":"sgtopic.business.data-centres"},{"relation":"entities","target_id":"sg.agency.edb"},{"relation":"entities","target_id":"sg.agency.imda"}],"locales":{"en":{"markdown":"# Data Centre Industry Anchors\n\nNew greenfield capacity requires the CFA as the allocation mechanism. The 2019 pause was temporary, not a permanent ban ([EDB\/IMDA DC-CFA2 factsheet](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026). Narrative lives in [data centre industry](\/en\/knowledge\/article\/sgkb.business-industry.data-centre-industry).\n\n## Capacity and policy timeline\n\n| Anchor | Value | Notes | As of |\n|---|---|---|---|\n| Operational capacity | Exceeding 1.4 GW | Operational IT\/power capacity framing | 2024 |\n| Digital economy share of GDP | Roughly 17% | Broader digital economy, not DC-only | 2022 |\n| Moratorium \/ pause | Temporary pause on new DC developments | Pre-authorised projects could proceed | From 2019 |\n| Pilot DC-CFA launch | Jul 2022 | EDB + IMDA allocation model | 2022 |\n| Pilot award | About 80 MW critical IT load (pilot 80MW in 2023) | Four winners; >20 proposals | Jul 2023 |\n| DC-CFA2 launch | At least 200 MW new capacity (DC-CFA2 200MW) | More possible via green pathways | 1 Dec 2025 |\n| DC-CFA2 provisional allocation | 200 MW provisionally allocated to four data-centre operators | Allocation outcome, not completed operational capacity | 21 Aug 2026 |\n\nSources: [IMDA Green DC Roadmap](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf); [EDB pilot winners](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [DC-CFA2 factsheet](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026.\n\n## DC-CFA2 sustainability thresholds\n\n| Requirement | Threshold | Population \/ applicability | As of |\n|---|---|---|---|\n| Power Usage Effectiveness (PUE) | \u2264 1.25 at 100% IT load | DC-CFA2 applicants | Dec 2025 launch |\n| Green Mark | BCA\u2013IMDA Green Mark for Data Centres 2024 Platinum | DC-CFA2 applicants | Dec 2025 |\n| Green energy share | \u2265 50% of facility power (fifty percent green energy) from eligible pathways | Biomethane, low-carbon ammonia\/hydrogen, novel fuel cells with CCS, BIPV, etc. | Dec 2025 |\n\nSource: [DC-CFA2 factsheet](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026. Do not cite the broader roadmap\u2019s older PUE 1.3 target as the CFA2 gate.","summary":"Dated Singapore data-centre capacity, DC-CFA allocation rounds, and DC-CFA2 PUE\/green-energy thresholds \u2014 not a permanent ban on new centres.","title":"Data Centre Industry Anchors"},"zh":{"markdown":"# \u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e\n\n\u65b0\u5efa\u7eff\u5730\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\u987b\u901a\u8fc7 CFA \u4f5c\u4e3a\u5206\u914d\u673a\u5236\u30022019 \u5e74\u7684\u6682\u505c\u662f\u4e34\u65f6\u63aa\u65bd\uff0c\u5e76\u975e\u6c38\u4e45\u7981\u4ee4\uff08[EDB\/IMDA DC-CFA2 \u8d44\u6599\u8868](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff0c\u8bbf\u95ee\u65e5\u671f\uff1a2026 \u5e74\u516b\u6708 9 \u65e5\uff09\u3002\u884c\u4e1a\u53d9\u8ff0\u89c1[\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a](\/zh\/knowledge\/article\/sgkb.business-industry.data-centre-industry)\u3002\n\n## \u5bb9\u91cf\u4e0e\u653f\u7b56\u65f6\u95f4\u7ebf\n\n| \u5173\u952e\u6570\u636e | \u6570\u503c | \u8bf4\u660e | \u622a\u81f3 |\n|---|---|---|---|\n| \u8fd0\u8425\u5bb9\u91cf | \u8d85\u8fc7 1.4 GW | \u8fd0\u8425 IT\uff0f\u7535\u529b\u5bb9\u91cf\u53e3\u5f84 | 2024 |\n| \u6570\u5b57\u7ecf\u6d4e\u5360 GDP \u6bd4\u91cd | \u7ea6 17% | \u5e7f\u4e49\u6570\u5b57\u7ecf\u6d4e\uff0c\u5e76\u975e\u4ec5\u6307\u6570\u636e\u4e2d\u5fc3 | 2022 |\n| \u6682\u505c\u4ee4\uff0f\u6682\u505c\u63aa\u65bd | \u6682\u65f6\u6682\u505c\u65b0\u6570\u636e\u4e2d\u5fc3\u9879\u76ee | \u5df2\u83b7\u9884\u5148\u6388\u6743\u7684\u9879\u76ee\u53ef\u7ee7\u7eed\u63a8\u8fdb | \u81ea 2019 \u5e74\u8d77 |\n| DC-CFA \u8bd5\u70b9\u542f\u52a8 | 2022 \u5e74\u4e03\u6708 | EDB + IMDA \u5206\u914d\u6a21\u5f0f | 2022 |\n| \u8bd5\u70b9\u6388\u4e88\u5bb9\u91cf | \u7ea6 80 MW \u5173\u952e IT \u8d1f\u8f7d\uff082023 \u5e74\u8bd5\u70b9 80MW\uff09 | \u56db\u4e2a\u83b7\u9009\u8005\uff1b\u8d85\u8fc7 20 \u4efd\u63d0\u6848 | 2023 \u5e74\u4e03\u6708 |\n| DC-CFA2 \u542f\u52a8 | \u81f3\u5c11\u65b0\u589e 200 MW \u5bb9\u91cf\uff08DC-CFA2 200MW\uff09 | \u901a\u8fc7\u7eff\u8272\u8def\u5f84\u8fd8\u53ef\u80fd\u589e\u52a0 | 2025 \u5e74\u5341\u4e8c\u6708 1 \u65e5 |\n| DC-CFA2 \u6682\u5b9a\u5206\u914d | \u6682\u5b9a\u5411\u56db\u5bb6\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5546\u5206\u914d 200 MW | \u5206\u914d\u7ed3\u679c\uff0c\u5e76\u975e\u5df2\u5efa\u6210\u7684\u8fd0\u8425\u5bb9\u91cf | 2026 \u5e74\u516b\u6708 21 \u65e5 |\n\n\u6765\u6e90\uff1a[IMDA \u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff1b[EDB \u8bd5\u70b9\u83b7\u9009\u8005](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[DC-CFA2 \u8d44\u6599\u8868](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff0c\u8bbf\u95ee\u65e5\u671f\uff1a2026 \u5e74\u516b\u6708 9 \u65e5\u3002\n\n## DC-CFA2 \u53ef\u6301\u7eed\u53d1\u5c55\u95e8\u69db\n\n| \u8981\u6c42 | \u95e8\u69db | \u9002\u7528\u5bf9\u8c61\uff0f\u8303\u56f4 | \u622a\u81f3 |\n|---|---|---|---|\n| \u7535\u529b\u4f7f\u7528\u6548\u7387\uff08PUE\uff09 | \u5728 100% IT \u8d1f\u8f7d\u4e0b \u2264 1.25 | DC-CFA2 \u7533\u8bf7\u8005 | 2025 \u5e74\u5341\u4e8c\u6708\u542f\u52a8\u65f6 |\n| Green Mark | BCA\u2013IMDA 2024 \u5e74\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7 | DC-CFA2 \u7533\u8bf7\u8005 | 2025 \u5e74\u5341\u4e8c\u6708 |\n| \u7eff\u8272\u80fd\u6e90\u5360\u6bd4 | \u8bbe\u65bd\u7535\u529b\u4e2d \u2265 50%\uff08\u767e\u5206\u4e4b\u4e94\u5341\u7eff\u8272\u80fd\u6e90\uff09\u6765\u81ea\u5408\u8d44\u683c\u8def\u5f84 | \u751f\u7269\u7532\u70f7\u3001\u4f4e\u78b3\u6c28\uff0f\u6c22\u3001\u914d\u5907 CCS \u7684\u65b0\u578b\u71c3\u6599\u7535\u6c60\u3001BIPV \u7b49 | 2025 \u5e74\u5341\u4e8c\u6708 |\n\n\u6765\u6e90\uff1a[DC-CFA2 \u8d44\u6599\u8868](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff0c\u8bbf\u95ee\u65e5\u671f\uff1a2026 \u5e74\u516b\u6708 9 \u65e5\u3002\u4e0d\u8981\u5c06\u8f83\u65e9\u8def\u7ebf\u56fe\u4e2d\u7684 PUE 1.3 \u76ee\u6807\u5f15\u7528\u4e3a CFA2 \u95e8\u69db\u3002","summary":"\u6ce8\u660e\u65e5\u671f\u7684\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\u3001DC-CFA \u5206\u914d\u8f6e\u6b21\uff0c\u4ee5\u53ca DC-CFA2 \u7684 PUE\uff0f\u7eff\u8272\u80fd\u6e90\u95e8\u69db\u2014\u2014\u5e76\u975e\u6c38\u4e45\u7981\u6b62\u65b0\u5efa\u4e2d\u5fc3\u3002","title":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e"}},"source_id":"sgkb.data.data-centre-industry-anchors","status":"verified","summary_en":"Dated Singapore data-centre capacity, DC-CFA allocation rounds, and DC-CFA2 PUE\/green-energy thresholds \u2014 not a permanent ban on new centres.","summary_zh":"\u6ce8\u660e\u65e5\u671f\u7684\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\u3001DC-CFA \u5206\u914d\u8f6e\u6b21\uff0c\u4ee5\u53ca DC-CFA2 \u7684 PUE\uff0f\u7eff\u8272\u80fd\u6e90\u95e8\u69db\u2014\u2014\u5e76\u975e\u6c38\u4e45\u7981\u6b62\u65b0\u5efa\u4e2d\u5fc3\u3002","title_en":"Data Centre Industry Anchors","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e"},"search_text":"Data Centre Industry Anchors\n\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e\nDated Singapore data-centre capacity, DC-CFA allocation rounds, and DC-CFA2 PUE\/green-energy thresholds \u2014 not a permanent ban on new centres.\n\u6ce8\u660e\u65e5\u671f\u7684\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\u3001DC-CFA \u5206\u914d\u8f6e\u6b21\uff0c\u4ee5\u53ca DC-CFA2 \u7684 PUE\uff0f\u7eff\u8272\u80fd\u6e90\u95e8\u69db\u2014\u2014\u5e76\u975e\u6c38\u4e45\u7981\u6b62\u65b0\u5efa\u4e2d\u5fc3\u3002\n{\"aliases\":[\"DC-CFA\",\"DC-CFA2\",\"data centre moratorium\",\"PUE\"],\"aliases_i18n\":[],\"canonical_format\":\"markdown\",\"classification_confidence\":\"high\",\"classification_source\":\"curated\",\"document_id\":\"sgkb.data.data-centre-industry-anchors\",\"document_sha256\":\"c369e828e6671cc4c1bc3e07423c626918726a5126869b7e07bfdd15003558e7\",\"document_type\":\"dataset\",\"domain\":\"data\",\"entities\":[\"sg.agency.edb\",\"sg.agency.imda\"],\"facets\":[\"business\",\"current\",\"infrastructure\",\"policy\",\"statistics\"],\"geographic_scope\":[\"national\"],\"grain\":\"one dated capacity, CFA allocation, or PUE\\\/green threshold anchor\",\"id\":\"sgkb.data.data-centre-industry-anchors\",\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-08-21\",\"path\":\"data\\\/data-centre-industry-anchors.md\",\"related\":[\"data-centre-industry\",\"energy-and-power-grid\",\"green-plan-2030\"],\"sources\":[{\"accessed\":\"2026-08-09\",\"publisher\":\"IMDA\",\"tier\":1,\"title\":\"IMDA \u2014 Green Data Centre Roadmap (May 2024)\",\"url\":\"https:\\\/\\\/www.imda.gov.sg\\\/-\\\/media\\\/imda\\\/files\\\/how-we-can-help\\\/green-dc-roadmap\\\/green-dc-roadmap.pdf\"},{\"accessed\":\"2026-08-09\",\"publisher\":\"EDB\",\"tier\":1,\"title\":\"EDB \u2014 Four DC-CFA pilot winners\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html\"},{\"accessed\":\"2026-08-09\",\"published\":\"2025-12-01\",\"publisher\":\"EDB \\\/ IMDA\",\"tier\":1,\"title\":\"EDB\\\/IMDA \u2014 DC-CFA2 launch factsheet\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/content\\\/dam\\\/edb-en\\\/about-edb\\\/media-releases\\\/news\\\/launch-of-second-data-centre-call-for-application\\\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf\"},{\"accessed\":\"2026-08-21\",\"published\":\"2026-08-21\",\"publisher\":\"Economic Development Board\",\"tier\":1,\"title\":\"EDB \u2014 Four data centre proposals selected under DC-CFA2\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html\"}],\"status\":\"verified\",\"summary\":\"Dated Singapore data-centre capacity, DC-CFA allocation rounds, and DC-CFA2 PUE\\\/green-energy thresholds \u2014 not a permanent ban on new centres.\",\"tags\":[\"tech\",\"energy\",\"policy\",\"statistics\"],\"temporal_scope\":\"current\",\"title\":\"Data Centre Industry Anchors\",\"topics\":[\"sgtopic.business.data-centres\"],\"update_cadence\":\"after EDB\\\/IMDA CFA rounds or Green DC Roadmap updates\",\"volatility\":\"fast\"}\n# Data Centre Industry Anchors\n\nNew greenfield capacity requires the CFA as the allocation mechanism. The 2019 pause was temporary, not a permanent ban ([EDB\/IMDA DC-CFA2 factsheet](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026). Narrative lives in [data centre industry](\/en\/knowledge\/article\/sgkb.business-industry.data-centre-industry).\n\n## Capacity and policy timeline\n\n| Anchor | Value | Notes | As of |\n|---|---|---|---|\n| Operational capacity | Exceeding 1.4 GW | Operational IT\/power capacity framing | 2024 |\n| Digital economy share of GDP | Roughly 17% | Broader digital economy, not DC-only | 2022 |\n| Moratorium \/ pause | Temporary pause on new DC developments | Pre-authorised projects could proceed | From 2019 |\n| Pilot DC-CFA launch | Jul 2022 | EDB + IMDA allocation model | 2022 |\n| Pilot award | About 80 MW critical IT load (pilot 80MW in 2023) | Four winners; >20 proposals | Jul 2023 |\n| DC-CFA2 launch | At least 200 MW new capacity (DC-CFA2 200MW) | More possible via green pathways | 1 Dec 2025 |\n| DC-CFA2 provisional allocation | 200 MW provisionally allocated to four data-centre operators | Allocation outcome, not completed operational capacity | 21 Aug 2026 |\n\nSources: [IMDA Green DC Roadmap](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf); [EDB pilot winners](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [DC-CFA2 factsheet](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026.\n\n## DC-CFA2 sustainability thresholds\n\n| Requirement | Threshold | Population \/ applicability | As of |\n|---|---|---|---|\n| Power Usage Effectiveness (PUE) | \u2264 1.25 at 100% IT load | DC-CFA2 applicants | Dec 2025 launch |\n| Green Mark | BCA\u2013IMDA Green Mark for Data Centres 2024 Platinum | DC-CFA2 applicants | Dec 2025 |\n| Green energy share | \u2265 50% of facility power (fifty percent green energy) from eligible pathways | Biomethane, low-carbon ammonia\/hydrogen, novel fuel cells with CCS, BIPV, etc. | Dec 2025 |\n\nSource: [DC-CFA2 factsheet](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf), accessed 9 August 2026. Do not cite the broader roadmap\u2019s older PUE 1.3 target as the CFA2 gate.\n# \u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e\n\n\u65b0\u5efa\u7eff\u5730\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\u987b\u901a\u8fc7 CFA \u4f5c\u4e3a\u5206\u914d\u673a\u5236\u30022019 \u5e74\u7684\u6682\u505c\u662f\u4e34\u65f6\u63aa\u65bd\uff0c\u5e76\u975e\u6c38\u4e45\u7981\u4ee4\uff08[EDB\/IMDA DC-CFA2 \u8d44\u6599\u8868](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff0c\u8bbf\u95ee\u65e5\u671f\uff1a2026 \u5e74\u516b\u6708 9 \u65e5\uff09\u3002\u884c\u4e1a\u53d9\u8ff0\u89c1[\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a](\/zh\/knowledge\/article\/sgkb.business-industry.data-centre-industry)\u3002\n\n## \u5bb9\u91cf\u4e0e\u653f\u7b56\u65f6\u95f4\u7ebf\n\n| \u5173\u952e\u6570\u636e | \u6570\u503c | \u8bf4\u660e | \u622a\u81f3 |\n|---|---|---|---|\n| \u8fd0\u8425\u5bb9\u91cf | \u8d85\u8fc7 1.4 GW | \u8fd0\u8425 IT\uff0f\u7535\u529b\u5bb9\u91cf\u53e3\u5f84 | 2024 |\n| \u6570\u5b57\u7ecf\u6d4e\u5360 GDP \u6bd4\u91cd | \u7ea6 17% | \u5e7f\u4e49\u6570\u5b57\u7ecf\u6d4e\uff0c\u5e76\u975e\u4ec5\u6307\u6570\u636e\u4e2d\u5fc3 | 2022 |\n| \u6682\u505c\u4ee4\uff0f\u6682\u505c\u63aa\u65bd | \u6682\u65f6\u6682\u505c\u65b0\u6570\u636e\u4e2d\u5fc3\u9879\u76ee | \u5df2\u83b7\u9884\u5148\u6388\u6743\u7684\u9879\u76ee\u53ef\u7ee7\u7eed\u63a8\u8fdb | \u81ea 2019 \u5e74\u8d77 |\n| DC-CFA \u8bd5\u70b9\u542f\u52a8 | 2022 \u5e74\u4e03\u6708 | EDB + IMDA \u5206\u914d\u6a21\u5f0f | 2022 |\n| \u8bd5\u70b9\u6388\u4e88\u5bb9\u91cf | \u7ea6 80 MW \u5173\u952e IT \u8d1f\u8f7d\uff082023 \u5e74\u8bd5\u70b9 80MW\uff09 | \u56db\u4e2a\u83b7\u9009\u8005\uff1b\u8d85\u8fc7 20 \u4efd\u63d0\u6848 | 2023 \u5e74\u4e03\u6708 |\n| DC-CFA2 \u542f\u52a8 | \u81f3\u5c11\u65b0\u589e 200 MW \u5bb9\u91cf\uff08DC-CFA2 200MW\uff09 | \u901a\u8fc7\u7eff\u8272\u8def\u5f84\u8fd8\u53ef\u80fd\u589e\u52a0 | 2025 \u5e74\u5341\u4e8c\u6708 1 \u65e5 |\n| DC-CFA2 \u6682\u5b9a\u5206\u914d | \u6682\u5b9a\u5411\u56db\u5bb6\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5546\u5206\u914d 200 MW | \u5206\u914d\u7ed3\u679c\uff0c\u5e76\u975e\u5df2\u5efa\u6210\u7684\u8fd0\u8425\u5bb9\u91cf | 2026 \u5e74\u516b\u6708 21 \u65e5 |\n\n\u6765\u6e90\uff1a[IMDA \u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff1b[EDB \u8bd5\u70b9\u83b7\u9009\u8005](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[DC-CFA2 \u8d44\u6599\u8868](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff0c\u8bbf\u95ee\u65e5\u671f\uff1a2026 \u5e74\u516b\u6708 9 \u65e5\u3002\n\n## DC-CFA2 \u53ef\u6301\u7eed\u53d1\u5c55\u95e8\u69db\n\n| \u8981\u6c42 | \u95e8\u69db | \u9002\u7528\u5bf9\u8c61\uff0f\u8303\u56f4 | \u622a\u81f3 |\n|---|---|---|---|\n| \u7535\u529b\u4f7f\u7528\u6548\u7387\uff08PUE\uff09 | \u5728 100% IT \u8d1f\u8f7d\u4e0b \u2264 1.25 | DC-CFA2 \u7533\u8bf7\u8005 | 2025 \u5e74\u5341\u4e8c\u6708\u542f\u52a8\u65f6 |\n| Green Mark | BCA\u2013IMDA 2024 \u5e74\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7 | DC-CFA2 \u7533\u8bf7\u8005 | 2025 \u5e74\u5341\u4e8c\u6708 |\n| \u7eff\u8272\u80fd\u6e90\u5360\u6bd4 | \u8bbe\u65bd\u7535\u529b\u4e2d \u2265 50%\uff08\u767e\u5206\u4e4b\u4e94\u5341\u7eff\u8272\u80fd\u6e90\uff09\u6765\u81ea\u5408\u8d44\u683c\u8def\u5f84 | \u751f\u7269\u7532\u70f7\u3001\u4f4e\u78b3\u6c28\uff0f\u6c22\u3001\u914d\u5907 CCS \u7684\u65b0\u578b\u71c3\u6599\u7535\u6c60\u3001BIPV \u7b49 | 2025 \u5e74\u5341\u4e8c\u6708 |\n\n\u6765\u6e90\uff1a[DC-CFA2 \u8d44\u6599\u8868](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff0c\u8bbf\u95ee\u65e5\u671f\uff1a2026 \u5e74\u516b\u6708 9 \u65e5\u3002\u4e0d\u8981\u5c06\u8f83\u65e9\u8def\u7ebf\u56fe\u4e2d\u7684 PUE 1.3 \u76ee\u6807\u5f15\u7528\u4e3a CFA2 \u95e8\u69db\u3002"},"related":[{"id":89679,"source_id":"sgkb.business-industry.data-centre-industry","kind":"article","title_en":"Data Centre Industry","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a","assurance":null,"subtype":null},{"id":90250,"source_id":"sgkb.environment-sustainability.energy-and-power-grid","kind":"article","title_en":"Energy and Power Grid","title_zh":"\u80fd\u6e90\u4e0e\u7535\u7f51","assurance":null,"subtype":null},{"id":90258,"source_id":"sgkb.environment-sustainability.green-plan-2030","kind":"article","title_en":"Singapore Green Plan 2030","title_zh":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030","assurance":null,"subtype":null},{"id":79811,"source_id":"sg.agency.imda","kind":"entity","title_en":"Infocomm Media Development Authority","title_zh":"\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40","assurance":null,"subtype":"statutory-board"},{"id":79800,"source_id":"sg.agency.edb","kind":"entity","title_en":"Singapore Economic Development Board","title_zh":"\u65b0\u52a0\u5761\u7ecf\u6d4e\u53d1\u5c55\u5c40","assurance":null,"subtype":"agency"},{"id":91973,"source_id":"sgtopic.business.data-centres","kind":"topic","title_en":"Data centres","title_zh":"\u6570\u636e\u4e2d\u5fc3","assurance":null,"subtype":null}]}