{"release_id":19,"data":{"id":90430,"release_id":19,"source_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","kind":"article","fingerprint":"5bd788f681e131dbf98b6bedc6533b1ce9998fa59c6958bbacb9ed4566c5d9c9","title_en":"Public-Sector Facilities Management Feedback and Procurement Guide 2026","title_zh":"\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-09-03","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["public-sector FM feedback channel","BCA FM Procurement Guide 2026","facilities-management procurement feedback Singapore"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","document_sha256":"d603d1ef56cd61c7bf270b29ee3463f9970ade40c03376a5dc62459e11fda1ae","document_type":"article","domain":"geography-urban-planning","entities":["sg.agency.bca"],"facets":["business","current","infrastructure","law","policy","procedure"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-09-03","path":"geography-urban-planning\/public-sector-fm-feedback-and-procurement-guide-2026.md","related":["built-environment-ai-centre-of-excellence","green-mark-version-7-2026"],"sources":[{"accessed":"2026-09-03","published":"2026-08-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"},{"accessed":"2026-09-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Procuring Facilities Management (FM) Services","url":"https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/"}],"status":"verified","summary":"BCA's 3 August 2026 circular introduces an ad-hoc feedback channel for public-sector facilities-management projects and revises procurement guidance around collaboration, payment and subcontracting practices.","tags":["policy","regulation","how-to"],"temporal_scope":"current","title":"Public-Sector Facilities Management Feedback and Procurement Guide 2026","topics":["sgtopic.geography","sgtopic.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026"],"volatility":"fast"},"date":"2026-09-03","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/public-sector-fm-feedback-and-procurement-guide-2026.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":12,"input_hash":"51002f4800bc0eef2b2fee5f6bbfc85d4c226dabc778d241cdd76043a438011c","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026#overview","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"],"content_sha256":"7bfd728b1badb8e5625d5f355b49e180badb805dd20bcd916e497f150191f1c3","document_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","document_sha256":"d603d1ef56cd61c7bf270b29ee3463f9970ade40c03376a5dc62459e11fda1ae","section_sources":[{"accessed":"2026-09-03","published":"2026-08-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026#ad-hoc-feedback-channel","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"],"content_sha256":"7b7803e0be3c74c6b3f54b8075ad0ab7e90cdc21ef4e3096293e91a76dec234c","document_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","document_sha256":"d603d1ef56cd61c7bf270b29ee3463f9970ade40c03376a5dc62459e11fda1ae","section_sources":[{"accessed":"2026-09-03","published":"2026-08-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026#what-the-revised-procurement-guide-covers","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"],"content_sha256":"83995cbd0110de5eae406654a74da31fa610123802815baf3a87b88d222eceaa","document_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","document_sha256":"d603d1ef56cd61c7bf270b29ee3463f9970ade40c03376a5dc62459e11fda1ae","section_sources":[{"accessed":"2026-09-03","published":"2026-08-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026#payment-subcontracting-and-registration-boundary","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf","https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/"],"content_sha256":"3048a560cb587739da283803af1b005c8fb92801f458914a513be429f2033264","document_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","document_sha256":"d603d1ef56cd61c7bf270b29ee3463f9970ade40c03376a5dc62459e11fda1ae","section_sources":[{"accessed":"2026-09-03","published":"2026-08-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"},{"accessed":"2026-09-03","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Procuring Facilities Management (FM) Services","url":"https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/"}]}],"links":[{"relation":"related","target_id":"sgkb.business-industry.built-environment-ai-centre-of-excellence"},{"relation":"related","target_id":"sgkb.geography-urban-planning.green-mark-version-7-2026"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026"},{"relation":"entities","target_id":"sg.agency.bca"}],"locales":{"en":{"markdown":"# Public-Sector Facilities Management Feedback and Procurement Guide 2026\n\nThe Building and Construction Authority (**BCA**) announced on **3 August 2026** a new feedback channel for public-sector facilities-management (FM) projects and a revised **Guide on FM Procurement**. The circular is addressed to firms registered in BCA's FM Registry and forms part of the sector's effort to improve maintenance quality, collaboration and productivity under manpower and building-stock pressures ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## Ad-hoc feedback channel\n\nThe feedback channel allows FM companies and subcontractors to submit project-specific feedback directly to BCA and government agencies at any time. Firms can describe positive experiences as well as areas for improvement through the feedback form hosted with BCA's FM project systems. BCA says the channel is intended to encourage a more collaborative FM environment, improve standards and support wider adoption of progressive practices over time. It is a feedback and sector-improvement route, not a tender-award mechanism, complaint adjudication guarantee or substitute for contractual remedies ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## What the revised procurement guide covers\n\nBCA says the FM Procurement Guide, first issued in 2021, covers the public-sector FM tender lifecycle: pre-tender preparation, tender preparation and evaluation, and post-tender management. The 2026 revision incorporates stakeholder feedback and focuses on **collaborative contracting**, **progressive payment practices** and **subcontracting practices**. Its guidance includes collaborative approaches, equitable risk allocation, performance and innovation incentives, and clearer communication across the FM value chain ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## Payment, subcontracting and registration boundary\n\nThe revised guide promotes fair, transparent and prompt payment, including performance-linked incentives or deductions and tiered payment mechanisms tied to work done and key performance indicators. It also sets out good practices for fair tendering, clearer contractual terms, appropriate risk allocation and stronger communication between service buyers, FM companies and subcontractors. BCA's wider procurement page states that firms intending to tender for public-sector integrated FM or managing-agent services must hold the relevant **FM01** registration; the guide does not itself create a new grant or replace the FM Registry's registration requirements ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf); [BCA, accessed 3 September 2026](https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/)).","summary":"BCA's 3 August 2026 circular introduces an ad-hoc feedback channel for public-sector facilities-management projects and revises procurement guidance around collaboration, payment and subcontracting practices.","title":"Public-Sector Facilities Management Feedback and Procurement Guide 2026"},"zh":{"markdown":"# \u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026\n\n\u5efa\u7b51\u4e0e\u5efa\u8bbe\u5c40\uff08**BCA**\uff09\u4e8e **3 \u65e5\u516b\u6708 2026** \u5ba3\u5e03\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\uff08FM\uff09\u9879\u76ee\u8bbe\u7acb\u65b0\u7684\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2 **FM \u91c7\u8d2d\u6307\u5357**\u3002\u8be5\u901a\u544a\u9762\u5411\u5728 BCA \u7684 FM \u6ce8\u518c\u540d\u5f55\u767b\u8bb0\u7684\u516c\u53f8\uff0c\u662f\u8be5\u884c\u4e1a\u5728\u52b3\u52a8\u529b\u548c\u5efa\u7b51\u5b58\u91cf\u538b\u529b\u4e0b\u63d0\u5347\u7ef4\u62a4\u8d28\u91cf\u3001\u534f\u4f5c\u548c\u751f\u4ea7\u529b\u5de5\u4f5c\u7684\u4e00\u90e8\u5206\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4e34\u65f6\u53cd\u9988\u6e20\u9053\n\n\u8be5\u53cd\u9988\u6e20\u9053\u5141\u8bb8 FM \u516c\u53f8\u548c\u5206\u5305\u5546\u968f\u65f6\u5411 BCA \u548c\u653f\u5e9c\u673a\u6784\u76f4\u63a5\u63d0\u4ea4\u9488\u5bf9\u5177\u4f53\u9879\u76ee\u7684\u53cd\u9988\u3002\u516c\u53f8\u53ef\u901a\u8fc7\u4e0e BCA \u7684 FM \u9879\u76ee\u7cfb\u7edf\u914d\u5957\u7684\u53cd\u9988\u8868\uff0c\u63cf\u8ff0\u826f\u597d\u4f53\u9a8c\u4ee5\u53ca\u6709\u5f85\u6539\u8fdb\u4e4b\u5904\u3002BCA \u8868\u793a\uff0c\u8be5\u6e20\u9053\u65e8\u5728\u9f13\u52b1\u66f4\u5177\u534f\u4f5c\u6027\u7684 FM \u73af\u5883\u3001\u63d0\u5347\u6807\u51c6\uff0c\u5e76\u652f\u6301\u6e10\u8fdb\u5f0f\u505a\u6cd5\u968f\u7740\u65f6\u95f4\u63a8\u79fb\u5f97\u5230\u66f4\u5e7f\u6cdb\u7684\u91c7\u7528\u3002\u8fd9\u662f\u4e00\u4e2a\u53cd\u9988\u548c\u884c\u4e1a\u6539\u8fdb\u6e20\u9053\uff0c\u5e76\u975e\u6295\u6807\u6388\u6807\u673a\u5236\u3001\u6295\u8bc9\u88c1\u51b3\u4fdd\u8bc1\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u5408\u540c\u6551\u6d4e\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4fee\u8ba2\u7248\u91c7\u8d2d\u6307\u5357\u7684\u5185\u5bb9\n\nBCA \u8868\u793a\uff0cFM \u91c7\u8d2d\u6307\u5357\u4e8e 2021 \u5e74\u9996\u6b21\u53d1\u5e03\uff0c\u6db5\u76d6\u516c\u5171\u90e8\u95e8 FM \u62db\u6807\u5468\u671f\uff1a\u62db\u6807\u524d\u51c6\u5907\u3001\u62db\u6807\u51c6\u5907\u4e0e\u8bc4\u4f30\uff0c\u4ee5\u53ca\u62db\u6807\u540e\u7ba1\u7406\u30022026 \u5e74\u4fee\u8ba2\u7248\u7eb3\u5165\u4e86\u5229\u76ca\u76f8\u5173\u65b9\u7684\u53cd\u9988\uff0c\u5e76\u91cd\u70b9\u5173\u6ce8 **\u534f\u4f5c\u5f0f\u5408\u540c**\u3001**\u6e10\u8fdb\u5f0f\u4ed8\u6b3e\u505a\u6cd5** \u548c **\u5206\u5305\u505a\u6cd5**\u3002\u6307\u5357\u5305\u62ec\u534f\u4f5c\u65b9\u6cd5\u3001\u516c\u5e73\u7684\u98ce\u9669\u5206\u914d\u3001\u7ee9\u6548\u548c\u521b\u65b0\u6fc0\u52b1\uff0c\u4ee5\u53ca FM \u4ef7\u503c\u94fe\u4e2d\u66f4\u6e05\u6670\u7684\u6c9f\u901a\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4ed8\u6b3e\u3001\u5206\u5305\u4e0e\u6ce8\u518c\u8303\u56f4\n\n\u4fee\u8ba2\u7248\u6307\u5357\u63d0\u5021\u516c\u5e73\u3001\u900f\u660e\u548c\u53ca\u65f6\u4ed8\u6b3e\uff0c\u5305\u62ec\u4e0e\u7ee9\u6548\u6302\u94a9\u7684\u5956\u52b1\u6216\u6263\u6b3e\uff0c\u4ee5\u53ca\u4e0e\u5df2\u5b8c\u6210\u5de5\u4f5c\u548c\u5173\u952e\u7ee9\u6548\u6307\u6807\u6302\u94a9\u7684\u5206\u7ea7\u4ed8\u6b3e\u673a\u5236\u3002\u6307\u5357\u8fd8\u5217\u51fa\u516c\u5e73\u62db\u6807\u3001\u66f4\u6e05\u6670\u7684\u5408\u540c\u6761\u6b3e\u3001\u9002\u5f53\u7684\u98ce\u9669\u5206\u914d\uff0c\u4ee5\u53ca\u52a0\u5f3a\u670d\u52a1\u91c7\u8d2d\u65b9\u3001FM \u516c\u53f8\u548c\u5206\u5305\u5546\u4e4b\u95f4\u6c9f\u901a\u7684\u826f\u597d\u505a\u6cd5\u3002BCA \u7684\u7efc\u5408\u91c7\u8d2d\u7f51\u9875\u6307\u51fa\uff0c\u62df\u6295\u6807\u516c\u5171\u90e8\u95e8\u7efc\u5408 FM \u670d\u52a1\u6216\u7ba1\u7406\u4ee3\u7406\u670d\u52a1\u7684\u516c\u53f8\u5fc5\u987b\u6301\u6709\u76f8\u5173 **FM01** \u6ce8\u518c\uff1b\u8be5\u6307\u5357\u672c\u8eab\u4e0d\u4f1a\u8bbe\u7acb\u65b0\u7684\u62e8\u6b3e\uff0c\u4e5f\u4e0d\u4f1a\u53d6\u4ee3 FM \u6ce8\u518c\u540d\u5f55\u7684\u6ce8\u518c\u8981\u6c42\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff1b[BCA\uff0c\u67e5\u9605\u4e8e 3 \u65e5\u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/)\uff09\u3002","summary":"BCA \u4e8e 3 \u65e5\u516b\u6708 2026 \u53d1\u5e03\u7684\u901a\u544a\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u9879\u76ee\u5f15\u5165\u4e34\u65f6\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2\u6709\u5173\u534f\u4f5c\u3001\u4ed8\u6b3e\u548c\u5206\u5305\u505a\u6cd5\u7684\u91c7\u8d2d\u6307\u5357\u3002","title":"\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026"}},"source_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","status":"verified","summary_en":"BCA's 3 August 2026 circular introduces an ad-hoc feedback channel for public-sector facilities-management projects and revises procurement guidance around collaboration, payment and subcontracting practices.","summary_zh":"BCA \u4e8e 3 \u65e5\u516b\u6708 2026 \u53d1\u5e03\u7684\u901a\u544a\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u9879\u76ee\u5f15\u5165\u4e34\u65f6\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2\u6709\u5173\u534f\u4f5c\u3001\u4ed8\u6b3e\u548c\u5206\u5305\u505a\u6cd5\u7684\u91c7\u8d2d\u6307\u5357\u3002","title_en":"Public-Sector Facilities Management Feedback and Procurement Guide 2026","title_zh":"\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026","wiki":{"domain":"geography-urban-planning","last_verified":"2026-09-03","locales":{"en":{"markdown":"# Public-Sector Facilities Management Feedback and Procurement Guide 2026\n\nThe Building and Construction Authority (**BCA**) announced on **3 August 2026** a new feedback channel for public-sector facilities-management (FM) projects and a revised **Guide on FM Procurement**. The circular is addressed to firms registered in BCA's FM Registry and forms part of the sector's effort to improve maintenance quality, collaboration and productivity under manpower and building-stock pressures ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## Ad-hoc feedback channel\n\nThe feedback channel allows FM companies and subcontractors to submit project-specific feedback directly to BCA and government agencies at any time. Firms can describe positive experiences as well as areas for improvement through the feedback form hosted with BCA's FM project systems. BCA says the channel is intended to encourage a more collaborative FM environment, improve standards and support wider adoption of progressive practices over time. It is a feedback and sector-improvement route, not a tender-award mechanism, complaint adjudication guarantee or substitute for contractual remedies ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## What the revised procurement guide covers\n\nBCA says the FM Procurement Guide, first issued in 2021, covers the public-sector FM tender lifecycle: pre-tender preparation, tender preparation and evaluation, and post-tender management. The 2026 revision incorporates stakeholder feedback and focuses on **collaborative contracting**, **progressive payment practices** and **subcontracting practices**. Its guidance includes collaborative approaches, equitable risk allocation, performance and innovation incentives, and clearer communication across the FM value chain ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## Payment, subcontracting and registration boundary\n\nThe revised guide promotes fair, transparent and prompt payment, including performance-linked incentives or deductions and tiered payment mechanisms tied to work done and key performance indicators. It also sets out good practices for fair tendering, clearer contractual terms, appropriate risk allocation and stronger communication between service buyers, FM companies and subcontractors. BCA's wider procurement page states that firms intending to tender for public-sector integrated FM or managing-agent services must hold the relevant **FM01** registration; the guide does not itself create a new grant or replace the FM Registry's registration requirements ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf); [BCA, accessed 3 September 2026](https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/)).","summary":"BCA's 3 August 2026 circular introduces an ad-hoc feedback channel for public-sector facilities-management projects and revises procurement guidance around collaboration, payment and subcontracting practices.","title":"Public-Sector Facilities Management Feedback and Procurement Guide 2026"},"zh":{"markdown":"# \u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026\n\n\u5efa\u7b51\u4e0e\u5efa\u8bbe\u5c40\uff08**BCA**\uff09\u4e8e **3 \u65e5\u516b\u6708 2026** \u5ba3\u5e03\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\uff08FM\uff09\u9879\u76ee\u8bbe\u7acb\u65b0\u7684\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2 **FM \u91c7\u8d2d\u6307\u5357**\u3002\u8be5\u901a\u544a\u9762\u5411\u5728 BCA \u7684 FM \u6ce8\u518c\u540d\u5f55\u767b\u8bb0\u7684\u516c\u53f8\uff0c\u662f\u8be5\u884c\u4e1a\u5728\u52b3\u52a8\u529b\u548c\u5efa\u7b51\u5b58\u91cf\u538b\u529b\u4e0b\u63d0\u5347\u7ef4\u62a4\u8d28\u91cf\u3001\u534f\u4f5c\u548c\u751f\u4ea7\u529b\u5de5\u4f5c\u7684\u4e00\u90e8\u5206\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4e34\u65f6\u53cd\u9988\u6e20\u9053\n\n\u8be5\u53cd\u9988\u6e20\u9053\u5141\u8bb8 FM \u516c\u53f8\u548c\u5206\u5305\u5546\u968f\u65f6\u5411 BCA \u548c\u653f\u5e9c\u673a\u6784\u76f4\u63a5\u63d0\u4ea4\u9488\u5bf9\u5177\u4f53\u9879\u76ee\u7684\u53cd\u9988\u3002\u516c\u53f8\u53ef\u901a\u8fc7\u4e0e BCA \u7684 FM \u9879\u76ee\u7cfb\u7edf\u914d\u5957\u7684\u53cd\u9988\u8868\uff0c\u63cf\u8ff0\u826f\u597d\u4f53\u9a8c\u4ee5\u53ca\u6709\u5f85\u6539\u8fdb\u4e4b\u5904\u3002BCA \u8868\u793a\uff0c\u8be5\u6e20\u9053\u65e8\u5728\u9f13\u52b1\u66f4\u5177\u534f\u4f5c\u6027\u7684 FM \u73af\u5883\u3001\u63d0\u5347\u6807\u51c6\uff0c\u5e76\u652f\u6301\u6e10\u8fdb\u5f0f\u505a\u6cd5\u968f\u7740\u65f6\u95f4\u63a8\u79fb\u5f97\u5230\u66f4\u5e7f\u6cdb\u7684\u91c7\u7528\u3002\u8fd9\u662f\u4e00\u4e2a\u53cd\u9988\u548c\u884c\u4e1a\u6539\u8fdb\u6e20\u9053\uff0c\u5e76\u975e\u6295\u6807\u6388\u6807\u673a\u5236\u3001\u6295\u8bc9\u88c1\u51b3\u4fdd\u8bc1\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u5408\u540c\u6551\u6d4e\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4fee\u8ba2\u7248\u91c7\u8d2d\u6307\u5357\u7684\u5185\u5bb9\n\nBCA \u8868\u793a\uff0cFM \u91c7\u8d2d\u6307\u5357\u4e8e 2021 \u5e74\u9996\u6b21\u53d1\u5e03\uff0c\u6db5\u76d6\u516c\u5171\u90e8\u95e8 FM \u62db\u6807\u5468\u671f\uff1a\u62db\u6807\u524d\u51c6\u5907\u3001\u62db\u6807\u51c6\u5907\u4e0e\u8bc4\u4f30\uff0c\u4ee5\u53ca\u62db\u6807\u540e\u7ba1\u7406\u30022026 \u5e74\u4fee\u8ba2\u7248\u7eb3\u5165\u4e86\u5229\u76ca\u76f8\u5173\u65b9\u7684\u53cd\u9988\uff0c\u5e76\u91cd\u70b9\u5173\u6ce8 **\u534f\u4f5c\u5f0f\u5408\u540c**\u3001**\u6e10\u8fdb\u5f0f\u4ed8\u6b3e\u505a\u6cd5** \u548c **\u5206\u5305\u505a\u6cd5**\u3002\u6307\u5357\u5305\u62ec\u534f\u4f5c\u65b9\u6cd5\u3001\u516c\u5e73\u7684\u98ce\u9669\u5206\u914d\u3001\u7ee9\u6548\u548c\u521b\u65b0\u6fc0\u52b1\uff0c\u4ee5\u53ca FM \u4ef7\u503c\u94fe\u4e2d\u66f4\u6e05\u6670\u7684\u6c9f\u901a\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4ed8\u6b3e\u3001\u5206\u5305\u4e0e\u6ce8\u518c\u8303\u56f4\n\n\u4fee\u8ba2\u7248\u6307\u5357\u63d0\u5021\u516c\u5e73\u3001\u900f\u660e\u548c\u53ca\u65f6\u4ed8\u6b3e\uff0c\u5305\u62ec\u4e0e\u7ee9\u6548\u6302\u94a9\u7684\u5956\u52b1\u6216\u6263\u6b3e\uff0c\u4ee5\u53ca\u4e0e\u5df2\u5b8c\u6210\u5de5\u4f5c\u548c\u5173\u952e\u7ee9\u6548\u6307\u6807\u6302\u94a9\u7684\u5206\u7ea7\u4ed8\u6b3e\u673a\u5236\u3002\u6307\u5357\u8fd8\u5217\u51fa\u516c\u5e73\u62db\u6807\u3001\u66f4\u6e05\u6670\u7684\u5408\u540c\u6761\u6b3e\u3001\u9002\u5f53\u7684\u98ce\u9669\u5206\u914d\uff0c\u4ee5\u53ca\u52a0\u5f3a\u670d\u52a1\u91c7\u8d2d\u65b9\u3001FM \u516c\u53f8\u548c\u5206\u5305\u5546\u4e4b\u95f4\u6c9f\u901a\u7684\u826f\u597d\u505a\u6cd5\u3002BCA \u7684\u7efc\u5408\u91c7\u8d2d\u7f51\u9875\u6307\u51fa\uff0c\u62df\u6295\u6807\u516c\u5171\u90e8\u95e8\u7efc\u5408 FM \u670d\u52a1\u6216\u7ba1\u7406\u4ee3\u7406\u670d\u52a1\u7684\u516c\u53f8\u5fc5\u987b\u6301\u6709\u76f8\u5173 **FM01** \u6ce8\u518c\uff1b\u8be5\u6307\u5357\u672c\u8eab\u4e0d\u4f1a\u8bbe\u7acb\u65b0\u7684\u62e8\u6b3e\uff0c\u4e5f\u4e0d\u4f1a\u53d6\u4ee3 FM \u6ce8\u518c\u540d\u5f55\u7684\u6ce8\u518c\u8981\u6c42\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff1b[BCA\uff0c\u67e5\u9605\u4e8e 3 \u65e5\u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/)\uff09\u3002","summary":"BCA \u4e8e 3 \u65e5\u516b\u6708 2026 \u53d1\u5e03\u7684\u901a\u544a\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u9879\u76ee\u5f15\u5165\u4e34\u65f6\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2\u6709\u5173\u534f\u4f5c\u3001\u4ed8\u6b3e\u548c\u5206\u5305\u505a\u6cd5\u7684\u91c7\u8d2d\u6307\u5357\u3002","title":"\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026"}},"path":"geography-urban-planning\/public-sector-fm-feedback-and-procurement-guide-2026.md","related_source_ids":["sgkb.business-industry.built-environment-ai-centre-of-excellence","sgkb.geography-urban-planning.green-mark-version-7-2026"],"source_hash":"51002f4800bc0eef2b2fee5f6bbfc85d4c226dabc778d241cdd76043a438011c","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf"},{"title":"BCA \u2014 Procuring Facilities Management (FM) Services","url":"https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/"}]}},"search_text":"Public-Sector Facilities Management Feedback and Procurement Guide 2026\n\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026\nBCA's 3 August 2026 circular introduces an ad-hoc feedback channel for public-sector facilities-management projects and revises procurement guidance around collaboration, payment and subcontracting practices.\nBCA \u4e8e 3 \u65e5\u516b\u6708 2026 \u53d1\u5e03\u7684\u901a\u544a\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u9879\u76ee\u5f15\u5165\u4e34\u65f6\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2\u6709\u5173\u534f\u4f5c\u3001\u4ed8\u6b3e\u548c\u5206\u5305\u505a\u6cd5\u7684\u91c7\u8d2d\u6307\u5357\u3002\n{\"aliases\":[\"public-sector FM feedback channel\",\"BCA FM Procurement Guide 2026\",\"facilities-management procurement feedback Singapore\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026\",\"document_sha256\":\"d603d1ef56cd61c7bf270b29ee3463f9970ade40c03376a5dc62459e11fda1ae\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.agency.bca\"],\"facets\":[\"business\",\"current\",\"infrastructure\",\"law\",\"policy\",\"procedure\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-09-03\",\"path\":\"geography-urban-planning\\\/public-sector-fm-feedback-and-procurement-guide-2026.md\",\"related\":[\"built-environment-ai-centre-of-excellence\",\"green-mark-version-7-2026\"],\"sources\":[{\"accessed\":\"2026-09-03\",\"published\":\"2026-08-03\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Circular on New Feedback Channel on Public Sector Facilities Management (FM) Projects and Revised Guide on FM Procurement\",\"url\":\"https:\\\/\\\/isomer-user-content.by.gov.sg\\\/338\\\/8c0a94fc-4542-4c79-8219-42355e48b4c8\\\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf\"},{\"accessed\":\"2026-09-03\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Procuring Facilities Management (FM) Services\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/growth-and-transformation\\\/procurement\\\/procurement-and-legal-frameworks\\\/procuring-facilities-management-fm-services\\\/\"}],\"status\":\"verified\",\"summary\":\"BCA's 3 August 2026 circular introduces an ad-hoc feedback channel for public-sector facilities-management projects and revises procurement guidance around collaboration, payment and subcontracting practices.\",\"tags\":[\"policy\",\"regulation\",\"how-to\"],\"temporal_scope\":\"current\",\"title\":\"Public-Sector Facilities Management Feedback and Procurement Guide 2026\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026\"],\"volatility\":\"fast\"}\n# Public-Sector Facilities Management Feedback and Procurement Guide 2026\n\nThe Building and Construction Authority (**BCA**) announced on **3 August 2026** a new feedback channel for public-sector facilities-management (FM) projects and a revised **Guide on FM Procurement**. The circular is addressed to firms registered in BCA's FM Registry and forms part of the sector's effort to improve maintenance quality, collaboration and productivity under manpower and building-stock pressures ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## Ad-hoc feedback channel\n\nThe feedback channel allows FM companies and subcontractors to submit project-specific feedback directly to BCA and government agencies at any time. Firms can describe positive experiences as well as areas for improvement through the feedback form hosted with BCA's FM project systems. BCA says the channel is intended to encourage a more collaborative FM environment, improve standards and support wider adoption of progressive practices over time. It is a feedback and sector-improvement route, not a tender-award mechanism, complaint adjudication guarantee or substitute for contractual remedies ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## What the revised procurement guide covers\n\nBCA says the FM Procurement Guide, first issued in 2021, covers the public-sector FM tender lifecycle: pre-tender preparation, tender preparation and evaluation, and post-tender management. The 2026 revision incorporates stakeholder feedback and focuses on **collaborative contracting**, **progressive payment practices** and **subcontracting practices**. Its guidance includes collaborative approaches, equitable risk allocation, performance and innovation incentives, and clearer communication across the FM value chain ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)).\n\n## Payment, subcontracting and registration boundary\n\nThe revised guide promotes fair, transparent and prompt payment, including performance-linked incentives or deductions and tiered payment mechanisms tied to work done and key performance indicators. It also sets out good practices for fair tendering, clearer contractual terms, appropriate risk allocation and stronger communication between service buyers, FM companies and subcontractors. BCA's wider procurement page states that firms intending to tender for public-sector integrated FM or managing-agent services must hold the relevant **FM01** registration; the guide does not itself create a new grant or replace the FM Registry's registration requirements ([BCA, 3 August 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf); [BCA, accessed 3 September 2026](https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/)).\n# \u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026\n\n\u5efa\u7b51\u4e0e\u5efa\u8bbe\u5c40\uff08**BCA**\uff09\u4e8e **3 \u65e5\u516b\u6708 2026** \u5ba3\u5e03\uff0c\u4e3a\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\uff08FM\uff09\u9879\u76ee\u8bbe\u7acb\u65b0\u7684\u53cd\u9988\u6e20\u9053\uff0c\u5e76\u4fee\u8ba2 **FM \u91c7\u8d2d\u6307\u5357**\u3002\u8be5\u901a\u544a\u9762\u5411\u5728 BCA \u7684 FM \u6ce8\u518c\u540d\u5f55\u767b\u8bb0\u7684\u516c\u53f8\uff0c\u662f\u8be5\u884c\u4e1a\u5728\u52b3\u52a8\u529b\u548c\u5efa\u7b51\u5b58\u91cf\u538b\u529b\u4e0b\u63d0\u5347\u7ef4\u62a4\u8d28\u91cf\u3001\u534f\u4f5c\u548c\u751f\u4ea7\u529b\u5de5\u4f5c\u7684\u4e00\u90e8\u5206\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4e34\u65f6\u53cd\u9988\u6e20\u9053\n\n\u8be5\u53cd\u9988\u6e20\u9053\u5141\u8bb8 FM \u516c\u53f8\u548c\u5206\u5305\u5546\u968f\u65f6\u5411 BCA \u548c\u653f\u5e9c\u673a\u6784\u76f4\u63a5\u63d0\u4ea4\u9488\u5bf9\u5177\u4f53\u9879\u76ee\u7684\u53cd\u9988\u3002\u516c\u53f8\u53ef\u901a\u8fc7\u4e0e BCA \u7684 FM \u9879\u76ee\u7cfb\u7edf\u914d\u5957\u7684\u53cd\u9988\u8868\uff0c\u63cf\u8ff0\u826f\u597d\u4f53\u9a8c\u4ee5\u53ca\u6709\u5f85\u6539\u8fdb\u4e4b\u5904\u3002BCA \u8868\u793a\uff0c\u8be5\u6e20\u9053\u65e8\u5728\u9f13\u52b1\u66f4\u5177\u534f\u4f5c\u6027\u7684 FM \u73af\u5883\u3001\u63d0\u5347\u6807\u51c6\uff0c\u5e76\u652f\u6301\u6e10\u8fdb\u5f0f\u505a\u6cd5\u968f\u7740\u65f6\u95f4\u63a8\u79fb\u5f97\u5230\u66f4\u5e7f\u6cdb\u7684\u91c7\u7528\u3002\u8fd9\u662f\u4e00\u4e2a\u53cd\u9988\u548c\u884c\u4e1a\u6539\u8fdb\u6e20\u9053\uff0c\u5e76\u975e\u6295\u6807\u6388\u6807\u673a\u5236\u3001\u6295\u8bc9\u88c1\u51b3\u4fdd\u8bc1\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u5408\u540c\u6551\u6d4e\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4fee\u8ba2\u7248\u91c7\u8d2d\u6307\u5357\u7684\u5185\u5bb9\n\nBCA \u8868\u793a\uff0cFM \u91c7\u8d2d\u6307\u5357\u4e8e 2021 \u5e74\u9996\u6b21\u53d1\u5e03\uff0c\u6db5\u76d6\u516c\u5171\u90e8\u95e8 FM \u62db\u6807\u5468\u671f\uff1a\u62db\u6807\u524d\u51c6\u5907\u3001\u62db\u6807\u51c6\u5907\u4e0e\u8bc4\u4f30\uff0c\u4ee5\u53ca\u62db\u6807\u540e\u7ba1\u7406\u30022026 \u5e74\u4fee\u8ba2\u7248\u7eb3\u5165\u4e86\u5229\u76ca\u76f8\u5173\u65b9\u7684\u53cd\u9988\uff0c\u5e76\u91cd\u70b9\u5173\u6ce8 **\u534f\u4f5c\u5f0f\u5408\u540c**\u3001**\u6e10\u8fdb\u5f0f\u4ed8\u6b3e\u505a\u6cd5** \u548c **\u5206\u5305\u505a\u6cd5**\u3002\u6307\u5357\u5305\u62ec\u534f\u4f5c\u65b9\u6cd5\u3001\u516c\u5e73\u7684\u98ce\u9669\u5206\u914d\u3001\u7ee9\u6548\u548c\u521b\u65b0\u6fc0\u52b1\uff0c\u4ee5\u53ca FM \u4ef7\u503c\u94fe\u4e2d\u66f4\u6e05\u6670\u7684\u6c9f\u901a\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff09\u3002\n\n## \u4ed8\u6b3e\u3001\u5206\u5305\u4e0e\u6ce8\u518c\u8303\u56f4\n\n\u4fee\u8ba2\u7248\u6307\u5357\u63d0\u5021\u516c\u5e73\u3001\u900f\u660e\u548c\u53ca\u65f6\u4ed8\u6b3e\uff0c\u5305\u62ec\u4e0e\u7ee9\u6548\u6302\u94a9\u7684\u5956\u52b1\u6216\u6263\u6b3e\uff0c\u4ee5\u53ca\u4e0e\u5df2\u5b8c\u6210\u5de5\u4f5c\u548c\u5173\u952e\u7ee9\u6548\u6307\u6807\u6302\u94a9\u7684\u5206\u7ea7\u4ed8\u6b3e\u673a\u5236\u3002\u6307\u5357\u8fd8\u5217\u51fa\u516c\u5e73\u62db\u6807\u3001\u66f4\u6e05\u6670\u7684\u5408\u540c\u6761\u6b3e\u3001\u9002\u5f53\u7684\u98ce\u9669\u5206\u914d\uff0c\u4ee5\u53ca\u52a0\u5f3a\u670d\u52a1\u91c7\u8d2d\u65b9\u3001FM \u516c\u53f8\u548c\u5206\u5305\u5546\u4e4b\u95f4\u6c9f\u901a\u7684\u826f\u597d\u505a\u6cd5\u3002BCA \u7684\u7efc\u5408\u91c7\u8d2d\u7f51\u9875\u6307\u51fa\uff0c\u62df\u6295\u6807\u516c\u5171\u90e8\u95e8\u7efc\u5408 FM \u670d\u52a1\u6216\u7ba1\u7406\u4ee3\u7406\u670d\u52a1\u7684\u516c\u53f8\u5fc5\u987b\u6301\u6709\u76f8\u5173 **FM01** \u6ce8\u518c\uff1b\u8be5\u6307\u5357\u672c\u8eab\u4e0d\u4f1a\u8bbe\u7acb\u65b0\u7684\u62e8\u6b3e\uff0c\u4e5f\u4e0d\u4f1a\u53d6\u4ee3 FM \u6ce8\u518c\u540d\u5f55\u7684\u6ce8\u518c\u8981\u6c42\uff08[BCA\uff0c3 \u65e5\u516b\u6708 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/8c0a94fc-4542-4c79-8219-42355e48b4c8\/Circular%20on%20Adhoc%20Feedback%2C%20Revised%20FM%20Guide%202.pdf)\uff1b[BCA\uff0c\u67e5\u9605\u4e8e 3 \u65e5\u4e5d\u6708 2026](https:\/\/www1.bca.gov.sg\/growth-and-transformation\/procurement\/procurement-and-legal-frameworks\/procuring-facilities-management-fm-services\/)\uff09\u3002"},"related":[{"id":89658,"source_id":"sgkb.business-industry.built-environment-ai-centre-of-excellence","kind":"article","title_en":"Built Environment AI Centre of Excellence","title_zh":"\u5efa\u6210\u73af\u5883\u4eba\u5de5\u667a\u80fd\u5353\u8d8a\u4e2d\u5fc3","assurance":null,"subtype":null},{"id":90414,"source_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","kind":"article","title_en":"Green Mark Version 7.0","title_zh":"\u7eff\u8272\u6807\u5fd7 7.0 \u7248","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null},{"id":92627,"source_id":"sgtopic.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","kind":"topic","title_en":"Public-Sector Facilities Management Feedback and Procurement Guide 2026","title_zh":"\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026","assurance":null,"subtype":null}]}