{"release_id":19,"data":{"id":90427,"release_id":19,"source_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","kind":"article","fingerprint":"51a4ef71595025129a1c58ed003966ea9c3651010b39cc41d4c08e63ba7ee855","title_en":"Post-Installed Anchor Safety Guidance","title_zh":"\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-09-01","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["post-installed anchors Singapore","PIA safety guidance","BCA PIA circular"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","document_sha256":"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873","document_type":"article","domain":"geography-urban-planning","entities":["sg.agency.bca"],"facets":["current","geography","infrastructure","law","policy"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-09-01","path":"geography-urban-planning\/post-installed-anchor-safety.md","related":["proactive-facade-maintenance","suspended-ceiling-safety","ura-and-master-plan"],"sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore","tier":1,"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}],"status":"verified","summary":"BCA, ACES and IES issued September 2026 guidance on the design and construction of post-installed-anchor connections, including qualified-product, installation, material and quality-assurance considerations.","tags":["policy","regulation","public-safety","planning-area"],"temporal_scope":"current","title":"Post-Installed Anchor Safety Guidance","topics":["sgtopic.geography","sgtopic.geography-urban-planning.post-installed-anchor-safety"],"volatility":"fast"},"date":"2026-09-01","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/post-installed-anchor-safety.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":12,"input_hash":"d8455af675cfd0d56c2de1dfba2de54995535a2337d0ad251359b38baa03ff93","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.post-installed-anchor-safety#overview","citation_urls":["https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"],"content_sha256":"ab5eae6ad3459a79d933a31e9cac0073ebc8e5689648fd6b24dfe0ad78f11e02","document_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","document_sha256":"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore","tier":1,"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}]},{"chunk_id":"sgkb.geography-urban-planning.post-installed-anchor-safety#design-and-construction-responsibility","citation_urls":["https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"],"content_sha256":"4d12dc28447487775d338b9555b2ffd031352a228222f5d90f4fd89c618da1ca","document_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","document_sha256":"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore","tier":1,"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}]},{"chunk_id":"sgkb.geography-urban-planning.post-installed-anchor-safety#connection-robustness","citation_urls":["https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"],"content_sha256":"2640dbb3acece13e0ecb024a22831d84e45c01dcbbc1869751aad259ddd74791","document_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","document_sha256":"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore","tier":1,"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}]},{"chunk_id":"sgkb.geography-urban-planning.post-installed-anchor-safety#materials-product-qualification-and-local-standards","citation_urls":["https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"],"content_sha256":"9295728ef30d17a0b1b1715201ce99a161a6d8399cda89542ff03d9aca720117","document_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","document_sha256":"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore","tier":1,"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}]},{"chunk_id":"sgkb.geography-urban-planning.post-installed-anchor-safety#interpretation-boundary","citation_urls":["https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"],"content_sha256":"9e3aa4cbaea3293bd8e1c530dee2a0852f2d37200a255958f29e4ef465c53894","document_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","document_sha256":"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore","tier":1,"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}]}],"links":[{"relation":"related","target_id":"sgkb.geography-urban-planning.proactive-facade-maintenance"},{"relation":"related","target_id":"sgkb.geography-urban-planning.suspended-ceiling-safety"},{"relation":"related","target_id":"sgkb.geography-urban-planning.ura-and-master-plan"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.post-installed-anchor-safety"},{"relation":"entities","target_id":"sg.agency.bca"}],"locales":{"en":{"markdown":"# Post-Installed Anchor Safety Guidance\n\nThe Building and Construction Authority (BCA), Association of Consulting Engineers Singapore (ACES) and Institution of Engineers Singapore (IES) issued a joint circular on **1 September 2026** covering key considerations for connections using **post-installed anchors (PIAs)**. The circular responds to recurring shortcomings in PIA design and construction that BCA says have resulted in structural deficiencies. It provides practical guidance on connection design, material selection, product qualification, installation and quality assurance; it is intended for Qualified Persons (QPs), builders and other industry stakeholders ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Design and construction responsibility\n\nQPs are to incorporate the circular's considerations into their designs and ensure proper implementation during construction. Builders must install PIAs according to approved plans under the supervision of the QP's site supervisor. If site conditions differ from the design assumptions, or installation cannot follow the approved plans, the QP must be notified and consulted before changes are made. BCA states that deviations involving anchor type, location, configuration or drilled depth without the QP's concurrence are strictly prohibited. The circular does not transfer all safety responsibility to a product supplier or installer ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Connection robustness\n\nThe guidance gives particular attention to tension and hanging structures because failure of one tension member may not be safely redistributed and can contribute to progressive collapse. Shear connections are preferred where practicable, but they still require proper design, including consideration of concrete edge breakout. Where tension connections are used, the design should provide sufficient redundancy so that an isolated failure does not overload remaining anchors or members. For new construction, cast-in connections are recommended instead of post-installed connections where practicable; this is a recommendation tied to connection circumstances, not a universal ban on PIAs ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Materials, product qualification and local standards\n\nAnchor material and corrosion protection should match environmental exposure and intended service life. For external applications such as fa\u00e7ade and cladding fixings exposed to weather, the circular says corrosion-resistant stainless-steel anchors should generally be specified, with higher corrosion resistance considered in marine or high-chloride conditions. PIA products should hold a valid European Technical Assessment (ETA) under the relevant European Assessment Documents, depending on the anchor type and intended application. An ETA is product- and condition-specific: products with ETAs are not automatically equivalent, and design values and optional assessments can differ ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Interpretation boundary\n\nThe circular is engineering guidance for safe design and construction; it does not provide one anchor product, one capacity value or a universal approval for every application. Designers must assess the actual connection, loads, base material, edge distances, environmental exposure, product qualification scope and installation conditions. The circular also reminds QPs of their duties under the Building Control Act and subsidiary regulations, and builders must follow approved plans and supervision arrangements. Readers should therefore use the relevant standards and qualified professional assessment rather than infer that any ETA or any stainless-steel anchor is suitable for every project ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).","summary":"BCA, ACES and IES issued September 2026 guidance on the design and construction of post-installed-anchor connections, including qualified-product, installation, material and quality-assurance considerations.","title":"Post-Installed Anchor Safety Guidance"},"zh":{"markdown":"# \u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u3001\u65b0\u52a0\u5761\u54a8\u8be2\u5de5\u7a0b\u5e08\u534f\u4f1a\uff08ACES\uff09\u548c\u65b0\u52a0\u5761\u5de5\u7a0b\u5e08\u5b66\u4f1a\uff08IES\uff09\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5** \u8054\u5408\u53d1\u5e03\u901a\u51fd\uff0c\u6db5\u76d6\u91c7\u7528**\u540e\u7f6e\u951a\u6813\uff08PIA\uff09**\u7684\u8fde\u63a5\u7684\u5173\u952e\u8003\u91cf\u3002\u8be5\u901a\u51fd\u65e8\u5728\u56de\u5e94\u540e\u7f6e\u951a\u6813\u8bbe\u8ba1\u548c\u65bd\u5de5\u4e2d\u53cd\u590d\u51fa\u73b0\u7684\u7f3a\u9677\uff1b\u5efa\u8bbe\u5c40\u79f0\u8fd9\u4e9b\u7f3a\u9677\u5df2\u5bfc\u81f4\u7ed3\u6784\u95ee\u9898\u3002\u901a\u51fd\u5c31\u8fde\u63a5\u8bbe\u8ba1\u3001\u6750\u6599\u9009\u62e9\u3001\u4ea7\u54c1\u8ba4\u8bc1\u3001\u5b89\u88c5\u548c\u8d28\u91cf\u4fdd\u8bc1\u63d0\u4f9b\u5b9e\u7528\u6307\u5bfc\uff0c\u4f9b\u5408\u683c\u8d1f\u8d23\u4eba\uff08QP\uff09\u3001\u5efa\u7b51\u5546\u53ca\u5176\u4ed6\u884c\u4e1a\u5229\u76ca\u76f8\u5173\u8005\u53c2\u8003\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u8bbe\u8ba1\u4e0e\u65bd\u5de5\u8d23\u4efb\n\n\u5408\u683c\u8d1f\u8d23\u4eba\u5e94\u5c06\u901a\u51fd\u4e2d\u7684\u8003\u91cf\u7eb3\u5165\u8bbe\u8ba1\uff0c\u5e76\u786e\u4fdd\u65bd\u5de5\u671f\u95f4\u6b63\u786e\u5b9e\u65bd\u3002\u5efa\u7b51\u5546\u5fc5\u987b\u5728\u5408\u683c\u8d1f\u8d23\u4eba\u7684\u73b0\u573a\u4e3b\u7ba1\u76d1\u7763\u4e0b\uff0c\u6309\u7167\u83b7\u6279\u56fe\u5219\u5b89\u88c5\u540e\u7f6e\u951a\u6813\u3002\u5982\u679c\u73b0\u573a\u6761\u4ef6\u4e0e\u8bbe\u8ba1\u5047\u8bbe\u4e0d\u540c\uff0c\u6216\u65e0\u6cd5\u6309\u7167\u83b7\u6279\u56fe\u5219\u65bd\u5de5\uff0c\u5fc5\u987b\u5728\u4f5c\u51fa\u66f4\u6539\u524d\u901a\u77e5\u5408\u683c\u8d1f\u8d23\u4eba\u5e76\u5f81\u6c42\u5176\u610f\u89c1\u3002\u5efa\u8bbe\u5c40\u58f0\u660e\uff0c\u672a\u7ecf\u5408\u683c\u8d1f\u8d23\u4eba\u540c\u610f\uff0c\u64c5\u81ea\u66f4\u6539\u951a\u6813\u7c7b\u578b\u3001\u4f4d\u7f6e\u3001\u914d\u7f6e\u6216\u94bb\u5b54\u6df1\u5ea6\u7684\u505a\u6cd5\u4e25\u683c\u7981\u6b62\u3002\u901a\u51fd\u5e76\u672a\u5c06\u5168\u90e8\u5b89\u5168\u8d23\u4efb\u8f6c\u79fb\u7ed9\u4ea7\u54c1\u4f9b\u5e94\u5546\u6216\u5b89\u88c5\u4eba\u5458\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u8fde\u63a5\u7a33\u5065\u6027\n\n\u6307\u5357\u7279\u522b\u5173\u6ce8\u53d7\u62c9\u548c\u60ac\u6302\u7ed3\u6784\uff0c\u56e0\u4e3a\u4e00\u6839\u53d7\u62c9\u6784\u4ef6\u5931\u6548\u540e\uff0c\u8377\u8f7d\u53ef\u80fd\u65e0\u6cd5\u5b89\u5168\u91cd\u65b0\u5206\u914d\uff0c\u5e76\u53ef\u80fd\u5bfc\u81f4\u8fde\u7eed\u5012\u584c\u3002\u5728\u53ef\u884c\u65f6\u4f18\u5148\u91c7\u7528\u526a\u529b\u8fde\u63a5\uff0c\u4f46\u4ecd\u987b\u8fdb\u884c\u9002\u5f53\u8bbe\u8ba1\uff0c\u5305\u62ec\u8003\u8651\u6df7\u51dd\u571f\u8fb9\u7f18\u7834\u574f\u3002\u91c7\u7528\u53d7\u62c9\u8fde\u63a5\u65f6\uff0c\u8bbe\u8ba1\u5e94\u63d0\u4f9b\u8db3\u591f\u5197\u4f59\uff0c\u907f\u514d\u5355\u4e2a\u6784\u4ef6\u5931\u6548\u5bfc\u81f4\u5176\u4f59\u951a\u6813\u6216\u6784\u4ef6\u8d85\u8f7d\u3002\u5bf9\u4e8e\u65b0\u5efa\u5de5\u7a0b\uff0c\u5728\u53ef\u884c\u65f6\u5efa\u8bae\u91c7\u7528\u9884\u57cb\u8fde\u63a5\uff0c\u800c\u975e\u540e\u7f6e\u8fde\u63a5\uff1b\u8fd9\u662f\u9488\u5bf9\u8fde\u63a5\u5177\u4f53\u60c5\u51b5\u63d0\u51fa\u7684\u5efa\u8bae\uff0c\u5e76\u975e\u666e\u904d\u7981\u6b62\u4f7f\u7528\u540e\u7f6e\u951a\u6813\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u6750\u6599\u3001\u4ea7\u54c1\u8ba4\u8bc1\u4e0e\u672c\u5730\u6807\u51c6\n\n\u951a\u6813\u6750\u6599\u548c\u9632\u8150\u63aa\u65bd\u5e94\u7b26\u5408\u73af\u5883\u66b4\u9732\u6761\u4ef6\u548c\u9884\u671f\u4f7f\u7528\u5bff\u547d\u3002\u5bf9\u4e8e\u66b4\u9732\u4e8e\u5929\u6c14\u73af\u5883\u7684\u5916\u90e8\u5e94\u7528\uff0c\u4f8b\u5982\u5e55\u5899\u548c\u8986\u5c42\u56fa\u5b9a\u4ef6\uff0c\u901a\u51fd\u79f0\u901a\u5e38\u5e94\u6307\u5b9a\u8010\u8150\u8680\u4e0d\u9508\u94a2\u951a\u6813\uff1b\u5728\u6d77\u6d0b\u6216\u9ad8\u6c2f\u73af\u5883\u4e2d\u5e94\u8003\u8651\u66f4\u9ad8\u7684\u8010\u8150\u8680\u6027\u3002\u540e\u7f6e\u951a\u6813\u4ea7\u54c1\u5e94\u4f9d\u636e\u951a\u6813\u7c7b\u578b\u548c\u9884\u671f\u7528\u9014\uff0c\u6301\u6709\u76f8\u5173\u6b27\u6d32\u8bc4\u4f30\u6587\u4ef6\u9879\u4e0b\u6709\u6548\u7684\u6b27\u6d32\u6280\u672f\u8bc4\u4f30\uff08ETA\uff09\u3002ETA \u4ec5\u9002\u7528\u4e8e\u7279\u5b9a\u4ea7\u54c1\u548c\u6761\u4ef6\uff1a\u53d6\u5f97 ETA \u7684\u4ea7\u54c1\u5e76\u975e\u81ea\u52a8\u7b49\u540c\uff0c\u8bbe\u8ba1\u503c\u548c\u53ef\u9009\u8bc4\u4f30\u4e5f\u53ef\u80fd\u4e0d\u540c\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u89e3\u91ca\u8303\u56f4\n\n\u8be5\u901a\u51fd\u662f\u5173\u4e8e\u5b89\u5168\u8bbe\u8ba1\u548c\u65bd\u5de5\u7684\u5de5\u7a0b\u6307\u5357\uff1b\u5b83\u6ca1\u6709\u6307\u5b9a\u5355\u4e00\u951a\u6813\u4ea7\u54c1\u6216\u5355\u4e00\u627f\u8f7d\u529b\u6570\u503c\uff0c\u4e5f\u6ca1\u6709\u5bf9\u6240\u6709\u5e94\u7528\u4f5c\u51fa\u666e\u904d\u6279\u51c6\u3002\u8bbe\u8ba1\u4eba\u5458\u5fc5\u987b\u8bc4\u4f30\u5b9e\u9645\u8fde\u63a5\u3001\u8377\u8f7d\u3001\u57fa\u6750\u3001\u8fb9\u8ddd\u3001\u73af\u5883\u66b4\u9732\u3001\u4ea7\u54c1\u8ba4\u8bc1\u8303\u56f4\u548c\u5b89\u88c5\u6761\u4ef6\u3002\u901a\u51fd\u8fd8\u63d0\u9192\u5408\u683c\u8d1f\u8d23\u4eba\u5c65\u884c\u300a\u5efa\u7b51\u7ba1\u5236\u6cd5\u300b\u53ca\u9644\u5c5e\u6cd5\u89c4\u89c4\u5b9a\u7684\u804c\u8d23\uff1b\u5efa\u7b51\u5546\u5fc5\u987b\u9075\u5b88\u83b7\u6279\u56fe\u5219\u548c\u76d1\u7763\u5b89\u6392\u3002\u56e0\u6b64\uff0c\u8bfb\u8005\u5e94\u4f9d\u636e\u76f8\u5173\u6807\u51c6\u5e76\u8fdb\u884c\u5408\u683c\u7684\u4e13\u4e1a\u8bc4\u4f30\uff0c\u4e0d\u5e94\u63a8\u65ad\u4efb\u4f55 ETA \u6216\u4efb\u4f55\u4e0d\u9508\u94a2\u951a\u6813\u90fd\u9002\u7528\u4e8e\u6240\u6709\u9879\u76ee\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002","summary":"\u5efa\u8bbe\u5c40\u3001ACES \u548c IES \u4e8e 2026 \u5e74\u4e5d\u6708\u53d1\u5e03\u4e86\u6709\u5173\u540e\u7f6e\u951a\u6813\u8fde\u63a5\u8bbe\u8ba1\u4e0e\u65bd\u5de5\u7684\u6307\u5357\uff0c\u5185\u5bb9\u5305\u62ec\u5408\u683c\u4ea7\u54c1\u3001\u5b89\u88c5\u3001\u6750\u6599\u548c\u8d28\u91cf\u4fdd\u8bc1\u65b9\u9762\u7684\u8003\u91cf\u3002","title":"\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357"}},"source_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","status":"verified","summary_en":"BCA, ACES and IES issued September 2026 guidance on the design and construction of post-installed-anchor connections, including qualified-product, installation, material and quality-assurance considerations.","summary_zh":"\u5efa\u8bbe\u5c40\u3001ACES \u548c IES \u4e8e 2026 \u5e74\u4e5d\u6708\u53d1\u5e03\u4e86\u6709\u5173\u540e\u7f6e\u951a\u6813\u8fde\u63a5\u8bbe\u8ba1\u4e0e\u65bd\u5de5\u7684\u6307\u5357\uff0c\u5185\u5bb9\u5305\u62ec\u5408\u683c\u4ea7\u54c1\u3001\u5b89\u88c5\u3001\u6750\u6599\u548c\u8d28\u91cf\u4fdd\u8bc1\u65b9\u9762\u7684\u8003\u91cf\u3002","title_en":"Post-Installed Anchor Safety Guidance","title_zh":"\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357","wiki":{"domain":"geography-urban-planning","last_verified":"2026-09-01","locales":{"en":{"markdown":"# Post-Installed Anchor Safety Guidance\n\nThe Building and Construction Authority (BCA), Association of Consulting Engineers Singapore (ACES) and Institution of Engineers Singapore (IES) issued a joint circular on **1 September 2026** covering key considerations for connections using **post-installed anchors (PIAs)**. The circular responds to recurring shortcomings in PIA design and construction that BCA says have resulted in structural deficiencies. It provides practical guidance on connection design, material selection, product qualification, installation and quality assurance; it is intended for Qualified Persons (QPs), builders and other industry stakeholders ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Design and construction responsibility\n\nQPs are to incorporate the circular's considerations into their designs and ensure proper implementation during construction. Builders must install PIAs according to approved plans under the supervision of the QP's site supervisor. If site conditions differ from the design assumptions, or installation cannot follow the approved plans, the QP must be notified and consulted before changes are made. BCA states that deviations involving anchor type, location, configuration or drilled depth without the QP's concurrence are strictly prohibited. The circular does not transfer all safety responsibility to a product supplier or installer ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Connection robustness\n\nThe guidance gives particular attention to tension and hanging structures because failure of one tension member may not be safely redistributed and can contribute to progressive collapse. Shear connections are preferred where practicable, but they still require proper design, including consideration of concrete edge breakout. Where tension connections are used, the design should provide sufficient redundancy so that an isolated failure does not overload remaining anchors or members. For new construction, cast-in connections are recommended instead of post-installed connections where practicable; this is a recommendation tied to connection circumstances, not a universal ban on PIAs ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Materials, product qualification and local standards\n\nAnchor material and corrosion protection should match environmental exposure and intended service life. For external applications such as fa\u00e7ade and cladding fixings exposed to weather, the circular says corrosion-resistant stainless-steel anchors should generally be specified, with higher corrosion resistance considered in marine or high-chloride conditions. PIA products should hold a valid European Technical Assessment (ETA) under the relevant European Assessment Documents, depending on the anchor type and intended application. An ETA is product- and condition-specific: products with ETAs are not automatically equivalent, and design values and optional assessments can differ ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Interpretation boundary\n\nThe circular is engineering guidance for safe design and construction; it does not provide one anchor product, one capacity value or a universal approval for every application. Designers must assess the actual connection, loads, base material, edge distances, environmental exposure, product qualification scope and installation conditions. The circular also reminds QPs of their duties under the Building Control Act and subsidiary regulations, and builders must follow approved plans and supervision arrangements. Readers should therefore use the relevant standards and qualified professional assessment rather than infer that any ETA or any stainless-steel anchor is suitable for every project ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).","summary":"BCA, ACES and IES issued September 2026 guidance on the design and construction of post-installed-anchor connections, including qualified-product, installation, material and quality-assurance considerations.","title":"Post-Installed Anchor Safety Guidance"},"zh":{"markdown":"# \u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u3001\u65b0\u52a0\u5761\u54a8\u8be2\u5de5\u7a0b\u5e08\u534f\u4f1a\uff08ACES\uff09\u548c\u65b0\u52a0\u5761\u5de5\u7a0b\u5e08\u5b66\u4f1a\uff08IES\uff09\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5** \u8054\u5408\u53d1\u5e03\u901a\u51fd\uff0c\u6db5\u76d6\u91c7\u7528**\u540e\u7f6e\u951a\u6813\uff08PIA\uff09**\u7684\u8fde\u63a5\u7684\u5173\u952e\u8003\u91cf\u3002\u8be5\u901a\u51fd\u65e8\u5728\u56de\u5e94\u540e\u7f6e\u951a\u6813\u8bbe\u8ba1\u548c\u65bd\u5de5\u4e2d\u53cd\u590d\u51fa\u73b0\u7684\u7f3a\u9677\uff1b\u5efa\u8bbe\u5c40\u79f0\u8fd9\u4e9b\u7f3a\u9677\u5df2\u5bfc\u81f4\u7ed3\u6784\u95ee\u9898\u3002\u901a\u51fd\u5c31\u8fde\u63a5\u8bbe\u8ba1\u3001\u6750\u6599\u9009\u62e9\u3001\u4ea7\u54c1\u8ba4\u8bc1\u3001\u5b89\u88c5\u548c\u8d28\u91cf\u4fdd\u8bc1\u63d0\u4f9b\u5b9e\u7528\u6307\u5bfc\uff0c\u4f9b\u5408\u683c\u8d1f\u8d23\u4eba\uff08QP\uff09\u3001\u5efa\u7b51\u5546\u53ca\u5176\u4ed6\u884c\u4e1a\u5229\u76ca\u76f8\u5173\u8005\u53c2\u8003\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u8bbe\u8ba1\u4e0e\u65bd\u5de5\u8d23\u4efb\n\n\u5408\u683c\u8d1f\u8d23\u4eba\u5e94\u5c06\u901a\u51fd\u4e2d\u7684\u8003\u91cf\u7eb3\u5165\u8bbe\u8ba1\uff0c\u5e76\u786e\u4fdd\u65bd\u5de5\u671f\u95f4\u6b63\u786e\u5b9e\u65bd\u3002\u5efa\u7b51\u5546\u5fc5\u987b\u5728\u5408\u683c\u8d1f\u8d23\u4eba\u7684\u73b0\u573a\u4e3b\u7ba1\u76d1\u7763\u4e0b\uff0c\u6309\u7167\u83b7\u6279\u56fe\u5219\u5b89\u88c5\u540e\u7f6e\u951a\u6813\u3002\u5982\u679c\u73b0\u573a\u6761\u4ef6\u4e0e\u8bbe\u8ba1\u5047\u8bbe\u4e0d\u540c\uff0c\u6216\u65e0\u6cd5\u6309\u7167\u83b7\u6279\u56fe\u5219\u65bd\u5de5\uff0c\u5fc5\u987b\u5728\u4f5c\u51fa\u66f4\u6539\u524d\u901a\u77e5\u5408\u683c\u8d1f\u8d23\u4eba\u5e76\u5f81\u6c42\u5176\u610f\u89c1\u3002\u5efa\u8bbe\u5c40\u58f0\u660e\uff0c\u672a\u7ecf\u5408\u683c\u8d1f\u8d23\u4eba\u540c\u610f\uff0c\u64c5\u81ea\u66f4\u6539\u951a\u6813\u7c7b\u578b\u3001\u4f4d\u7f6e\u3001\u914d\u7f6e\u6216\u94bb\u5b54\u6df1\u5ea6\u7684\u505a\u6cd5\u4e25\u683c\u7981\u6b62\u3002\u901a\u51fd\u5e76\u672a\u5c06\u5168\u90e8\u5b89\u5168\u8d23\u4efb\u8f6c\u79fb\u7ed9\u4ea7\u54c1\u4f9b\u5e94\u5546\u6216\u5b89\u88c5\u4eba\u5458\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u8fde\u63a5\u7a33\u5065\u6027\n\n\u6307\u5357\u7279\u522b\u5173\u6ce8\u53d7\u62c9\u548c\u60ac\u6302\u7ed3\u6784\uff0c\u56e0\u4e3a\u4e00\u6839\u53d7\u62c9\u6784\u4ef6\u5931\u6548\u540e\uff0c\u8377\u8f7d\u53ef\u80fd\u65e0\u6cd5\u5b89\u5168\u91cd\u65b0\u5206\u914d\uff0c\u5e76\u53ef\u80fd\u5bfc\u81f4\u8fde\u7eed\u5012\u584c\u3002\u5728\u53ef\u884c\u65f6\u4f18\u5148\u91c7\u7528\u526a\u529b\u8fde\u63a5\uff0c\u4f46\u4ecd\u987b\u8fdb\u884c\u9002\u5f53\u8bbe\u8ba1\uff0c\u5305\u62ec\u8003\u8651\u6df7\u51dd\u571f\u8fb9\u7f18\u7834\u574f\u3002\u91c7\u7528\u53d7\u62c9\u8fde\u63a5\u65f6\uff0c\u8bbe\u8ba1\u5e94\u63d0\u4f9b\u8db3\u591f\u5197\u4f59\uff0c\u907f\u514d\u5355\u4e2a\u6784\u4ef6\u5931\u6548\u5bfc\u81f4\u5176\u4f59\u951a\u6813\u6216\u6784\u4ef6\u8d85\u8f7d\u3002\u5bf9\u4e8e\u65b0\u5efa\u5de5\u7a0b\uff0c\u5728\u53ef\u884c\u65f6\u5efa\u8bae\u91c7\u7528\u9884\u57cb\u8fde\u63a5\uff0c\u800c\u975e\u540e\u7f6e\u8fde\u63a5\uff1b\u8fd9\u662f\u9488\u5bf9\u8fde\u63a5\u5177\u4f53\u60c5\u51b5\u63d0\u51fa\u7684\u5efa\u8bae\uff0c\u5e76\u975e\u666e\u904d\u7981\u6b62\u4f7f\u7528\u540e\u7f6e\u951a\u6813\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u6750\u6599\u3001\u4ea7\u54c1\u8ba4\u8bc1\u4e0e\u672c\u5730\u6807\u51c6\n\n\u951a\u6813\u6750\u6599\u548c\u9632\u8150\u63aa\u65bd\u5e94\u7b26\u5408\u73af\u5883\u66b4\u9732\u6761\u4ef6\u548c\u9884\u671f\u4f7f\u7528\u5bff\u547d\u3002\u5bf9\u4e8e\u66b4\u9732\u4e8e\u5929\u6c14\u73af\u5883\u7684\u5916\u90e8\u5e94\u7528\uff0c\u4f8b\u5982\u5e55\u5899\u548c\u8986\u5c42\u56fa\u5b9a\u4ef6\uff0c\u901a\u51fd\u79f0\u901a\u5e38\u5e94\u6307\u5b9a\u8010\u8150\u8680\u4e0d\u9508\u94a2\u951a\u6813\uff1b\u5728\u6d77\u6d0b\u6216\u9ad8\u6c2f\u73af\u5883\u4e2d\u5e94\u8003\u8651\u66f4\u9ad8\u7684\u8010\u8150\u8680\u6027\u3002\u540e\u7f6e\u951a\u6813\u4ea7\u54c1\u5e94\u4f9d\u636e\u951a\u6813\u7c7b\u578b\u548c\u9884\u671f\u7528\u9014\uff0c\u6301\u6709\u76f8\u5173\u6b27\u6d32\u8bc4\u4f30\u6587\u4ef6\u9879\u4e0b\u6709\u6548\u7684\u6b27\u6d32\u6280\u672f\u8bc4\u4f30\uff08ETA\uff09\u3002ETA \u4ec5\u9002\u7528\u4e8e\u7279\u5b9a\u4ea7\u54c1\u548c\u6761\u4ef6\uff1a\u53d6\u5f97 ETA \u7684\u4ea7\u54c1\u5e76\u975e\u81ea\u52a8\u7b49\u540c\uff0c\u8bbe\u8ba1\u503c\u548c\u53ef\u9009\u8bc4\u4f30\u4e5f\u53ef\u80fd\u4e0d\u540c\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u89e3\u91ca\u8303\u56f4\n\n\u8be5\u901a\u51fd\u662f\u5173\u4e8e\u5b89\u5168\u8bbe\u8ba1\u548c\u65bd\u5de5\u7684\u5de5\u7a0b\u6307\u5357\uff1b\u5b83\u6ca1\u6709\u6307\u5b9a\u5355\u4e00\u951a\u6813\u4ea7\u54c1\u6216\u5355\u4e00\u627f\u8f7d\u529b\u6570\u503c\uff0c\u4e5f\u6ca1\u6709\u5bf9\u6240\u6709\u5e94\u7528\u4f5c\u51fa\u666e\u904d\u6279\u51c6\u3002\u8bbe\u8ba1\u4eba\u5458\u5fc5\u987b\u8bc4\u4f30\u5b9e\u9645\u8fde\u63a5\u3001\u8377\u8f7d\u3001\u57fa\u6750\u3001\u8fb9\u8ddd\u3001\u73af\u5883\u66b4\u9732\u3001\u4ea7\u54c1\u8ba4\u8bc1\u8303\u56f4\u548c\u5b89\u88c5\u6761\u4ef6\u3002\u901a\u51fd\u8fd8\u63d0\u9192\u5408\u683c\u8d1f\u8d23\u4eba\u5c65\u884c\u300a\u5efa\u7b51\u7ba1\u5236\u6cd5\u300b\u53ca\u9644\u5c5e\u6cd5\u89c4\u89c4\u5b9a\u7684\u804c\u8d23\uff1b\u5efa\u7b51\u5546\u5fc5\u987b\u9075\u5b88\u83b7\u6279\u56fe\u5219\u548c\u76d1\u7763\u5b89\u6392\u3002\u56e0\u6b64\uff0c\u8bfb\u8005\u5e94\u4f9d\u636e\u76f8\u5173\u6807\u51c6\u5e76\u8fdb\u884c\u5408\u683c\u7684\u4e13\u4e1a\u8bc4\u4f30\uff0c\u4e0d\u5e94\u63a8\u65ad\u4efb\u4f55 ETA \u6216\u4efb\u4f55\u4e0d\u9508\u94a2\u951a\u6813\u90fd\u9002\u7528\u4e8e\u6240\u6709\u9879\u76ee\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002","summary":"\u5efa\u8bbe\u5c40\u3001ACES \u548c IES \u4e8e 2026 \u5e74\u4e5d\u6708\u53d1\u5e03\u4e86\u6709\u5173\u540e\u7f6e\u951a\u6813\u8fde\u63a5\u8bbe\u8ba1\u4e0e\u65bd\u5de5\u7684\u6307\u5357\uff0c\u5185\u5bb9\u5305\u62ec\u5408\u683c\u4ea7\u54c1\u3001\u5b89\u88c5\u3001\u6750\u6599\u548c\u8d28\u91cf\u4fdd\u8bc1\u65b9\u9762\u7684\u8003\u91cf\u3002","title":"\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357"}},"path":"geography-urban-planning\/post-installed-anchor-safety.md","related_source_ids":["sgkb.geography-urban-planning.proactive-facade-maintenance","sgkb.geography-urban-planning.suspended-ceiling-safety","sgkb.geography-urban-planning.ura-and-master-plan"],"source_hash":"d8455af675cfd0d56c2de1dfba2de54995535a2337d0ad251359b38baa03ff93","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"Joint BCA\/ACES\/IES Circular \u2014 Key Considerations for Post-Installed Anchors","url":"https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1"}]}},"search_text":"Post-Installed Anchor Safety Guidance\n\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357\nBCA, ACES and IES issued September 2026 guidance on the design and construction of post-installed-anchor connections, including qualified-product, installation, material and quality-assurance considerations.\n\u5efa\u8bbe\u5c40\u3001ACES \u548c IES \u4e8e 2026 \u5e74\u4e5d\u6708\u53d1\u5e03\u4e86\u6709\u5173\u540e\u7f6e\u951a\u6813\u8fde\u63a5\u8bbe\u8ba1\u4e0e\u65bd\u5de5\u7684\u6307\u5357\uff0c\u5185\u5bb9\u5305\u62ec\u5408\u683c\u4ea7\u54c1\u3001\u5b89\u88c5\u3001\u6750\u6599\u548c\u8d28\u91cf\u4fdd\u8bc1\u65b9\u9762\u7684\u8003\u91cf\u3002\n{\"aliases\":[\"post-installed anchors Singapore\",\"PIA safety guidance\",\"BCA PIA circular\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.post-installed-anchor-safety\",\"document_sha256\":\"aface5ab7fb17b465a09632d2ca0edae9aea203a1013a4ff75a9ff54d0a7c873\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.agency.bca\"],\"facets\":[\"current\",\"geography\",\"infrastructure\",\"law\",\"policy\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-09-01\",\"path\":\"geography-urban-planning\\\/post-installed-anchor-safety.md\",\"related\":[\"proactive-facade-maintenance\",\"suspended-ceiling-safety\",\"ura-and-master-plan\"],\"sources\":[{\"accessed\":\"2026-09-01\",\"published\":\"2026-09-01\",\"publisher\":\"Building and Construction Authority, Association of Consulting Engineers Singapore, and Institution of Engineers Singapore\",\"tier\":1,\"title\":\"Joint BCA\\\/ACES\\\/IES Circular \u2014 Key Considerations for Post-Installed Anchors\",\"url\":\"https:\\\/\\\/info.corenet.gov.sg\\\/docs\\\/default-source\\\/bca-circulars\\\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1\"}],\"status\":\"verified\",\"summary\":\"BCA, ACES and IES issued September 2026 guidance on the design and construction of post-installed-anchor connections, including qualified-product, installation, material and quality-assurance considerations.\",\"tags\":[\"policy\",\"regulation\",\"public-safety\",\"planning-area\"],\"temporal_scope\":\"current\",\"title\":\"Post-Installed Anchor Safety Guidance\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.post-installed-anchor-safety\"],\"volatility\":\"fast\"}\n# Post-Installed Anchor Safety Guidance\n\nThe Building and Construction Authority (BCA), Association of Consulting Engineers Singapore (ACES) and Institution of Engineers Singapore (IES) issued a joint circular on **1 September 2026** covering key considerations for connections using **post-installed anchors (PIAs)**. The circular responds to recurring shortcomings in PIA design and construction that BCA says have resulted in structural deficiencies. It provides practical guidance on connection design, material selection, product qualification, installation and quality assurance; it is intended for Qualified Persons (QPs), builders and other industry stakeholders ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Design and construction responsibility\n\nQPs are to incorporate the circular's considerations into their designs and ensure proper implementation during construction. Builders must install PIAs according to approved plans under the supervision of the QP's site supervisor. If site conditions differ from the design assumptions, or installation cannot follow the approved plans, the QP must be notified and consulted before changes are made. BCA states that deviations involving anchor type, location, configuration or drilled depth without the QP's concurrence are strictly prohibited. The circular does not transfer all safety responsibility to a product supplier or installer ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Connection robustness\n\nThe guidance gives particular attention to tension and hanging structures because failure of one tension member may not be safely redistributed and can contribute to progressive collapse. Shear connections are preferred where practicable, but they still require proper design, including consideration of concrete edge breakout. Where tension connections are used, the design should provide sufficient redundancy so that an isolated failure does not overload remaining anchors or members. For new construction, cast-in connections are recommended instead of post-installed connections where practicable; this is a recommendation tied to connection circumstances, not a universal ban on PIAs ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Materials, product qualification and local standards\n\nAnchor material and corrosion protection should match environmental exposure and intended service life. For external applications such as fa\u00e7ade and cladding fixings exposed to weather, the circular says corrosion-resistant stainless-steel anchors should generally be specified, with higher corrosion resistance considered in marine or high-chloride conditions. PIA products should hold a valid European Technical Assessment (ETA) under the relevant European Assessment Documents, depending on the anchor type and intended application. An ETA is product- and condition-specific: products with ETAs are not automatically equivalent, and design values and optional assessments can differ ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n\n## Interpretation boundary\n\nThe circular is engineering guidance for safe design and construction; it does not provide one anchor product, one capacity value or a universal approval for every application. Designers must assess the actual connection, loads, base material, edge distances, environmental exposure, product qualification scope and installation conditions. The circular also reminds QPs of their duties under the Building Control Act and subsidiary regulations, and builders must follow approved plans and supervision arrangements. Readers should therefore use the relevant standards and qualified professional assessment rather than infer that any ETA or any stainless-steel anchor is suitable for every project ([BCA\/ACES\/IES, 1 September 2026](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)).\n# \u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u3001\u65b0\u52a0\u5761\u54a8\u8be2\u5de5\u7a0b\u5e08\u534f\u4f1a\uff08ACES\uff09\u548c\u65b0\u52a0\u5761\u5de5\u7a0b\u5e08\u5b66\u4f1a\uff08IES\uff09\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5** \u8054\u5408\u53d1\u5e03\u901a\u51fd\uff0c\u6db5\u76d6\u91c7\u7528**\u540e\u7f6e\u951a\u6813\uff08PIA\uff09**\u7684\u8fde\u63a5\u7684\u5173\u952e\u8003\u91cf\u3002\u8be5\u901a\u51fd\u65e8\u5728\u56de\u5e94\u540e\u7f6e\u951a\u6813\u8bbe\u8ba1\u548c\u65bd\u5de5\u4e2d\u53cd\u590d\u51fa\u73b0\u7684\u7f3a\u9677\uff1b\u5efa\u8bbe\u5c40\u79f0\u8fd9\u4e9b\u7f3a\u9677\u5df2\u5bfc\u81f4\u7ed3\u6784\u95ee\u9898\u3002\u901a\u51fd\u5c31\u8fde\u63a5\u8bbe\u8ba1\u3001\u6750\u6599\u9009\u62e9\u3001\u4ea7\u54c1\u8ba4\u8bc1\u3001\u5b89\u88c5\u548c\u8d28\u91cf\u4fdd\u8bc1\u63d0\u4f9b\u5b9e\u7528\u6307\u5bfc\uff0c\u4f9b\u5408\u683c\u8d1f\u8d23\u4eba\uff08QP\uff09\u3001\u5efa\u7b51\u5546\u53ca\u5176\u4ed6\u884c\u4e1a\u5229\u76ca\u76f8\u5173\u8005\u53c2\u8003\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u8bbe\u8ba1\u4e0e\u65bd\u5de5\u8d23\u4efb\n\n\u5408\u683c\u8d1f\u8d23\u4eba\u5e94\u5c06\u901a\u51fd\u4e2d\u7684\u8003\u91cf\u7eb3\u5165\u8bbe\u8ba1\uff0c\u5e76\u786e\u4fdd\u65bd\u5de5\u671f\u95f4\u6b63\u786e\u5b9e\u65bd\u3002\u5efa\u7b51\u5546\u5fc5\u987b\u5728\u5408\u683c\u8d1f\u8d23\u4eba\u7684\u73b0\u573a\u4e3b\u7ba1\u76d1\u7763\u4e0b\uff0c\u6309\u7167\u83b7\u6279\u56fe\u5219\u5b89\u88c5\u540e\u7f6e\u951a\u6813\u3002\u5982\u679c\u73b0\u573a\u6761\u4ef6\u4e0e\u8bbe\u8ba1\u5047\u8bbe\u4e0d\u540c\uff0c\u6216\u65e0\u6cd5\u6309\u7167\u83b7\u6279\u56fe\u5219\u65bd\u5de5\uff0c\u5fc5\u987b\u5728\u4f5c\u51fa\u66f4\u6539\u524d\u901a\u77e5\u5408\u683c\u8d1f\u8d23\u4eba\u5e76\u5f81\u6c42\u5176\u610f\u89c1\u3002\u5efa\u8bbe\u5c40\u58f0\u660e\uff0c\u672a\u7ecf\u5408\u683c\u8d1f\u8d23\u4eba\u540c\u610f\uff0c\u64c5\u81ea\u66f4\u6539\u951a\u6813\u7c7b\u578b\u3001\u4f4d\u7f6e\u3001\u914d\u7f6e\u6216\u94bb\u5b54\u6df1\u5ea6\u7684\u505a\u6cd5\u4e25\u683c\u7981\u6b62\u3002\u901a\u51fd\u5e76\u672a\u5c06\u5168\u90e8\u5b89\u5168\u8d23\u4efb\u8f6c\u79fb\u7ed9\u4ea7\u54c1\u4f9b\u5e94\u5546\u6216\u5b89\u88c5\u4eba\u5458\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u8fde\u63a5\u7a33\u5065\u6027\n\n\u6307\u5357\u7279\u522b\u5173\u6ce8\u53d7\u62c9\u548c\u60ac\u6302\u7ed3\u6784\uff0c\u56e0\u4e3a\u4e00\u6839\u53d7\u62c9\u6784\u4ef6\u5931\u6548\u540e\uff0c\u8377\u8f7d\u53ef\u80fd\u65e0\u6cd5\u5b89\u5168\u91cd\u65b0\u5206\u914d\uff0c\u5e76\u53ef\u80fd\u5bfc\u81f4\u8fde\u7eed\u5012\u584c\u3002\u5728\u53ef\u884c\u65f6\u4f18\u5148\u91c7\u7528\u526a\u529b\u8fde\u63a5\uff0c\u4f46\u4ecd\u987b\u8fdb\u884c\u9002\u5f53\u8bbe\u8ba1\uff0c\u5305\u62ec\u8003\u8651\u6df7\u51dd\u571f\u8fb9\u7f18\u7834\u574f\u3002\u91c7\u7528\u53d7\u62c9\u8fde\u63a5\u65f6\uff0c\u8bbe\u8ba1\u5e94\u63d0\u4f9b\u8db3\u591f\u5197\u4f59\uff0c\u907f\u514d\u5355\u4e2a\u6784\u4ef6\u5931\u6548\u5bfc\u81f4\u5176\u4f59\u951a\u6813\u6216\u6784\u4ef6\u8d85\u8f7d\u3002\u5bf9\u4e8e\u65b0\u5efa\u5de5\u7a0b\uff0c\u5728\u53ef\u884c\u65f6\u5efa\u8bae\u91c7\u7528\u9884\u57cb\u8fde\u63a5\uff0c\u800c\u975e\u540e\u7f6e\u8fde\u63a5\uff1b\u8fd9\u662f\u9488\u5bf9\u8fde\u63a5\u5177\u4f53\u60c5\u51b5\u63d0\u51fa\u7684\u5efa\u8bae\uff0c\u5e76\u975e\u666e\u904d\u7981\u6b62\u4f7f\u7528\u540e\u7f6e\u951a\u6813\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u6750\u6599\u3001\u4ea7\u54c1\u8ba4\u8bc1\u4e0e\u672c\u5730\u6807\u51c6\n\n\u951a\u6813\u6750\u6599\u548c\u9632\u8150\u63aa\u65bd\u5e94\u7b26\u5408\u73af\u5883\u66b4\u9732\u6761\u4ef6\u548c\u9884\u671f\u4f7f\u7528\u5bff\u547d\u3002\u5bf9\u4e8e\u66b4\u9732\u4e8e\u5929\u6c14\u73af\u5883\u7684\u5916\u90e8\u5e94\u7528\uff0c\u4f8b\u5982\u5e55\u5899\u548c\u8986\u5c42\u56fa\u5b9a\u4ef6\uff0c\u901a\u51fd\u79f0\u901a\u5e38\u5e94\u6307\u5b9a\u8010\u8150\u8680\u4e0d\u9508\u94a2\u951a\u6813\uff1b\u5728\u6d77\u6d0b\u6216\u9ad8\u6c2f\u73af\u5883\u4e2d\u5e94\u8003\u8651\u66f4\u9ad8\u7684\u8010\u8150\u8680\u6027\u3002\u540e\u7f6e\u951a\u6813\u4ea7\u54c1\u5e94\u4f9d\u636e\u951a\u6813\u7c7b\u578b\u548c\u9884\u671f\u7528\u9014\uff0c\u6301\u6709\u76f8\u5173\u6b27\u6d32\u8bc4\u4f30\u6587\u4ef6\u9879\u4e0b\u6709\u6548\u7684\u6b27\u6d32\u6280\u672f\u8bc4\u4f30\uff08ETA\uff09\u3002ETA \u4ec5\u9002\u7528\u4e8e\u7279\u5b9a\u4ea7\u54c1\u548c\u6761\u4ef6\uff1a\u53d6\u5f97 ETA \u7684\u4ea7\u54c1\u5e76\u975e\u81ea\u52a8\u7b49\u540c\uff0c\u8bbe\u8ba1\u503c\u548c\u53ef\u9009\u8bc4\u4f30\u4e5f\u53ef\u80fd\u4e0d\u540c\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002\n\n## \u89e3\u91ca\u8303\u56f4\n\n\u8be5\u901a\u51fd\u662f\u5173\u4e8e\u5b89\u5168\u8bbe\u8ba1\u548c\u65bd\u5de5\u7684\u5de5\u7a0b\u6307\u5357\uff1b\u5b83\u6ca1\u6709\u6307\u5b9a\u5355\u4e00\u951a\u6813\u4ea7\u54c1\u6216\u5355\u4e00\u627f\u8f7d\u529b\u6570\u503c\uff0c\u4e5f\u6ca1\u6709\u5bf9\u6240\u6709\u5e94\u7528\u4f5c\u51fa\u666e\u904d\u6279\u51c6\u3002\u8bbe\u8ba1\u4eba\u5458\u5fc5\u987b\u8bc4\u4f30\u5b9e\u9645\u8fde\u63a5\u3001\u8377\u8f7d\u3001\u57fa\u6750\u3001\u8fb9\u8ddd\u3001\u73af\u5883\u66b4\u9732\u3001\u4ea7\u54c1\u8ba4\u8bc1\u8303\u56f4\u548c\u5b89\u88c5\u6761\u4ef6\u3002\u901a\u51fd\u8fd8\u63d0\u9192\u5408\u683c\u8d1f\u8d23\u4eba\u5c65\u884c\u300a\u5efa\u7b51\u7ba1\u5236\u6cd5\u300b\u53ca\u9644\u5c5e\u6cd5\u89c4\u89c4\u5b9a\u7684\u804c\u8d23\uff1b\u5efa\u7b51\u5546\u5fc5\u987b\u9075\u5b88\u83b7\u6279\u56fe\u5219\u548c\u76d1\u7763\u5b89\u6392\u3002\u56e0\u6b64\uff0c\u8bfb\u8005\u5e94\u4f9d\u636e\u76f8\u5173\u6807\u51c6\u5e76\u8fdb\u884c\u5408\u683c\u7684\u4e13\u4e1a\u8bc4\u4f30\uff0c\u4e0d\u5e94\u63a8\u65ad\u4efb\u4f55 ETA \u6216\u4efb\u4f55\u4e0d\u9508\u94a2\u951a\u6813\u90fd\u9002\u7528\u4e8e\u6240\u6709\u9879\u76ee\uff08[\u5efa\u8bbe\u5c40\/ACES\/IES\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/info.corenet.gov.sg\/docs\/default-source\/bca-circulars\/appbca-2026-15-key-considerations-fr-pias.pdf?sfvrsn=279121c4_1)\uff09\u3002"},"related":[{"id":90405,"source_id":"sgkb.geography-urban-planning.concrete-identity-testing-sampling","kind":"article","title_en":"Concrete Identity-Testing Sampling Guidance","title_zh":"\u6df7\u51dd\u571f\u8eab\u4efd\u68c0\u9a8c\u62bd\u6837\u6307\u5357","assurance":null,"subtype":null},{"id":90409,"source_id":"sgkb.geography-urban-planning.fixed-installation-regulations-2025","kind":"article","title_en":"Fixed Installation Regulations 2025","title_zh":"\u56fa\u5b9a\u88c5\u7f6e\u6cd5\u89c4 2025","assurance":null,"subtype":null},{"id":90415,"source_id":"sgkb.geography-urban-planning.iacc-resolution-platform","kind":"article","title_en":"Inter-Agency Coordinating Committee Resolution Platform","title_zh":"\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0","assurance":null,"subtype":null},{"id":90429,"source_id":"sgkb.geography-urban-planning.proactive-facade-maintenance","kind":"article","title_en":"Proactive Fa\u00e7ade Maintenance Guidance","title_zh":"\u5916\u5899\u4e3b\u52a8\u7ef4\u62a4\u6307\u5357","assurance":null,"subtype":null},{"id":90433,"source_id":"sgkb.geography-urban-planning.reused-steel-framework-2026","kind":"article","title_en":"Reused Steel Framework 2026","title_zh":"\u518d\u7528\u94a2\u6750\u6846\u67b6 2026","assurance":null,"subtype":null},{"id":90436,"source_id":"sgkb.geography-urban-planning.suspended-ceiling-safety","kind":"article","title_en":"Suspended Ceiling Safety Advisory","title_zh":"\u60ac\u6302\u5f0f\u5929\u82b1\u677f\u5b89\u5168\u901a\u544a","assurance":null,"subtype":null},{"id":90437,"source_id":"sgkb.geography-urban-planning.ura-and-master-plan","kind":"article","title_en":"URA and the Master Plan","title_zh":"\u5e02\u533a\u91cd\u5efa\u5c40\u4e0e\u603b\u4f53\u89c4\u5212","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null},{"id":92624,"source_id":"sgtopic.geography-urban-planning.post-installed-anchor-safety","kind":"topic","title_en":"Post-Installed Anchor Safety Guidance","title_zh":"\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357","assurance":null,"subtype":null}]}