{"release_id":19,"data":{"id":90432,"release_id":19,"source_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","kind":"article","fingerprint":"93e39c76b81e794b8bb7ae59a110feb3442b4ef1f1d98b33fb412f89dfc0c426","title_en":"Remote Site Supervision for Structural Works","title_zh":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-09-02","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["Remote Site Supervision guidebook","RSS structural works","Guidebook for Remote Supervision Structural Works","RSS Guidebook Version 2"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","document_sha256":"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b","document_type":"article","domain":"geography-urban-planning","entities":["sg.agency.bca"],"facets":["current","infrastructure","institution","policy","procedure"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-09-02","path":"geography-urban-planning\/remote-site-supervision-structural-works-2026.md","related":["pre-construction-survey-guidelines-2026","ags-sg-site-investigation-data","fixed-installations-maintenance-outcome-guidebook-2026"],"sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circulars","url":"https:\/\/www1.bca.gov.sg\/resources\/circulars\/"},{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Annual Report 2024\/2025","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf"}],"status":"verified","summary":"BCA's Guidebook for Remote Site Supervision (Structural Works) provides good practices for using technology to complement physical supervision by Qualified Persons and site supervisors, with Version 2 issued through a July 2026 joint industry circular.","tags":["construction","research","policy","how-to"],"temporal_scope":"current","title":"Remote Site Supervision for Structural Works","topics":["sgtopic.geography","sgtopic.geography-urban-planning.remote-site-supervision-structural-works-2026"],"volatility":"slow"},"date":"2026-09-02","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/remote-site-supervision-structural-works-2026.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":12,"input_hash":"afe776586d8842681bce7017e59d069e6c0e022edb0246a466c4582e993f6011","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026#overview","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/","https:\/\/www1.bca.gov.sg\/resources\/circulars\/"],"content_sha256":"c3221630815e905857fd6d3fe33bef7e76090b5b2bb04dd54e9f2cf6a57cb783","document_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","document_sha256":"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circulars","url":"https:\/\/www1.bca.gov.sg\/resources\/circulars\/"}]},{"chunk_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026#why-remote-supervision-exists","citation_urls":["https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf"],"content_sha256":"a227ca526930effc1b569c8ae4084f9223326f661e0f30e0049c4f05a7fad832","document_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","document_sha256":"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Annual Report 2024\/2025","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026#version-2-and-the-industry-framework","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/","https:\/\/www1.bca.gov.sg\/resources\/circulars\/"],"content_sha256":"abd15f444fc831da33842b9b44d4835f0df1e180d478dd753165d615aaeab2bf","document_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","document_sha256":"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circulars","url":"https:\/\/www1.bca.gov.sg\/resources\/circulars\/"}]},{"chunk_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026#relationship-to-physical-supervision-and-records","citation_urls":["https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf"],"content_sha256":"0ce241b171b744abbcb4f5c8436729aacbb62e7421a93742dcce530232dff856","document_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","document_sha256":"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Annual Report 2024\/2025","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026#what-the-guidebook-does-not-establish","citation_urls":[],"content_sha256":"717c76dd179d1114b5828ab6edefe0a820a730bfd9ddf542131de3b02f13026b","document_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","document_sha256":"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b","section_sources":[]}],"links":[{"relation":"related","target_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026"},{"relation":"related","target_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data"},{"relation":"related","target_id":"sgkb.geography-urban-planning.fixed-installations-maintenance-outcome-guidebook-2026"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.remote-site-supervision-structural-works-2026"},{"relation":"entities","target_id":"sg.agency.bca"}],"locales":{"en":{"markdown":"# Remote Site Supervision for Structural Works\n\nSingapore's Building and Construction Authority (BCA) maintains a Guidebook for Remote Site Supervision (Structural Works) as part of its structural-plan guidance. The guidebook describes good practices for using technology to complement physical supervision by Qualified Persons (QPs) and site supervisors. A joint BCA\/ACES\/IES\/SCAL circular dated 15 July 2026 announced Version 2 ([BCA Guidelines for ST Plan Applications, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA Circulars, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)).\n\n## Why remote supervision exists\n\nRemote supervision addresses situations where structural work or fabrication needs to be observed across locations, including local and overseas fabrication yards and construction sites. BCA's annual report describes pilot programmes across major infrastructure and private projects and positions remote supervision as a technology-supported complement to on-site supervision. The purpose is to improve the ability to observe and document work while preserving the professional responsibility attached to structural supervision ([BCA Annual Report 2024\/2025, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)).\n\n## Version 2 and the industry framework\n\nVersion 2 is an update to the guidebook rather than a new category of structural approval. BCA lists the guidebook among the resources relevant to structural-plan applications, while the July 2026 circular was issued jointly with the Association of Consulting Engineers Singapore, Institution of Engineers Singapore and Singapore Contractors Association Limited. The version update should therefore be read with the current structural-plan, permit and supervision framework and with any project-specific directions applying to the works ([BCA Guidelines for ST Plan Applications, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA Circulars, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)).\n\n## Relationship to physical supervision and records\n\nRemote site supervision does not mean that structural works become unsupervised or that a video connection alone proves conformity. QPs and site supervisors remain responsible for determining whether remote methods are suitable and for meeting the applicable supervision and record requirements. BCA's annual report describes the approach as technology that complements physical supervision, so project teams must retain the required professional reviews, evidence and on-site controls rather than treating remote observation as a blanket substitute ([BCA Annual Report 2024\/2025, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)).\n\n## What the guidebook does not establish\n\nThe guidebook is a good-practice and implementation resource. It does not by itself approve a structural plan, appoint a QP, alter the Building Control Act or remove requirements for permits, site supervision, inspection, testing or records. Whether remote supervision can be used, and how it must be implemented, depends on the current BCA framework, the QP's professional assessment, the type and risk of work, and the project's applicable conditions.","summary":"BCA's Guidebook for Remote Site Supervision (Structural Works) provides good practices for using technology to complement physical supervision by Qualified Persons and site supervisors, with Version 2 issued through a July 2026 joint industry circular.","title":"Remote Site Supervision for Structural Works"},"zh":{"markdown":"# \u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\n\n\u65b0\u52a0\u5761\u5efa\u7b51\u4e0e\u5efa\u8bbe\u5c40\uff08BCA\uff09\u5c06\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u7eb3\u5165\u5176\u7ed3\u6784\u56fe\u5219\u76f8\u5173\u6307\u5357\u3002\u8be5\u6307\u5357\u4ecb\u7ecd\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\uff08QP\uff09\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u7684\u826f\u597d\u505a\u6cd5\u3002BCA\/ACES\/IES\/SCAL \u4e8e 15 \u65e5\u4e03\u6708 2026 \u8054\u5408\u53d1\u5e03\u901a\u544a\uff0c\u5ba3\u5e03\u7b2c 2 \u7248\uff08[BCA \u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u6307\u5357\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA \u901a\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)\uff09\u3002\n\n## \u8fdc\u7a0b\u76d1\u7763\u7684\u7f18\u7531\n\n\u5f53\u7ed3\u6784\u5de5\u7a0b\u6216\u5236\u9020\u5de5\u4f5c\u9700\u8981\u8de8\u5730\u70b9\u89c2\u5bdf\u65f6\uff0c\u8fdc\u7a0b\u76d1\u7763\u53ef\u5e94\u5bf9\u76f8\u5173\u60c5\u51b5\uff0c\u5305\u62ec\u672c\u5730\u548c\u6d77\u5916\u5236\u9020\u573a\u5730\u4ee5\u53ca\u5efa\u7b51\u5de5\u5730\u3002BCA \u5e74\u5ea6\u62a5\u544a\u4ecb\u7ecd\u4e86\u4e3b\u8981\u57fa\u7840\u8bbe\u65bd\u548c\u79c1\u4eba\u9879\u76ee\u4e2d\u7684\u8bd5\u70b9\u8ba1\u5212\uff0c\u5e76\u5c06\u8fdc\u7a0b\u76d1\u7763\u5b9a\u4f4d\u4e3a\u73b0\u573a\u76d1\u7763\u7684\u6280\u672f\u8f85\u52a9\u65b9\u5f0f\u3002\u5176\u76ee\u7684\u662f\u63d0\u5347\u89c2\u5bdf\u548c\u8bb0\u5f55\u5de5\u4f5c\u7684\u80fd\u529b\uff0c\u540c\u65f6\u4fdd\u7559\u7ed3\u6784\u76d1\u7763\u6240\u627f\u62c5\u7684\u4e13\u4e1a\u8d23\u4efb\uff08[BCA 2024\/2025 \u5e74\u5ea6\u62a5\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)\uff09\u3002\n\n## \u7b2c 2 \u7248\u4e0e\u884c\u4e1a\u6846\u67b6\n\n\u7b2c 2 \u7248\u662f\u5bf9\u6307\u5357\u7684\u66f4\u65b0\uff0c\u5e76\u975e\u65b0\u7684\u7ed3\u6784\u5ba1\u6279\u7c7b\u522b\u3002BCA \u5c06\u8be5\u6307\u5357\u5217\u4e3a\u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u76f8\u5173\u8d44\u6e90\u4e4b\u4e00\uff1b\u4e03\u6708 2026 \u7684\u901a\u544a\u5219\u7531 BCA \u4e0e\u65b0\u52a0\u5761\u54a8\u8be2\u5de5\u7a0b\u5e08\u534f\u4f1a\u3001\u65b0\u52a0\u5761\u5de5\u7a0b\u5e08\u5b66\u4f1a\u548c\u65b0\u52a0\u5761\u627f\u5305\u5546\u534f\u4f1a\u8054\u5408\u53d1\u5e03\u3002\u56e0\u6b64\uff0c\u5e94\u7ed3\u5408\u73b0\u884c\u7ed3\u6784\u56fe\u5219\u3001\u8bb8\u53ef\u8bc1\u548c\u76d1\u7763\u6846\u67b6\uff0c\u4ee5\u53ca\u9002\u7528\u4e8e\u76f8\u5173\u5de5\u7a0b\u7684\u4efb\u4f55\u9879\u76ee\u7279\u5b9a\u6307\u793a\u6765\u7406\u89e3\u8fd9\u4e00\u7248\u672c\u66f4\u65b0\uff08[BCA \u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u6307\u5357\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA \u901a\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)\uff09\u3002\n\n## \u4e0e\u5b9e\u4f53\u76d1\u7763\u548c\u8bb0\u5f55\u7684\u5173\u7cfb\n\n\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u5e76\u4e0d\u610f\u5473\u7740\u7ed3\u6784\u5de5\u7a0b\u65e0\u4eba\u76d1\u7763\uff0c\u4e5f\u4e0d\u610f\u5473\u7740\u4ec5\u51ed\u89c6\u9891\u8fde\u63a5\u5c31\u80fd\u8bc1\u660e\u7b26\u5408\u8981\u6c42\u3002QP \u548c\u73b0\u573a\u4e3b\u7ba1\u4ecd\u987b\u8d1f\u8d23\u5224\u65ad\u8fdc\u7a0b\u65b9\u6cd5\u662f\u5426\u9002\u7528\uff0c\u5e76\u6ee1\u8db3\u9002\u7528\u7684\u76d1\u7763\u548c\u8bb0\u5f55\u8981\u6c42\u3002BCA \u5e74\u5ea6\u62a5\u544a\u5c06\u6b64\u65b9\u6cd5\u63cf\u8ff0\u4e3a\u8865\u5145\u5b9e\u4f53\u76d1\u7763\u7684\u6280\u672f\uff0c\u56e0\u6b64\u9879\u76ee\u56e2\u961f\u5fc5\u987b\u4fdd\u7559\u6240\u9700\u7684\u4e13\u4e1a\u5ba1\u67e5\u3001\u8bc1\u636e\u548c\u73b0\u573a\u7ba1\u63a7\uff0c\u4e0d\u5e94\u5c06\u8fdc\u7a0b\u89c2\u5bdf\u89c6\u4e3a\u4e00\u6982\u9002\u7528\u7684\u66ff\u4ee3\u65b9\u5f0f\uff08[BCA 2024\/2025 \u5e74\u5ea6\u62a5\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)\uff09\u3002\n\n## \u6307\u5357\u672a\u786e\u7acb\u7684\u4e8b\u9879\n\n\u8be5\u6307\u5357\u662f\u826f\u597d\u505a\u6cd5\u548c\u5b9e\u65bd\u53c2\u8003\u8d44\u6599\u3002\u5b83\u672c\u8eab\u4e0d\u4f1a\u6279\u51c6\u7ed3\u6784\u56fe\u5219\u3001\u59d4\u4efb QP\u3001\u4fee\u8ba2\u300a\u5efa\u7b51\u7ba1\u5236\u6cd5\u300b\uff0c\u4e5f\u4e0d\u4f1a\u53d6\u6d88\u8bb8\u53ef\u8bc1\u3001\u73b0\u573a\u76d1\u7763\u3001\u68c0\u67e5\u3001\u6d4b\u8bd5\u6216\u8bb0\u5f55\u65b9\u9762\u7684\u8981\u6c42\u3002\u80fd\u5426\u91c7\u7528\u8fdc\u7a0b\u76d1\u7763\u4ee5\u53ca\u5fc5\u987b\u5982\u4f55\u5b9e\u65bd\uff0c\u53d6\u51b3\u4e8e BCA \u73b0\u884c\u6846\u67b6\u3001QP \u7684\u4e13\u4e1a\u8bc4\u4f30\u3001\u5de5\u7a0b\u7c7b\u578b\u548c\u98ce\u9669\uff0c\u4ee5\u53ca\u9879\u76ee\u9002\u7528\u6761\u4ef6\u3002","summary":"BCA \u7684\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u4ecb\u7ecd\u5982\u4f55\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u505a\u6cd5\uff1b\u7b2c 2 \u7248\u901a\u8fc7 \u4e03\u6708 2026 \u7684\u884c\u4e1a\u8054\u5408\u901a\u544a\u53d1\u5e03\u3002","title":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763"}},"source_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","status":"verified","summary_en":"BCA's Guidebook for Remote Site Supervision (Structural Works) provides good practices for using technology to complement physical supervision by Qualified Persons and site supervisors, with Version 2 issued through a July 2026 joint industry circular.","summary_zh":"BCA \u7684\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u4ecb\u7ecd\u5982\u4f55\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u505a\u6cd5\uff1b\u7b2c 2 \u7248\u901a\u8fc7 \u4e03\u6708 2026 \u7684\u884c\u4e1a\u8054\u5408\u901a\u544a\u53d1\u5e03\u3002","title_en":"Remote Site Supervision for Structural Works","title_zh":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763","wiki":{"domain":"geography-urban-planning","last_verified":"2026-09-02","locales":{"en":{"markdown":"# Remote Site Supervision for Structural Works\n\nSingapore's Building and Construction Authority (BCA) maintains a Guidebook for Remote Site Supervision (Structural Works) as part of its structural-plan guidance. The guidebook describes good practices for using technology to complement physical supervision by Qualified Persons (QPs) and site supervisors. A joint BCA\/ACES\/IES\/SCAL circular dated 15 July 2026 announced Version 2 ([BCA Guidelines for ST Plan Applications, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA Circulars, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)).\n\n## Why remote supervision exists\n\nRemote supervision addresses situations where structural work or fabrication needs to be observed across locations, including local and overseas fabrication yards and construction sites. BCA's annual report describes pilot programmes across major infrastructure and private projects and positions remote supervision as a technology-supported complement to on-site supervision. The purpose is to improve the ability to observe and document work while preserving the professional responsibility attached to structural supervision ([BCA Annual Report 2024\/2025, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)).\n\n## Version 2 and the industry framework\n\nVersion 2 is an update to the guidebook rather than a new category of structural approval. BCA lists the guidebook among the resources relevant to structural-plan applications, while the July 2026 circular was issued jointly with the Association of Consulting Engineers Singapore, Institution of Engineers Singapore and Singapore Contractors Association Limited. The version update should therefore be read with the current structural-plan, permit and supervision framework and with any project-specific directions applying to the works ([BCA Guidelines for ST Plan Applications, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA Circulars, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)).\n\n## Relationship to physical supervision and records\n\nRemote site supervision does not mean that structural works become unsupervised or that a video connection alone proves conformity. QPs and site supervisors remain responsible for determining whether remote methods are suitable and for meeting the applicable supervision and record requirements. BCA's annual report describes the approach as technology that complements physical supervision, so project teams must retain the required professional reviews, evidence and on-site controls rather than treating remote observation as a blanket substitute ([BCA Annual Report 2024\/2025, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)).\n\n## What the guidebook does not establish\n\nThe guidebook is a good-practice and implementation resource. It does not by itself approve a structural plan, appoint a QP, alter the Building Control Act or remove requirements for permits, site supervision, inspection, testing or records. Whether remote supervision can be used, and how it must be implemented, depends on the current BCA framework, the QP's professional assessment, the type and risk of work, and the project's applicable conditions.","summary":"BCA's Guidebook for Remote Site Supervision (Structural Works) provides good practices for using technology to complement physical supervision by Qualified Persons and site supervisors, with Version 2 issued through a July 2026 joint industry circular.","title":"Remote Site Supervision for Structural Works"},"zh":{"markdown":"# \u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\n\n\u65b0\u52a0\u5761\u5efa\u7b51\u4e0e\u5efa\u8bbe\u5c40\uff08BCA\uff09\u5c06\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u7eb3\u5165\u5176\u7ed3\u6784\u56fe\u5219\u76f8\u5173\u6307\u5357\u3002\u8be5\u6307\u5357\u4ecb\u7ecd\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\uff08QP\uff09\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u7684\u826f\u597d\u505a\u6cd5\u3002BCA\/ACES\/IES\/SCAL \u4e8e 15 \u65e5\u4e03\u6708 2026 \u8054\u5408\u53d1\u5e03\u901a\u544a\uff0c\u5ba3\u5e03\u7b2c 2 \u7248\uff08[BCA \u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u6307\u5357\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA \u901a\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)\uff09\u3002\n\n## \u8fdc\u7a0b\u76d1\u7763\u7684\u7f18\u7531\n\n\u5f53\u7ed3\u6784\u5de5\u7a0b\u6216\u5236\u9020\u5de5\u4f5c\u9700\u8981\u8de8\u5730\u70b9\u89c2\u5bdf\u65f6\uff0c\u8fdc\u7a0b\u76d1\u7763\u53ef\u5e94\u5bf9\u76f8\u5173\u60c5\u51b5\uff0c\u5305\u62ec\u672c\u5730\u548c\u6d77\u5916\u5236\u9020\u573a\u5730\u4ee5\u53ca\u5efa\u7b51\u5de5\u5730\u3002BCA \u5e74\u5ea6\u62a5\u544a\u4ecb\u7ecd\u4e86\u4e3b\u8981\u57fa\u7840\u8bbe\u65bd\u548c\u79c1\u4eba\u9879\u76ee\u4e2d\u7684\u8bd5\u70b9\u8ba1\u5212\uff0c\u5e76\u5c06\u8fdc\u7a0b\u76d1\u7763\u5b9a\u4f4d\u4e3a\u73b0\u573a\u76d1\u7763\u7684\u6280\u672f\u8f85\u52a9\u65b9\u5f0f\u3002\u5176\u76ee\u7684\u662f\u63d0\u5347\u89c2\u5bdf\u548c\u8bb0\u5f55\u5de5\u4f5c\u7684\u80fd\u529b\uff0c\u540c\u65f6\u4fdd\u7559\u7ed3\u6784\u76d1\u7763\u6240\u627f\u62c5\u7684\u4e13\u4e1a\u8d23\u4efb\uff08[BCA 2024\/2025 \u5e74\u5ea6\u62a5\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)\uff09\u3002\n\n## \u7b2c 2 \u7248\u4e0e\u884c\u4e1a\u6846\u67b6\n\n\u7b2c 2 \u7248\u662f\u5bf9\u6307\u5357\u7684\u66f4\u65b0\uff0c\u5e76\u975e\u65b0\u7684\u7ed3\u6784\u5ba1\u6279\u7c7b\u522b\u3002BCA \u5c06\u8be5\u6307\u5357\u5217\u4e3a\u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u76f8\u5173\u8d44\u6e90\u4e4b\u4e00\uff1b\u4e03\u6708 2026 \u7684\u901a\u544a\u5219\u7531 BCA \u4e0e\u65b0\u52a0\u5761\u54a8\u8be2\u5de5\u7a0b\u5e08\u534f\u4f1a\u3001\u65b0\u52a0\u5761\u5de5\u7a0b\u5e08\u5b66\u4f1a\u548c\u65b0\u52a0\u5761\u627f\u5305\u5546\u534f\u4f1a\u8054\u5408\u53d1\u5e03\u3002\u56e0\u6b64\uff0c\u5e94\u7ed3\u5408\u73b0\u884c\u7ed3\u6784\u56fe\u5219\u3001\u8bb8\u53ef\u8bc1\u548c\u76d1\u7763\u6846\u67b6\uff0c\u4ee5\u53ca\u9002\u7528\u4e8e\u76f8\u5173\u5de5\u7a0b\u7684\u4efb\u4f55\u9879\u76ee\u7279\u5b9a\u6307\u793a\u6765\u7406\u89e3\u8fd9\u4e00\u7248\u672c\u66f4\u65b0\uff08[BCA \u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u6307\u5357\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA \u901a\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)\uff09\u3002\n\n## \u4e0e\u5b9e\u4f53\u76d1\u7763\u548c\u8bb0\u5f55\u7684\u5173\u7cfb\n\n\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u5e76\u4e0d\u610f\u5473\u7740\u7ed3\u6784\u5de5\u7a0b\u65e0\u4eba\u76d1\u7763\uff0c\u4e5f\u4e0d\u610f\u5473\u7740\u4ec5\u51ed\u89c6\u9891\u8fde\u63a5\u5c31\u80fd\u8bc1\u660e\u7b26\u5408\u8981\u6c42\u3002QP \u548c\u73b0\u573a\u4e3b\u7ba1\u4ecd\u987b\u8d1f\u8d23\u5224\u65ad\u8fdc\u7a0b\u65b9\u6cd5\u662f\u5426\u9002\u7528\uff0c\u5e76\u6ee1\u8db3\u9002\u7528\u7684\u76d1\u7763\u548c\u8bb0\u5f55\u8981\u6c42\u3002BCA \u5e74\u5ea6\u62a5\u544a\u5c06\u6b64\u65b9\u6cd5\u63cf\u8ff0\u4e3a\u8865\u5145\u5b9e\u4f53\u76d1\u7763\u7684\u6280\u672f\uff0c\u56e0\u6b64\u9879\u76ee\u56e2\u961f\u5fc5\u987b\u4fdd\u7559\u6240\u9700\u7684\u4e13\u4e1a\u5ba1\u67e5\u3001\u8bc1\u636e\u548c\u73b0\u573a\u7ba1\u63a7\uff0c\u4e0d\u5e94\u5c06\u8fdc\u7a0b\u89c2\u5bdf\u89c6\u4e3a\u4e00\u6982\u9002\u7528\u7684\u66ff\u4ee3\u65b9\u5f0f\uff08[BCA 2024\/2025 \u5e74\u5ea6\u62a5\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)\uff09\u3002\n\n## \u6307\u5357\u672a\u786e\u7acb\u7684\u4e8b\u9879\n\n\u8be5\u6307\u5357\u662f\u826f\u597d\u505a\u6cd5\u548c\u5b9e\u65bd\u53c2\u8003\u8d44\u6599\u3002\u5b83\u672c\u8eab\u4e0d\u4f1a\u6279\u51c6\u7ed3\u6784\u56fe\u5219\u3001\u59d4\u4efb QP\u3001\u4fee\u8ba2\u300a\u5efa\u7b51\u7ba1\u5236\u6cd5\u300b\uff0c\u4e5f\u4e0d\u4f1a\u53d6\u6d88\u8bb8\u53ef\u8bc1\u3001\u73b0\u573a\u76d1\u7763\u3001\u68c0\u67e5\u3001\u6d4b\u8bd5\u6216\u8bb0\u5f55\u65b9\u9762\u7684\u8981\u6c42\u3002\u80fd\u5426\u91c7\u7528\u8fdc\u7a0b\u76d1\u7763\u4ee5\u53ca\u5fc5\u987b\u5982\u4f55\u5b9e\u65bd\uff0c\u53d6\u51b3\u4e8e BCA \u73b0\u884c\u6846\u67b6\u3001QP \u7684\u4e13\u4e1a\u8bc4\u4f30\u3001\u5de5\u7a0b\u7c7b\u578b\u548c\u98ce\u9669\uff0c\u4ee5\u53ca\u9879\u76ee\u9002\u7528\u6761\u4ef6\u3002","summary":"BCA \u7684\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u4ecb\u7ecd\u5982\u4f55\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u505a\u6cd5\uff1b\u7b2c 2 \u7248\u901a\u8fc7 \u4e03\u6708 2026 \u7684\u884c\u4e1a\u8054\u5408\u901a\u544a\u53d1\u5e03\u3002","title":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763"}},"path":"geography-urban-planning\/remote-site-supervision-structural-works-2026.md","related_source_ids":["sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","sgkb.geography-urban-planning.ags-sg-site-investigation-data","sgkb.geography-urban-planning.fixed-installations-maintenance-outcome-guidebook-2026"],"source_hash":"afe776586d8842681bce7017e59d069e6c0e022edb0246a466c4582e993f6011","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"title":"BCA \u2014 Circulars","url":"https:\/\/www1.bca.gov.sg\/resources\/circulars\/"},{"title":"BCA \u2014 Annual Report 2024\/2025","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf"}]}},"search_text":"Remote Site Supervision for Structural Works\n\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\nBCA's Guidebook for Remote Site Supervision (Structural Works) provides good practices for using technology to complement physical supervision by Qualified Persons and site supervisors, with Version 2 issued through a July 2026 joint industry circular.\nBCA \u7684\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u4ecb\u7ecd\u5982\u4f55\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u505a\u6cd5\uff1b\u7b2c 2 \u7248\u901a\u8fc7 \u4e03\u6708 2026 \u7684\u884c\u4e1a\u8054\u5408\u901a\u544a\u53d1\u5e03\u3002\n{\"aliases\":[\"Remote Site Supervision guidebook\",\"RSS structural works\",\"Guidebook for Remote Supervision Structural Works\",\"RSS Guidebook Version 2\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026\",\"document_sha256\":\"44b59e25e67c111d686b45e68818b2dbd307d1ee47d7ad4f07debf70db12fd3b\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.agency.bca\"],\"facets\":[\"current\",\"infrastructure\",\"institution\",\"policy\",\"procedure\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-09-02\",\"path\":\"geography-urban-planning\\\/remote-site-supervision-structural-works-2026.md\",\"related\":[\"pre-construction-survey-guidelines-2026\",\"ags-sg-site-investigation-data\",\"fixed-installations-maintenance-outcome-guidebook-2026\"],\"sources\":[{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Guidelines for ST Plan Applications\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/safety-and-standards\\\/applications-and-licenses\\\/structural-plan-submission\\\/guidelines-for-st-plan-applications\\\/\"},{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Circulars\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/resources\\\/circulars\\\/\"},{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Annual Report 2024\\\/2025\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/docs\\\/default-source\\\/docs-corp-news-and-publications\\\/annual-reports\\\/bca-ar-2025.pdf\"}],\"status\":\"verified\",\"summary\":\"BCA's Guidebook for Remote Site Supervision (Structural Works) provides good practices for using technology to complement physical supervision by Qualified Persons and site supervisors, with Version 2 issued through a July 2026 joint industry circular.\",\"tags\":[\"construction\",\"research\",\"policy\",\"how-to\"],\"temporal_scope\":\"current\",\"title\":\"Remote Site Supervision for Structural Works\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.remote-site-supervision-structural-works-2026\"],\"volatility\":\"slow\"}\n# Remote Site Supervision for Structural Works\n\nSingapore's Building and Construction Authority (BCA) maintains a Guidebook for Remote Site Supervision (Structural Works) as part of its structural-plan guidance. The guidebook describes good practices for using technology to complement physical supervision by Qualified Persons (QPs) and site supervisors. A joint BCA\/ACES\/IES\/SCAL circular dated 15 July 2026 announced Version 2 ([BCA Guidelines for ST Plan Applications, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA Circulars, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)).\n\n## Why remote supervision exists\n\nRemote supervision addresses situations where structural work or fabrication needs to be observed across locations, including local and overseas fabrication yards and construction sites. BCA's annual report describes pilot programmes across major infrastructure and private projects and positions remote supervision as a technology-supported complement to on-site supervision. The purpose is to improve the ability to observe and document work while preserving the professional responsibility attached to structural supervision ([BCA Annual Report 2024\/2025, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)).\n\n## Version 2 and the industry framework\n\nVersion 2 is an update to the guidebook rather than a new category of structural approval. BCA lists the guidebook among the resources relevant to structural-plan applications, while the July 2026 circular was issued jointly with the Association of Consulting Engineers Singapore, Institution of Engineers Singapore and Singapore Contractors Association Limited. The version update should therefore be read with the current structural-plan, permit and supervision framework and with any project-specific directions applying to the works ([BCA Guidelines for ST Plan Applications, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA Circulars, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)).\n\n## Relationship to physical supervision and records\n\nRemote site supervision does not mean that structural works become unsupervised or that a video connection alone proves conformity. QPs and site supervisors remain responsible for determining whether remote methods are suitable and for meeting the applicable supervision and record requirements. BCA's annual report describes the approach as technology that complements physical supervision, so project teams must retain the required professional reviews, evidence and on-site controls rather than treating remote observation as a blanket substitute ([BCA Annual Report 2024\/2025, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)).\n\n## What the guidebook does not establish\n\nThe guidebook is a good-practice and implementation resource. It does not by itself approve a structural plan, appoint a QP, alter the Building Control Act or remove requirements for permits, site supervision, inspection, testing or records. Whether remote supervision can be used, and how it must be implemented, depends on the current BCA framework, the QP's professional assessment, the type and risk of work, and the project's applicable conditions.\n# \u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\n\n\u65b0\u52a0\u5761\u5efa\u7b51\u4e0e\u5efa\u8bbe\u5c40\uff08BCA\uff09\u5c06\u300a\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u6307\u5357\u300b\u7eb3\u5165\u5176\u7ed3\u6784\u56fe\u5219\u76f8\u5173\u6307\u5357\u3002\u8be5\u6307\u5357\u4ecb\u7ecd\u8fd0\u7528\u6280\u672f\u4f5c\u4e3a\u5408\u683c\u4eba\u58eb\uff08QP\uff09\u548c\u73b0\u573a\u4e3b\u7ba1\u5b9e\u4f53\u76d1\u7763\u7684\u8865\u5145\u7684\u826f\u597d\u505a\u6cd5\u3002BCA\/ACES\/IES\/SCAL \u4e8e 15 \u65e5\u4e03\u6708 2026 \u8054\u5408\u53d1\u5e03\u901a\u544a\uff0c\u5ba3\u5e03\u7b2c 2 \u7248\uff08[BCA \u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u6307\u5357\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA \u901a\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)\uff09\u3002\n\n## \u8fdc\u7a0b\u76d1\u7763\u7684\u7f18\u7531\n\n\u5f53\u7ed3\u6784\u5de5\u7a0b\u6216\u5236\u9020\u5de5\u4f5c\u9700\u8981\u8de8\u5730\u70b9\u89c2\u5bdf\u65f6\uff0c\u8fdc\u7a0b\u76d1\u7763\u53ef\u5e94\u5bf9\u76f8\u5173\u60c5\u51b5\uff0c\u5305\u62ec\u672c\u5730\u548c\u6d77\u5916\u5236\u9020\u573a\u5730\u4ee5\u53ca\u5efa\u7b51\u5de5\u5730\u3002BCA \u5e74\u5ea6\u62a5\u544a\u4ecb\u7ecd\u4e86\u4e3b\u8981\u57fa\u7840\u8bbe\u65bd\u548c\u79c1\u4eba\u9879\u76ee\u4e2d\u7684\u8bd5\u70b9\u8ba1\u5212\uff0c\u5e76\u5c06\u8fdc\u7a0b\u76d1\u7763\u5b9a\u4f4d\u4e3a\u73b0\u573a\u76d1\u7763\u7684\u6280\u672f\u8f85\u52a9\u65b9\u5f0f\u3002\u5176\u76ee\u7684\u662f\u63d0\u5347\u89c2\u5bdf\u548c\u8bb0\u5f55\u5de5\u4f5c\u7684\u80fd\u529b\uff0c\u540c\u65f6\u4fdd\u7559\u7ed3\u6784\u76d1\u7763\u6240\u627f\u62c5\u7684\u4e13\u4e1a\u8d23\u4efb\uff08[BCA 2024\/2025 \u5e74\u5ea6\u62a5\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)\uff09\u3002\n\n## \u7b2c 2 \u7248\u4e0e\u884c\u4e1a\u6846\u67b6\n\n\u7b2c 2 \u7248\u662f\u5bf9\u6307\u5357\u7684\u66f4\u65b0\uff0c\u5e76\u975e\u65b0\u7684\u7ed3\u6784\u5ba1\u6279\u7c7b\u522b\u3002BCA \u5c06\u8be5\u6307\u5357\u5217\u4e3a\u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u76f8\u5173\u8d44\u6e90\u4e4b\u4e00\uff1b\u4e03\u6708 2026 \u7684\u901a\u544a\u5219\u7531 BCA \u4e0e\u65b0\u52a0\u5761\u54a8\u8be2\u5de5\u7a0b\u5e08\u534f\u4f1a\u3001\u65b0\u52a0\u5761\u5de5\u7a0b\u5e08\u5b66\u4f1a\u548c\u65b0\u52a0\u5761\u627f\u5305\u5546\u534f\u4f1a\u8054\u5408\u53d1\u5e03\u3002\u56e0\u6b64\uff0c\u5e94\u7ed3\u5408\u73b0\u884c\u7ed3\u6784\u56fe\u5219\u3001\u8bb8\u53ef\u8bc1\u548c\u76d1\u7763\u6846\u67b6\uff0c\u4ee5\u53ca\u9002\u7528\u4e8e\u76f8\u5173\u5de5\u7a0b\u7684\u4efb\u4f55\u9879\u76ee\u7279\u5b9a\u6307\u793a\u6765\u7406\u89e3\u8fd9\u4e00\u7248\u672c\u66f4\u65b0\uff08[BCA \u7ed3\u6784\u56fe\u5219\u7533\u8bf7\u6307\u5357\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA \u901a\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/resources\/circulars\/)\uff09\u3002\n\n## \u4e0e\u5b9e\u4f53\u76d1\u7763\u548c\u8bb0\u5f55\u7684\u5173\u7cfb\n\n\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763\u5e76\u4e0d\u610f\u5473\u7740\u7ed3\u6784\u5de5\u7a0b\u65e0\u4eba\u76d1\u7763\uff0c\u4e5f\u4e0d\u610f\u5473\u7740\u4ec5\u51ed\u89c6\u9891\u8fde\u63a5\u5c31\u80fd\u8bc1\u660e\u7b26\u5408\u8981\u6c42\u3002QP \u548c\u73b0\u573a\u4e3b\u7ba1\u4ecd\u987b\u8d1f\u8d23\u5224\u65ad\u8fdc\u7a0b\u65b9\u6cd5\u662f\u5426\u9002\u7528\uff0c\u5e76\u6ee1\u8db3\u9002\u7528\u7684\u76d1\u7763\u548c\u8bb0\u5f55\u8981\u6c42\u3002BCA \u5e74\u5ea6\u62a5\u544a\u5c06\u6b64\u65b9\u6cd5\u63cf\u8ff0\u4e3a\u8865\u5145\u5b9e\u4f53\u76d1\u7763\u7684\u6280\u672f\uff0c\u56e0\u6b64\u9879\u76ee\u56e2\u961f\u5fc5\u987b\u4fdd\u7559\u6240\u9700\u7684\u4e13\u4e1a\u5ba1\u67e5\u3001\u8bc1\u636e\u548c\u73b0\u573a\u7ba1\u63a7\uff0c\u4e0d\u5e94\u5c06\u8fdc\u7a0b\u89c2\u5bdf\u89c6\u4e3a\u4e00\u6982\u9002\u7528\u7684\u66ff\u4ee3\u65b9\u5f0f\uff08[BCA 2024\/2025 \u5e74\u5ea6\u62a5\u544a\uff0c\u67e5\u9605\u4e8e 2 \u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-news-and-publications\/annual-reports\/bca-ar-2025.pdf)\uff09\u3002\n\n## \u6307\u5357\u672a\u786e\u7acb\u7684\u4e8b\u9879\n\n\u8be5\u6307\u5357\u662f\u826f\u597d\u505a\u6cd5\u548c\u5b9e\u65bd\u53c2\u8003\u8d44\u6599\u3002\u5b83\u672c\u8eab\u4e0d\u4f1a\u6279\u51c6\u7ed3\u6784\u56fe\u5219\u3001\u59d4\u4efb QP\u3001\u4fee\u8ba2\u300a\u5efa\u7b51\u7ba1\u5236\u6cd5\u300b\uff0c\u4e5f\u4e0d\u4f1a\u53d6\u6d88\u8bb8\u53ef\u8bc1\u3001\u73b0\u573a\u76d1\u7763\u3001\u68c0\u67e5\u3001\u6d4b\u8bd5\u6216\u8bb0\u5f55\u65b9\u9762\u7684\u8981\u6c42\u3002\u80fd\u5426\u91c7\u7528\u8fdc\u7a0b\u76d1\u7763\u4ee5\u53ca\u5fc5\u987b\u5982\u4f55\u5b9e\u65bd\uff0c\u53d6\u51b3\u4e8e BCA \u73b0\u884c\u6846\u67b6\u3001QP \u7684\u4e13\u4e1a\u8bc4\u4f30\u3001\u5de5\u7a0b\u7c7b\u578b\u548c\u98ce\u9669\uff0c\u4ee5\u53ca\u9879\u76ee\u9002\u7528\u6761\u4ef6\u3002"},"related":[{"id":90399,"source_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","kind":"article","title_en":"AGS(SG) Standardised Site-Investigation Data","title_zh":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e","assurance":null,"subtype":null},{"id":90410,"source_id":"sgkb.geography-urban-planning.fixed-installations-maintenance-outcome-guidebook-2026","kind":"article","title_en":"Fixed Installations Maintenance Outcome Guidebooks 2026","title_zh":"\u56fa\u5b9a\u88c5\u7f6e\u7ef4\u62a4\u6210\u679c\u6307\u5357 2026","assurance":null,"subtype":null},{"id":90428,"source_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","kind":"article","title_en":"Pre-Construction Survey Guidelines","title_zh":"\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357","assurance":null,"subtype":null},{"id":90435,"source_id":"sgkb.geography-urban-planning.site-supervisor-requirements-risk-based-inspection-2026","kind":"article","title_en":"Site Supervisor Requirements and Risk-Based Inspection","title_zh":"\u73b0\u573a\u4e3b\u7ba1\u8981\u6c42\u548c\u57fa\u4e8e\u98ce\u9669\u7684\u68c0\u67e5","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null},{"id":92628,"source_id":"sgtopic.geography-urban-planning.remote-site-supervision-structural-works-2026","kind":"topic","title_en":"Remote Site Supervision for Structural Works","title_zh":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763","assurance":null,"subtype":null}]}