{"release_id":19,"data":{"id":90428,"release_id":19,"source_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","kind":"article","fingerprint":"8b8031f79f70aedc5946578b6b1d5f0668a18beebe783a54de1926528c31cea2","title_en":"Pre-Construction Survey Guidelines","title_zh":"\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-09-02","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["BCA pre-construction survey","Guidelines on Pre-Construction Survey","preconstruction survey zones","landed development communication plan"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","document_sha256":"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0","document_type":"article","domain":"geography-urban-planning","entities":["sg.agency.bca"],"facets":["business","current","infrastructure","law","policy","procedure"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-09-02","path":"geography-urban-planning\/pre-construction-survey-guidelines-2026.md","related":["ags-sg-site-investigation-data","concrete-identity-testing-sampling","fixed-installation-regulations-2025"],"sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Pre-construction Survey and Communication Plan for Landed Development","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"},{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines on Preconstruction Survey","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf"},{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"}],"status":"verified","summary":"BCA's Singapore pre-construction survey guidance sets minimum survey zones for landed and non-landed developments, records nearby existing conditions before specified works, and links landed projects to neighbour notification and access.","tags":["construction","regulation","policy","how-to"],"temporal_scope":"current","title":"Pre-Construction Survey Guidelines","topics":["sgtopic.geography","sgtopic.geography-urban-planning.pre-construction-survey-guidelines-2026"],"volatility":"slow"},"date":"2026-09-02","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/pre-construction-survey-guidelines-2026.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":12,"input_hash":"0c57fd675620298ee5cc64d2bb8eb28e386687fab948bd49c36f4a815e500806","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026#overview","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"],"content_sha256":"e3983cf5dcde21ad5f96d0f1cb59bf3effc7917506530f54c2f71fdd20854ffe","document_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","document_sha256":"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Pre-construction Survey and Communication Plan for Landed Development","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"}]},{"chunk_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026#minimum-survey-zones","citation_urls":["https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf"],"content_sha256":"5d9a4098fe54873f0ab9b60570cce0f6ef5eb081e4cc5c2ebc109892a74d9bba","document_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","document_sha256":"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines on Preconstruction Survey","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026#soil-categories-and-interpretation","citation_urls":["https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf"],"content_sha256":"914cfeea878c125b90c87de069213f6ecbe15606c47f834bef72934ffc97c4e4","document_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","document_sha256":"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines on Preconstruction Survey","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026#landed-property-communication-plan","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"],"content_sha256":"649b84f4f39fb3a82098baf9de6c681f142a96f28ca2131991ce760a82ae7b0c","document_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","document_sha256":"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Pre-construction Survey and Communication Plan for Landed Development","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"}]},{"chunk_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026#purpose-and-limits-of-the-survey","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"],"content_sha256":"537cf5f9360b68e05f535b7c0137f29e814fef5e285395f66a5bad1290aa6cb4","document_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","document_sha256":"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Pre-construction Survey and Communication Plan for Landed Development","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"}]}],"links":[{"relation":"related","target_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data"},{"relation":"related","target_id":"sgkb.geography-urban-planning.concrete-identity-testing-sampling"},{"relation":"related","target_id":"sgkb.geography-urban-planning.fixed-installation-regulations-2025"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.pre-construction-survey-guidelines-2026"},{"relation":"entities","target_id":"sg.agency.bca"}],"locales":{"en":{"markdown":"# Pre-Construction Survey Guidelines\n\nThe Building and Construction Authority (BCA) requires a pre-construction survey before specified works to establish the condition of nearby existing buildings and structures. BCA's current guidance covers demolition, piling, foundation, tunnelling and site-formation works; for landed property development it also sets neighbour-notification and communication-plan steps ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n\n## Minimum survey zones\n\nBCA's guideline specifies a minimum zone rather than a single distance for every project. For a landed development, the minimum zone is 15 m. For a non-landed development with a basement or other underground space, the zone depends on soil and excavation depth: 30 m or 3H for good soils; 60 m or 6H for soft soils without fluvial sand, peat or peaty clay; and 90 m or 9H for soft soils with fluvial sand, peat or peaty clay. Where two values are shown, the larger paired value is adopted: this is the larger paired value rule. H means the maximum excavation depth, including localised pits ([BCA Guidelines on Preconstruction Survey, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)).\n\n## Soil categories and interpretation\n\nThe guideline defines good soils as medium-dense to very-dense sand and gravel, or firm to hard silt and clay. Soft soils include very-loose to loose sand and gravel, or very-soft to soft silt and clay. The fluvial-soil distinction matters because the stated minimum zone for non-landed underground works is wider where fluvial sand, peat or peaty clay is present. These categories are part of the guideline's survey-zone calculation; they should not be used as a substitute for the project's geotechnical investigation or professional assessment ([BCA Guidelines on Preconstruction Survey, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)).\n\n## Landed-property communication plan\n\nBefore building works for landed property, BCA's current page says the builder must inform neighbours and obtain written consent for access where necessary. Where new reinforced-concrete walls abut an existing party or boundary wall, the builder must also notify BCA using the relevant forms during permit application. The forms cover neighbour notification, access consent, communication-plan status, pre-construction-survey status and the specific boundary-wall concreting notification ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n\n## Purpose and limits of the survey\n\nThe survey records pre-existing conditions so that the condition of nearby properties and structures is known before construction and can be compared with later observations. BCA's homeowner guidance also describes providing neighbours with a copy of the survey report and using professional impact assessment and monitoring where proposed works may affect surrounding properties. A survey is therefore an evidence and risk-control measure; it does not by itself authorise construction, guarantee that damage will not occur, or replace the permit, design, monitoring and safety duties applying to the works ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).","summary":"BCA's Singapore pre-construction survey guidance sets minimum survey zones for landed and non-landed developments, records nearby existing conditions before specified works, and links landed projects to neighbour notification and access.","title":"Pre-Construction Survey Guidelines"},"zh":{"markdown":"# \u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u5f00\u59cb\u524d\u8fdb\u884c\u65bd\u5de5\u524d\u52d8\u5bdf\uff0c\u4ee5\u786e\u5b9a\u9644\u8fd1\u73b0\u6709\u5efa\u7b51\u7269\u548c\u6784\u7b51\u7269\u7684\u72b6\u51b5\u3002\u5efa\u8bbe\u5c40\u73b0\u884c\u6307\u5357\u6db5\u76d6\u62c6\u9664\u3001\u6253\u6869\u3001\u5730\u57fa\u3001\u96a7\u9053\u548c\u573a\u5730\u5e73\u6574\u5de5\u7a0b\uff1b\u5bf9\u4e8e\u6709\u5730\u7269\u4e1a\u5f00\u53d1\u9879\u76ee\uff0c\u8fd8\u89c4\u5b9a\u4e86\u90bb\u5c45\u901a\u77e5\u548c\u6c9f\u901a\u8ba1\u5212\u6b65\u9aa4\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002\n\n## \u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\n\n\u5efa\u8bbe\u5c40\u6307\u5357\u89c4\u5b9a\u7684\u662f\u6700\u4f4e\u8303\u56f4\uff0c\u800c\u975e\u9002\u7528\u4e8e\u6bcf\u4e2a\u9879\u76ee\u7684\u5355\u4e00\u8ddd\u79bb\u3002\u6709\u5730\u5f00\u53d1\u9879\u76ee\u7684\u6700\u4f4e\u8303\u56f4\u4e3a 15 m\u3002\u5bf9\u4e8e\u8bbe\u6709\u5730\u4e0b\u5ba4\u6216\u5176\u4ed6\u5730\u4e0b\u7a7a\u95f4\u7684\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\uff0c\u8303\u56f4\u53d6\u51b3\u4e8e\u571f\u8d28\u548c\u5f00\u6316\u6df1\u5ea6\uff1a\u826f\u597d\u571f\u8d28\u4e3a 30 m \u6216 3H\uff1b\u4e0d\u542b\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u7684\u8f6f\u571f\u4e3a 60 m \u6216 6H\uff1b\u542b\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u7684\u8f6f\u571f\u4e3a 90 m \u6216 9H\u3002\u5f53\u5217\u51fa\u4e24\u4e2a\u6570\u503c\u65f6\uff0c\u5e94\u91c7\u7528\u6210\u5bf9\u6570\u503c\u4e2d\u8f83\u5927\u7684\u4e00\u4e2a\uff1a\u8fd9\u5c31\u662f\u91c7\u7528\u8f83\u5927\u914d\u5bf9\u503c\u7684\u89c4\u5219\u3002H \u8868\u793a\u6700\u5927\u5f00\u6316\u6df1\u5ea6\uff0c\u5305\u62ec\u5c40\u90e8\u5751\u69fd\uff08[\u5efa\u8bbe\u5c40\u300a\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u300b\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)\uff09\u3002\n\n## \u571f\u8d28\u7c7b\u522b\u4e0e\u89e3\u91ca\n\n\u6307\u5357\u5c06\u826f\u597d\u571f\u8d28\u5b9a\u4e49\u4e3a\u4e2d\u5bc6\u81f3\u6781\u5bc6\u7684\u7802\u571f\u548c\u783e\u77f3\uff0c\u6216\u575a\u5b9e\u81f3\u575a\u786c\u7684\u7c89\u571f\u548c\u9ecf\u571f\u3002\u8f6f\u571f\u5305\u62ec\u6781\u677e\u81f3\u677e\u6563\u7684\u7802\u571f\u548c\u783e\u77f3\uff0c\u6216\u6781\u8f6f\u81f3\u8f6f\u7684\u7c89\u571f\u548c\u9ecf\u571f\u3002\u533a\u5206\u6cb3\u6d41\u51b2\u79ef\u571f\u5f88\u91cd\u8981\uff0c\u56e0\u4e3a\u975e\u6709\u5730\u5730\u4e0b\u5de5\u7a0b\u5728\u5b58\u5728\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u65f6\uff0c\u89c4\u5b9a\u7684\u6700\u4f4e\u8303\u56f4\u66f4\u5927\u3002\u8fd9\u4e9b\u7c7b\u522b\u7528\u4e8e\u8ba1\u7b97\u6307\u5357\u89c4\u5b9a\u7684\u52d8\u5bdf\u8303\u56f4\uff0c\u4e0d\u5e94\u66ff\u4ee3\u9879\u76ee\u7684\u5ca9\u571f\u5de5\u7a0b\u8c03\u67e5\u6216\u4e13\u4e1a\u8bc4\u4f30\uff08[\u5efa\u8bbe\u5c40\u300a\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u300b\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)\uff09\u3002\n\n## \u6709\u5730\u7269\u4e1a\u6c9f\u901a\u8ba1\u5212\n\n\u5728\u6709\u5730\u7269\u4e1a\u8fdb\u884c\u5efa\u7b51\u5de5\u7a0b\u524d\uff0c\u5efa\u8bbe\u5c40\u73b0\u884c\u7f51\u9875\u6307\u51fa\uff0c\u5efa\u7b51\u5546\u5fc5\u987b\u544a\u77e5\u90bb\u5c45\uff0c\u5e76\u5728\u9700\u8981\u8fdb\u5165\u90bb\u5c45\u7269\u4e1a\u65f6\u53d6\u5f97\u4e66\u9762\u540c\u610f\u3002\u65b0\u5efa\u94a2\u7b4b\u6df7\u51dd\u571f\u5899\u4e0e\u73b0\u6709\u5171\u7528\u5899\u6216\u8fb9\u754c\u5899\u76f8\u90bb\u65f6\uff0c\u5efa\u7b51\u5546\u8fd8\u5fc5\u987b\u5728\u7533\u8bf7\u8bb8\u53ef\u8bc1\u671f\u95f4\u4f7f\u7528\u76f8\u5173\u8868\u683c\u901a\u77e5\u5efa\u8bbe\u5c40\u3002\u8fd9\u4e9b\u8868\u683c\u6d89\u53ca\u90bb\u5c45\u901a\u77e5\u3001\u51fa\u5165\u540c\u610f\u3001\u6c9f\u901a\u8ba1\u5212\u72b6\u6001\u3001\u65bd\u5de5\u524d\u52d8\u5bdf\u72b6\u6001\uff0c\u4ee5\u53ca\u7279\u5b9a\u7684\u8fb9\u754c\u5899\u6df7\u51dd\u571f\u6d47\u7b51\u901a\u77e5\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002\n\n## \u52d8\u5bdf\u7684\u76ee\u7684\u4e0e\u5c40\u9650\n\n\u52d8\u5bdf\u4f1a\u8bb0\u5f55\u65e2\u6709\u72b6\u51b5\uff0c\u4ee5\u4fbf\u5728\u65bd\u5de5\u524d\u4e86\u89e3\u9644\u8fd1\u7269\u4e1a\u548c\u6784\u7b51\u7269\u7684\u72b6\u6001\uff0c\u5e76\u4e0e\u4e4b\u540e\u7684\u89c2\u5bdf\u7ed3\u679c\u8fdb\u884c\u6bd4\u8f83\u3002\u5efa\u8bbe\u5c40\u9762\u5411\u623f\u4e3b\u7684\u6307\u5357\u8fd8\u63d0\u5230\uff0c\u5e94\u5411\u90bb\u5c45\u63d0\u4f9b\u52d8\u5bdf\u62a5\u544a\u526f\u672c\uff1b\u5982\u679c\u62df\u8bae\u5de5\u7a0b\u53ef\u80fd\u5f71\u54cd\u5468\u8fb9\u7269\u4e1a\uff0c\u5219\u5e94\u5f00\u5c55\u4e13\u4e1a\u5f71\u54cd\u8bc4\u4f30\u548c\u76d1\u6d4b\u3002\u56e0\u6b64\uff0c\u52d8\u5bdf\u662f\u4e00\u9879\u8bc1\u636e\u8bb0\u5f55\u548c\u98ce\u9669\u63a7\u5236\u63aa\u65bd\uff1b\u5b83\u672c\u8eab\u5e76\u4e0d\u6388\u6743\u65bd\u5de5\u3001\u4e0d\u4fdd\u8bc1\u4e0d\u4f1a\u53d1\u751f\u635f\u574f\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u9002\u7528\u4e8e\u76f8\u5173\u5de5\u7a0b\u7684\u8bb8\u53ef\u8bc1\u3001\u8bbe\u8ba1\u3001\u76d1\u6d4b\u548c\u5b89\u5168\u804c\u8d23\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002","summary":"\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\u7684\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u4e3a\u6709\u5730\u548c\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\u89c4\u5b9a\u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\uff0c\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u524d\u8bb0\u5f55\u9644\u8fd1\u73b0\u6709\u72b6\u51b5\uff0c\u5e76\u8981\u6c42\u6709\u5730\u9879\u76ee\u901a\u77e5\u90bb\u5c45\u5e76\u5b89\u6392\u51fa\u5165\u3002","title":"\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357"}},"source_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","status":"verified","summary_en":"BCA's Singapore pre-construction survey guidance sets minimum survey zones for landed and non-landed developments, records nearby existing conditions before specified works, and links landed projects to neighbour notification and access.","summary_zh":"\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\u7684\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u4e3a\u6709\u5730\u548c\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\u89c4\u5b9a\u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\uff0c\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u524d\u8bb0\u5f55\u9644\u8fd1\u73b0\u6709\u72b6\u51b5\uff0c\u5e76\u8981\u6c42\u6709\u5730\u9879\u76ee\u901a\u77e5\u90bb\u5c45\u5e76\u5b89\u6392\u51fa\u5165\u3002","title_en":"Pre-Construction Survey Guidelines","title_zh":"\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357","wiki":{"domain":"geography-urban-planning","last_verified":"2026-09-02","locales":{"en":{"markdown":"# Pre-Construction Survey Guidelines\n\nThe Building and Construction Authority (BCA) requires a pre-construction survey before specified works to establish the condition of nearby existing buildings and structures. BCA's current guidance covers demolition, piling, foundation, tunnelling and site-formation works; for landed property development it also sets neighbour-notification and communication-plan steps ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n\n## Minimum survey zones\n\nBCA's guideline specifies a minimum zone rather than a single distance for every project. For a landed development, the minimum zone is 15 m. For a non-landed development with a basement or other underground space, the zone depends on soil and excavation depth: 30 m or 3H for good soils; 60 m or 6H for soft soils without fluvial sand, peat or peaty clay; and 90 m or 9H for soft soils with fluvial sand, peat or peaty clay. Where two values are shown, the larger paired value is adopted: this is the larger paired value rule. H means the maximum excavation depth, including localised pits ([BCA Guidelines on Preconstruction Survey, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)).\n\n## Soil categories and interpretation\n\nThe guideline defines good soils as medium-dense to very-dense sand and gravel, or firm to hard silt and clay. Soft soils include very-loose to loose sand and gravel, or very-soft to soft silt and clay. The fluvial-soil distinction matters because the stated minimum zone for non-landed underground works is wider where fluvial sand, peat or peaty clay is present. These categories are part of the guideline's survey-zone calculation; they should not be used as a substitute for the project's geotechnical investigation or professional assessment ([BCA Guidelines on Preconstruction Survey, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)).\n\n## Landed-property communication plan\n\nBefore building works for landed property, BCA's current page says the builder must inform neighbours and obtain written consent for access where necessary. Where new reinforced-concrete walls abut an existing party or boundary wall, the builder must also notify BCA using the relevant forms during permit application. The forms cover neighbour notification, access consent, communication-plan status, pre-construction-survey status and the specific boundary-wall concreting notification ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n\n## Purpose and limits of the survey\n\nThe survey records pre-existing conditions so that the condition of nearby properties and structures is known before construction and can be compared with later observations. BCA's homeowner guidance also describes providing neighbours with a copy of the survey report and using professional impact assessment and monitoring where proposed works may affect surrounding properties. A survey is therefore an evidence and risk-control measure; it does not by itself authorise construction, guarantee that damage will not occur, or replace the permit, design, monitoring and safety duties applying to the works ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).","summary":"BCA's Singapore pre-construction survey guidance sets minimum survey zones for landed and non-landed developments, records nearby existing conditions before specified works, and links landed projects to neighbour notification and access.","title":"Pre-Construction Survey Guidelines"},"zh":{"markdown":"# \u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u5f00\u59cb\u524d\u8fdb\u884c\u65bd\u5de5\u524d\u52d8\u5bdf\uff0c\u4ee5\u786e\u5b9a\u9644\u8fd1\u73b0\u6709\u5efa\u7b51\u7269\u548c\u6784\u7b51\u7269\u7684\u72b6\u51b5\u3002\u5efa\u8bbe\u5c40\u73b0\u884c\u6307\u5357\u6db5\u76d6\u62c6\u9664\u3001\u6253\u6869\u3001\u5730\u57fa\u3001\u96a7\u9053\u548c\u573a\u5730\u5e73\u6574\u5de5\u7a0b\uff1b\u5bf9\u4e8e\u6709\u5730\u7269\u4e1a\u5f00\u53d1\u9879\u76ee\uff0c\u8fd8\u89c4\u5b9a\u4e86\u90bb\u5c45\u901a\u77e5\u548c\u6c9f\u901a\u8ba1\u5212\u6b65\u9aa4\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002\n\n## \u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\n\n\u5efa\u8bbe\u5c40\u6307\u5357\u89c4\u5b9a\u7684\u662f\u6700\u4f4e\u8303\u56f4\uff0c\u800c\u975e\u9002\u7528\u4e8e\u6bcf\u4e2a\u9879\u76ee\u7684\u5355\u4e00\u8ddd\u79bb\u3002\u6709\u5730\u5f00\u53d1\u9879\u76ee\u7684\u6700\u4f4e\u8303\u56f4\u4e3a 15 m\u3002\u5bf9\u4e8e\u8bbe\u6709\u5730\u4e0b\u5ba4\u6216\u5176\u4ed6\u5730\u4e0b\u7a7a\u95f4\u7684\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\uff0c\u8303\u56f4\u53d6\u51b3\u4e8e\u571f\u8d28\u548c\u5f00\u6316\u6df1\u5ea6\uff1a\u826f\u597d\u571f\u8d28\u4e3a 30 m \u6216 3H\uff1b\u4e0d\u542b\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u7684\u8f6f\u571f\u4e3a 60 m \u6216 6H\uff1b\u542b\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u7684\u8f6f\u571f\u4e3a 90 m \u6216 9H\u3002\u5f53\u5217\u51fa\u4e24\u4e2a\u6570\u503c\u65f6\uff0c\u5e94\u91c7\u7528\u6210\u5bf9\u6570\u503c\u4e2d\u8f83\u5927\u7684\u4e00\u4e2a\uff1a\u8fd9\u5c31\u662f\u91c7\u7528\u8f83\u5927\u914d\u5bf9\u503c\u7684\u89c4\u5219\u3002H \u8868\u793a\u6700\u5927\u5f00\u6316\u6df1\u5ea6\uff0c\u5305\u62ec\u5c40\u90e8\u5751\u69fd\uff08[\u5efa\u8bbe\u5c40\u300a\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u300b\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)\uff09\u3002\n\n## \u571f\u8d28\u7c7b\u522b\u4e0e\u89e3\u91ca\n\n\u6307\u5357\u5c06\u826f\u597d\u571f\u8d28\u5b9a\u4e49\u4e3a\u4e2d\u5bc6\u81f3\u6781\u5bc6\u7684\u7802\u571f\u548c\u783e\u77f3\uff0c\u6216\u575a\u5b9e\u81f3\u575a\u786c\u7684\u7c89\u571f\u548c\u9ecf\u571f\u3002\u8f6f\u571f\u5305\u62ec\u6781\u677e\u81f3\u677e\u6563\u7684\u7802\u571f\u548c\u783e\u77f3\uff0c\u6216\u6781\u8f6f\u81f3\u8f6f\u7684\u7c89\u571f\u548c\u9ecf\u571f\u3002\u533a\u5206\u6cb3\u6d41\u51b2\u79ef\u571f\u5f88\u91cd\u8981\uff0c\u56e0\u4e3a\u975e\u6709\u5730\u5730\u4e0b\u5de5\u7a0b\u5728\u5b58\u5728\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u65f6\uff0c\u89c4\u5b9a\u7684\u6700\u4f4e\u8303\u56f4\u66f4\u5927\u3002\u8fd9\u4e9b\u7c7b\u522b\u7528\u4e8e\u8ba1\u7b97\u6307\u5357\u89c4\u5b9a\u7684\u52d8\u5bdf\u8303\u56f4\uff0c\u4e0d\u5e94\u66ff\u4ee3\u9879\u76ee\u7684\u5ca9\u571f\u5de5\u7a0b\u8c03\u67e5\u6216\u4e13\u4e1a\u8bc4\u4f30\uff08[\u5efa\u8bbe\u5c40\u300a\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u300b\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)\uff09\u3002\n\n## \u6709\u5730\u7269\u4e1a\u6c9f\u901a\u8ba1\u5212\n\n\u5728\u6709\u5730\u7269\u4e1a\u8fdb\u884c\u5efa\u7b51\u5de5\u7a0b\u524d\uff0c\u5efa\u8bbe\u5c40\u73b0\u884c\u7f51\u9875\u6307\u51fa\uff0c\u5efa\u7b51\u5546\u5fc5\u987b\u544a\u77e5\u90bb\u5c45\uff0c\u5e76\u5728\u9700\u8981\u8fdb\u5165\u90bb\u5c45\u7269\u4e1a\u65f6\u53d6\u5f97\u4e66\u9762\u540c\u610f\u3002\u65b0\u5efa\u94a2\u7b4b\u6df7\u51dd\u571f\u5899\u4e0e\u73b0\u6709\u5171\u7528\u5899\u6216\u8fb9\u754c\u5899\u76f8\u90bb\u65f6\uff0c\u5efa\u7b51\u5546\u8fd8\u5fc5\u987b\u5728\u7533\u8bf7\u8bb8\u53ef\u8bc1\u671f\u95f4\u4f7f\u7528\u76f8\u5173\u8868\u683c\u901a\u77e5\u5efa\u8bbe\u5c40\u3002\u8fd9\u4e9b\u8868\u683c\u6d89\u53ca\u90bb\u5c45\u901a\u77e5\u3001\u51fa\u5165\u540c\u610f\u3001\u6c9f\u901a\u8ba1\u5212\u72b6\u6001\u3001\u65bd\u5de5\u524d\u52d8\u5bdf\u72b6\u6001\uff0c\u4ee5\u53ca\u7279\u5b9a\u7684\u8fb9\u754c\u5899\u6df7\u51dd\u571f\u6d47\u7b51\u901a\u77e5\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002\n\n## \u52d8\u5bdf\u7684\u76ee\u7684\u4e0e\u5c40\u9650\n\n\u52d8\u5bdf\u4f1a\u8bb0\u5f55\u65e2\u6709\u72b6\u51b5\uff0c\u4ee5\u4fbf\u5728\u65bd\u5de5\u524d\u4e86\u89e3\u9644\u8fd1\u7269\u4e1a\u548c\u6784\u7b51\u7269\u7684\u72b6\u6001\uff0c\u5e76\u4e0e\u4e4b\u540e\u7684\u89c2\u5bdf\u7ed3\u679c\u8fdb\u884c\u6bd4\u8f83\u3002\u5efa\u8bbe\u5c40\u9762\u5411\u623f\u4e3b\u7684\u6307\u5357\u8fd8\u63d0\u5230\uff0c\u5e94\u5411\u90bb\u5c45\u63d0\u4f9b\u52d8\u5bdf\u62a5\u544a\u526f\u672c\uff1b\u5982\u679c\u62df\u8bae\u5de5\u7a0b\u53ef\u80fd\u5f71\u54cd\u5468\u8fb9\u7269\u4e1a\uff0c\u5219\u5e94\u5f00\u5c55\u4e13\u4e1a\u5f71\u54cd\u8bc4\u4f30\u548c\u76d1\u6d4b\u3002\u56e0\u6b64\uff0c\u52d8\u5bdf\u662f\u4e00\u9879\u8bc1\u636e\u8bb0\u5f55\u548c\u98ce\u9669\u63a7\u5236\u63aa\u65bd\uff1b\u5b83\u672c\u8eab\u5e76\u4e0d\u6388\u6743\u65bd\u5de5\u3001\u4e0d\u4fdd\u8bc1\u4e0d\u4f1a\u53d1\u751f\u635f\u574f\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u9002\u7528\u4e8e\u76f8\u5173\u5de5\u7a0b\u7684\u8bb8\u53ef\u8bc1\u3001\u8bbe\u8ba1\u3001\u76d1\u6d4b\u548c\u5b89\u5168\u804c\u8d23\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002","summary":"\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\u7684\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u4e3a\u6709\u5730\u548c\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\u89c4\u5b9a\u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\uff0c\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u524d\u8bb0\u5f55\u9644\u8fd1\u73b0\u6709\u72b6\u51b5\uff0c\u5e76\u8981\u6c42\u6709\u5730\u9879\u76ee\u901a\u77e5\u90bb\u5c45\u5e76\u5b89\u6392\u51fa\u5165\u3002","title":"\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357"}},"path":"geography-urban-planning\/pre-construction-survey-guidelines-2026.md","related_source_ids":["sgkb.geography-urban-planning.ags-sg-site-investigation-data","sgkb.geography-urban-planning.concrete-identity-testing-sampling","sgkb.geography-urban-planning.fixed-installation-regulations-2025"],"source_hash":"0c57fd675620298ee5cc64d2bb8eb28e386687fab948bd49c36f4a815e500806","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Pre-construction Survey and Communication Plan for Landed Development","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/"},{"title":"BCA \u2014 Guidelines on Preconstruction Survey","url":"https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf"},{"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"}]}},"search_text":"Pre-Construction Survey Guidelines\n\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\nBCA's Singapore pre-construction survey guidance sets minimum survey zones for landed and non-landed developments, records nearby existing conditions before specified works, and links landed projects to neighbour notification and access.\n\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\u7684\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u4e3a\u6709\u5730\u548c\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\u89c4\u5b9a\u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\uff0c\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u524d\u8bb0\u5f55\u9644\u8fd1\u73b0\u6709\u72b6\u51b5\uff0c\u5e76\u8981\u6c42\u6709\u5730\u9879\u76ee\u901a\u77e5\u90bb\u5c45\u5e76\u5b89\u6392\u51fa\u5165\u3002\n{\"aliases\":[\"BCA pre-construction survey\",\"Guidelines on Pre-Construction Survey\",\"preconstruction survey zones\",\"landed development communication plan\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026\",\"document_sha256\":\"c6dfa94641017ebc61fff7d56dca6baadf37b3ac855493d6a83de8aa34c512e0\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.agency.bca\"],\"facets\":[\"business\",\"current\",\"infrastructure\",\"law\",\"policy\",\"procedure\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-09-02\",\"path\":\"geography-urban-planning\\\/pre-construction-survey-guidelines-2026.md\",\"related\":[\"ags-sg-site-investigation-data\",\"concrete-identity-testing-sampling\",\"fixed-installation-regulations-2025\"],\"sources\":[{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Pre-construction Survey and Communication Plan for Landed Development\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/safety-and-standards\\\/applications-and-licenses\\\/permit-for-structural-works\\\/pre-construction-survey-and-communication-plan-for-landed-development\\\/\"},{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Guidelines on Preconstruction Survey\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/docs\\\/default-source\\\/docs-corp-regulatory\\\/building-control\\\/guidelines_on_preconstruction_survey.pdf\"},{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Guidelines for ST Plan Applications\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/safety-and-standards\\\/applications-and-licenses\\\/structural-plan-submission\\\/guidelines-for-st-plan-applications\\\/\"}],\"status\":\"verified\",\"summary\":\"BCA's Singapore pre-construction survey guidance sets minimum survey zones for landed and non-landed developments, records nearby existing conditions before specified works, and links landed projects to neighbour notification and access.\",\"tags\":[\"construction\",\"regulation\",\"policy\",\"how-to\"],\"temporal_scope\":\"current\",\"title\":\"Pre-Construction Survey Guidelines\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.pre-construction-survey-guidelines-2026\"],\"volatility\":\"slow\"}\n# Pre-Construction Survey Guidelines\n\nThe Building and Construction Authority (BCA) requires a pre-construction survey before specified works to establish the condition of nearby existing buildings and structures. BCA's current guidance covers demolition, piling, foundation, tunnelling and site-formation works; for landed property development it also sets neighbour-notification and communication-plan steps ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n\n## Minimum survey zones\n\nBCA's guideline specifies a minimum zone rather than a single distance for every project. For a landed development, the minimum zone is 15 m. For a non-landed development with a basement or other underground space, the zone depends on soil and excavation depth: 30 m or 3H for good soils; 60 m or 6H for soft soils without fluvial sand, peat or peaty clay; and 90 m or 9H for soft soils with fluvial sand, peat or peaty clay. Where two values are shown, the larger paired value is adopted: this is the larger paired value rule. H means the maximum excavation depth, including localised pits ([BCA Guidelines on Preconstruction Survey, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)).\n\n## Soil categories and interpretation\n\nThe guideline defines good soils as medium-dense to very-dense sand and gravel, or firm to hard silt and clay. Soft soils include very-loose to loose sand and gravel, or very-soft to soft silt and clay. The fluvial-soil distinction matters because the stated minimum zone for non-landed underground works is wider where fluvial sand, peat or peaty clay is present. These categories are part of the guideline's survey-zone calculation; they should not be used as a substitute for the project's geotechnical investigation or professional assessment ([BCA Guidelines on Preconstruction Survey, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)).\n\n## Landed-property communication plan\n\nBefore building works for landed property, BCA's current page says the builder must inform neighbours and obtain written consent for access where necessary. Where new reinforced-concrete walls abut an existing party or boundary wall, the builder must also notify BCA using the relevant forms during permit application. The forms cover neighbour notification, access consent, communication-plan status, pre-construction-survey status and the specific boundary-wall concreting notification ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n\n## Purpose and limits of the survey\n\nThe survey records pre-existing conditions so that the condition of nearby properties and structures is known before construction and can be compared with later observations. BCA's homeowner guidance also describes providing neighbours with a copy of the survey report and using professional impact assessment and monitoring where proposed works may affect surrounding properties. A survey is therefore an evidence and risk-control measure; it does not by itself authorise construction, guarantee that damage will not occur, or replace the permit, design, monitoring and safety duties applying to the works ([BCA Pre-construction Survey and Communication Plan, accessed 2 September 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)).\n# \u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u8981\u6c42\u5728\u6307\u5b9a\u5de5\u7a0b\u5f00\u59cb\u524d\u8fdb\u884c\u65bd\u5de5\u524d\u52d8\u5bdf\uff0c\u4ee5\u786e\u5b9a\u9644\u8fd1\u73b0\u6709\u5efa\u7b51\u7269\u548c\u6784\u7b51\u7269\u7684\u72b6\u51b5\u3002\u5efa\u8bbe\u5c40\u73b0\u884c\u6307\u5357\u6db5\u76d6\u62c6\u9664\u3001\u6253\u6869\u3001\u5730\u57fa\u3001\u96a7\u9053\u548c\u573a\u5730\u5e73\u6574\u5de5\u7a0b\uff1b\u5bf9\u4e8e\u6709\u5730\u7269\u4e1a\u5f00\u53d1\u9879\u76ee\uff0c\u8fd8\u89c4\u5b9a\u4e86\u90bb\u5c45\u901a\u77e5\u548c\u6c9f\u901a\u8ba1\u5212\u6b65\u9aa4\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002\n\n## \u6700\u4f4e\u52d8\u5bdf\u8303\u56f4\n\n\u5efa\u8bbe\u5c40\u6307\u5357\u89c4\u5b9a\u7684\u662f\u6700\u4f4e\u8303\u56f4\uff0c\u800c\u975e\u9002\u7528\u4e8e\u6bcf\u4e2a\u9879\u76ee\u7684\u5355\u4e00\u8ddd\u79bb\u3002\u6709\u5730\u5f00\u53d1\u9879\u76ee\u7684\u6700\u4f4e\u8303\u56f4\u4e3a 15 m\u3002\u5bf9\u4e8e\u8bbe\u6709\u5730\u4e0b\u5ba4\u6216\u5176\u4ed6\u5730\u4e0b\u7a7a\u95f4\u7684\u975e\u6709\u5730\u5f00\u53d1\u9879\u76ee\uff0c\u8303\u56f4\u53d6\u51b3\u4e8e\u571f\u8d28\u548c\u5f00\u6316\u6df1\u5ea6\uff1a\u826f\u597d\u571f\u8d28\u4e3a 30 m \u6216 3H\uff1b\u4e0d\u542b\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u7684\u8f6f\u571f\u4e3a 60 m \u6216 6H\uff1b\u542b\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u7684\u8f6f\u571f\u4e3a 90 m \u6216 9H\u3002\u5f53\u5217\u51fa\u4e24\u4e2a\u6570\u503c\u65f6\uff0c\u5e94\u91c7\u7528\u6210\u5bf9\u6570\u503c\u4e2d\u8f83\u5927\u7684\u4e00\u4e2a\uff1a\u8fd9\u5c31\u662f\u91c7\u7528\u8f83\u5927\u914d\u5bf9\u503c\u7684\u89c4\u5219\u3002H \u8868\u793a\u6700\u5927\u5f00\u6316\u6df1\u5ea6\uff0c\u5305\u62ec\u5c40\u90e8\u5751\u69fd\uff08[\u5efa\u8bbe\u5c40\u300a\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u300b\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)\uff09\u3002\n\n## \u571f\u8d28\u7c7b\u522b\u4e0e\u89e3\u91ca\n\n\u6307\u5357\u5c06\u826f\u597d\u571f\u8d28\u5b9a\u4e49\u4e3a\u4e2d\u5bc6\u81f3\u6781\u5bc6\u7684\u7802\u571f\u548c\u783e\u77f3\uff0c\u6216\u575a\u5b9e\u81f3\u575a\u786c\u7684\u7c89\u571f\u548c\u9ecf\u571f\u3002\u8f6f\u571f\u5305\u62ec\u6781\u677e\u81f3\u677e\u6563\u7684\u7802\u571f\u548c\u783e\u77f3\uff0c\u6216\u6781\u8f6f\u81f3\u8f6f\u7684\u7c89\u571f\u548c\u9ecf\u571f\u3002\u533a\u5206\u6cb3\u6d41\u51b2\u79ef\u571f\u5f88\u91cd\u8981\uff0c\u56e0\u4e3a\u975e\u6709\u5730\u5730\u4e0b\u5de5\u7a0b\u5728\u5b58\u5728\u6cb3\u6d41\u51b2\u79ef\u7802\u3001\u6ce5\u70ad\u6216\u6ce5\u70ad\u8d28\u9ecf\u571f\u65f6\uff0c\u89c4\u5b9a\u7684\u6700\u4f4e\u8303\u56f4\u66f4\u5927\u3002\u8fd9\u4e9b\u7c7b\u522b\u7528\u4e8e\u8ba1\u7b97\u6307\u5357\u89c4\u5b9a\u7684\u52d8\u5bdf\u8303\u56f4\uff0c\u4e0d\u5e94\u66ff\u4ee3\u9879\u76ee\u7684\u5ca9\u571f\u5de5\u7a0b\u8c03\u67e5\u6216\u4e13\u4e1a\u8bc4\u4f30\uff08[\u5efa\u8bbe\u5c40\u300a\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357\u300b\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/docs\/default-source\/docs-corp-regulatory\/building-control\/guidelines_on_preconstruction_survey.pdf)\uff09\u3002\n\n## \u6709\u5730\u7269\u4e1a\u6c9f\u901a\u8ba1\u5212\n\n\u5728\u6709\u5730\u7269\u4e1a\u8fdb\u884c\u5efa\u7b51\u5de5\u7a0b\u524d\uff0c\u5efa\u8bbe\u5c40\u73b0\u884c\u7f51\u9875\u6307\u51fa\uff0c\u5efa\u7b51\u5546\u5fc5\u987b\u544a\u77e5\u90bb\u5c45\uff0c\u5e76\u5728\u9700\u8981\u8fdb\u5165\u90bb\u5c45\u7269\u4e1a\u65f6\u53d6\u5f97\u4e66\u9762\u540c\u610f\u3002\u65b0\u5efa\u94a2\u7b4b\u6df7\u51dd\u571f\u5899\u4e0e\u73b0\u6709\u5171\u7528\u5899\u6216\u8fb9\u754c\u5899\u76f8\u90bb\u65f6\uff0c\u5efa\u7b51\u5546\u8fd8\u5fc5\u987b\u5728\u7533\u8bf7\u8bb8\u53ef\u8bc1\u671f\u95f4\u4f7f\u7528\u76f8\u5173\u8868\u683c\u901a\u77e5\u5efa\u8bbe\u5c40\u3002\u8fd9\u4e9b\u8868\u683c\u6d89\u53ca\u90bb\u5c45\u901a\u77e5\u3001\u51fa\u5165\u540c\u610f\u3001\u6c9f\u901a\u8ba1\u5212\u72b6\u6001\u3001\u65bd\u5de5\u524d\u52d8\u5bdf\u72b6\u6001\uff0c\u4ee5\u53ca\u7279\u5b9a\u7684\u8fb9\u754c\u5899\u6df7\u51dd\u571f\u6d47\u7b51\u901a\u77e5\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002\n\n## \u52d8\u5bdf\u7684\u76ee\u7684\u4e0e\u5c40\u9650\n\n\u52d8\u5bdf\u4f1a\u8bb0\u5f55\u65e2\u6709\u72b6\u51b5\uff0c\u4ee5\u4fbf\u5728\u65bd\u5de5\u524d\u4e86\u89e3\u9644\u8fd1\u7269\u4e1a\u548c\u6784\u7b51\u7269\u7684\u72b6\u6001\uff0c\u5e76\u4e0e\u4e4b\u540e\u7684\u89c2\u5bdf\u7ed3\u679c\u8fdb\u884c\u6bd4\u8f83\u3002\u5efa\u8bbe\u5c40\u9762\u5411\u623f\u4e3b\u7684\u6307\u5357\u8fd8\u63d0\u5230\uff0c\u5e94\u5411\u90bb\u5c45\u63d0\u4f9b\u52d8\u5bdf\u62a5\u544a\u526f\u672c\uff1b\u5982\u679c\u62df\u8bae\u5de5\u7a0b\u53ef\u80fd\u5f71\u54cd\u5468\u8fb9\u7269\u4e1a\uff0c\u5219\u5e94\u5f00\u5c55\u4e13\u4e1a\u5f71\u54cd\u8bc4\u4f30\u548c\u76d1\u6d4b\u3002\u56e0\u6b64\uff0c\u52d8\u5bdf\u662f\u4e00\u9879\u8bc1\u636e\u8bb0\u5f55\u548c\u98ce\u9669\u63a7\u5236\u63aa\u65bd\uff1b\u5b83\u672c\u8eab\u5e76\u4e0d\u6388\u6743\u65bd\u5de5\u3001\u4e0d\u4fdd\u8bc1\u4e0d\u4f1a\u53d1\u751f\u635f\u574f\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u9002\u7528\u4e8e\u76f8\u5173\u5de5\u7a0b\u7684\u8bb8\u53ef\u8bc1\u3001\u8bbe\u8ba1\u3001\u76d1\u6d4b\u548c\u5b89\u5168\u804c\u8d23\uff08[\u5efa\u8bbe\u5c40\u65bd\u5de5\u524d\u52d8\u5bdf\u4e0e\u6c9f\u901a\u8ba1\u5212\uff0c\u8bbf\u95ee\u4e8e 2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/permit-for-structural-works\/pre-construction-survey-and-communication-plan-for-landed-development\/)\uff09\u3002"},"related":[{"id":90399,"source_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","kind":"article","title_en":"AGS(SG) Standardised Site-Investigation Data","title_zh":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e","assurance":null,"subtype":null},{"id":90405,"source_id":"sgkb.geography-urban-planning.concrete-identity-testing-sampling","kind":"article","title_en":"Concrete Identity-Testing Sampling Guidance","title_zh":"\u6df7\u51dd\u571f\u8eab\u4efd\u68c0\u9a8c\u62bd\u6837\u6307\u5357","assurance":null,"subtype":null},{"id":90409,"source_id":"sgkb.geography-urban-planning.fixed-installation-regulations-2025","kind":"article","title_en":"Fixed Installation Regulations 2025","title_zh":"\u56fa\u5b9a\u88c5\u7f6e\u6cd5\u89c4 2025","assurance":null,"subtype":null},{"id":90432,"source_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","kind":"article","title_en":"Remote Site Supervision for Structural Works","title_zh":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763","assurance":null,"subtype":null},{"id":90435,"source_id":"sgkb.geography-urban-planning.site-supervisor-requirements-risk-based-inspection-2026","kind":"article","title_en":"Site Supervisor Requirements and Risk-Based Inspection","title_zh":"\u73b0\u573a\u4e3b\u7ba1\u8981\u6c42\u548c\u57fa\u4e8e\u98ce\u9669\u7684\u68c0\u67e5","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null},{"id":92625,"source_id":"sgtopic.geography-urban-planning.pre-construction-survey-guidelines-2026","kind":"topic","title_en":"Pre-Construction Survey Guidelines","title_zh":"\u65bd\u5de5\u524d\u6d4b\u91cf\u6307\u5357","assurance":null,"subtype":null}]}