{"release_id":19,"data":{"id":90399,"release_id":19,"source_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","kind":"article","fingerprint":"0603ae7c1a3c8980d41f6c451dba3a523eb2b403e352e19f1399352f323b3f23","title_en":"AGS(SG) Standardised Site-Investigation Data","title_zh":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e","domain":"geography-urban-planning","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-11-05","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["AGS(SG)","AGS SG","standardised electronic site-investigation data","Singapore AGS format"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","document_sha256":"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865","document_type":"article","domain":"geography-urban-planning","entities":["sg.agency.bca","sg.agency.sac"],"facets":["current","infrastructure","policy"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-11-05","path":"geography-urban-planning\/ags-sg-site-investigation-data.md","related":["interactive-singapore-geological-map","granite-fines-concrete-specification-2026","reused-steel-framework-2026"],"sources":[{"accessed":"2026-11-05","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-11-05","publisher":"Singapore Accreditation Council","tier":1,"title":"Singapore Accreditation Council \u2014 Overview","url":"https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/"},{"accessed":"2026-10-21","published":"2022-03-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Submission of Site Investigation Data in Standardised Electronic Format (1 March 2022)","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf"},{"accessed":"2026-10-21","published":"2025-09","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"},{"accessed":"2026-10-21","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 AGS(SG) Excel Template","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx"},{"accessed":"2026-10-21","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 AGS(SG) Sample File","url":"https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip"}],"status":"verified","summary":"BCA's AGS(SG) standard supports structured site-investigation data exchange; specified submissions have used the format since October 2022, with Edition 3.0 published in September 2025 and current templates and samples online.","tags":["construction","research","policy","concept"],"temporal_scope":"current","title":"AGS(SG) Standardised Site-Investigation Data","topics":["sgtopic.geography","sgtopic.geography-urban-planning.ags-sg-site-investigation-data"],"volatility":"slow"},"date":"2026-11-05","domain":"geography-urban-planning","evidence_paths":["source\/geography-urban-planning\/ags-sg-site-investigation-data.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl","artefacts\/mentions.jsonl"],"expected_version":12,"input_hash":"5efd6dc91f91a05c0c6170e006330881e4136f91a5484b879e133d11612f1de1","kind":"article","lineage":[{"chunk_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data#overview","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/","https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"],"content_sha256":"fe559b5fe3d264777404dc404a605be0b6768437e6cef545b2c117a75162217c","document_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","document_sha256":"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865","section_sources":[{"accessed":"2026-11-05","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-10-21","published":"2025-09","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data#data-covered-and-purpose","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf","https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx","https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip"],"content_sha256":"74e6229458b9f8163cd5c8c941682d1e8faf557e7376d98807b935da88120af1","document_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","document_sha256":"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865","section_sources":[{"accessed":"2026-10-21","published":"2025-09","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"},{"accessed":"2026-10-21","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 AGS(SG) Excel Template","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx"},{"accessed":"2026-10-21","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 AGS(SG) Sample File","url":"https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip"}]},{"chunk_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data#submission-responsibilities-and-supporting-files","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"],"content_sha256":"f6d8a5d649b2097970d60d7d6238ac21b4a68fa3f44e1aee3ac7d75156c5a28c","document_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","document_sha256":"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865","section_sources":[{"accessed":"2026-10-21","published":"2025-09","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data#project-identification-and-file-management","citation_urls":["https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf","https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"],"content_sha256":"979dadf6bc05e87723917d7755b1666840427b06bd56db204389fed24c71048c","document_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","document_sha256":"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865","section_sources":[{"accessed":"2026-11-05","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-10-21","published":"2022-03-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Submission of Site Investigation Data in Standardised Electronic Format (1 March 2022)","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf"}]},{"chunk_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data#relationship-to-structural-plan-work","citation_urls":["https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/","https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/","https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf","https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf"],"content_sha256":"75310a99a98297ec70ee8015c703845bae9106e73e73aeca64fdecb83cb6fc09","document_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","document_sha256":"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865","section_sources":[{"accessed":"2026-11-05","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"accessed":"2026-11-05","publisher":"Singapore Accreditation Council","tier":1,"title":"Singapore Accreditation Council \u2014 Overview","url":"https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/"},{"accessed":"2026-10-21","published":"2022-03-01","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Submission of Site Investigation Data in Standardised Electronic Format (1 March 2022)","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf"},{"accessed":"2026-10-21","published":"2025-09","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"}]}],"links":[{"relation":"related","target_id":"sgkb.geography-urban-planning.interactive-singapore-geological-map"},{"relation":"related","target_id":"sgkb.geography-urban-planning.granite-fines-concrete-specification-2026"},{"relation":"related","target_id":"sgkb.geography-urban-planning.reused-steel-framework-2026"},{"relation":"topics","target_id":"sgtopic.geography"},{"relation":"topics","target_id":"sgtopic.geography-urban-planning.ags-sg-site-investigation-data"},{"relation":"entities","target_id":"sg.agency.bca"},{"relation":"entities","target_id":"sg.agency.sac"},{"relation":"mentions","target_id":"sg.agency.enterprisesg"}],"locales":{"en":{"markdown":"# AGS(SG) Standardised Site-Investigation Data\n\nAGS(SG) is Singapore's standardised electronic format for transferring site-investigation data. BCA's Singapore Geological Office developed it because electronic data had been prepared in incompatible formats, making sharing and reuse difficult. The protocol is tailored to Singapore practice and based, where applicable, on the AGS format established by the UK Association of Geotechnical and Geoenvironmental Specialists. BCA lists **Edition 3.0**, issued in September 2025, as the current edition on its structural-plan guidance page ([BCA, Guidelines for ST Plan Applications, accessed 5 November 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA, AGS(SG) Edition 3.0](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)).\n\n## Data covered and purpose\n\nThe guidelines cover geological, geotechnical, geo-environmental and geophysical records; laboratory-testing data may also be included, while some geophysical data use formats such as LAS and SEG-Y. AGS(SG)'s groups and fields capture project identification, boreholes, cone-penetration tests, samples, laboratory results, monitoring and supporting records. Its key fields link related records\u2014for example, a sample and its test results\u2014to the relevant project or hole. BCA explains that common structured files reduce repeated manual entry and the errors or omissions that can accompany re-entry, while making transfer, storage, retrieval, analysis and design use more efficient. The published template and sample file help practitioners prepare and inspect the exchange format ([BCA, AGS(SG) Edition 3.0, accessed 5 November 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf); [BCA, AGS(SG) Excel Template](https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx); [BCA, AGS(SG) Sample File](https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip)).\n\n## Submission responsibilities and supporting files\n\nThe standard describes the transmitted project, borehole and test records as **base data**. It organises these records into named groups and fields, linked through key fields such as project and hole identifiers. This structure supports consistent machine-readable relationships\u2014for example between a borehole, a sample and laboratory results\u2014and provides standard abbreviations, codes and units. Edition 3.0 says interpreted or derived data should not be transmitted as AGS(SG) base data, because further processing remains at the receiving user's discretion and control. BCA places responsibility on the submitting party to ensure that data is true, correct, accurate and complete, and calls for format, integrity, completeness and validation checks before submission. A conforming file is therefore a better-structured project record, not independent certification that the investigation or its measurements are correct ([BCA, AGS(SG) Edition 3.0, accessed 21 October 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)).\n\n## Project identification and file management\n\nFrom **1 October 2022**, BCA required AGS(SG) electronic-format submission for site-investigation works, with data using the geological-unit names in BCA's updated stratigraphic framework. The circular gives borehole-log examples and directs users to the electronic-transfer guidelines for the related codes. BCA's current guidance now provides the Edition 3.0 standard and preparation resources; project teams should use the current BCA documents and submission instructions rather than rely on old media-labelling examples or superseded editions ([BCA Circular APPBCA-2022-02, 1 March 2022](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf); [BCA, Guidelines for ST Plan Applications, accessed 21 October 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)).\n\n## Relationship to structural-plan work\n\nBCA's circular frames AGS(SG) submission as part of adopting a consistent geological stratigraphic framework, while the standard itself is about electronic transfer and data management. **AGS(SG) compliance does not accredit a firm.** Accreditation is a separate requirement: BCA's current guidance states that site-investigation works must be carried out by an **inspection body accredited and approved by the Singapore Accreditation Council (SAC)** under its Site Investigation scheme. SAC is the national accreditation body operating under Enterprise Singapore; check the current SAC register for an organisation's status and scope. This is a provider-qualification requirement, not a feature granted by submitting a correctly formatted AGS(SG) file ([BCA, Guidelines for ST Plan Applications, accessed 5 November 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [SAC, Overview, accessed 5 November 2026](https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/)).\n\nNeither a correctly structured dataset nor its submission replaces the site investigation, geological or geotechnical interpretation, Ground Investigation Report, Geotechnical Design Report, Qualified Person's assessment, or project-specific statutory submissions. **AGS(SG) does not approve a structural plan.** BCA also states that submitted data is supplied on an \u201cas-is\u201d basis; users remain responsible for deciding whether it is fit for their purposes and for the engineering judgements made from it ([BCA, AGS(SG) Edition 3.0](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf); [BCA, Circular APPBCA-2022-02](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)).","summary":"BCA's AGS(SG) standard supports structured site-investigation data exchange; specified submissions have used the format since October 2022, with Edition 3.0 published in September 2025 and current templates and samples online.","title":"AGS(SG) Standardised Site-Investigation Data"},"zh":{"markdown":"# AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e\n\nAGS(SG) \u662f\u65b0\u52a0\u5761\u7528\u4e8e\u4f20\u8f93\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u6807\u51c6\u5316\u7535\u5b50\u683c\u5f0f\u3002\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684\u65b0\u52a0\u5761\u5730\u8d28\u529e\u516c\u5ba4\u5236\u5b9a\u8be5\u683c\u5f0f\uff0c\u662f\u56e0\u4e3a\u7535\u5b50\u6570\u636e\u91c7\u7528\u7684\u683c\u5f0f\u5f7c\u6b64\u4e0d\u517c\u5bb9\uff0c\u96be\u4ee5\u5171\u4eab\u548c\u91cd\u590d\u4f7f\u7528\u3002\u8be5\u89c4\u8303\u4f9d\u636e\u65b0\u52a0\u5761\u7684\u5b9e\u8df5\u91cf\u8eab\u5236\u5b9a\uff0c\u5e76\u5728\u9002\u7528\u60c5\u51b5\u4e0b\u4ee5\u82f1\u56fd\u5ca9\u571f\u4e0e\u5730\u8d28\u73af\u5883\u4e13\u4e1a\u4eba\u58eb\u534f\u4f1a\u786e\u7acb\u7684 AGS \u683c\u5f0f\u4e3a\u57fa\u7840\u3002BCA \u5728\u5176\u7ed3\u6784\u56fe\u6307\u5bfc\u9875\u9762\u4e0a\u5c06 **\u7b2c 3.0 \u7248**\uff082025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff09\u5217\u4e3a\u73b0\u884c\u7248\u672c\uff08[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff09\u3002\n\n## \u6db5\u76d6\u7684\u6570\u636e\u4e0e\u7528\u9014\n\n\u6307\u5357\u6db5\u76d6\u5730\u8d28\u3001\u5ca9\u571f\u3001\u5730\u8d28\u73af\u5883\u548c\u5730\u7403\u7269\u7406\u8bb0\u5f55\uff1b\u4e5f\u53ef\u7eb3\u5165\u5b9e\u9a8c\u5ba4\u6d4b\u8bd5\u6570\u636e\uff0c\u800c\u90e8\u5206\u5730\u7403\u7269\u7406\u6570\u636e\u91c7\u7528 LAS \u548c SEG-Y \u7b49\u683c\u5f0f\u3002AGS(SG) \u7684\u6570\u636e\u7ec4\u548c\u5b57\u6bb5\u7528\u4e8e\u8bb0\u5f55\u9879\u76ee\u8bc6\u522b\u4fe1\u606f\u3001\u94bb\u5b54\u3001\u9759\u529b\u89e6\u63a2\u6d4b\u8bd5\u3001\u6837\u672c\u3001\u5b9e\u9a8c\u5ba4\u7ed3\u679c\u3001\u76d1\u6d4b\u6570\u636e\u548c\u8f85\u52a9\u8bb0\u5f55\u3002\u5176\u5173\u952e\u5b57\u6bb5\u5c06\u76f8\u5173\u8bb0\u5f55\u5173\u8054\u8d77\u6765\uff0c\u4f8b\u5982\u628a\u6837\u672c\u53ca\u5176\u6d4b\u8bd5\u7ed3\u679c\u5173\u8054\u5230\u76f8\u5e94\u9879\u76ee\u6216\u94bb\u5b54\u3002BCA \u8bf4\u660e\uff0c\u901a\u7528\u7684\u7ed3\u6784\u5316\u6587\u4ef6\u53ef\u51cf\u5c11\u91cd\u590d\u624b\u52a8\u5f55\u5165\uff0c\u4ee5\u53ca\u91cd\u65b0\u5f55\u5165\u53ef\u80fd\u9020\u6210\u7684\u9519\u8bef\u6216\u9057\u6f0f\uff0c\u540c\u65f6\u63d0\u9ad8\u6570\u636e\u4f20\u8f93\u3001\u5b58\u50a8\u3001\u68c0\u7d22\u3001\u5206\u6790\u548c\u8bbe\u8ba1\u4f7f\u7528\u7684\u6548\u7387\u3002\u5df2\u53d1\u5e03\u7684\u6a21\u677f\u548c\u6837\u672c\u6587\u4ef6\u6709\u52a9\u4e8e\u4ece\u4e1a\u4eba\u5458\u7f16\u5236\u548c\u68c0\u67e5\u4ea4\u6362\u683c\u5f0f\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff1b[BCA\uff0cAGS(SG) Excel \u6a21\u677f](https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx)\uff1b[BCA\uff0cAGS(SG) \u6837\u672c\u6587\u4ef6](https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip)\uff09\u3002\n\n## \u63d0\u4ea4\u8d23\u4efb\u4e0e\u8f85\u52a9\u6587\u4ef6\n\n\u8be5\u6807\u51c6\u5c06\u4f20\u8f93\u7684\u9879\u76ee\u3001\u94bb\u5b54\u548c\u6d4b\u8bd5\u8bb0\u5f55\u79f0\u4e3a**\u57fa\u7840\u6570\u636e**\u3002\u8fd9\u4e9b\u8bb0\u5f55\u6309\u547d\u540d\u7684\u6570\u636e\u7ec4\u548c\u5b57\u6bb5\u7ec4\u7ec7\uff0c\u5e76\u901a\u8fc7\u9879\u76ee\u548c\u94bb\u5b54\u6807\u8bc6\u7b26\u7b49\u5173\u952e\u5b57\u6bb5\u5173\u8054\u3002\u8fd9\u79cd\u7ed3\u6784\u652f\u6301\u4e00\u81f4\u7684\u673a\u5668\u53ef\u8bfb\u5173\u7cfb\uff0c\u4f8b\u5982\u94bb\u5b54\u3001\u6837\u672c\u548c\u5b9e\u9a8c\u5ba4\u7ed3\u679c\u4e4b\u95f4\u7684\u5173\u7cfb\uff0c\u5e76\u63d0\u4f9b\u6807\u51c6\u7f29\u5199\u3001\u4ee3\u7801\u548c\u5355\u4f4d\u3002\u7b2c 3.0 \u7248\u6307\u51fa\uff0c\u4e0d\u5e94\u5c06\u89e3\u91ca\u6216\u63a8\u5bfc\u5f97\u51fa\u7684\u6570\u636e\u4f5c\u4e3a AGS(SG) \u57fa\u7840\u6570\u636e\u4f20\u8f93\uff0c\u56e0\u4e3a\u540e\u7eed\u5904\u7406\u7531\u63a5\u6536\u7528\u6237\u81ea\u884c\u51b3\u5b9a\u548c\u63a7\u5236\u3002BCA \u8981\u6c42\u63d0\u4ea4\u65b9\u786e\u4fdd\u6570\u636e\u771f\u5b9e\u3001\u6b63\u786e\u3001\u51c6\u786e\u4e14\u5b8c\u6574\uff0c\u5e76\u8981\u6c42\u5728\u63d0\u4ea4\u524d\u68c0\u67e5\u683c\u5f0f\u3001\u5b8c\u6574\u6027\u3001\u6570\u636e\u9f50\u5168\u7a0b\u5ea6\u548c\u6709\u6548\u6027\u3002\u56e0\u6b64\uff0c\u7b26\u5408\u89c4\u8303\u7684\u6587\u4ef6\u662f\u7ed3\u6784\u66f4\u5b8c\u5584\u7684\u9879\u76ee\u8bb0\u5f55\uff0c\u5e76\u4e0d\u80fd\u72ec\u7acb\u8bc1\u660e\u8c03\u67e5\u6216\u6d4b\u91cf\u7ed3\u679c\u6b63\u786e\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248\uff0c\u4e8e 2026 \u5e74\u5341\u6708 21 \u65e5\u67e5\u9605](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff09\u3002\n\n## \u9879\u76ee\u8bc6\u522b\u4e0e\u6587\u4ef6\u7ba1\u7406\n\n\u81ea **2022 \u5e74\u5341\u6708 1 \u65e5**\u8d77\uff0cBCA \u8981\u6c42\u573a\u5730\u8c03\u67e5\u5de5\u7a0b\u4ee5 AGS(SG) \u7535\u5b50\u683c\u5f0f\u63d0\u4ea4\uff0c\u6570\u636e\u987b\u91c7\u7528 BCA \u66f4\u65b0\u540e\u7684\u5730\u5c42\u6846\u67b6\u4e2d\u7684\u5730\u8d28\u5355\u5143\u540d\u79f0\u3002\u8be5\u901a\u544a\u63d0\u4f9b\u4e86\u94bb\u5b54\u8bb0\u5f55\u793a\u4f8b\uff0c\u5e76\u6307\u5f15\u7528\u6237\u53c2\u9605\u7535\u5b50\u4f20\u8f93\u6307\u5357\u4e86\u89e3\u76f8\u5173\u4ee3\u7801\u3002BCA \u73b0\u884c\u6307\u5357\u63d0\u4f9b\u7b2c 3.0 \u7248\u6807\u51c6\u548c\u7f16\u5236\u8d44\u6e90\uff1b\u9879\u76ee\u56e2\u961f\u5e94\u4f7f\u7528 BCA \u5f53\u524d\u7684\u6587\u4ef6\u548c\u63d0\u4ea4\u8bf4\u660e\uff0c\u800c\u4e0d\u8981\u4f9d\u8d56\u65e7\u7684\u4ecb\u8d28\u6807\u7b7e\u793a\u4f8b\u6216\u5df2\u88ab\u53d6\u4ee3\u7684\u7248\u672c\uff08[BCA \u901a\u544a APPBCA-2022-02\uff0c2022 \u5e74\u4e09\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)\uff1b[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u6708 21 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff09\u3002\n\n## \u4e0e\u7ed3\u6784\u56fe\u5de5\u4f5c\u7684\u5173\u7cfb\n\nBCA \u7684\u901a\u544a\u5c06 AGS(SG) \u63d0\u4ea4\u5b9a\u4f4d\u4e3a\u91c7\u7528\u7edf\u4e00\u5730\u8d28\u5730\u5c42\u6846\u67b6\u7684\u4e00\u90e8\u5206\uff0c\u800c\u8be5\u6807\u51c6\u672c\u8eab\u6d89\u53ca\u7535\u5b50\u4f20\u8f93\u548c\u6570\u636e\u7ba1\u7406\u3002**\u7b26\u5408 AGS(SG) \u5e76\u4e0d\u4ee3\u8868\u4f01\u4e1a\u83b7\u5f97\u8ba4\u8bc1\u3002**\u8ba4\u8bc1\u662f\u53e6\u4e00\u9879\u8981\u6c42\uff1aBCA \u7684\u73b0\u884c\u6307\u5357\u6307\u51fa\uff0c\u573a\u5730\u8c03\u67e5\u5de5\u7a0b\u5fc5\u987b\u7531\u65b0\u52a0\u5761\u8ba4\u53ef\u7406\u4e8b\u4f1a\uff08SAC\uff09\u4f9d\u636e\u5176\u573a\u5730\u8c03\u67e5\u8ba1\u5212\u8ba4\u53ef\u5e76\u6279\u51c6\u7684**\u68c0\u9a8c\u673a\u6784**\u6267\u884c\u3002SAC \u662f\u7531\u65b0\u52a0\u5761\u4f01\u4e1a\u53d1\u5c55\u5c40\u8fd0\u4f5c\u7684\u56fd\u5bb6\u8ba4\u53ef\u673a\u6784\uff1b\u5e94\u67e5\u8be2 SAC \u7684\u73b0\u884c\u767b\u8bb0\u518c\uff0c\u4ee5\u6838\u5b9e\u673a\u6784\u7684\u72b6\u6001\u548c\u8ba4\u53ef\u8303\u56f4\u3002\u8fd9\u662f\u5bf9\u670d\u52a1\u63d0\u4f9b\u65b9\u8d44\u683c\u7684\u8981\u6c42\uff0c\u5e76\u975e\u6b63\u786e\u683c\u5f0f\u7684 AGS(SG) \u6587\u4ef6\u5728\u63d0\u4ea4\u540e\u4fbf\u80fd\u53d6\u5f97\u7684\u8d44\u683c\uff08[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[SAC\uff0c\u300a\u6982\u51b5\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/)\uff09\u3002\n\n\u7ed3\u6784\u6b63\u786e\u7684\u6570\u636e\u96c6\u53ca\u5176\u63d0\u4ea4\u5747\u4e0d\u80fd\u66ff\u4ee3\u573a\u5730\u8c03\u67e5\u3001\u5730\u8d28\u6216\u5ca9\u571f\u89e3\u91ca\u3001\u5730\u8d28\u8c03\u67e5\u62a5\u544a\u3001\u5ca9\u571f\u8bbe\u8ba1\u62a5\u544a\u3001\u5408\u683c\u4eba\u58eb\u7684\u8bc4\u4f30\uff0c\u6216\u9488\u5bf9\u5177\u4f53\u9879\u76ee\u7684\u6cd5\u5b9a\u63d0\u4ea4\u3002**AGS(SG) \u4e0d\u4f1a\u6279\u51c6\u7ed3\u6784\u56fe\u3002**BCA \u8fd8\u6307\u51fa\uff0c\u63d0\u4ea4\u7684\u6570\u636e\u6309\u201c\u73b0\u72b6\u201d\u63d0\u4f9b\uff1b\u7528\u6237\u4ecd\u987b\u81ea\u884c\u5224\u65ad\u6570\u636e\u662f\u5426\u9002\u5408\u5176\u7528\u9014\uff0c\u5e76\u5bf9\u636e\u6b64\u4f5c\u51fa\u7684\u5de5\u7a0b\u5224\u65ad\u8d1f\u8d23\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff1b[BCA \u901a\u544a APPBCA-2022-02](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)\uff09\u3002","summary":"\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 AGS(SG) \u6807\u51c6\u652f\u6301\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u7ed3\u6784\u5316\u4ea4\u6362\uff1b\u81ea 2022 \u5e74\u5341\u6708\u8d77\uff0c\u6307\u5b9a\u63d0\u4ea4\u5185\u5bb9\u5df2\u91c7\u7528\u8be5\u683c\u5f0f\u3002\u7b2c 3.0 \u7248\u4e8e 2025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff0c\u73b0\u884c\u6a21\u677f\u548c\u6837\u672c\u53ef\u5728\u7ebf\u83b7\u53d6\u3002","title":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e"}},"source_id":"sgkb.geography-urban-planning.ags-sg-site-investigation-data","status":"verified","summary_en":"BCA's AGS(SG) standard supports structured site-investigation data exchange; specified submissions have used the format since October 2022, with Edition 3.0 published in September 2025 and current templates and samples online.","summary_zh":"\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 AGS(SG) \u6807\u51c6\u652f\u6301\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u7ed3\u6784\u5316\u4ea4\u6362\uff1b\u81ea 2022 \u5e74\u5341\u6708\u8d77\uff0c\u6307\u5b9a\u63d0\u4ea4\u5185\u5bb9\u5df2\u91c7\u7528\u8be5\u683c\u5f0f\u3002\u7b2c 3.0 \u7248\u4e8e 2025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff0c\u73b0\u884c\u6a21\u677f\u548c\u6837\u672c\u53ef\u5728\u7ebf\u83b7\u53d6\u3002","title_en":"AGS(SG) Standardised Site-Investigation Data","title_zh":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e","wiki":{"domain":"geography-urban-planning","last_verified":"2026-11-05","locales":{"en":{"markdown":"# AGS(SG) Standardised Site-Investigation Data\n\nAGS(SG) is Singapore's standardised electronic format for transferring site-investigation data. BCA's Singapore Geological Office developed it because electronic data had been prepared in incompatible formats, making sharing and reuse difficult. The protocol is tailored to Singapore practice and based, where applicable, on the AGS format established by the UK Association of Geotechnical and Geoenvironmental Specialists. BCA lists **Edition 3.0**, issued in September 2025, as the current edition on its structural-plan guidance page ([BCA, Guidelines for ST Plan Applications, accessed 5 November 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA, AGS(SG) Edition 3.0](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)).\n\n## Data covered and purpose\n\nThe guidelines cover geological, geotechnical, geo-environmental and geophysical records; laboratory-testing data may also be included, while some geophysical data use formats such as LAS and SEG-Y. AGS(SG)'s groups and fields capture project identification, boreholes, cone-penetration tests, samples, laboratory results, monitoring and supporting records. Its key fields link related records\u2014for example, a sample and its test results\u2014to the relevant project or hole. BCA explains that common structured files reduce repeated manual entry and the errors or omissions that can accompany re-entry, while making transfer, storage, retrieval, analysis and design use more efficient. The published template and sample file help practitioners prepare and inspect the exchange format ([BCA, AGS(SG) Edition 3.0, accessed 5 November 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf); [BCA, AGS(SG) Excel Template](https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx); [BCA, AGS(SG) Sample File](https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip)).\n\n## Submission responsibilities and supporting files\n\nThe standard describes the transmitted project, borehole and test records as **base data**. It organises these records into named groups and fields, linked through key fields such as project and hole identifiers. This structure supports consistent machine-readable relationships\u2014for example between a borehole, a sample and laboratory results\u2014and provides standard abbreviations, codes and units. Edition 3.0 says interpreted or derived data should not be transmitted as AGS(SG) base data, because further processing remains at the receiving user's discretion and control. BCA places responsibility on the submitting party to ensure that data is true, correct, accurate and complete, and calls for format, integrity, completeness and validation checks before submission. A conforming file is therefore a better-structured project record, not independent certification that the investigation or its measurements are correct ([BCA, AGS(SG) Edition 3.0, accessed 21 October 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)).\n\n## Project identification and file management\n\nFrom **1 October 2022**, BCA required AGS(SG) electronic-format submission for site-investigation works, with data using the geological-unit names in BCA's updated stratigraphic framework. The circular gives borehole-log examples and directs users to the electronic-transfer guidelines for the related codes. BCA's current guidance now provides the Edition 3.0 standard and preparation resources; project teams should use the current BCA documents and submission instructions rather than rely on old media-labelling examples or superseded editions ([BCA Circular APPBCA-2022-02, 1 March 2022](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf); [BCA, Guidelines for ST Plan Applications, accessed 21 October 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)).\n\n## Relationship to structural-plan work\n\nBCA's circular frames AGS(SG) submission as part of adopting a consistent geological stratigraphic framework, while the standard itself is about electronic transfer and data management. **AGS(SG) compliance does not accredit a firm.** Accreditation is a separate requirement: BCA's current guidance states that site-investigation works must be carried out by an **inspection body accredited and approved by the Singapore Accreditation Council (SAC)** under its Site Investigation scheme. SAC is the national accreditation body operating under Enterprise Singapore; check the current SAC register for an organisation's status and scope. This is a provider-qualification requirement, not a feature granted by submitting a correctly formatted AGS(SG) file ([BCA, Guidelines for ST Plan Applications, accessed 5 November 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [SAC, Overview, accessed 5 November 2026](https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/)).\n\nNeither a correctly structured dataset nor its submission replaces the site investigation, geological or geotechnical interpretation, Ground Investigation Report, Geotechnical Design Report, Qualified Person's assessment, or project-specific statutory submissions. **AGS(SG) does not approve a structural plan.** BCA also states that submitted data is supplied on an \u201cas-is\u201d basis; users remain responsible for deciding whether it is fit for their purposes and for the engineering judgements made from it ([BCA, AGS(SG) Edition 3.0](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf); [BCA, Circular APPBCA-2022-02](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)).","summary":"BCA's AGS(SG) standard supports structured site-investigation data exchange; specified submissions have used the format since October 2022, with Edition 3.0 published in September 2025 and current templates and samples online.","title":"AGS(SG) Standardised Site-Investigation Data"},"zh":{"markdown":"# AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e\n\nAGS(SG) \u662f\u65b0\u52a0\u5761\u7528\u4e8e\u4f20\u8f93\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u6807\u51c6\u5316\u7535\u5b50\u683c\u5f0f\u3002\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684\u65b0\u52a0\u5761\u5730\u8d28\u529e\u516c\u5ba4\u5236\u5b9a\u8be5\u683c\u5f0f\uff0c\u662f\u56e0\u4e3a\u7535\u5b50\u6570\u636e\u91c7\u7528\u7684\u683c\u5f0f\u5f7c\u6b64\u4e0d\u517c\u5bb9\uff0c\u96be\u4ee5\u5171\u4eab\u548c\u91cd\u590d\u4f7f\u7528\u3002\u8be5\u89c4\u8303\u4f9d\u636e\u65b0\u52a0\u5761\u7684\u5b9e\u8df5\u91cf\u8eab\u5236\u5b9a\uff0c\u5e76\u5728\u9002\u7528\u60c5\u51b5\u4e0b\u4ee5\u82f1\u56fd\u5ca9\u571f\u4e0e\u5730\u8d28\u73af\u5883\u4e13\u4e1a\u4eba\u58eb\u534f\u4f1a\u786e\u7acb\u7684 AGS \u683c\u5f0f\u4e3a\u57fa\u7840\u3002BCA \u5728\u5176\u7ed3\u6784\u56fe\u6307\u5bfc\u9875\u9762\u4e0a\u5c06 **\u7b2c 3.0 \u7248**\uff082025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff09\u5217\u4e3a\u73b0\u884c\u7248\u672c\uff08[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff09\u3002\n\n## \u6db5\u76d6\u7684\u6570\u636e\u4e0e\u7528\u9014\n\n\u6307\u5357\u6db5\u76d6\u5730\u8d28\u3001\u5ca9\u571f\u3001\u5730\u8d28\u73af\u5883\u548c\u5730\u7403\u7269\u7406\u8bb0\u5f55\uff1b\u4e5f\u53ef\u7eb3\u5165\u5b9e\u9a8c\u5ba4\u6d4b\u8bd5\u6570\u636e\uff0c\u800c\u90e8\u5206\u5730\u7403\u7269\u7406\u6570\u636e\u91c7\u7528 LAS \u548c SEG-Y \u7b49\u683c\u5f0f\u3002AGS(SG) \u7684\u6570\u636e\u7ec4\u548c\u5b57\u6bb5\u7528\u4e8e\u8bb0\u5f55\u9879\u76ee\u8bc6\u522b\u4fe1\u606f\u3001\u94bb\u5b54\u3001\u9759\u529b\u89e6\u63a2\u6d4b\u8bd5\u3001\u6837\u672c\u3001\u5b9e\u9a8c\u5ba4\u7ed3\u679c\u3001\u76d1\u6d4b\u6570\u636e\u548c\u8f85\u52a9\u8bb0\u5f55\u3002\u5176\u5173\u952e\u5b57\u6bb5\u5c06\u76f8\u5173\u8bb0\u5f55\u5173\u8054\u8d77\u6765\uff0c\u4f8b\u5982\u628a\u6837\u672c\u53ca\u5176\u6d4b\u8bd5\u7ed3\u679c\u5173\u8054\u5230\u76f8\u5e94\u9879\u76ee\u6216\u94bb\u5b54\u3002BCA \u8bf4\u660e\uff0c\u901a\u7528\u7684\u7ed3\u6784\u5316\u6587\u4ef6\u53ef\u51cf\u5c11\u91cd\u590d\u624b\u52a8\u5f55\u5165\uff0c\u4ee5\u53ca\u91cd\u65b0\u5f55\u5165\u53ef\u80fd\u9020\u6210\u7684\u9519\u8bef\u6216\u9057\u6f0f\uff0c\u540c\u65f6\u63d0\u9ad8\u6570\u636e\u4f20\u8f93\u3001\u5b58\u50a8\u3001\u68c0\u7d22\u3001\u5206\u6790\u548c\u8bbe\u8ba1\u4f7f\u7528\u7684\u6548\u7387\u3002\u5df2\u53d1\u5e03\u7684\u6a21\u677f\u548c\u6837\u672c\u6587\u4ef6\u6709\u52a9\u4e8e\u4ece\u4e1a\u4eba\u5458\u7f16\u5236\u548c\u68c0\u67e5\u4ea4\u6362\u683c\u5f0f\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff1b[BCA\uff0cAGS(SG) Excel \u6a21\u677f](https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx)\uff1b[BCA\uff0cAGS(SG) \u6837\u672c\u6587\u4ef6](https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip)\uff09\u3002\n\n## \u63d0\u4ea4\u8d23\u4efb\u4e0e\u8f85\u52a9\u6587\u4ef6\n\n\u8be5\u6807\u51c6\u5c06\u4f20\u8f93\u7684\u9879\u76ee\u3001\u94bb\u5b54\u548c\u6d4b\u8bd5\u8bb0\u5f55\u79f0\u4e3a**\u57fa\u7840\u6570\u636e**\u3002\u8fd9\u4e9b\u8bb0\u5f55\u6309\u547d\u540d\u7684\u6570\u636e\u7ec4\u548c\u5b57\u6bb5\u7ec4\u7ec7\uff0c\u5e76\u901a\u8fc7\u9879\u76ee\u548c\u94bb\u5b54\u6807\u8bc6\u7b26\u7b49\u5173\u952e\u5b57\u6bb5\u5173\u8054\u3002\u8fd9\u79cd\u7ed3\u6784\u652f\u6301\u4e00\u81f4\u7684\u673a\u5668\u53ef\u8bfb\u5173\u7cfb\uff0c\u4f8b\u5982\u94bb\u5b54\u3001\u6837\u672c\u548c\u5b9e\u9a8c\u5ba4\u7ed3\u679c\u4e4b\u95f4\u7684\u5173\u7cfb\uff0c\u5e76\u63d0\u4f9b\u6807\u51c6\u7f29\u5199\u3001\u4ee3\u7801\u548c\u5355\u4f4d\u3002\u7b2c 3.0 \u7248\u6307\u51fa\uff0c\u4e0d\u5e94\u5c06\u89e3\u91ca\u6216\u63a8\u5bfc\u5f97\u51fa\u7684\u6570\u636e\u4f5c\u4e3a AGS(SG) \u57fa\u7840\u6570\u636e\u4f20\u8f93\uff0c\u56e0\u4e3a\u540e\u7eed\u5904\u7406\u7531\u63a5\u6536\u7528\u6237\u81ea\u884c\u51b3\u5b9a\u548c\u63a7\u5236\u3002BCA \u8981\u6c42\u63d0\u4ea4\u65b9\u786e\u4fdd\u6570\u636e\u771f\u5b9e\u3001\u6b63\u786e\u3001\u51c6\u786e\u4e14\u5b8c\u6574\uff0c\u5e76\u8981\u6c42\u5728\u63d0\u4ea4\u524d\u68c0\u67e5\u683c\u5f0f\u3001\u5b8c\u6574\u6027\u3001\u6570\u636e\u9f50\u5168\u7a0b\u5ea6\u548c\u6709\u6548\u6027\u3002\u56e0\u6b64\uff0c\u7b26\u5408\u89c4\u8303\u7684\u6587\u4ef6\u662f\u7ed3\u6784\u66f4\u5b8c\u5584\u7684\u9879\u76ee\u8bb0\u5f55\uff0c\u5e76\u4e0d\u80fd\u72ec\u7acb\u8bc1\u660e\u8c03\u67e5\u6216\u6d4b\u91cf\u7ed3\u679c\u6b63\u786e\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248\uff0c\u4e8e 2026 \u5e74\u5341\u6708 21 \u65e5\u67e5\u9605](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff09\u3002\n\n## \u9879\u76ee\u8bc6\u522b\u4e0e\u6587\u4ef6\u7ba1\u7406\n\n\u81ea **2022 \u5e74\u5341\u6708 1 \u65e5**\u8d77\uff0cBCA \u8981\u6c42\u573a\u5730\u8c03\u67e5\u5de5\u7a0b\u4ee5 AGS(SG) \u7535\u5b50\u683c\u5f0f\u63d0\u4ea4\uff0c\u6570\u636e\u987b\u91c7\u7528 BCA \u66f4\u65b0\u540e\u7684\u5730\u5c42\u6846\u67b6\u4e2d\u7684\u5730\u8d28\u5355\u5143\u540d\u79f0\u3002\u8be5\u901a\u544a\u63d0\u4f9b\u4e86\u94bb\u5b54\u8bb0\u5f55\u793a\u4f8b\uff0c\u5e76\u6307\u5f15\u7528\u6237\u53c2\u9605\u7535\u5b50\u4f20\u8f93\u6307\u5357\u4e86\u89e3\u76f8\u5173\u4ee3\u7801\u3002BCA \u73b0\u884c\u6307\u5357\u63d0\u4f9b\u7b2c 3.0 \u7248\u6807\u51c6\u548c\u7f16\u5236\u8d44\u6e90\uff1b\u9879\u76ee\u56e2\u961f\u5e94\u4f7f\u7528 BCA \u5f53\u524d\u7684\u6587\u4ef6\u548c\u63d0\u4ea4\u8bf4\u660e\uff0c\u800c\u4e0d\u8981\u4f9d\u8d56\u65e7\u7684\u4ecb\u8d28\u6807\u7b7e\u793a\u4f8b\u6216\u5df2\u88ab\u53d6\u4ee3\u7684\u7248\u672c\uff08[BCA \u901a\u544a APPBCA-2022-02\uff0c2022 \u5e74\u4e09\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)\uff1b[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u6708 21 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff09\u3002\n\n## \u4e0e\u7ed3\u6784\u56fe\u5de5\u4f5c\u7684\u5173\u7cfb\n\nBCA \u7684\u901a\u544a\u5c06 AGS(SG) \u63d0\u4ea4\u5b9a\u4f4d\u4e3a\u91c7\u7528\u7edf\u4e00\u5730\u8d28\u5730\u5c42\u6846\u67b6\u7684\u4e00\u90e8\u5206\uff0c\u800c\u8be5\u6807\u51c6\u672c\u8eab\u6d89\u53ca\u7535\u5b50\u4f20\u8f93\u548c\u6570\u636e\u7ba1\u7406\u3002**\u7b26\u5408 AGS(SG) \u5e76\u4e0d\u4ee3\u8868\u4f01\u4e1a\u83b7\u5f97\u8ba4\u8bc1\u3002**\u8ba4\u8bc1\u662f\u53e6\u4e00\u9879\u8981\u6c42\uff1aBCA \u7684\u73b0\u884c\u6307\u5357\u6307\u51fa\uff0c\u573a\u5730\u8c03\u67e5\u5de5\u7a0b\u5fc5\u987b\u7531\u65b0\u52a0\u5761\u8ba4\u53ef\u7406\u4e8b\u4f1a\uff08SAC\uff09\u4f9d\u636e\u5176\u573a\u5730\u8c03\u67e5\u8ba1\u5212\u8ba4\u53ef\u5e76\u6279\u51c6\u7684**\u68c0\u9a8c\u673a\u6784**\u6267\u884c\u3002SAC \u662f\u7531\u65b0\u52a0\u5761\u4f01\u4e1a\u53d1\u5c55\u5c40\u8fd0\u4f5c\u7684\u56fd\u5bb6\u8ba4\u53ef\u673a\u6784\uff1b\u5e94\u67e5\u8be2 SAC \u7684\u73b0\u884c\u767b\u8bb0\u518c\uff0c\u4ee5\u6838\u5b9e\u673a\u6784\u7684\u72b6\u6001\u548c\u8ba4\u53ef\u8303\u56f4\u3002\u8fd9\u662f\u5bf9\u670d\u52a1\u63d0\u4f9b\u65b9\u8d44\u683c\u7684\u8981\u6c42\uff0c\u5e76\u975e\u6b63\u786e\u683c\u5f0f\u7684 AGS(SG) \u6587\u4ef6\u5728\u63d0\u4ea4\u540e\u4fbf\u80fd\u53d6\u5f97\u7684\u8d44\u683c\uff08[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[SAC\uff0c\u300a\u6982\u51b5\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/)\uff09\u3002\n\n\u7ed3\u6784\u6b63\u786e\u7684\u6570\u636e\u96c6\u53ca\u5176\u63d0\u4ea4\u5747\u4e0d\u80fd\u66ff\u4ee3\u573a\u5730\u8c03\u67e5\u3001\u5730\u8d28\u6216\u5ca9\u571f\u89e3\u91ca\u3001\u5730\u8d28\u8c03\u67e5\u62a5\u544a\u3001\u5ca9\u571f\u8bbe\u8ba1\u62a5\u544a\u3001\u5408\u683c\u4eba\u58eb\u7684\u8bc4\u4f30\uff0c\u6216\u9488\u5bf9\u5177\u4f53\u9879\u76ee\u7684\u6cd5\u5b9a\u63d0\u4ea4\u3002**AGS(SG) \u4e0d\u4f1a\u6279\u51c6\u7ed3\u6784\u56fe\u3002**BCA \u8fd8\u6307\u51fa\uff0c\u63d0\u4ea4\u7684\u6570\u636e\u6309\u201c\u73b0\u72b6\u201d\u63d0\u4f9b\uff1b\u7528\u6237\u4ecd\u987b\u81ea\u884c\u5224\u65ad\u6570\u636e\u662f\u5426\u9002\u5408\u5176\u7528\u9014\uff0c\u5e76\u5bf9\u636e\u6b64\u4f5c\u51fa\u7684\u5de5\u7a0b\u5224\u65ad\u8d1f\u8d23\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff1b[BCA \u901a\u544a APPBCA-2022-02](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)\uff09\u3002","summary":"\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 AGS(SG) \u6807\u51c6\u652f\u6301\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u7ed3\u6784\u5316\u4ea4\u6362\uff1b\u81ea 2022 \u5e74\u5341\u6708\u8d77\uff0c\u6307\u5b9a\u63d0\u4ea4\u5185\u5bb9\u5df2\u91c7\u7528\u8be5\u683c\u5f0f\u3002\u7b2c 3.0 \u7248\u4e8e 2025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff0c\u73b0\u884c\u6a21\u677f\u548c\u6837\u672c\u53ef\u5728\u7ebf\u83b7\u53d6\u3002","title":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e"}},"path":"geography-urban-planning\/ags-sg-site-investigation-data.md","related_source_ids":["sgkb.geography-urban-planning.interactive-singapore-geological-map","sgkb.geography-urban-planning.granite-fines-concrete-specification-2026","sgkb.geography-urban-planning.reused-steel-framework-2026"],"source_hash":"5efd6dc91f91a05c0c6170e006330881e4136f91a5484b879e133d11612f1de1","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Guidelines for ST Plan Applications","url":"https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/"},{"title":"Singapore Accreditation Council \u2014 Overview","url":"https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/"},{"title":"BCA \u2014 Submission of Site Investigation Data in Standardised Electronic Format (1 March 2022)","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf"},{"title":"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf"},{"title":"BCA \u2014 AGS(SG) Excel Template","url":"https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx"},{"title":"BCA \u2014 AGS(SG) Sample File","url":"https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip"}]}},"search_text":"AGS(SG) Standardised Site-Investigation Data\nAGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e\nBCA's AGS(SG) standard supports structured site-investigation data exchange; specified submissions have used the format since October 2022, with Edition 3.0 published in September 2025 and current templates and samples online.\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684 AGS(SG) \u6807\u51c6\u652f\u6301\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u7ed3\u6784\u5316\u4ea4\u6362\uff1b\u81ea 2022 \u5e74\u5341\u6708\u8d77\uff0c\u6307\u5b9a\u63d0\u4ea4\u5185\u5bb9\u5df2\u91c7\u7528\u8be5\u683c\u5f0f\u3002\u7b2c 3.0 \u7248\u4e8e 2025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff0c\u73b0\u884c\u6a21\u677f\u548c\u6837\u672c\u53ef\u5728\u7ebf\u83b7\u53d6\u3002\n{\"aliases\":[\"AGS(SG)\",\"AGS SG\",\"standardised electronic site-investigation data\",\"Singapore AGS format\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.geography-urban-planning.ags-sg-site-investigation-data\",\"document_sha256\":\"da4227845588b7b050271b47daedf839ec45da608bec50a0cc4116aad04c8865\",\"document_type\":\"article\",\"domain\":\"geography-urban-planning\",\"entities\":[\"sg.agency.bca\",\"sg.agency.sac\"],\"facets\":[\"current\",\"infrastructure\",\"policy\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-11-05\",\"path\":\"geography-urban-planning\\\/ags-sg-site-investigation-data.md\",\"related\":[\"interactive-singapore-geological-map\",\"granite-fines-concrete-specification-2026\",\"reused-steel-framework-2026\"],\"sources\":[{\"accessed\":\"2026-11-05\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Guidelines for ST Plan Applications\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/safety-and-standards\\\/applications-and-licenses\\\/structural-plan-submission\\\/guidelines-for-st-plan-applications\\\/\"},{\"accessed\":\"2026-11-05\",\"publisher\":\"Singapore Accreditation Council\",\"tier\":1,\"title\":\"Singapore Accreditation Council \u2014 Overview\",\"url\":\"https:\\\/\\\/www.sac-accreditation.gov.sg\\\/about\\\/our-history\\\/overview\\\/\"},{\"accessed\":\"2026-10-21\",\"published\":\"2022-03-01\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Submission of Site Investigation Data in Standardised Electronic Format (1 March 2022)\",\"url\":\"https:\\\/\\\/isomer-user-content.by.gov.sg\\\/338\\\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\\\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf\"},{\"accessed\":\"2026-10-21\",\"published\":\"2025-09\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Guidelines for Electronic Transfer of Site Investigation Data, Edition 3.0\",\"url\":\"https:\\\/\\\/isomer-user-content.by.gov.sg\\\/338\\\/01160470-7743-42cb-9223-29a0593c02c5\\\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf\"},{\"accessed\":\"2026-10-21\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 AGS(SG) Excel Template\",\"url\":\"https:\\\/\\\/isomer-user-content.by.gov.sg\\\/338\\\/2981529c-3d4f-4086-b4a1-483e8a07c365\\\/ags(sg)-excel-template.xlsx\"},{\"accessed\":\"2026-10-21\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 AGS(SG) Sample File\",\"url\":\"https:\\\/\\\/file.go.gov.sg\\\/ags-sample-file-zip.zip\"}],\"status\":\"verified\",\"summary\":\"BCA's AGS(SG) standard supports structured site-investigation data exchange; specified submissions have used the format since October 2022, with Edition 3.0 published in September 2025 and current templates and samples online.\",\"tags\":[\"construction\",\"research\",\"policy\",\"concept\"],\"temporal_scope\":\"current\",\"title\":\"AGS(SG) Standardised Site-Investigation Data\",\"topics\":[\"sgtopic.geography\",\"sgtopic.geography-urban-planning.ags-sg-site-investigation-data\"],\"volatility\":\"slow\"}\n# AGS(SG) Standardised Site-Investigation Data\n\nAGS(SG) is Singapore's standardised electronic format for transferring site-investigation data. BCA's Singapore Geological Office developed it because electronic data had been prepared in incompatible formats, making sharing and reuse difficult. The protocol is tailored to Singapore practice and based, where applicable, on the AGS format established by the UK Association of Geotechnical and Geoenvironmental Specialists. BCA lists **Edition 3.0**, issued in September 2025, as the current edition on its structural-plan guidance page ([BCA, Guidelines for ST Plan Applications, accessed 5 November 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [BCA, AGS(SG) Edition 3.0](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)).\n\n## Data covered and purpose\n\nThe guidelines cover geological, geotechnical, geo-environmental and geophysical records; laboratory-testing data may also be included, while some geophysical data use formats such as LAS and SEG-Y. AGS(SG)'s groups and fields capture project identification, boreholes, cone-penetration tests, samples, laboratory results, monitoring and supporting records. Its key fields link related records\u2014for example, a sample and its test results\u2014to the relevant project or hole. BCA explains that common structured files reduce repeated manual entry and the errors or omissions that can accompany re-entry, while making transfer, storage, retrieval, analysis and design use more efficient. The published template and sample file help practitioners prepare and inspect the exchange format ([BCA, AGS(SG) Edition 3.0, accessed 5 November 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf); [BCA, AGS(SG) Excel Template](https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx); [BCA, AGS(SG) Sample File](https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip)).\n\n## Submission responsibilities and supporting files\n\nThe standard describes the transmitted project, borehole and test records as **base data**. It organises these records into named groups and fields, linked through key fields such as project and hole identifiers. This structure supports consistent machine-readable relationships\u2014for example between a borehole, a sample and laboratory results\u2014and provides standard abbreviations, codes and units. Edition 3.0 says interpreted or derived data should not be transmitted as AGS(SG) base data, because further processing remains at the receiving user's discretion and control. BCA places responsibility on the submitting party to ensure that data is true, correct, accurate and complete, and calls for format, integrity, completeness and validation checks before submission. A conforming file is therefore a better-structured project record, not independent certification that the investigation or its measurements are correct ([BCA, AGS(SG) Edition 3.0, accessed 21 October 2026](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)).\n\n## Project identification and file management\n\nFrom **1 October 2022**, BCA required AGS(SG) electronic-format submission for site-investigation works, with data using the geological-unit names in BCA's updated stratigraphic framework. The circular gives borehole-log examples and directs users to the electronic-transfer guidelines for the related codes. BCA's current guidance now provides the Edition 3.0 standard and preparation resources; project teams should use the current BCA documents and submission instructions rather than rely on old media-labelling examples or superseded editions ([BCA Circular APPBCA-2022-02, 1 March 2022](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf); [BCA, Guidelines for ST Plan Applications, accessed 21 October 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)).\n\n## Relationship to structural-plan work\n\nBCA's circular frames AGS(SG) submission as part of adopting a consistent geological stratigraphic framework, while the standard itself is about electronic transfer and data management. **AGS(SG) compliance does not accredit a firm.** Accreditation is a separate requirement: BCA's current guidance states that site-investigation works must be carried out by an **inspection body accredited and approved by the Singapore Accreditation Council (SAC)** under its Site Investigation scheme. SAC is the national accreditation body operating under Enterprise Singapore; check the current SAC register for an organisation's status and scope. This is a provider-qualification requirement, not a feature granted by submitting a correctly formatted AGS(SG) file ([BCA, Guidelines for ST Plan Applications, accessed 5 November 2026](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/); [SAC, Overview, accessed 5 November 2026](https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/)).\n\nNeither a correctly structured dataset nor its submission replaces the site investigation, geological or geotechnical interpretation, Ground Investigation Report, Geotechnical Design Report, Qualified Person's assessment, or project-specific statutory submissions. **AGS(SG) does not approve a structural plan.** BCA also states that submitted data is supplied on an \u201cas-is\u201d basis; users remain responsible for deciding whether it is fit for their purposes and for the engineering judgements made from it ([BCA, AGS(SG) Edition 3.0](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf); [BCA, Circular APPBCA-2022-02](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)).\n# AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u8c03\u67e5\u6570\u636e\n\nAGS(SG) \u662f\u65b0\u52a0\u5761\u7528\u4e8e\u4f20\u8f93\u573a\u5730\u8c03\u67e5\u6570\u636e\u7684\u6807\u51c6\u5316\u7535\u5b50\u683c\u5f0f\u3002\u5efa\u8bbe\u5c40\uff08BCA\uff09\u7684\u65b0\u52a0\u5761\u5730\u8d28\u529e\u516c\u5ba4\u5236\u5b9a\u8be5\u683c\u5f0f\uff0c\u662f\u56e0\u4e3a\u7535\u5b50\u6570\u636e\u91c7\u7528\u7684\u683c\u5f0f\u5f7c\u6b64\u4e0d\u517c\u5bb9\uff0c\u96be\u4ee5\u5171\u4eab\u548c\u91cd\u590d\u4f7f\u7528\u3002\u8be5\u89c4\u8303\u4f9d\u636e\u65b0\u52a0\u5761\u7684\u5b9e\u8df5\u91cf\u8eab\u5236\u5b9a\uff0c\u5e76\u5728\u9002\u7528\u60c5\u51b5\u4e0b\u4ee5\u82f1\u56fd\u5ca9\u571f\u4e0e\u5730\u8d28\u73af\u5883\u4e13\u4e1a\u4eba\u58eb\u534f\u4f1a\u786e\u7acb\u7684 AGS \u683c\u5f0f\u4e3a\u57fa\u7840\u3002BCA \u5728\u5176\u7ed3\u6784\u56fe\u6307\u5bfc\u9875\u9762\u4e0a\u5c06 **\u7b2c 3.0 \u7248**\uff082025 \u5e74\u4e5d\u6708\u53d1\u5e03\uff09\u5217\u4e3a\u73b0\u884c\u7248\u672c\uff08[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff09\u3002\n\n## \u6db5\u76d6\u7684\u6570\u636e\u4e0e\u7528\u9014\n\n\u6307\u5357\u6db5\u76d6\u5730\u8d28\u3001\u5ca9\u571f\u3001\u5730\u8d28\u73af\u5883\u548c\u5730\u7403\u7269\u7406\u8bb0\u5f55\uff1b\u4e5f\u53ef\u7eb3\u5165\u5b9e\u9a8c\u5ba4\u6d4b\u8bd5\u6570\u636e\uff0c\u800c\u90e8\u5206\u5730\u7403\u7269\u7406\u6570\u636e\u91c7\u7528 LAS \u548c SEG-Y \u7b49\u683c\u5f0f\u3002AGS(SG) \u7684\u6570\u636e\u7ec4\u548c\u5b57\u6bb5\u7528\u4e8e\u8bb0\u5f55\u9879\u76ee\u8bc6\u522b\u4fe1\u606f\u3001\u94bb\u5b54\u3001\u9759\u529b\u89e6\u63a2\u6d4b\u8bd5\u3001\u6837\u672c\u3001\u5b9e\u9a8c\u5ba4\u7ed3\u679c\u3001\u76d1\u6d4b\u6570\u636e\u548c\u8f85\u52a9\u8bb0\u5f55\u3002\u5176\u5173\u952e\u5b57\u6bb5\u5c06\u76f8\u5173\u8bb0\u5f55\u5173\u8054\u8d77\u6765\uff0c\u4f8b\u5982\u628a\u6837\u672c\u53ca\u5176\u6d4b\u8bd5\u7ed3\u679c\u5173\u8054\u5230\u76f8\u5e94\u9879\u76ee\u6216\u94bb\u5b54\u3002BCA \u8bf4\u660e\uff0c\u901a\u7528\u7684\u7ed3\u6784\u5316\u6587\u4ef6\u53ef\u51cf\u5c11\u91cd\u590d\u624b\u52a8\u5f55\u5165\uff0c\u4ee5\u53ca\u91cd\u65b0\u5f55\u5165\u53ef\u80fd\u9020\u6210\u7684\u9519\u8bef\u6216\u9057\u6f0f\uff0c\u540c\u65f6\u63d0\u9ad8\u6570\u636e\u4f20\u8f93\u3001\u5b58\u50a8\u3001\u68c0\u7d22\u3001\u5206\u6790\u548c\u8bbe\u8ba1\u4f7f\u7528\u7684\u6548\u7387\u3002\u5df2\u53d1\u5e03\u7684\u6a21\u677f\u548c\u6837\u672c\u6587\u4ef6\u6709\u52a9\u4e8e\u4ece\u4e1a\u4eba\u5458\u7f16\u5236\u548c\u68c0\u67e5\u4ea4\u6362\u683c\u5f0f\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff1b[BCA\uff0cAGS(SG) Excel \u6a21\u677f](https:\/\/isomer-user-content.by.gov.sg\/338\/2981529c-3d4f-4086-b4a1-483e8a07c365\/ags(sg)-excel-template.xlsx)\uff1b[BCA\uff0cAGS(SG) \u6837\u672c\u6587\u4ef6](https:\/\/file.go.gov.sg\/ags-sample-file-zip.zip)\uff09\u3002\n\n## \u63d0\u4ea4\u8d23\u4efb\u4e0e\u8f85\u52a9\u6587\u4ef6\n\n\u8be5\u6807\u51c6\u5c06\u4f20\u8f93\u7684\u9879\u76ee\u3001\u94bb\u5b54\u548c\u6d4b\u8bd5\u8bb0\u5f55\u79f0\u4e3a**\u57fa\u7840\u6570\u636e**\u3002\u8fd9\u4e9b\u8bb0\u5f55\u6309\u547d\u540d\u7684\u6570\u636e\u7ec4\u548c\u5b57\u6bb5\u7ec4\u7ec7\uff0c\u5e76\u901a\u8fc7\u9879\u76ee\u548c\u94bb\u5b54\u6807\u8bc6\u7b26\u7b49\u5173\u952e\u5b57\u6bb5\u5173\u8054\u3002\u8fd9\u79cd\u7ed3\u6784\u652f\u6301\u4e00\u81f4\u7684\u673a\u5668\u53ef\u8bfb\u5173\u7cfb\uff0c\u4f8b\u5982\u94bb\u5b54\u3001\u6837\u672c\u548c\u5b9e\u9a8c\u5ba4\u7ed3\u679c\u4e4b\u95f4\u7684\u5173\u7cfb\uff0c\u5e76\u63d0\u4f9b\u6807\u51c6\u7f29\u5199\u3001\u4ee3\u7801\u548c\u5355\u4f4d\u3002\u7b2c 3.0 \u7248\u6307\u51fa\uff0c\u4e0d\u5e94\u5c06\u89e3\u91ca\u6216\u63a8\u5bfc\u5f97\u51fa\u7684\u6570\u636e\u4f5c\u4e3a AGS(SG) \u57fa\u7840\u6570\u636e\u4f20\u8f93\uff0c\u56e0\u4e3a\u540e\u7eed\u5904\u7406\u7531\u63a5\u6536\u7528\u6237\u81ea\u884c\u51b3\u5b9a\u548c\u63a7\u5236\u3002BCA \u8981\u6c42\u63d0\u4ea4\u65b9\u786e\u4fdd\u6570\u636e\u771f\u5b9e\u3001\u6b63\u786e\u3001\u51c6\u786e\u4e14\u5b8c\u6574\uff0c\u5e76\u8981\u6c42\u5728\u63d0\u4ea4\u524d\u68c0\u67e5\u683c\u5f0f\u3001\u5b8c\u6574\u6027\u3001\u6570\u636e\u9f50\u5168\u7a0b\u5ea6\u548c\u6709\u6548\u6027\u3002\u56e0\u6b64\uff0c\u7b26\u5408\u89c4\u8303\u7684\u6587\u4ef6\u662f\u7ed3\u6784\u66f4\u5b8c\u5584\u7684\u9879\u76ee\u8bb0\u5f55\uff0c\u5e76\u4e0d\u80fd\u72ec\u7acb\u8bc1\u660e\u8c03\u67e5\u6216\u6d4b\u91cf\u7ed3\u679c\u6b63\u786e\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248\uff0c\u4e8e 2026 \u5e74\u5341\u6708 21 \u65e5\u67e5\u9605](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff09\u3002\n\n## \u9879\u76ee\u8bc6\u522b\u4e0e\u6587\u4ef6\u7ba1\u7406\n\n\u81ea **2022 \u5e74\u5341\u6708 1 \u65e5**\u8d77\uff0cBCA \u8981\u6c42\u573a\u5730\u8c03\u67e5\u5de5\u7a0b\u4ee5 AGS(SG) \u7535\u5b50\u683c\u5f0f\u63d0\u4ea4\uff0c\u6570\u636e\u987b\u91c7\u7528 BCA \u66f4\u65b0\u540e\u7684\u5730\u5c42\u6846\u67b6\u4e2d\u7684\u5730\u8d28\u5355\u5143\u540d\u79f0\u3002\u8be5\u901a\u544a\u63d0\u4f9b\u4e86\u94bb\u5b54\u8bb0\u5f55\u793a\u4f8b\uff0c\u5e76\u6307\u5f15\u7528\u6237\u53c2\u9605\u7535\u5b50\u4f20\u8f93\u6307\u5357\u4e86\u89e3\u76f8\u5173\u4ee3\u7801\u3002BCA \u73b0\u884c\u6307\u5357\u63d0\u4f9b\u7b2c 3.0 \u7248\u6807\u51c6\u548c\u7f16\u5236\u8d44\u6e90\uff1b\u9879\u76ee\u56e2\u961f\u5e94\u4f7f\u7528 BCA \u5f53\u524d\u7684\u6587\u4ef6\u548c\u63d0\u4ea4\u8bf4\u660e\uff0c\u800c\u4e0d\u8981\u4f9d\u8d56\u65e7\u7684\u4ecb\u8d28\u6807\u7b7e\u793a\u4f8b\u6216\u5df2\u88ab\u53d6\u4ee3\u7684\u7248\u672c\uff08[BCA \u901a\u544a APPBCA-2022-02\uff0c2022 \u5e74\u4e09\u6708 1 \u65e5](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)\uff1b[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u6708 21 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff09\u3002\n\n## \u4e0e\u7ed3\u6784\u56fe\u5de5\u4f5c\u7684\u5173\u7cfb\n\nBCA \u7684\u901a\u544a\u5c06 AGS(SG) \u63d0\u4ea4\u5b9a\u4f4d\u4e3a\u91c7\u7528\u7edf\u4e00\u5730\u8d28\u5730\u5c42\u6846\u67b6\u7684\u4e00\u90e8\u5206\uff0c\u800c\u8be5\u6807\u51c6\u672c\u8eab\u6d89\u53ca\u7535\u5b50\u4f20\u8f93\u548c\u6570\u636e\u7ba1\u7406\u3002**\u7b26\u5408 AGS(SG) \u5e76\u4e0d\u4ee3\u8868\u4f01\u4e1a\u83b7\u5f97\u8ba4\u8bc1\u3002**\u8ba4\u8bc1\u662f\u53e6\u4e00\u9879\u8981\u6c42\uff1aBCA \u7684\u73b0\u884c\u6307\u5357\u6307\u51fa\uff0c\u573a\u5730\u8c03\u67e5\u5de5\u7a0b\u5fc5\u987b\u7531\u65b0\u52a0\u5761\u8ba4\u53ef\u7406\u4e8b\u4f1a\uff08SAC\uff09\u4f9d\u636e\u5176\u573a\u5730\u8c03\u67e5\u8ba1\u5212\u8ba4\u53ef\u5e76\u6279\u51c6\u7684**\u68c0\u9a8c\u673a\u6784**\u6267\u884c\u3002SAC \u662f\u7531\u65b0\u52a0\u5761\u4f01\u4e1a\u53d1\u5c55\u5c40\u8fd0\u4f5c\u7684\u56fd\u5bb6\u8ba4\u53ef\u673a\u6784\uff1b\u5e94\u67e5\u8be2 SAC \u7684\u73b0\u884c\u767b\u8bb0\u518c\uff0c\u4ee5\u6838\u5b9e\u673a\u6784\u7684\u72b6\u6001\u548c\u8ba4\u53ef\u8303\u56f4\u3002\u8fd9\u662f\u5bf9\u670d\u52a1\u63d0\u4f9b\u65b9\u8d44\u683c\u7684\u8981\u6c42\uff0c\u5e76\u975e\u6b63\u786e\u683c\u5f0f\u7684 AGS(SG) \u6587\u4ef6\u5728\u63d0\u4ea4\u540e\u4fbf\u80fd\u53d6\u5f97\u7684\u8d44\u683c\uff08[BCA\uff0c\u300a\u7ed3\u6784\u56fe\u7533\u8bf7\u6307\u5357\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www1.bca.gov.sg\/safety-and-standards\/applications-and-licenses\/structural-plan-submission\/guidelines-for-st-plan-applications\/)\uff1b[SAC\uff0c\u300a\u6982\u51b5\u300b\uff0c\u4e8e 2026 \u5e74\u5341\u4e00\u6708 5 \u65e5\u67e5\u9605](https:\/\/www.sac-accreditation.gov.sg\/about\/our-history\/overview\/)\uff09\u3002\n\n\u7ed3\u6784\u6b63\u786e\u7684\u6570\u636e\u96c6\u53ca\u5176\u63d0\u4ea4\u5747\u4e0d\u80fd\u66ff\u4ee3\u573a\u5730\u8c03\u67e5\u3001\u5730\u8d28\u6216\u5ca9\u571f\u89e3\u91ca\u3001\u5730\u8d28\u8c03\u67e5\u62a5\u544a\u3001\u5ca9\u571f\u8bbe\u8ba1\u62a5\u544a\u3001\u5408\u683c\u4eba\u58eb\u7684\u8bc4\u4f30\uff0c\u6216\u9488\u5bf9\u5177\u4f53\u9879\u76ee\u7684\u6cd5\u5b9a\u63d0\u4ea4\u3002**AGS(SG) \u4e0d\u4f1a\u6279\u51c6\u7ed3\u6784\u56fe\u3002**BCA \u8fd8\u6307\u51fa\uff0c\u63d0\u4ea4\u7684\u6570\u636e\u6309\u201c\u73b0\u72b6\u201d\u63d0\u4f9b\uff1b\u7528\u6237\u4ecd\u987b\u81ea\u884c\u5224\u65ad\u6570\u636e\u662f\u5426\u9002\u5408\u5176\u7528\u9014\uff0c\u5e76\u5bf9\u636e\u6b64\u4f5c\u51fa\u7684\u5de5\u7a0b\u5224\u65ad\u8d1f\u8d23\uff08[BCA\uff0cAGS(SG) \u7b2c 3.0 \u7248](https:\/\/isomer-user-content.by.gov.sg\/338\/01160470-7743-42cb-9223-29a0593c02c5\/standards-for-electronic-transfer-of-site-investigation-data_edition-3-0.pdf)\uff1b[BCA \u901a\u544a APPBCA-2022-02](https:\/\/isomer-user-content.by.gov.sg\/338\/c8ad4e7c-88e8-44ca-ad8b-ed2d77ea07e0\/circular-to-industry-on-submission-of-si-data-in-ags(sg)-format_01mar2022_bca-website.pdf)\uff09\u3002"},"related":[{"id":90413,"source_id":"sgkb.geography-urban-planning.granite-fines-concrete-specification-2026","kind":"article","title_en":"Granite Fines for Concrete: BCA Specification and Research","title_zh":"\u6df7\u51dd\u571f\u7528\u82b1\u5c97\u5ca9\u7ec6\u6599\uff1aBCA\u89c4\u8303\u4e0e\u7814\u7a76","assurance":null,"subtype":null},{"id":90417,"source_id":"sgkb.geography-urban-planning.interactive-singapore-geological-map","kind":"article","title_en":"Interactive Singapore Geological Map","title_zh":"\u65b0\u52a0\u5761\u4e92\u52a8\u5730\u8d28\u56fe","assurance":null,"subtype":null},{"id":90428,"source_id":"sgkb.geography-urban-planning.pre-construction-survey-guidelines-2026","kind":"article","title_en":"Pre-Construction Survey Guidelines","title_zh":"\u65bd\u5de5\u524d\u52d8\u5bdf\u6307\u5357","assurance":null,"subtype":null},{"id":90432,"source_id":"sgkb.geography-urban-planning.remote-site-supervision-structural-works-2026","kind":"article","title_en":"Remote Site Supervision for Structural Works","title_zh":"\u7ed3\u6784\u5de5\u7a0b\u8fdc\u7a0b\u73b0\u573a\u76d1\u7763","assurance":null,"subtype":null},{"id":90433,"source_id":"sgkb.geography-urban-planning.reused-steel-framework-2026","kind":"article","title_en":"Reused Steel Framework 2026","title_zh":"\u518d\u7528\u94a2\u6750\u6846\u67b6 2026","assurance":null,"subtype":null},{"id":90435,"source_id":"sgkb.geography-urban-planning.site-supervisor-requirements-risk-based-inspection-2026","kind":"article","title_en":"Site Supervisor Requirements and Risk-Based Inspection","title_zh":"\u73b0\u573a\u4e3b\u7ba1\u8981\u6c42\u548c\u57fa\u4e8e\u98ce\u9669\u7684\u68c0\u67e5","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":79803,"source_id":"sg.agency.enterprisesg","kind":"entity","title_en":"Enterprise Singapore","title_zh":"\u65b0\u52a0\u5761\u4f01\u4e1a\u53d1\u5c55\u5c40","assurance":null,"subtype":"statutory-board"},{"id":79866,"source_id":"sg.agency.sac","kind":"entity","title_en":"Singapore Accreditation Council","title_zh":"\u65b0\u52a0\u5761\u8ba4\u8bc1\u7406\u4e8b\u4f1a","assurance":null,"subtype":"national-accreditation-body"},{"id":92603,"source_id":"sgtopic.geography-urban-planning.ags-sg-site-investigation-data","kind":"topic","title_en":"AGS(SG) Standardised Site-Investigation Data","title_zh":"AGS(SG) \u6807\u51c6\u5316\u573a\u5730\u52d8\u5bdf\u6570\u636e","assurance":null,"subtype":null},{"id":92636,"source_id":"sgtopic.geography","kind":"topic","title_en":"Geography and urban planning","title_zh":"\u5730\u7406\u4e0e\u57ce\u5e02\u89c4\u5212","assurance":null,"subtype":null}]}