{"release_id":19,"data":{"id":90415,"release_id":19,"source_id":"sgkb.geography-urban-planning.iacc-resolution-platform","kind":"article","fingerprint":"fd7aa00e0ca89c112e793eb59c3022ee3be6a327211091e3072306eee9ad744c","title_en":"Inter-Agency Coordinating Committee Resolution Platform","title_zh":"\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-09-01","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["IACC Resolution platform","IACC FormSG","inter-agency regulatory resolution"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.iacc-resolution-platform","document_sha256":"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2","document_type":"article","domain":"geography-urban-planning","entities":["sg.agency.bca"],"facets":["current","geography","infrastructure","law","policy","procedure"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-09-01","path":"geography-urban-planning\/iacc-resolution-platform.md","related":["ura-and-master-plan","post-installed-anchor-safety"],"sources":[{"accessed":"2026-11-08","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Inter-Agency Coordinating Committee (IACC)","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/"},{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC Resolution Platform: Launch of FormSG","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"},{"accessed":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC FormSG lodgement portal","url":"https:\/\/go.gov.sg\/iacc-lodgement"}],"status":"verified","summary":"BCA's IACC Resolution platform helps project teams resolve conflicting regulatory requirements across agencies; a FormSG lodgement portal launched on 1 September 2026 to replace email submissions.","tags":["policy","regulation","planning-area","how-to"],"temporal_scope":"current","title":"Inter-Agency Coordinating Committee Resolution Platform","topics":["sgtopic.geography","sgtopic.geography-urban-planning.iacc-resolution-platform"],"volatility":"fast"},"date":"2026-09-01","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/iacc-resolution-platform.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl","artefacts\/mentions.jsonl"],"expected_version":12,"input_hash":"e4ae2520e7837564315584548bcac832e7e17a18103e1f9a6965aef0b69b431a","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.iacc-resolution-platform#overview","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"],"content_sha256":"508a54ec834427deb3d3ff52bdc90990a91491156d30a53af643e4c3803205ff","document_id":"sgkb.geography-urban-planning.iacc-resolution-platform","document_sha256":"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC Resolution Platform: Launch of FormSG","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.iacc-resolution-platform#formsg-lodgement-change","citation_urls":["https:\/\/go.gov.sg\/iacc-lodgement","https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"],"content_sha256":"6222958e07e0b8d41a558b02b5b68657057949f03754e5ce37ec910a2516466c","document_id":"sgkb.geography-urban-planning.iacc-resolution-platform","document_sha256":"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC Resolution Platform: Launch of FormSG","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"},{"accessed":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC FormSG lodgement portal","url":"https:\/\/go.gov.sg\/iacc-lodgement"}]},{"chunk_id":"sgkb.geography-urban-planning.iacc-resolution-platform#what-the-platform-resolves","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"],"content_sha256":"c6999db8b28427a3bb986bab9aa51ca4a75092b69e33c300f25b59077e2e39af","document_id":"sgkb.geography-urban-planning.iacc-resolution-platform","document_sha256":"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC Resolution Platform: Launch of FormSG","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.iacc-resolution-platform#who-participates-and-what-to-prepare","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/"],"content_sha256":"d3d902c65768190781b21c8f6b8b9832553c8ebca441e7e476bf903a2f039a1b","document_id":"sgkb.geography-urban-planning.iacc-resolution-platform","document_sha256":"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2","section_sources":[{"accessed":"2026-11-08","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Inter-Agency Coordinating Committee (IACC)","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/"}]},{"chunk_id":"sgkb.geography-urban-planning.iacc-resolution-platform#reported-resolution-performance-and-interpretation","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"],"content_sha256":"a0e34c9b1d30a6daf721b656d0fdfb0aefc70f3c53b468352f6d73a2d750d9ea","document_id":"sgkb.geography-urban-planning.iacc-resolution-platform","document_sha256":"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2","section_sources":[{"accessed":"2026-09-01","published":"2026-09-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 IACC Resolution Platform: Launch of FormSG","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"}]}],"links":[{"relation":"related","target_id":"sgkb.geography-urban-planning.ura-and-master-plan"},{"relation":"related","target_id":"sgkb.geography-urban-planning.post-installed-anchor-safety"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.iacc-resolution-platform"},{"relation":"entities","target_id":"sg.agency.bca"},{"relation":"mentions","target_id":"sg.agency.nparks"}],"locales":{"en":{"markdown":"# Inter-Agency Coordinating Committee Resolution Platform\n\nThe **Inter-Agency Coordinating Committee (IACC) Resolution platform** is a Singapore construction-project channel for resolving issues caused by conflicting regulatory requirements across two or more agencies. BCA's circular dated **1 September 2026** says the platform has handled cases lodged by industry practitioners since 2019 and that IACC holds regular monthly resolution meetings. Its purpose is to help project teams surface cross-agency regulatory conflicts early, so that issues can be clarified before they become clearance or construction delays ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## FormSG lodgement change\n\nThe new **FormSG** portal at [go.gov.sg\/iacc-lodgement](https:\/\/go.gov.sg\/iacc-lodgement) was scheduled to go live on **1 September 2026**. It replaces the previous email-based submission process for new IACC case lodgements. BCA says FormSG is designed to guide industry users to provide more complete and higher-quality information at first lodgement, and to enable concurrent dissemination of a case to relevant agencies rather than relying only on sequential workflows. New cases submitted by email are directed to the FormSG portal under the revised process ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## What the platform resolves\n\nThe platform is for project issues arising from conflicting or competing regulatory requirements between agencies. Under the earlier process, the IACC Secretariat could seek clarification from a project team before disseminating a case to relevant agencies. The revised workflow aims to identify information gaps earlier and allow agencies to consider a case concurrently. This is a coordination and resolution route; it does not itself grant planning permission, building approval, a regulatory exemption or a decision that overrides an individual agency's statutory requirements ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## Who participates and what to prepare\n\nBCA describes IACC as a tripartite coordinating committee formed in July 2011. It brings together regulators, public-sector developers and built-environment trade associations, and is chaired by BCA's Deputy Chief Executive Officer (Building Control). Standing regulatory members include BCA, LTA, NEA, NParks, PUB, SCDF and URA; EMA and IMDA are also represented. JTC, HDB and Town Councils represent public-sector developers, while ACES, IES, REDAS, SCAL and SIA represent industry. Beyond individual project conflicts, IACC can act as a sounding board on new rules and help identify systemic clashes or cross-agency process improvements. For a project-level case, BCA asks applicants to provide a clear account of the issue, supporting drawings or other documents and relevant agency discussions, the outcome sought, and any proposed alternative solution after considering agencies' responses. The resolution process starts once the case is sufficiently clear for agencies to assess ([BCA, IACC page](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/)).\n\n## Reported resolution performance and interpretation\n\nBCA's circular reports that **more than 90%** of cases lodged from **2021 onwards** were effectively resolved within **three months**, based on recent IACC records. The percentage describes the cases and period covered by that statement; it is not a guarantee that a new case will be resolved within three months and does not establish that every regulatory conflict is eligible or technically solvable through IACC. Project practitioners are encouraged to surface issues as early as necessary to minimise potential impasses in project clearance and construction ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).","summary":"BCA's IACC Resolution platform helps project teams resolve conflicting regulatory requirements across agencies; a FormSG lodgement portal launched on 1 September 2026 to replace email submissions.","title":"Inter-Agency Coordinating Committee Resolution Platform"},"zh":{"markdown":"# \u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0\n\n**\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0**\u662f\u65b0\u52a0\u5761\u5efa\u7b51\u9879\u76ee\u4f7f\u7528\u7684\u6e20\u9053\uff0c\u7528\u4e8e\u89e3\u51b3\u4e24\u4e2a\u6216\u591a\u4e2a\u673a\u6784\u4e4b\u95f4\u76d1\u7ba1\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u6240\u5f15\u53d1\u7684\u95ee\u9898\u3002\u5efa\u8bbe\u5c40\uff08BCA\uff09\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5**\u53d1\u5e03\u7684\u901a\u544a\u6307\u51fa\uff0c\u81ea 2019 \u5e74\u4ee5\u6765\uff0c\u8be5\u5e73\u53f0\u5df2\u5904\u7406\u4e1a\u754c\u4eba\u58eb\u63d0\u4ea4\u7684\u4e2a\u6848\uff0c\u800c IACC \u5b9a\u671f\u6bcf\u6708\u4e3e\u884c\u95ee\u9898\u89e3\u51b3\u4f1a\u8bae\u3002\u8be5\u5e73\u53f0\u65e8\u5728\u534f\u52a9\u9879\u76ee\u56e2\u961f\u53ca\u65e9\u63d0\u51fa\u8de8\u673a\u6784\u76d1\u7ba1\u51b2\u7a81\uff0c\u4ee5\u4fbf\u5728\u95ee\u9898\u6f14\u53d8\u4e3a\u5ba1\u6279\u6216\u65bd\u5de5\u5ef6\u8bef\u4e4b\u524d\u4e88\u4ee5\u6f84\u6e05\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## FormSG \u63d0\u4ea4\u65b9\u5f0f\u53d8\u66f4\n\n\u65b0\u7684 [FormSG](https:\/\/go.gov.sg\/iacc-lodgement) \u95e8\u6237\u539f\u5b9a\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5**\u542f\u7528\u3002\u8be5\u95e8\u6237\u53d6\u4ee3\u6b64\u524d\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b0\u7684 IACC \u4e2a\u6848\u7684\u6d41\u7a0b\u3002BCA \u8868\u793a\uff0cFormSG \u65e8\u5728\u5f15\u5bfc\u4e1a\u754c\u7528\u6237\u5728\u9996\u6b21\u63d0\u4ea4\u65f6\u63d0\u4f9b\u66f4\u5b8c\u6574\u3001\u8d28\u91cf\u66f4\u9ad8\u7684\u4fe1\u606f\uff0c\u5e76\u8ba9\u4e2a\u6848\u540c\u65f6\u5206\u53d1\u7ed9\u76f8\u5173\u673a\u6784\uff0c\u800c\u4e0d\u518d\u4ec5\u4f9d\u8d56\u5faa\u5e8f\u5904\u7406\u7684\u5de5\u4f5c\u6d41\u7a0b\u3002\u6839\u636e\u4fee\u8ba2\u540e\u7684\u6d41\u7a0b\uff0c\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u7684\u65b0\u4e2a\u6848\u5c06\u88ab\u5f15\u5bfc\u81f3 FormSG \u95e8\u6237\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## \u5e73\u53f0\u5904\u7406\u7684\u95ee\u9898\n\n\u8be5\u5e73\u53f0\u7528\u4e8e\u5904\u7406\u56e0\u5404\u673a\u6784\u4e4b\u95f4\u76d1\u7ba1\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u6216\u5b58\u5728\u7ade\u4e89\u800c\u4ea7\u751f\u7684\u9879\u76ee\u95ee\u9898\u3002\u6839\u636e\u65e9\u524d\u7684\u6d41\u7a0b\uff0cIACC \u79d8\u4e66\u5904\u53ef\u5728\u5c06\u4e2a\u6848\u5206\u53d1\u7ed9\u76f8\u5173\u673a\u6784\u4e4b\u524d\uff0c\u5148\u5411\u9879\u76ee\u56e2\u961f\u5bfb\u6c42\u6f84\u6e05\u3002\u4fee\u8ba2\u540e\u7684\u5de5\u4f5c\u6d41\u7a0b\u65e8\u5728\u53ca\u65e9\u53d1\u73b0\u4fe1\u606f\u7f3a\u53e3\uff0c\u5e76\u8ba9\u5404\u673a\u6784\u540c\u65f6\u5ba1\u8bae\u4e2a\u6848\u3002\u8fd9\u662f\u4e00\u4e2a\u534f\u8c03\u548c\u89e3\u51b3\u95ee\u9898\u7684\u6e20\u9053\uff1b\u5e73\u53f0\u672c\u8eab\u4e0d\u4f1a\u6388\u4e88\u89c4\u5212\u8bb8\u53ef\u3001\u5efa\u7b51\u6279\u51c6\u3001\u76d1\u7ba1\u8c41\u514d\uff0c\u4e5f\u4e0d\u4f1a\u4f5c\u51fa\u51cc\u9a7e\u4e8e\u4e2a\u522b\u673a\u6784\u6cd5\u5b9a\u8981\u6c42\u4e4b\u4e0a\u7684\u51b3\u5b9a\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## \u53c2\u4e0e\u8005\u53ca\u6240\u9700\u51c6\u5907\n\nBCA \u4ecb\u7ecd\uff0cIACC \u662f\u4e00\u4e2a\u4e8e 2011 \u5e74\u4e03\u6708\u6210\u7acb\u7684\u4e09\u65b9\u534f\u8c03\u59d4\u5458\u4f1a\uff0c\u6210\u5458\u5305\u62ec\u76d1\u7ba1\u673a\u6784\u3001\u516c\u5171\u90e8\u95e8\u5f00\u53d1\u5546\u548c\u5efa\u6210\u73af\u5883\u884c\u4e1a\u534f\u4f1a\uff0c\u7531 BCA \u526f\u9996\u5e2d\u6267\u884c\u5b98\uff08\u5efa\u7b51\u7ba1\u5236\uff09\u62c5\u4efb\u4e3b\u5e2d\u3002\u5e38\u8bbe\u76d1\u7ba1\u673a\u6784\u6210\u5458\u5305\u62ec BCA\u3001\u9646\u8def\u4ea4\u901a\u7ba1\u7406\u5c40\uff08LTA\uff09\u3001\u56fd\u5bb6\u73af\u5883\u5c40\uff08NEA\uff09\u3001\u56fd\u5bb6\u516c\u56ed\u5c40\uff08NParks\uff09\u3001\u516c\u7528\u4e8b\u4e1a\u5c40\uff08PUB\uff09\u3001\u65b0\u52a0\u5761\u6c11\u9632\u90e8\u961f\uff08SCDF\uff09\u548c\u5e02\u533a\u91cd\u5efa\u5c40\uff08URA\uff09\uff1b\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\uff08EMA\uff09\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\uff08IMDA\uff09\u4e5f\u6709\u4ee3\u8868\u53c2\u4e0e\u3002\u88d5\u5eca\u96c6\u56e2\uff08JTC\uff09\u3001\u5efa\u5c4b\u53d1\u5c55\u5c40\uff08HDB\uff09\u548c\u5e02\u9547\u7406\u4e8b\u4f1a\u4ee3\u8868\u516c\u5171\u90e8\u95e8\u5f00\u53d1\u5546\uff1bACES\u3001IES\u3001REDAS\u3001SCAL \u548c SIA \u5219\u4ee3\u8868\u4e1a\u754c\u3002\u9664\u4e86\u5904\u7406\u4e2a\u522b\u9879\u76ee\u51b2\u7a81\uff0cIACC \u8fd8\u53ef\u5c31\u65b0\u89c4\u7ae0\u63d0\u4f9b\u610f\u89c1\uff0c\u5e76\u534f\u52a9\u8bc6\u522b\u7cfb\u7edf\u6027\u51b2\u7a81\u6216\u6539\u8fdb\u8de8\u673a\u6784\u6d41\u7a0b\u3002\u5bf9\u4e8e\u9879\u76ee\u5c42\u9762\u7684\u4e2a\u6848\uff0cBCA \u8981\u6c42\u7533\u8bf7\u4eba\u63d0\u4f9b\u6e05\u6670\u7684\u95ee\u9898\u8bf4\u660e\u3001\u652f\u6301\u6027\u56fe\u7eb8\u6216\u5176\u4ed6\u6587\u4ef6\u53ca\u76f8\u5173\u673a\u6784\u8ba8\u8bba\u60c5\u51b5\u3001\u671f\u671b\u53d6\u5f97\u7684\u7ed3\u679c\uff0c\u4ee5\u53ca\u8003\u8651\u5404\u673a\u6784\u56de\u5e94\u540e\u63d0\u51fa\u7684\u4efb\u4f55\u66ff\u4ee3\u65b9\u6848\u3002\u5f85\u4e2a\u6848\u5185\u5bb9\u8db3\u591f\u6e05\u6670\u3001\u53ef\u4f9b\u5404\u673a\u6784\u8bc4\u4f30\u540e\uff0c\u95ee\u9898\u89e3\u51b3\u6d41\u7a0b\u4fbf\u4f1a\u5f00\u59cb\uff08[BCA\uff0cIACC \u9875\u9762](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/)\uff09\u3002\n\n## \u5df2\u62a5\u544a\u7684\u95ee\u9898\u89e3\u51b3\u6210\u6548\u53ca\u89e3\u8bfb\n\nBCA \u7684\u901a\u544a\u62a5\u544a\u79f0\uff0c\u6839\u636e IACC \u8fd1\u671f\u8bb0\u5f55\uff0c**2021 \u5e74\u8d77**\u63d0\u4ea4\u7684\u4e2a\u6848\u4e2d\uff0c**\u8d85\u8fc7 90%** \u5df2\u5728 **\u4e09\u4e2a\u6708\u5185**\u5f97\u5230\u6709\u6548\u89e3\u51b3\u3002\u8be5\u767e\u5206\u6bd4\u4ec5\u63cf\u8ff0\u8be5\u58f0\u660e\u6240\u6db5\u76d6\u7684\u4e2a\u6848\u548c\u671f\u95f4\uff1b\u8fd9\u5e76\u4e0d\u4fdd\u8bc1\u65b0\u7684\u4e2a\u6848\u4f1a\u5728\u4e09\u4e2a\u6708\u5185\u5f97\u5230\u89e3\u51b3\uff0c\u4e5f\u4e0d\u4ee3\u8868\u6bcf\u9879\u76d1\u7ba1\u51b2\u7a81\u90fd\u7b26\u5408 IACC \u5904\u7406\u8d44\u683c\uff0c\u6216\u90fd\u80fd\u901a\u8fc7 IACC \u4ece\u6280\u672f\u4e0a\u89e3\u51b3\u3002BCA \u9f13\u52b1\u9879\u76ee\u4ece\u4e1a\u8005\u5728\u6709\u9700\u8981\u65f6\u5c3d\u65e9\u63d0\u51fa\u95ee\u9898\uff0c\u4ee5\u5c3d\u91cf\u51cf\u5c11\u9879\u76ee\u5ba1\u6279\u548c\u65bd\u5de5\u8fc7\u7a0b\u4e2d\u53ef\u80fd\u51fa\u73b0\u7684\u50f5\u5c40\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002","summary":"\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 IACC \u95ee\u9898\u89e3\u51b3\u5e73\u53f0\u534f\u52a9\u9879\u76ee\u56e2\u961f\u89e3\u51b3\u5404\u673a\u6784\u4e4b\u95f4\u76f8\u4e92\u51b2\u7a81\u7684\u76d1\u7ba1\u8981\u6c42\uff1bFormSG \u63d0\u4ea4\u95e8\u6237\u4e8e 2026 \u5e74\u4e5d\u6708 1 \u65e5\u542f\u7528\uff0c\u4ee5\u53d6\u4ee3\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b9\u5f0f\u3002","title":"\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0"}},"source_id":"sgkb.geography-urban-planning.iacc-resolution-platform","status":"verified","summary_en":"BCA's IACC Resolution platform helps project teams resolve conflicting regulatory requirements across agencies; a FormSG lodgement portal launched on 1 September 2026 to replace email submissions.","summary_zh":"\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 IACC \u95ee\u9898\u89e3\u51b3\u5e73\u53f0\u534f\u52a9\u9879\u76ee\u56e2\u961f\u89e3\u51b3\u5404\u673a\u6784\u4e4b\u95f4\u76f8\u4e92\u51b2\u7a81\u7684\u76d1\u7ba1\u8981\u6c42\uff1bFormSG \u63d0\u4ea4\u95e8\u6237\u4e8e 2026 \u5e74\u4e5d\u6708 1 \u65e5\u542f\u7528\uff0c\u4ee5\u53d6\u4ee3\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b9\u5f0f\u3002","title_en":"Inter-Agency Coordinating Committee Resolution Platform","title_zh":"\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0","wiki":{"domain":"geography-urban-planning","last_verified":"2026-09-01","locales":{"en":{"markdown":"# Inter-Agency Coordinating Committee Resolution Platform\n\nThe **Inter-Agency Coordinating Committee (IACC) Resolution platform** is a Singapore construction-project channel for resolving issues caused by conflicting regulatory requirements across two or more agencies. BCA's circular dated **1 September 2026** says the platform has handled cases lodged by industry practitioners since 2019 and that IACC holds regular monthly resolution meetings. Its purpose is to help project teams surface cross-agency regulatory conflicts early, so that issues can be clarified before they become clearance or construction delays ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## FormSG lodgement change\n\nThe new **FormSG** portal at [go.gov.sg\/iacc-lodgement](https:\/\/go.gov.sg\/iacc-lodgement) was scheduled to go live on **1 September 2026**. It replaces the previous email-based submission process for new IACC case lodgements. BCA says FormSG is designed to guide industry users to provide more complete and higher-quality information at first lodgement, and to enable concurrent dissemination of a case to relevant agencies rather than relying only on sequential workflows. New cases submitted by email are directed to the FormSG portal under the revised process ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## What the platform resolves\n\nThe platform is for project issues arising from conflicting or competing regulatory requirements between agencies. Under the earlier process, the IACC Secretariat could seek clarification from a project team before disseminating a case to relevant agencies. The revised workflow aims to identify information gaps earlier and allow agencies to consider a case concurrently. This is a coordination and resolution route; it does not itself grant planning permission, building approval, a regulatory exemption or a decision that overrides an individual agency's statutory requirements ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## Who participates and what to prepare\n\nBCA describes IACC as a tripartite coordinating committee formed in July 2011. It brings together regulators, public-sector developers and built-environment trade associations, and is chaired by BCA's Deputy Chief Executive Officer (Building Control). Standing regulatory members include BCA, LTA, NEA, NParks, PUB, SCDF and URA; EMA and IMDA are also represented. JTC, HDB and Town Councils represent public-sector developers, while ACES, IES, REDAS, SCAL and SIA represent industry. Beyond individual project conflicts, IACC can act as a sounding board on new rules and help identify systemic clashes or cross-agency process improvements. For a project-level case, BCA asks applicants to provide a clear account of the issue, supporting drawings or other documents and relevant agency discussions, the outcome sought, and any proposed alternative solution after considering agencies' responses. The resolution process starts once the case is sufficiently clear for agencies to assess ([BCA, IACC page](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/)).\n\n## Reported resolution performance and interpretation\n\nBCA's circular reports that **more than 90%** of cases lodged from **2021 onwards** were effectively resolved within **three months**, based on recent IACC records. The percentage describes the cases and period covered by that statement; it is not a guarantee that a new case will be resolved within three months and does not establish that every regulatory conflict is eligible or technically solvable through IACC. Project practitioners are encouraged to surface issues as early as necessary to minimise potential impasses in project clearance and construction ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).","summary":"BCA's IACC Resolution platform helps project teams resolve conflicting regulatory requirements across agencies; a FormSG lodgement portal launched on 1 September 2026 to replace email submissions.","title":"Inter-Agency Coordinating Committee Resolution Platform"},"zh":{"markdown":"# \u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0\n\n**\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0**\u662f\u65b0\u52a0\u5761\u5efa\u7b51\u9879\u76ee\u4f7f\u7528\u7684\u6e20\u9053\uff0c\u7528\u4e8e\u89e3\u51b3\u4e24\u4e2a\u6216\u591a\u4e2a\u673a\u6784\u4e4b\u95f4\u76d1\u7ba1\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u6240\u5f15\u53d1\u7684\u95ee\u9898\u3002\u5efa\u8bbe\u5c40\uff08BCA\uff09\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5**\u53d1\u5e03\u7684\u901a\u544a\u6307\u51fa\uff0c\u81ea 2019 \u5e74\u4ee5\u6765\uff0c\u8be5\u5e73\u53f0\u5df2\u5904\u7406\u4e1a\u754c\u4eba\u58eb\u63d0\u4ea4\u7684\u4e2a\u6848\uff0c\u800c IACC \u5b9a\u671f\u6bcf\u6708\u4e3e\u884c\u95ee\u9898\u89e3\u51b3\u4f1a\u8bae\u3002\u8be5\u5e73\u53f0\u65e8\u5728\u534f\u52a9\u9879\u76ee\u56e2\u961f\u53ca\u65e9\u63d0\u51fa\u8de8\u673a\u6784\u76d1\u7ba1\u51b2\u7a81\uff0c\u4ee5\u4fbf\u5728\u95ee\u9898\u6f14\u53d8\u4e3a\u5ba1\u6279\u6216\u65bd\u5de5\u5ef6\u8bef\u4e4b\u524d\u4e88\u4ee5\u6f84\u6e05\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## FormSG \u63d0\u4ea4\u65b9\u5f0f\u53d8\u66f4\n\n\u65b0\u7684 [FormSG](https:\/\/go.gov.sg\/iacc-lodgement) \u95e8\u6237\u539f\u5b9a\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5**\u542f\u7528\u3002\u8be5\u95e8\u6237\u53d6\u4ee3\u6b64\u524d\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b0\u7684 IACC \u4e2a\u6848\u7684\u6d41\u7a0b\u3002BCA \u8868\u793a\uff0cFormSG \u65e8\u5728\u5f15\u5bfc\u4e1a\u754c\u7528\u6237\u5728\u9996\u6b21\u63d0\u4ea4\u65f6\u63d0\u4f9b\u66f4\u5b8c\u6574\u3001\u8d28\u91cf\u66f4\u9ad8\u7684\u4fe1\u606f\uff0c\u5e76\u8ba9\u4e2a\u6848\u540c\u65f6\u5206\u53d1\u7ed9\u76f8\u5173\u673a\u6784\uff0c\u800c\u4e0d\u518d\u4ec5\u4f9d\u8d56\u5faa\u5e8f\u5904\u7406\u7684\u5de5\u4f5c\u6d41\u7a0b\u3002\u6839\u636e\u4fee\u8ba2\u540e\u7684\u6d41\u7a0b\uff0c\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u7684\u65b0\u4e2a\u6848\u5c06\u88ab\u5f15\u5bfc\u81f3 FormSG \u95e8\u6237\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## \u5e73\u53f0\u5904\u7406\u7684\u95ee\u9898\n\n\u8be5\u5e73\u53f0\u7528\u4e8e\u5904\u7406\u56e0\u5404\u673a\u6784\u4e4b\u95f4\u76d1\u7ba1\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u6216\u5b58\u5728\u7ade\u4e89\u800c\u4ea7\u751f\u7684\u9879\u76ee\u95ee\u9898\u3002\u6839\u636e\u65e9\u524d\u7684\u6d41\u7a0b\uff0cIACC \u79d8\u4e66\u5904\u53ef\u5728\u5c06\u4e2a\u6848\u5206\u53d1\u7ed9\u76f8\u5173\u673a\u6784\u4e4b\u524d\uff0c\u5148\u5411\u9879\u76ee\u56e2\u961f\u5bfb\u6c42\u6f84\u6e05\u3002\u4fee\u8ba2\u540e\u7684\u5de5\u4f5c\u6d41\u7a0b\u65e8\u5728\u53ca\u65e9\u53d1\u73b0\u4fe1\u606f\u7f3a\u53e3\uff0c\u5e76\u8ba9\u5404\u673a\u6784\u540c\u65f6\u5ba1\u8bae\u4e2a\u6848\u3002\u8fd9\u662f\u4e00\u4e2a\u534f\u8c03\u548c\u89e3\u51b3\u95ee\u9898\u7684\u6e20\u9053\uff1b\u5e73\u53f0\u672c\u8eab\u4e0d\u4f1a\u6388\u4e88\u89c4\u5212\u8bb8\u53ef\u3001\u5efa\u7b51\u6279\u51c6\u3001\u76d1\u7ba1\u8c41\u514d\uff0c\u4e5f\u4e0d\u4f1a\u4f5c\u51fa\u51cc\u9a7e\u4e8e\u4e2a\u522b\u673a\u6784\u6cd5\u5b9a\u8981\u6c42\u4e4b\u4e0a\u7684\u51b3\u5b9a\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## \u53c2\u4e0e\u8005\u53ca\u6240\u9700\u51c6\u5907\n\nBCA \u4ecb\u7ecd\uff0cIACC \u662f\u4e00\u4e2a\u4e8e 2011 \u5e74\u4e03\u6708\u6210\u7acb\u7684\u4e09\u65b9\u534f\u8c03\u59d4\u5458\u4f1a\uff0c\u6210\u5458\u5305\u62ec\u76d1\u7ba1\u673a\u6784\u3001\u516c\u5171\u90e8\u95e8\u5f00\u53d1\u5546\u548c\u5efa\u6210\u73af\u5883\u884c\u4e1a\u534f\u4f1a\uff0c\u7531 BCA \u526f\u9996\u5e2d\u6267\u884c\u5b98\uff08\u5efa\u7b51\u7ba1\u5236\uff09\u62c5\u4efb\u4e3b\u5e2d\u3002\u5e38\u8bbe\u76d1\u7ba1\u673a\u6784\u6210\u5458\u5305\u62ec BCA\u3001\u9646\u8def\u4ea4\u901a\u7ba1\u7406\u5c40\uff08LTA\uff09\u3001\u56fd\u5bb6\u73af\u5883\u5c40\uff08NEA\uff09\u3001\u56fd\u5bb6\u516c\u56ed\u5c40\uff08NParks\uff09\u3001\u516c\u7528\u4e8b\u4e1a\u5c40\uff08PUB\uff09\u3001\u65b0\u52a0\u5761\u6c11\u9632\u90e8\u961f\uff08SCDF\uff09\u548c\u5e02\u533a\u91cd\u5efa\u5c40\uff08URA\uff09\uff1b\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\uff08EMA\uff09\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\uff08IMDA\uff09\u4e5f\u6709\u4ee3\u8868\u53c2\u4e0e\u3002\u88d5\u5eca\u96c6\u56e2\uff08JTC\uff09\u3001\u5efa\u5c4b\u53d1\u5c55\u5c40\uff08HDB\uff09\u548c\u5e02\u9547\u7406\u4e8b\u4f1a\u4ee3\u8868\u516c\u5171\u90e8\u95e8\u5f00\u53d1\u5546\uff1bACES\u3001IES\u3001REDAS\u3001SCAL \u548c SIA \u5219\u4ee3\u8868\u4e1a\u754c\u3002\u9664\u4e86\u5904\u7406\u4e2a\u522b\u9879\u76ee\u51b2\u7a81\uff0cIACC \u8fd8\u53ef\u5c31\u65b0\u89c4\u7ae0\u63d0\u4f9b\u610f\u89c1\uff0c\u5e76\u534f\u52a9\u8bc6\u522b\u7cfb\u7edf\u6027\u51b2\u7a81\u6216\u6539\u8fdb\u8de8\u673a\u6784\u6d41\u7a0b\u3002\u5bf9\u4e8e\u9879\u76ee\u5c42\u9762\u7684\u4e2a\u6848\uff0cBCA \u8981\u6c42\u7533\u8bf7\u4eba\u63d0\u4f9b\u6e05\u6670\u7684\u95ee\u9898\u8bf4\u660e\u3001\u652f\u6301\u6027\u56fe\u7eb8\u6216\u5176\u4ed6\u6587\u4ef6\u53ca\u76f8\u5173\u673a\u6784\u8ba8\u8bba\u60c5\u51b5\u3001\u671f\u671b\u53d6\u5f97\u7684\u7ed3\u679c\uff0c\u4ee5\u53ca\u8003\u8651\u5404\u673a\u6784\u56de\u5e94\u540e\u63d0\u51fa\u7684\u4efb\u4f55\u66ff\u4ee3\u65b9\u6848\u3002\u5f85\u4e2a\u6848\u5185\u5bb9\u8db3\u591f\u6e05\u6670\u3001\u53ef\u4f9b\u5404\u673a\u6784\u8bc4\u4f30\u540e\uff0c\u95ee\u9898\u89e3\u51b3\u6d41\u7a0b\u4fbf\u4f1a\u5f00\u59cb\uff08[BCA\uff0cIACC \u9875\u9762](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/)\uff09\u3002\n\n## \u5df2\u62a5\u544a\u7684\u95ee\u9898\u89e3\u51b3\u6210\u6548\u53ca\u89e3\u8bfb\n\nBCA \u7684\u901a\u544a\u62a5\u544a\u79f0\uff0c\u6839\u636e IACC \u8fd1\u671f\u8bb0\u5f55\uff0c**2021 \u5e74\u8d77**\u63d0\u4ea4\u7684\u4e2a\u6848\u4e2d\uff0c**\u8d85\u8fc7 90%** \u5df2\u5728 **\u4e09\u4e2a\u6708\u5185**\u5f97\u5230\u6709\u6548\u89e3\u51b3\u3002\u8be5\u767e\u5206\u6bd4\u4ec5\u63cf\u8ff0\u8be5\u58f0\u660e\u6240\u6db5\u76d6\u7684\u4e2a\u6848\u548c\u671f\u95f4\uff1b\u8fd9\u5e76\u4e0d\u4fdd\u8bc1\u65b0\u7684\u4e2a\u6848\u4f1a\u5728\u4e09\u4e2a\u6708\u5185\u5f97\u5230\u89e3\u51b3\uff0c\u4e5f\u4e0d\u4ee3\u8868\u6bcf\u9879\u76d1\u7ba1\u51b2\u7a81\u90fd\u7b26\u5408 IACC \u5904\u7406\u8d44\u683c\uff0c\u6216\u90fd\u80fd\u901a\u8fc7 IACC \u4ece\u6280\u672f\u4e0a\u89e3\u51b3\u3002BCA \u9f13\u52b1\u9879\u76ee\u4ece\u4e1a\u8005\u5728\u6709\u9700\u8981\u65f6\u5c3d\u65e9\u63d0\u51fa\u95ee\u9898\uff0c\u4ee5\u5c3d\u91cf\u51cf\u5c11\u9879\u76ee\u5ba1\u6279\u548c\u65bd\u5de5\u8fc7\u7a0b\u4e2d\u53ef\u80fd\u51fa\u73b0\u7684\u50f5\u5c40\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002","summary":"\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 IACC \u95ee\u9898\u89e3\u51b3\u5e73\u53f0\u534f\u52a9\u9879\u76ee\u56e2\u961f\u89e3\u51b3\u5404\u673a\u6784\u4e4b\u95f4\u76f8\u4e92\u51b2\u7a81\u7684\u76d1\u7ba1\u8981\u6c42\uff1bFormSG \u63d0\u4ea4\u95e8\u6237\u4e8e 2026 \u5e74\u4e5d\u6708 1 \u65e5\u542f\u7528\uff0c\u4ee5\u53d6\u4ee3\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b9\u5f0f\u3002","title":"\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0"}},"path":"geography-urban-planning\/iacc-resolution-platform.md","related_source_ids":["sgkb.geography-urban-planning.ura-and-master-plan","sgkb.geography-urban-planning.post-installed-anchor-safety"],"source_hash":"e4ae2520e7837564315584548bcac832e7e17a18103e1f9a6965aef0b69b431a","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Inter-Agency Coordinating Committee (IACC)","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/"},{"title":"BCA \u2014 IACC Resolution Platform: Launch of FormSG","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf"},{"title":"BCA \u2014 IACC FormSG lodgement portal","url":"https:\/\/go.gov.sg\/iacc-lodgement"}]}},"search_text":"Inter-Agency Coordinating Committee Resolution Platform\n\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0\nBCA's IACC Resolution platform helps project teams resolve conflicting regulatory requirements across agencies; a FormSG lodgement portal launched on 1 September 2026 to replace email submissions.\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 IACC \u95ee\u9898\u89e3\u51b3\u5e73\u53f0\u534f\u52a9\u9879\u76ee\u56e2\u961f\u89e3\u51b3\u5404\u673a\u6784\u4e4b\u95f4\u76f8\u4e92\u51b2\u7a81\u7684\u76d1\u7ba1\u8981\u6c42\uff1bFormSG \u63d0\u4ea4\u95e8\u6237\u4e8e 2026 \u5e74\u4e5d\u6708 1 \u65e5\u542f\u7528\uff0c\u4ee5\u53d6\u4ee3\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b9\u5f0f\u3002\n{\"aliases\":[\"IACC Resolution platform\",\"IACC FormSG\",\"inter-agency regulatory resolution\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.iacc-resolution-platform\",\"document_sha256\":\"67e75a135ba38c607779c8635cc12d19ae6b132864e10bf4b1631ab2b47d1dc2\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.agency.bca\"],\"facets\":[\"current\",\"geography\",\"infrastructure\",\"law\",\"policy\",\"procedure\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-09-01\",\"path\":\"geography-urban-planning\\\/iacc-resolution-platform.md\",\"related\":[\"ura-and-master-plan\",\"post-installed-anchor-safety\"],\"sources\":[{\"accessed\":\"2026-11-08\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Inter-Agency Coordinating Committee (IACC)\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/safety-and-standards\\\/applications-and-licenses\\\/building-plan-submission\\\/inter-agency-coordinating-committee-iacc\\\/\"},{\"accessed\":\"2026-09-01\",\"published\":\"2026-09-01\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 IACC Resolution Platform: Launch of FormSG\",\"url\":\"https:\\\/\\\/isomer-user-content.by.gov.sg\\\/338\\\/ea99df85-8092-45c4-b9a0-f8606f58481f\\\/FINAL%20Industry%20Circular.pdf\"},{\"accessed\":\"2026-09-01\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 IACC FormSG lodgement portal\",\"url\":\"https:\\\/\\\/go.gov.sg\\\/iacc-lodgement\"}],\"status\":\"verified\",\"summary\":\"BCA's IACC Resolution platform helps project teams resolve conflicting regulatory requirements across agencies; a FormSG lodgement portal launched on 1 September 2026 to replace email submissions.\",\"tags\":[\"policy\",\"regulation\",\"planning-area\",\"how-to\"],\"temporal_scope\":\"current\",\"title\":\"Inter-Agency Coordinating Committee Resolution Platform\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.iacc-resolution-platform\"],\"volatility\":\"fast\"}\n# Inter-Agency Coordinating Committee Resolution Platform\n\nThe **Inter-Agency Coordinating Committee (IACC) Resolution platform** is a Singapore construction-project channel for resolving issues caused by conflicting regulatory requirements across two or more agencies. BCA's circular dated **1 September 2026** says the platform has handled cases lodged by industry practitioners since 2019 and that IACC holds regular monthly resolution meetings. Its purpose is to help project teams surface cross-agency regulatory conflicts early, so that issues can be clarified before they become clearance or construction delays ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## FormSG lodgement change\n\nThe new **FormSG** portal at [go.gov.sg\/iacc-lodgement](https:\/\/go.gov.sg\/iacc-lodgement) was scheduled to go live on **1 September 2026**. It replaces the previous email-based submission process for new IACC case lodgements. BCA says FormSG is designed to guide industry users to provide more complete and higher-quality information at first lodgement, and to enable concurrent dissemination of a case to relevant agencies rather than relying only on sequential workflows. New cases submitted by email are directed to the FormSG portal under the revised process ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## What the platform resolves\n\nThe platform is for project issues arising from conflicting or competing regulatory requirements between agencies. Under the earlier process, the IACC Secretariat could seek clarification from a project team before disseminating a case to relevant agencies. The revised workflow aims to identify information gaps earlier and allow agencies to consider a case concurrently. This is a coordination and resolution route; it does not itself grant planning permission, building approval, a regulatory exemption or a decision that overrides an individual agency's statutory requirements ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n\n## Who participates and what to prepare\n\nBCA describes IACC as a tripartite coordinating committee formed in July 2011. It brings together regulators, public-sector developers and built-environment trade associations, and is chaired by BCA's Deputy Chief Executive Officer (Building Control). Standing regulatory members include BCA, LTA, NEA, NParks, PUB, SCDF and URA; EMA and IMDA are also represented. JTC, HDB and Town Councils represent public-sector developers, while ACES, IES, REDAS, SCAL and SIA represent industry. Beyond individual project conflicts, IACC can act as a sounding board on new rules and help identify systemic clashes or cross-agency process improvements. For a project-level case, BCA asks applicants to provide a clear account of the issue, supporting drawings or other documents and relevant agency discussions, the outcome sought, and any proposed alternative solution after considering agencies' responses. The resolution process starts once the case is sufficiently clear for agencies to assess ([BCA, IACC page](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/)).\n\n## Reported resolution performance and interpretation\n\nBCA's circular reports that **more than 90%** of cases lodged from **2021 onwards** were effectively resolved within **three months**, based on recent IACC records. The percentage describes the cases and period covered by that statement; it is not a guarantee that a new case will be resolved within three months and does not establish that every regulatory conflict is eligible or technically solvable through IACC. Project practitioners are encouraged to surface issues as early as necessary to minimise potential impasses in project clearance and construction ([BCA, 1 September 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)).\n# \u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0\n\n**\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\uff08IACC\uff09\u95ee\u9898\u89e3\u51b3\u5e73\u53f0**\u662f\u65b0\u52a0\u5761\u5efa\u7b51\u9879\u76ee\u4f7f\u7528\u7684\u6e20\u9053\uff0c\u7528\u4e8e\u89e3\u51b3\u4e24\u4e2a\u6216\u591a\u4e2a\u673a\u6784\u4e4b\u95f4\u76d1\u7ba1\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u6240\u5f15\u53d1\u7684\u95ee\u9898\u3002\u5efa\u8bbe\u5c40\uff08BCA\uff09\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5**\u53d1\u5e03\u7684\u901a\u544a\u6307\u51fa\uff0c\u81ea 2019 \u5e74\u4ee5\u6765\uff0c\u8be5\u5e73\u53f0\u5df2\u5904\u7406\u4e1a\u754c\u4eba\u58eb\u63d0\u4ea4\u7684\u4e2a\u6848\uff0c\u800c IACC \u5b9a\u671f\u6bcf\u6708\u4e3e\u884c\u95ee\u9898\u89e3\u51b3\u4f1a\u8bae\u3002\u8be5\u5e73\u53f0\u65e8\u5728\u534f\u52a9\u9879\u76ee\u56e2\u961f\u53ca\u65e9\u63d0\u51fa\u8de8\u673a\u6784\u76d1\u7ba1\u51b2\u7a81\uff0c\u4ee5\u4fbf\u5728\u95ee\u9898\u6f14\u53d8\u4e3a\u5ba1\u6279\u6216\u65bd\u5de5\u5ef6\u8bef\u4e4b\u524d\u4e88\u4ee5\u6f84\u6e05\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## FormSG \u63d0\u4ea4\u65b9\u5f0f\u53d8\u66f4\n\n\u65b0\u7684 [FormSG](https:\/\/go.gov.sg\/iacc-lodgement) \u95e8\u6237\u539f\u5b9a\u4e8e **2026 \u5e74\u4e5d\u6708 1 \u65e5**\u542f\u7528\u3002\u8be5\u95e8\u6237\u53d6\u4ee3\u6b64\u524d\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u65b0\u7684 IACC \u4e2a\u6848\u7684\u6d41\u7a0b\u3002BCA \u8868\u793a\uff0cFormSG \u65e8\u5728\u5f15\u5bfc\u4e1a\u754c\u7528\u6237\u5728\u9996\u6b21\u63d0\u4ea4\u65f6\u63d0\u4f9b\u66f4\u5b8c\u6574\u3001\u8d28\u91cf\u66f4\u9ad8\u7684\u4fe1\u606f\uff0c\u5e76\u8ba9\u4e2a\u6848\u540c\u65f6\u5206\u53d1\u7ed9\u76f8\u5173\u673a\u6784\uff0c\u800c\u4e0d\u518d\u4ec5\u4f9d\u8d56\u5faa\u5e8f\u5904\u7406\u7684\u5de5\u4f5c\u6d41\u7a0b\u3002\u6839\u636e\u4fee\u8ba2\u540e\u7684\u6d41\u7a0b\uff0c\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u7684\u65b0\u4e2a\u6848\u5c06\u88ab\u5f15\u5bfc\u81f3 FormSG \u95e8\u6237\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## \u5e73\u53f0\u5904\u7406\u7684\u95ee\u9898\n\n\u8be5\u5e73\u53f0\u7528\u4e8e\u5904\u7406\u56e0\u5404\u673a\u6784\u4e4b\u95f4\u76d1\u7ba1\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u6216\u5b58\u5728\u7ade\u4e89\u800c\u4ea7\u751f\u7684\u9879\u76ee\u95ee\u9898\u3002\u6839\u636e\u65e9\u524d\u7684\u6d41\u7a0b\uff0cIACC \u79d8\u4e66\u5904\u53ef\u5728\u5c06\u4e2a\u6848\u5206\u53d1\u7ed9\u76f8\u5173\u673a\u6784\u4e4b\u524d\uff0c\u5148\u5411\u9879\u76ee\u56e2\u961f\u5bfb\u6c42\u6f84\u6e05\u3002\u4fee\u8ba2\u540e\u7684\u5de5\u4f5c\u6d41\u7a0b\u65e8\u5728\u53ca\u65e9\u53d1\u73b0\u4fe1\u606f\u7f3a\u53e3\uff0c\u5e76\u8ba9\u5404\u673a\u6784\u540c\u65f6\u5ba1\u8bae\u4e2a\u6848\u3002\u8fd9\u662f\u4e00\u4e2a\u534f\u8c03\u548c\u89e3\u51b3\u95ee\u9898\u7684\u6e20\u9053\uff1b\u5e73\u53f0\u672c\u8eab\u4e0d\u4f1a\u6388\u4e88\u89c4\u5212\u8bb8\u53ef\u3001\u5efa\u7b51\u6279\u51c6\u3001\u76d1\u7ba1\u8c41\u514d\uff0c\u4e5f\u4e0d\u4f1a\u4f5c\u51fa\u51cc\u9a7e\u4e8e\u4e2a\u522b\u673a\u6784\u6cd5\u5b9a\u8981\u6c42\u4e4b\u4e0a\u7684\u51b3\u5b9a\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002\n\n## \u53c2\u4e0e\u8005\u53ca\u6240\u9700\u51c6\u5907\n\nBCA \u4ecb\u7ecd\uff0cIACC \u662f\u4e00\u4e2a\u4e8e 2011 \u5e74\u4e03\u6708\u6210\u7acb\u7684\u4e09\u65b9\u534f\u8c03\u59d4\u5458\u4f1a\uff0c\u6210\u5458\u5305\u62ec\u76d1\u7ba1\u673a\u6784\u3001\u516c\u5171\u90e8\u95e8\u5f00\u53d1\u5546\u548c\u5efa\u6210\u73af\u5883\u884c\u4e1a\u534f\u4f1a\uff0c\u7531 BCA \u526f\u9996\u5e2d\u6267\u884c\u5b98\uff08\u5efa\u7b51\u7ba1\u5236\uff09\u62c5\u4efb\u4e3b\u5e2d\u3002\u5e38\u8bbe\u76d1\u7ba1\u673a\u6784\u6210\u5458\u5305\u62ec BCA\u3001\u9646\u8def\u4ea4\u901a\u7ba1\u7406\u5c40\uff08LTA\uff09\u3001\u56fd\u5bb6\u73af\u5883\u5c40\uff08NEA\uff09\u3001\u56fd\u5bb6\u516c\u56ed\u5c40\uff08NParks\uff09\u3001\u516c\u7528\u4e8b\u4e1a\u5c40\uff08PUB\uff09\u3001\u65b0\u52a0\u5761\u6c11\u9632\u90e8\u961f\uff08SCDF\uff09\u548c\u5e02\u533a\u91cd\u5efa\u5c40\uff08URA\uff09\uff1b\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\uff08EMA\uff09\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\uff08IMDA\uff09\u4e5f\u6709\u4ee3\u8868\u53c2\u4e0e\u3002\u88d5\u5eca\u96c6\u56e2\uff08JTC\uff09\u3001\u5efa\u5c4b\u53d1\u5c55\u5c40\uff08HDB\uff09\u548c\u5e02\u9547\u7406\u4e8b\u4f1a\u4ee3\u8868\u516c\u5171\u90e8\u95e8\u5f00\u53d1\u5546\uff1bACES\u3001IES\u3001REDAS\u3001SCAL \u548c SIA \u5219\u4ee3\u8868\u4e1a\u754c\u3002\u9664\u4e86\u5904\u7406\u4e2a\u522b\u9879\u76ee\u51b2\u7a81\uff0cIACC \u8fd8\u53ef\u5c31\u65b0\u89c4\u7ae0\u63d0\u4f9b\u610f\u89c1\uff0c\u5e76\u534f\u52a9\u8bc6\u522b\u7cfb\u7edf\u6027\u51b2\u7a81\u6216\u6539\u8fdb\u8de8\u673a\u6784\u6d41\u7a0b\u3002\u5bf9\u4e8e\u9879\u76ee\u5c42\u9762\u7684\u4e2a\u6848\uff0cBCA \u8981\u6c42\u7533\u8bf7\u4eba\u63d0\u4f9b\u6e05\u6670\u7684\u95ee\u9898\u8bf4\u660e\u3001\u652f\u6301\u6027\u56fe\u7eb8\u6216\u5176\u4ed6\u6587\u4ef6\u53ca\u76f8\u5173\u673a\u6784\u8ba8\u8bba\u60c5\u51b5\u3001\u671f\u671b\u53d6\u5f97\u7684\u7ed3\u679c\uff0c\u4ee5\u53ca\u8003\u8651\u5404\u673a\u6784\u56de\u5e94\u540e\u63d0\u51fa\u7684\u4efb\u4f55\u66ff\u4ee3\u65b9\u6848\u3002\u5f85\u4e2a\u6848\u5185\u5bb9\u8db3\u591f\u6e05\u6670\u3001\u53ef\u4f9b\u5404\u673a\u6784\u8bc4\u4f30\u540e\uff0c\u95ee\u9898\u89e3\u51b3\u6d41\u7a0b\u4fbf\u4f1a\u5f00\u59cb\uff08[BCA\uff0cIACC \u9875\u9762](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/building-plan-submission\/inter-agency-coordinating-committee-iacc\/)\uff09\u3002\n\n## \u5df2\u62a5\u544a\u7684\u95ee\u9898\u89e3\u51b3\u6210\u6548\u53ca\u89e3\u8bfb\n\nBCA \u7684\u901a\u544a\u62a5\u544a\u79f0\uff0c\u6839\u636e IACC \u8fd1\u671f\u8bb0\u5f55\uff0c**2021 \u5e74\u8d77**\u63d0\u4ea4\u7684\u4e2a\u6848\u4e2d\uff0c**\u8d85\u8fc7 90%** \u5df2\u5728 **\u4e09\u4e2a\u6708\u5185**\u5f97\u5230\u6709\u6548\u89e3\u51b3\u3002\u8be5\u767e\u5206\u6bd4\u4ec5\u63cf\u8ff0\u8be5\u58f0\u660e\u6240\u6db5\u76d6\u7684\u4e2a\u6848\u548c\u671f\u95f4\uff1b\u8fd9\u5e76\u4e0d\u4fdd\u8bc1\u65b0\u7684\u4e2a\u6848\u4f1a\u5728\u4e09\u4e2a\u6708\u5185\u5f97\u5230\u89e3\u51b3\uff0c\u4e5f\u4e0d\u4ee3\u8868\u6bcf\u9879\u76d1\u7ba1\u51b2\u7a81\u90fd\u7b26\u5408 IACC \u5904\u7406\u8d44\u683c\uff0c\u6216\u90fd\u80fd\u901a\u8fc7 IACC \u4ece\u6280\u672f\u4e0a\u89e3\u51b3\u3002BCA \u9f13\u52b1\u9879\u76ee\u4ece\u4e1a\u8005\u5728\u6709\u9700\u8981\u65f6\u5c3d\u65e9\u63d0\u51fa\u95ee\u9898\uff0c\u4ee5\u5c3d\u91cf\u51cf\u5c11\u9879\u76ee\u5ba1\u6279\u548c\u65bd\u5de5\u8fc7\u7a0b\u4e2d\u53ef\u80fd\u51fa\u73b0\u7684\u50f5\u5c40\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/ea99df85-8092-45c4-b9a0-f8606f58481f\/FINAL%20Industry%20Circular.pdf)\uff09\u3002"},"related":[{"id":90427,"source_id":"sgkb.geography-urban-planning.post-installed-anchor-safety","kind":"article","title_en":"Post-Installed Anchor Safety Guidance","title_zh":"\u540e\u7f6e\u951a\u6813\u5b89\u5168\u6307\u5357","assurance":null,"subtype":null},{"id":90437,"source_id":"sgkb.geography-urban-planning.ura-and-master-plan","kind":"article","title_en":"URA and the Master Plan","title_zh":"\u5e02\u533a\u91cd\u5efa\u5c40\u4e0e\u603b\u4f53\u89c4\u5212","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":79850,"source_id":"sg.agency.nparks","kind":"entity","title_en":"National Parks Board","title_zh":"\u56fd\u5bb6\u516c\u56ed\u5c40","assurance":null,"subtype":"statutory-board"},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null},{"id":92617,"source_id":"sgtopic.geography-urban-planning.iacc-resolution-platform","kind":"topic","title_en":"Inter-Agency Coordinating Committee Resolution Platform","title_zh":"\u8de8\u673a\u6784\u534f\u8c03\u59d4\u5458\u4f1a\u51b3\u8bae\u5e73\u53f0","assurance":null,"subtype":null}]}