{"release_id":19,"data":{"id":90414,"release_id":19,"source_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","kind":"article","fingerprint":"8edcbd99fa67f0054517ff74f16178c2afe10fe7d020fe644771158956fd0d2d","title_en":"Green Mark Version 7.0","title_zh":"\u7eff\u8272\u6807\u5fd7 7.0 \u7248","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-09-02","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["Green Mark v7.0","Green Mark Version 7","GM v7"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","document_sha256":"e6360ec66b7e1100d21c441a25080dbfda3fb5d886eda7fb68f2e5510d6837fe","document_type":"article","domain":"geography-urban-planning","entities":["sg.scheme.green-mark-v7","sg.agency.bca"],"facets":["business","current","infrastructure","law","policy"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-09-02","path":"geography-urban-planning\/green-mark-version-7-2026.md","related":["green-mark-standards-government-land-sales-2026","green-buildings-innovation-cluster-gbic"],"sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Green Mark Version 7","url":"https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"}],"status":"verified","summary":"BCA's Green Mark Version 7.0 refresh introduces an energy-only pathway, SLE70, portfolio certification and a transition from Green Mark 2021.","tags":["policy","tech","regulation","construction"],"temporal_scope":"current","title":"Green Mark Version 7.0","topics":["sgtopic.geography","sgtopic.geography-urban-planning.green-mark-version-7-2026"],"volatility":"fast"},"date":"2026-09-02","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/green-mark-version-7-2026.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl"],"expected_version":12,"input_hash":"dce0287047231c7c4c7a0fd46bbe852149bf3e151a74f93c67a1b0cf862d54b6","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.green-mark-version-7-2026#overview","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"],"content_sha256":"749166ba342219391127566254bd81f2dac323b87f85b90ef98f2a7ee95f55fe","document_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","document_sha256":"e6360ec66b7e1100d21c441a25080dbfda3fb5d886eda7fb68f2e5510d6837fe","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Green Mark Version 7","url":"https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"}]},{"chunk_id":"sgkb.geography-urban-planning.green-mark-version-7-2026#what-is-new","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"],"content_sha256":"7571c0d84c8d018ee1d74f07761eb7043bb0dac080b94cfc39951b2a6efaed47","document_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","document_sha256":"e6360ec66b7e1100d21c441a25080dbfda3fb5d886eda7fb68f2e5510d6837fe","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Green Mark Version 7","url":"https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"}]},{"chunk_id":"sgkb.geography-urban-planning.green-mark-version-7-2026#roadmap-and-transition","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"],"content_sha256":"4f94b6fd0ed81b684a8a71db6fb311d84817e0100b4c71933c481a8a3418c24f","document_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","document_sha256":"e6360ec66b7e1100d21c441a25080dbfda3fb5d886eda7fb68f2e5510d6837fe","section_sources":[{"accessed":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Green Mark Version 7","url":"https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"}]}],"links":[{"relation":"related","target_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026"},{"relation":"related","target_id":"sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.green-mark-version-7-2026"},{"relation":"entities","target_id":"sg.scheme.green-mark-v7"},{"relation":"entities","target_id":"sg.agency.bca"}],"locales":{"en":{"markdown":"# Green Mark Version 7.0\n\n**Green Mark Version 7.0** is BCA\u2019s next refresh of Singapore\u2019s Green Mark building-certification scheme. BCA describes it as offering more pathways, flexibility and options for projects pursuing lower energy use and carbon outcomes under the Singapore Green Building Masterplan ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\n## What is new\n\nGreen Mark v7.0 introduces an energy-performance-only pathway, a new SLE70 tier for projects achieving at least 70% energy savings, streamlined maintainability criteria, recognition for alternative cooling technologies, portfolio certification for similar buildings under one parent application, and possible extension of certification validity from three years to five years for sustained performers that continue meeting their energy-use target ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\nThe energy-only pathway lists energy-savings levels of 45%, 50%, 55%, 60%, 70% and 100%, corresponding to EE45, EE50, EE55, SLE60, SLE70 and zero-energy (**ZE**) ratings; the page notes that the 100% level is offset by on-site renewable generation. These are certification pathways and thresholds, not a claim that every building can achieve a particular rating ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\n## Roadmap and transition\n\nBCA reports that more than 30 pilot projects were completed during the industry co-creation and criteria-refinement phase, with a planned Green Mark v7.0 launch at the International Built Environment Week on 2 September 2026. The roadmap states that new Green Mark 2021 applications will stop from 1 April 2027 and ongoing Green Mark 2021 projects must be completed by the end of 2027 ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).","summary":"BCA's Green Mark Version 7.0 refresh introduces an energy-only pathway, SLE70, portfolio certification and a transition from Green Mark 2021.","title":"Green Mark Version 7.0"},"zh":{"markdown":"# \u7eff\u8272\u6807\u5fd7 7.0 \u7248\n\n**\u7eff\u8272\u6807\u5fd7 7.0 \u7248** \u662f BCA \u5bf9\u65b0\u52a0\u5761\u7eff\u8272\u6807\u5fd7\u5efa\u7b51\u8ba4\u8bc1\u8ba1\u5212\u7684\u4e0b\u4e00\u6b21\u66f4\u65b0\u3002BCA \u8868\u793a\uff0c\u8be5\u7248\u672c\u4e3a\u4f9d\u636e\u300a\u65b0\u52a0\u5761\u7eff\u8272\u5efa\u7b51\u603b\u84dd\u56fe\u300b\u5bfb\u6c42\u964d\u4f4e\u80fd\u8017\u548c\u78b3\u6392\u653e\u6210\u679c\u7684\u9879\u76ee\u63d0\u4f9b\u66f4\u591a\u8def\u5f84\u3001\u7075\u6d3b\u6027\u548c\u9009\u9879\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n## \u65b0\u5185\u5bb9\n\n\u7eff\u8272\u6807\u5fd7 v7.0 \u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u8868\u73b0\u7684\u8def\u5f84\u3001\u9762\u5411\u5b9e\u73b0\u81f3\u5c11 70% \u8282\u80fd\u9879\u76ee\u7684\u5168\u65b0 SLE70 \u7b49\u7ea7\u3001\u7b80\u5316\u7684\u53ef\u7ef4\u62a4\u6027\u6807\u51c6\u3001\u5bf9\u66ff\u4ee3\u51b7\u5374\u6280\u672f\u7684\u8ba4\u53ef\u3001\u5141\u8bb8\u540c\u4e00\u6bcd\u7533\u8bf7\u4e0b\u7c7b\u4f3c\u5efa\u7b51\u8fdb\u884c\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u5bf9\u6301\u7eed\u8fbe\u5230\u80fd\u8017\u76ee\u6807\u7684\u9879\u76ee\u5c06\u8ba4\u8bc1\u6709\u6548\u671f\u4ece\u4e09\u5e74\u5ef6\u957f\u81f3\u4e94\u5e74\u7684\u53ef\u80fd\u6027\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u5217\u51fa\u7684\u8282\u80fd\u6c34\u5e73\u4e3a 45%\u300150%\u300155%\u300160%\u300170% \u548c 100%\uff0c\u5206\u522b\u5bf9\u5e94 EE45\u3001EE50\u3001EE55\u3001SLE60\u3001SLE70 \u548c\u96f6\u80fd\u8017\uff08**ZE**\uff09\u8bc4\u7ea7\uff1b\u9875\u9762\u6307\u51fa\uff0c100% \u7684\u6c34\u5e73\u901a\u8fc7\u73b0\u573a\u53ef\u518d\u751f\u80fd\u6e90\u53d1\u7535\u62b5\u6d88\u3002\u8fd9\u4e9b\u662f\u8ba4\u8bc1\u8def\u5f84\u548c\u95e8\u69db\uff0c\u5e76\u975e\u58f0\u79f0\u6bcf\u680b\u5efa\u7b51\u90fd\u80fd\u8fbe\u5230\u7279\u5b9a\u8bc4\u7ea7\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n## \u8def\u7ebf\u56fe\u548c\u8fc7\u6e21\n\nBCA \u62a5\u544a\u79f0\uff0c\u5728\u884c\u4e1a\u5171\u540c\u521b\u5236\u548c\u6807\u51c6\u5b8c\u5584\u9636\u6bb5\u5df2\u5b8c\u6210 30 \u591a\u4e2a\u8bd5\u70b9\u9879\u76ee\uff0c\u5e76\u8ba1\u5212\u63a8\u51fa\u7eff\u8272\u6807\u5fd7 v7.0\uff0c\u4e8e 2 \u4e5d\u6708 2026 \u5e74\u5728\u56fd\u9645\u5efa\u7b51\u73af\u5883\u5468\u4eae\u76f8\u3002\u8def\u7ebf\u56fe\u6307\u51fa\uff0c\u65b0\u7684\u7eff\u8272\u6807\u5fd7 2021 \u7248\u7533\u8bf7\u5c06\u81ea 1 \u65e5 \u56db\u6708 2027 \u5e74\u8d77\u505c\u6b62\u63a5\u53d7\uff0c\u8fdb\u884c\u4e2d\u7684\u7eff\u8272\u6807\u5fd7 2021 \u7248\u9879\u76ee\u5fc5\u987b\u5728 2027 \u5e74\u5e74\u5e95\u524d\u5b8c\u6210\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002","summary":"BCA \u7684\u7eff\u8272\u6807\u5fd7 7.0 \u7248\u66f4\u65b0\u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u3001SLE70\u3001\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u4ece\u7eff\u8272\u6807\u5fd7 2021 \u7248\u8fc7\u6e21\u7684\u5b89\u6392\u3002","title":"\u7eff\u8272\u6807\u5fd7 7.0 \u7248"}},"source_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","status":"verified","summary_en":"BCA's Green Mark Version 7.0 refresh introduces an energy-only pathway, SLE70, portfolio certification and a transition from Green Mark 2021.","summary_zh":"BCA \u7684\u7eff\u8272\u6807\u5fd7 7.0 \u7248\u66f4\u65b0\u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u3001SLE70\u3001\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u4ece\u7eff\u8272\u6807\u5fd7 2021 \u7248\u8fc7\u6e21\u7684\u5b89\u6392\u3002","title_en":"Green Mark Version 7.0","title_zh":"\u7eff\u8272\u6807\u5fd7 7.0 \u7248","wiki":{"domain":"geography-urban-planning","last_verified":"2026-09-02","locales":{"en":{"markdown":"# Green Mark Version 7.0\n\n**Green Mark Version 7.0** is BCA\u2019s next refresh of Singapore\u2019s Green Mark building-certification scheme. BCA describes it as offering more pathways, flexibility and options for projects pursuing lower energy use and carbon outcomes under the Singapore Green Building Masterplan ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\n## What is new\n\nGreen Mark v7.0 introduces an energy-performance-only pathway, a new SLE70 tier for projects achieving at least 70% energy savings, streamlined maintainability criteria, recognition for alternative cooling technologies, portfolio certification for similar buildings under one parent application, and possible extension of certification validity from three years to five years for sustained performers that continue meeting their energy-use target ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\nThe energy-only pathway lists energy-savings levels of 45%, 50%, 55%, 60%, 70% and 100%, corresponding to EE45, EE50, EE55, SLE60, SLE70 and zero-energy (**ZE**) ratings; the page notes that the 100% level is offset by on-site renewable generation. These are certification pathways and thresholds, not a claim that every building can achieve a particular rating ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\n## Roadmap and transition\n\nBCA reports that more than 30 pilot projects were completed during the industry co-creation and criteria-refinement phase, with a planned Green Mark v7.0 launch at the International Built Environment Week on 2 September 2026. The roadmap states that new Green Mark 2021 applications will stop from 1 April 2027 and ongoing Green Mark 2021 projects must be completed by the end of 2027 ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).","summary":"BCA's Green Mark Version 7.0 refresh introduces an energy-only pathway, SLE70, portfolio certification and a transition from Green Mark 2021.","title":"Green Mark Version 7.0"},"zh":{"markdown":"# \u7eff\u8272\u6807\u5fd7 7.0 \u7248\n\n**\u7eff\u8272\u6807\u5fd7 7.0 \u7248** \u662f BCA \u5bf9\u65b0\u52a0\u5761\u7eff\u8272\u6807\u5fd7\u5efa\u7b51\u8ba4\u8bc1\u8ba1\u5212\u7684\u4e0b\u4e00\u6b21\u66f4\u65b0\u3002BCA \u8868\u793a\uff0c\u8be5\u7248\u672c\u4e3a\u4f9d\u636e\u300a\u65b0\u52a0\u5761\u7eff\u8272\u5efa\u7b51\u603b\u84dd\u56fe\u300b\u5bfb\u6c42\u964d\u4f4e\u80fd\u8017\u548c\u78b3\u6392\u653e\u6210\u679c\u7684\u9879\u76ee\u63d0\u4f9b\u66f4\u591a\u8def\u5f84\u3001\u7075\u6d3b\u6027\u548c\u9009\u9879\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n## \u65b0\u5185\u5bb9\n\n\u7eff\u8272\u6807\u5fd7 v7.0 \u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u8868\u73b0\u7684\u8def\u5f84\u3001\u9762\u5411\u5b9e\u73b0\u81f3\u5c11 70% \u8282\u80fd\u9879\u76ee\u7684\u5168\u65b0 SLE70 \u7b49\u7ea7\u3001\u7b80\u5316\u7684\u53ef\u7ef4\u62a4\u6027\u6807\u51c6\u3001\u5bf9\u66ff\u4ee3\u51b7\u5374\u6280\u672f\u7684\u8ba4\u53ef\u3001\u5141\u8bb8\u540c\u4e00\u6bcd\u7533\u8bf7\u4e0b\u7c7b\u4f3c\u5efa\u7b51\u8fdb\u884c\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u5bf9\u6301\u7eed\u8fbe\u5230\u80fd\u8017\u76ee\u6807\u7684\u9879\u76ee\u5c06\u8ba4\u8bc1\u6709\u6548\u671f\u4ece\u4e09\u5e74\u5ef6\u957f\u81f3\u4e94\u5e74\u7684\u53ef\u80fd\u6027\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u5217\u51fa\u7684\u8282\u80fd\u6c34\u5e73\u4e3a 45%\u300150%\u300155%\u300160%\u300170% \u548c 100%\uff0c\u5206\u522b\u5bf9\u5e94 EE45\u3001EE50\u3001EE55\u3001SLE60\u3001SLE70 \u548c\u96f6\u80fd\u8017\uff08**ZE**\uff09\u8bc4\u7ea7\uff1b\u9875\u9762\u6307\u51fa\uff0c100% \u7684\u6c34\u5e73\u901a\u8fc7\u73b0\u573a\u53ef\u518d\u751f\u80fd\u6e90\u53d1\u7535\u62b5\u6d88\u3002\u8fd9\u4e9b\u662f\u8ba4\u8bc1\u8def\u5f84\u548c\u95e8\u69db\uff0c\u5e76\u975e\u58f0\u79f0\u6bcf\u680b\u5efa\u7b51\u90fd\u80fd\u8fbe\u5230\u7279\u5b9a\u8bc4\u7ea7\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n## \u8def\u7ebf\u56fe\u548c\u8fc7\u6e21\n\nBCA \u62a5\u544a\u79f0\uff0c\u5728\u884c\u4e1a\u5171\u540c\u521b\u5236\u548c\u6807\u51c6\u5b8c\u5584\u9636\u6bb5\u5df2\u5b8c\u6210 30 \u591a\u4e2a\u8bd5\u70b9\u9879\u76ee\uff0c\u5e76\u8ba1\u5212\u63a8\u51fa\u7eff\u8272\u6807\u5fd7 v7.0\uff0c\u4e8e 2 \u4e5d\u6708 2026 \u5e74\u5728\u56fd\u9645\u5efa\u7b51\u73af\u5883\u5468\u4eae\u76f8\u3002\u8def\u7ebf\u56fe\u6307\u51fa\uff0c\u65b0\u7684\u7eff\u8272\u6807\u5fd7 2021 \u7248\u7533\u8bf7\u5c06\u81ea 1 \u65e5 \u56db\u6708 2027 \u5e74\u8d77\u505c\u6b62\u63a5\u53d7\uff0c\u8fdb\u884c\u4e2d\u7684\u7eff\u8272\u6807\u5fd7 2021 \u7248\u9879\u76ee\u5fc5\u987b\u5728 2027 \u5e74\u5e74\u5e95\u524d\u5b8c\u6210\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002","summary":"BCA \u7684\u7eff\u8272\u6807\u5fd7 7.0 \u7248\u66f4\u65b0\u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u3001SLE70\u3001\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u4ece\u7eff\u8272\u6807\u5fd7 2021 \u7248\u8fc7\u6e21\u7684\u5b89\u6392\u3002","title":"\u7eff\u8272\u6807\u5fd7 7.0 \u7248"}},"path":"geography-urban-planning\/green-mark-version-7-2026.md","related_source_ids":["sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic"],"source_hash":"dce0287047231c7c4c7a0fd46bbe852149bf3e151a74f93c67a1b0cf862d54b6","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Green Mark Version 7","url":"https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/"}]}},"search_text":"Green Mark Version 7.0\n\u7eff\u8272\u6807\u5fd7 7.0 \u7248\nBCA's Green Mark Version 7.0 refresh introduces an energy-only pathway, SLE70, portfolio certification and a transition from Green Mark 2021.\nBCA \u7684\u7eff\u8272\u6807\u5fd7 7.0 \u7248\u66f4\u65b0\u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u3001SLE70\u3001\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u4ece\u7eff\u8272\u6807\u5fd7 2021 \u7248\u8fc7\u6e21\u7684\u5b89\u6392\u3002\n{\"aliases\":[\"Green Mark v7.0\",\"Green Mark Version 7\",\"GM v7\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.green-mark-version-7-2026\",\"document_sha256\":\"e6360ec66b7e1100d21c441a25080dbfda3fb5d886eda7fb68f2e5510d6837fe\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.scheme.green-mark-v7\",\"sg.agency.bca\"],\"facets\":[\"business\",\"current\",\"infrastructure\",\"law\",\"policy\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-09-02\",\"path\":\"geography-urban-planning\\\/green-mark-version-7-2026.md\",\"related\":[\"green-mark-standards-government-land-sales-2026\",\"green-buildings-innovation-cluster-gbic\"],\"sources\":[{\"accessed\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Green Mark Version 7\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/sustainability\\\/greenmark\\\/green-mark-v7\\\/\"}],\"status\":\"verified\",\"summary\":\"BCA's Green Mark Version 7.0 refresh introduces an energy-only pathway, SLE70, portfolio certification and a transition from Green Mark 2021.\",\"tags\":[\"policy\",\"tech\",\"regulation\",\"construction\"],\"temporal_scope\":\"current\",\"title\":\"Green Mark Version 7.0\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.green-mark-version-7-2026\"],\"volatility\":\"fast\"}\n# Green Mark Version 7.0\n\n**Green Mark Version 7.0** is BCA\u2019s next refresh of Singapore\u2019s Green Mark building-certification scheme. BCA describes it as offering more pathways, flexibility and options for projects pursuing lower energy use and carbon outcomes under the Singapore Green Building Masterplan ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\n## What is new\n\nGreen Mark v7.0 introduces an energy-performance-only pathway, a new SLE70 tier for projects achieving at least 70% energy savings, streamlined maintainability criteria, recognition for alternative cooling technologies, portfolio certification for similar buildings under one parent application, and possible extension of certification validity from three years to five years for sustained performers that continue meeting their energy-use target ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\nThe energy-only pathway lists energy-savings levels of 45%, 50%, 55%, 60%, 70% and 100%, corresponding to EE45, EE50, EE55, SLE60, SLE70 and zero-energy (**ZE**) ratings; the page notes that the 100% level is offset by on-site renewable generation. These are certification pathways and thresholds, not a claim that every building can achieve a particular rating ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n\n## Roadmap and transition\n\nBCA reports that more than 30 pilot projects were completed during the industry co-creation and criteria-refinement phase, with a planned Green Mark v7.0 launch at the International Built Environment Week on 2 September 2026. The roadmap states that new Green Mark 2021 applications will stop from 1 April 2027 and ongoing Green Mark 2021 projects must be completed by the end of 2027 ([BCA, updated 2 September 2026](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)).\n# \u7eff\u8272\u6807\u5fd7 7.0 \u7248\n\n**\u7eff\u8272\u6807\u5fd7 7.0 \u7248** \u662f BCA \u5bf9\u65b0\u52a0\u5761\u7eff\u8272\u6807\u5fd7\u5efa\u7b51\u8ba4\u8bc1\u8ba1\u5212\u7684\u4e0b\u4e00\u6b21\u66f4\u65b0\u3002BCA \u8868\u793a\uff0c\u8be5\u7248\u672c\u4e3a\u4f9d\u636e\u300a\u65b0\u52a0\u5761\u7eff\u8272\u5efa\u7b51\u603b\u84dd\u56fe\u300b\u5bfb\u6c42\u964d\u4f4e\u80fd\u8017\u548c\u78b3\u6392\u653e\u6210\u679c\u7684\u9879\u76ee\u63d0\u4f9b\u66f4\u591a\u8def\u5f84\u3001\u7075\u6d3b\u6027\u548c\u9009\u9879\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n## \u65b0\u5185\u5bb9\n\n\u7eff\u8272\u6807\u5fd7 v7.0 \u5f15\u5165\u4ec5\u57fa\u4e8e\u80fd\u6548\u8868\u73b0\u7684\u8def\u5f84\u3001\u9762\u5411\u5b9e\u73b0\u81f3\u5c11 70% \u8282\u80fd\u9879\u76ee\u7684\u5168\u65b0 SLE70 \u7b49\u7ea7\u3001\u7b80\u5316\u7684\u53ef\u7ef4\u62a4\u6027\u6807\u51c6\u3001\u5bf9\u66ff\u4ee3\u51b7\u5374\u6280\u672f\u7684\u8ba4\u53ef\u3001\u5141\u8bb8\u540c\u4e00\u6bcd\u7533\u8bf7\u4e0b\u7c7b\u4f3c\u5efa\u7b51\u8fdb\u884c\u7ec4\u5408\u8ba4\u8bc1\uff0c\u4ee5\u53ca\u5bf9\u6301\u7eed\u8fbe\u5230\u80fd\u8017\u76ee\u6807\u7684\u9879\u76ee\u5c06\u8ba4\u8bc1\u6709\u6548\u671f\u4ece\u4e09\u5e74\u5ef6\u957f\u81f3\u4e94\u5e74\u7684\u53ef\u80fd\u6027\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n\u4ec5\u57fa\u4e8e\u80fd\u6548\u7684\u8def\u5f84\u5217\u51fa\u7684\u8282\u80fd\u6c34\u5e73\u4e3a 45%\u300150%\u300155%\u300160%\u300170% \u548c 100%\uff0c\u5206\u522b\u5bf9\u5e94 EE45\u3001EE50\u3001EE55\u3001SLE60\u3001SLE70 \u548c\u96f6\u80fd\u8017\uff08**ZE**\uff09\u8bc4\u7ea7\uff1b\u9875\u9762\u6307\u51fa\uff0c100% \u7684\u6c34\u5e73\u901a\u8fc7\u73b0\u573a\u53ef\u518d\u751f\u80fd\u6e90\u53d1\u7535\u62b5\u6d88\u3002\u8fd9\u4e9b\u662f\u8ba4\u8bc1\u8def\u5f84\u548c\u95e8\u69db\uff0c\u5e76\u975e\u58f0\u79f0\u6bcf\u680b\u5efa\u7b51\u90fd\u80fd\u8fbe\u5230\u7279\u5b9a\u8bc4\u7ea7\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002\n\n## \u8def\u7ebf\u56fe\u548c\u8fc7\u6e21\n\nBCA \u62a5\u544a\u79f0\uff0c\u5728\u884c\u4e1a\u5171\u540c\u521b\u5236\u548c\u6807\u51c6\u5b8c\u5584\u9636\u6bb5\u5df2\u5b8c\u6210 30 \u591a\u4e2a\u8bd5\u70b9\u9879\u76ee\uff0c\u5e76\u8ba1\u5212\u63a8\u51fa\u7eff\u8272\u6807\u5fd7 v7.0\uff0c\u4e8e 2 \u4e5d\u6708 2026 \u5e74\u5728\u56fd\u9645\u5efa\u7b51\u73af\u5883\u5468\u4eae\u76f8\u3002\u8def\u7ebf\u56fe\u6307\u51fa\uff0c\u65b0\u7684\u7eff\u8272\u6807\u5fd7 2021 \u7248\u7533\u8bf7\u5c06\u81ea 1 \u65e5 \u56db\u6708 2027 \u5e74\u8d77\u505c\u6b62\u63a5\u53d7\uff0c\u8fdb\u884c\u4e2d\u7684\u7eff\u8272\u6807\u5fd7 2021 \u7248\u9879\u76ee\u5fc5\u987b\u5728 2027 \u5e74\u5e74\u5e95\u524d\u5b8c\u6210\uff08[BCA\uff0c\u66f4\u65b0\u4e8e 2 \u4e5d\u6708 2026 \u5e74](https:\/\/www1.bca.gov.sg\/sustainability\/greenmark\/green-mark-v7\/)\uff09\u3002"},"related":[{"id":90256,"source_id":"sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic","kind":"article","title_en":"Green Buildings Innovation Cluster (GBIC)","title_zh":"\u7eff\u8272\u5efa\u7b51\u521b\u65b0\u96c6\u7fa4\uff08GBIC\uff09","assurance":null,"subtype":null},{"id":90257,"source_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","kind":"article","title_en":"Higher Green Mark Standard for Government Land Sales","title_zh":"\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6","assurance":null,"subtype":null},{"id":90425,"source_id":"sgkb.geography-urban-planning.periodic-energy-audit-pea-2026","kind":"article","title_en":"Mandatory Submission of Periodic Energy Audits","title_zh":"\u5f3a\u5236\u63d0\u4ea4\u5b9a\u671f\u80fd\u6e90\u5ba1\u8ba1\u62a5\u544a","assurance":null,"subtype":null},{"id":90430,"source_id":"sgkb.geography-urban-planning.public-sector-fm-feedback-and-procurement-guide-2026","kind":"article","title_en":"Public-Sector Facilities Management Feedback and Procurement Guide 2026","title_zh":"\u516c\u5171\u90e8\u95e8\u8bbe\u65bd\u7ba1\u7406\u53cd\u9988\u4e0e\u91c7\u8d2d\u6307\u5357 2026","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":82600,"source_id":"sg.scheme.green-mark-v7","kind":"entity","title_en":"Green Mark Version 7.0","title_zh":"Green Mark \u7b2c 7.0 \u7248","assurance":null,"subtype":"building-environmental-certification-scheme"},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null},{"id":92616,"source_id":"sgtopic.geography-urban-planning.green-mark-version-7-2026","kind":"topic","title_en":"Green Mark Version 7.0","title_zh":"\u7eff\u8272\u6807\u5fd7\u7b2c 7.0 \u7248","assurance":null,"subtype":null}]}