{"release_id":19,"data":{"id":90258,"release_id":19,"source_id":"sgkb.environment-sustainability.green-plan-2030","kind":"article","fingerprint":"6f0f5636f7dac7b0721863113c2c544644772b68b73bec52b7c3b845e84f82ac","title_en":"Singapore Green Plan 2030","title_zh":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030","domain":"environment-sustainability","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-08-10","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["Green Plan","Green Plan 2030","Singapore current carbon tax rate","carbon tax per tonne Singapore","carbon tax facility threshold","SGP 2030","Singapore Green Plan","climate policy","net zero 2050","NDC"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","document_type":"article","domain":"environment-sustainability","entities":["sg.scheme.singapore-green-plan-2030","sg.agency.mse","sg.agency.ema","sg.statute.carbon-pricing-act"],"facets":["current","policy"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-08-10","path":"environment-sustainability\/green-plan-2030.md","related":["annual-rates","climate-policy-anchors","coastal-protection","energy-and-power-grid","green-plan-anchors"],"sources":[{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Home","url":"https:\/\/www.greenplan.gov.sg\/"},{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Overview","url":"https:\/\/www.greenplan.gov.sg\/overview\/"},{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Our Targets","url":"https:\/\/www.greenplan.gov.sg\/targets\/"},{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Energy Reset","url":"https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/"},{"accessed":"2026-08-08","title":"MSE \u2014 Singapore Green Plan 2030","url":"https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/"},{"accessed":"2026-08-08","title":"MSE \u2014 Net zero by 2050 and revised 2030 NDC (25 Oct 2022)","url":"https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/"},{"accessed":"2026-08-08","title":"EMA \u2014 Solar target raised to 3 GWp by 2030 (2 Mar 2026)","url":"https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030"},{"accessed":"2026-08-08","title":"EMA \u2014 Regional Power Grids","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"},{"accessed":"2026-08-08","title":"NEA \u2014 Carbon Tax","url":"https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX"}],"status":"verified","summary":"Singapore's climate policy for the 2020s is delivered mainly through the Singapore Green Plan 2030 \u2014 five-pillar sustainability targets launched in 2021 \u2014 under national pledges of emissions peaking and net zero by 2050.","tags":["climate","policy","energy","waste","nature"],"temporal_scope":"current","title":"Singapore Green Plan 2030","topics":["sgtopic.environment","sgtopic.environment.climate","sgtopic.environment.green-plan"],"volatility":"fast"},"date":"2026-08-10","domain":"environment-sustainability","evidence_paths":["source\/environment-sustainability\/green-plan-2030.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl","artefacts\/mentions.jsonl"],"expected_version":12,"input_hash":"f094a5836137f594f39700347936123ff816742cbebd135d5929d5bc86d64fb4","kind":"article","lineage":[{"chunk_id":"sgkb.environment-sustainability.green-plan-2030#overview","citation_urls":["https:\/\/www.greenplan.gov.sg\/overview\/","https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/"],"content_sha256":"e5629dda94b301a38102abacb196639bdf1e83fefd61ec8cd6c319591e64a300","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","section_sources":[{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Overview","url":"https:\/\/www.greenplan.gov.sg\/overview\/"},{"accessed":"2026-08-08","title":"MSE \u2014 Singapore Green Plan 2030","url":"https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-plan-2030#five-pillars-and-how-the-plan-is-organised","citation_urls":["https:\/\/www.greenplan.gov.sg\/","https:\/\/www.greenplan.gov.sg\/targets\/"],"content_sha256":"e6cb11324f3e688f8c5cf61b81019687c6c9d9099e26a7baf7ba71703c6465a8","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","section_sources":[{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Home","url":"https:\/\/www.greenplan.gov.sg\/"},{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Our Targets","url":"https:\/\/www.greenplan.gov.sg\/targets\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-plan-2030#city-in-nature-and-sustainable-living-targets","citation_urls":["https:\/\/www.greenplan.gov.sg\/targets\/"],"content_sha256":"0df34576a3c482f35bb4377bc0a59317548aecc34bd22f017257369b97233db4","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","section_sources":[{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Our Targets","url":"https:\/\/www.greenplan.gov.sg\/targets\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-plan-2030#energy-reset-solar-imports-buildings-and-vehicles","citation_urls":["https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030","https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/","https:\/\/www.greenplan.gov.sg\/targets\/","https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"],"content_sha256":"2fe4a640e7b06e5bd5073b88c87497ce63e2c0ee8b3a1a3ea9e32c9afe2d5a53","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","section_sources":[{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Our Targets","url":"https:\/\/www.greenplan.gov.sg\/targets\/"},{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Energy Reset","url":"https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/"},{"accessed":"2026-08-08","title":"EMA \u2014 Solar target raised to 3 GWp by 2030 (2 Mar 2026)","url":"https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030"},{"accessed":"2026-08-08","title":"EMA \u2014 Regional Power Grids","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"}]},{"chunk_id":"sgkb.environment-sustainability.green-plan-2030#green-economy-resilient-future-and-the-30-by-30-food-goal","citation_urls":["https:\/\/www.greenplan.gov.sg\/targets\/"],"content_sha256":"5f1caf0a0ce4079becfa023a450a8b60fb2324f4a2874133197b67550b73288c","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","section_sources":[{"accessed":"2026-08-08","title":"Singapore Green Plan 2030 \u2014 Our Targets","url":"https:\/\/www.greenplan.gov.sg\/targets\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-plan-2030#net-zero-2050-the-2030-ndc-and-the-carbon-tax","citation_urls":["https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/","https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX"],"content_sha256":"32b82f43a83c3096fa29be045d79c38cb7d1356287e752a38e17fbba571269b4","document_id":"sgkb.environment-sustainability.green-plan-2030","document_sha256":"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf","section_sources":[{"accessed":"2026-08-08","title":"MSE \u2014 Net zero by 2050 and revised 2030 NDC (25 Oct 2022)","url":"https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/"},{"accessed":"2026-08-08","title":"NEA \u2014 Carbon Tax","url":"https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX"}]}],"links":[{"relation":"related","target_id":"sgkb.data.annual-rates"},{"relation":"related","target_id":"sgkb.data.climate-policy-anchors"},{"relation":"related","target_id":"sgkb.environment-sustainability.coastal-protection"},{"relation":"related","target_id":"sgkb.environment-sustainability.energy-and-power-grid"},{"relation":"related","target_id":"sgkb.data.green-plan-anchors"},{"relation":"topics","target_id":"sgtopic.environment"},{"relation":"topics","target_id":"sgtopic.environment.climate"},{"relation":"topics","target_id":"sgtopic.environment.green-plan"},{"relation":"entities","target_id":"sg.scheme.singapore-green-plan-2030"},{"relation":"entities","target_id":"sg.agency.mse"},{"relation":"entities","target_id":"sg.agency.ema"},{"relation":"entities","target_id":"sg.statute.carbon-pricing-act"},{"relation":"mentions","target_id":"sg.geo.island.jurong-island"},{"relation":"mentions","target_id":"sg.place.semakau-landfill"}],"locales":{"en":{"markdown":"# Singapore Green Plan 2030\n\nThe Singapore Green Plan 2030 is Singapore's whole-of-nation sustainability and climate-delivery agenda for the decade to 2030. Launched in February 2021 and spearheaded by five ministries \u2014 Sustainability and the Environment (MSE), Trade and Industry (MTI), Transport (MOT), National Development (MND), and Education (MOE) \u2014 it packs concrete sector targets into five pillars and frames them as delivery vehicles for Singapore's Paris Agreement commitments and its long-term aspiration of net zero emissions by 2050 ([greenplan.gov.sg overview, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/overview\/); [MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/)). It is a coordinating national plan rather than a single statute: individual ministries and agencies own the programmes, while the Green Plan brand and targets site collect the public scorecard. Physical weather and geography sit in [physical geography and climate](\/en\/knowledge\/article\/sgkb.geography-urban-planning.physical-geography-and-climate); power-system mechanics sit in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid); shoreline adaptation sits in [coastal protection](\/en\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection) \u2014 this article owns the national climate-policy and Green Plan target frame.\n\n## Five pillars and how the plan is organised\n\nThe Green Plan's five pillars are City in Nature, Energy Reset, Sustainable Living, Green Economy, and Resilient Future ([greenplan.gov.sg, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/)). City in Nature covers parks, trees, and access to green space. Energy Reset covers solar and other cleaner power, greener buildings and towns, and the shift to cleaner-energy vehicles, aviation ground operations, and harbour craft. Sustainable Living covers household water and waste habits, public and active transport modal share, and schools' carbon footprint. Green Economy covers investment quality, Jurong Island's energy-and-chemicals transition, green finance and carbon services, tourism, and enterprise capability. Resilient Future covers coastal and flood protection planning and the \"30 by 30\" local food goal ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Headline public messaging often highlights a short list \u2014 plant one million more trees, raise solar deployment, cut waste to landfill by 30% by 2030, make at least 20% of schools carbon-neutral by 2030, and require cleaner-energy models for all new car and taxi registrations from 2030 \u2014 but the official targets page is denser and should be preferred when a figure is contested ([greenplan.gov.sg, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/); [greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)).\n\n## City in Nature and Sustainable Living targets\n\nUnder City in Nature, Singapore aims by 2030 to double the annual tree-planting rate relative to the 2020\u20132030 pathway so that one million more trees are planted, increase nature parks' land area by over 50% from the 2020 baseline, and put every household within a 10-minute walk of a park; intermediate 2026 park-development targets and a 2035 goal of adding 1,000 ha of green spaces sit alongside those ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Sustainable Living pairs resource-use targets with mobility and schools. Household water consumption is to fall to 130 litres per capita per day by 2030 \u2014 a figure that should be read with [water story](\/en\/knowledge\/article\/sgkb.environment-sustainability.water-story) rather than treated as a free-standing water-security plan. Waste sent to landfill is to fall 20% per capita per day by 2026 and 30% by 2030, which is the Green Plan's bridge into the incineration-and-[Semakau](\/en\/knowledge\/article\/sgkb.environment-sustainability.semakau-and-waste) system ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). On commuting, the plan targets 75% mass public transport (rail and bus) peak-period modal share by 2030, rising above 80% by 2040, with public, active and shared modes accounting for nine in ten peak-period journeys by 2040; supporting hardware includes electric buses making up half the public bus fleet by 2030, diesel buses replaced with cleaner-energy buses by 2040, the rail network expanded to 360 km by the early 2030s, and cycling paths expanded to around 1,300 km ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Schools are to cut net carbon emissions by two-thirds by 2030, with at least 20% carbon-neutral ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). These modal-share and rail goals intersect [public transport system](\/en\/knowledge\/article\/sgkb.transport.public-transport-system) and the [future rail projects](\/en\/knowledge\/article\/sgkb.transport.future-rail-projects) pipeline; the Green Plan states the destinations, while transport agencies own the lines and buses.\n\n## Energy Reset: solar, imports, buildings, and vehicles\n\nEnergy Reset is the pillar most exposed to target revisions because Singapore's domestic renewable options are narrow. Solar remains the main domestic renewable for electricity: Singapore hit 2 GWp of installed capacity in 2025 \u2014 meeting the earlier \"at least 2 GWp by 2030\" milestone five years early \u2014 and the Energy Market Authority raised the 2030 solar deployment target to 3 GWp on 2 March 2026, stating that 3 GWp could generate about 2,800 GWh a year, enough for roughly half a million households ([EMA, accessed Aug 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)). Some Green Plan pages still list the older \"at least 2 GWp by 2030\" wording even after that announcement, so readers should treat EMA's March 2026 release as the current solar target and treat lagging Green Plan copy as stale ([Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). EMA also notes that solar can realistically cover only around 10% of Singapore's projected energy needs by 2050, which is why the same pillar emphasises regional power imports ([EMA, accessed Aug 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)). Some Green Plan pages still cite an earlier \"up to 4 GW by 2035\" import ambition; EMA's Regional Power Grids page (updated October 2025) states the current target as around **6 GW** of low-carbon electricity by 2035 \u2014 about one-third of projected energy demand then \u2014 so readers should treat the 6 GW figure as current and the lagging 4 GW Green Plan copy as superseded ([EMA Regional Power Grids, accessed Aug 2026](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids); [Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); see [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid) for market and grid detail). Energy storage targets on Green Plan pages include a 200 MWh ESS deployment target marked achieved in December 2022 and a 285 MWh Jurong Island system cited on the Energy Reset page, alongside hydrogen and more efficient gas-fired plant ([Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Buildings are to be 80% green by Gross Floor Area by 2030, with 80% of new buildings Super Low Energy from 2030 and best-in-class green buildings 80% more energy-efficient than 2005 levels; existing HDB towns are to cut energy use 15% by 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). On vehicles, new diesel car and taxi registrations cease from 2025, all new car and taxi registrations are to be cleaner-energy models from 2030, 60,000 EV charging points are targeted by 2030, all HDB towns are to be EV-ready by 2025, and all vehicles are to run on cleaner energy by 2040 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Parallel cleaner-energy rules apply to Changi airside vehicles and to new harbour craft in Singapore port waters from 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)).\n\n## Green Economy, Resilient Future, and the 30-by-30 food goal\n\nThe Green Economy pillar is directional rather than a single numeric KPI sheet: Singapore wants new investments that are best-in-class on energy and carbon efficiency; Jurong Island positioned as a sustainable energy and chemicals park; and Singapore positioned as a sustainable tourism destination, a green-finance and carbon-services hub for Asia's transition, and a regional centre for sustainability solutions, while grooming local enterprises to capture those markets ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Resilient Future ties climate adaptation to food security. By 2030, coastal protection plans are to be completed for City-East Coast, the North-West Coast (Lim Chu Kang and Sungei Kadut), and Jurong Island \u2014 the planning step that precedes heavy coastal engineering detailed in [coastal protection](\/en\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection) ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). The same pillar carries the agri-food \"30 by 30\" goal: build capability and capacity to produce 30% of Singapore's nutritional needs locally and sustainably by 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). That food target is frequently cited outside the Green Plan brand \u2014 including in [economy overview](\/en\/knowledge\/article\/sgkb.economy-finance.economy-overview) \u2014 but its canonical home in the sustainability agenda is here. Regional environmental risk that the Green Plan does not itself extinguish, notably [transboundary haze](\/en\/knowledge\/article\/sgkb.environment-sustainability.haze), remains a separate diplomatic and statutory track even as domestic emissions and greening programmes accelerate.\n\n## Net zero 2050, the 2030 NDC, and the carbon tax\n\nThe Green Plan's decade targets sit under a longer climate trajectory announced in October 2022: net zero emissions by 2050 as Singapore's Long-Term Low-Emissions Development Strategy, and a revised 2030 Nationally Determined Contribution to reduce emissions to around 60 MtCO2e in 2030 after peaking earlier ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). MSE stated explicitly that those pledges are contingent on technological and economic viability of options such as hydrogen and carbon capture, and on international cooperation including carbon credits and renewable electricity imports \u2014 a frank acknowledgment that an alternative-energy-disadvantaged city-state cannot treat domestic solar as sufficient ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). The public sector's GreenGov.SG track aims for net zero around 2045, contingent on the same technology and cooperation conditions; Jurong Lake District aims for net zero for new developments around the same horizon ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). The main economy-wide price signal is the carbon tax under the Carbon Pricing Act 2018, applied to industrial facilities with annual direct GHG emissions of at least 25,000 tCO2e. After an introductory S$5\/t period from 2019 to 2023, the rate is S$25\/t in 2024\u20132025 and S$45\/t in 2026\u20132027, with a view to S$50\u201380\/t by 2030; from 2024, taxable facilities may offset up to 5% of taxable emissions with eligible international carbon credits ([NEA, accessed Aug 2026](https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX); see also [annual rates](\/en\/knowledge\/dataset\/sgkb.data.annual-rates)). The Green Plan therefore combines programme targets, infrastructure build-outs, and a rising carbon price \u2014 not a single lever \u2014 and its numbers move when agencies revise ambitions mid-decade, as the 2026 solar-target lift shows.","summary":"Singapore's climate policy for the 2020s is delivered mainly through the Singapore Green Plan 2030 \u2014 five-pillar sustainability targets launched in 2021 \u2014 under national pledges of emissions peaking and net zero by 2050.","title":"Singapore Green Plan 2030"},"zh":{"markdown":"# \u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\n\n\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u662f\u65b0\u52a0\u5761\u9762\u5411 2030\u5e74\u7684\u5168\u793e\u4f1a\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u6c14\u5019\u884c\u52a8\u8bae\u7a0b\u3002\u8be5\u8ba1\u5212\u4e8e 2021 \u5e74\u4e8c\u6708\u63a8\u51fa\uff0c\u7531\u4e94\u4e2a\u90e8\u95e8\u7275\u5934\u2014\u2014\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u73af\u5883\u90e8\uff08MSE\uff09\u3001\u8d38\u6613\u4e0e\u5de5\u4e1a\u90e8\uff08MTI\uff09\u3001\u4ea4\u901a\u90e8\uff08MOT\uff09\u3001\u56fd\u5bb6\u53d1\u5c55\u90e8\uff08MND\uff09\u548c\u6559\u80b2\u90e8\uff08MOE\uff09\u2014\u2014\u5c06\u5177\u4f53\u7684\u884c\u4e1a\u76ee\u6807\u7eb3\u5165\u4e94\u5927\u652f\u67f1\uff0c\u5e76\u5c06\u5176\u5b9a\u4f4d\u4e3a\u843d\u5b9e\u65b0\u52a0\u5761\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u627f\u8bfa\u53ca\u5b9e\u73b0 2050 \u5e74\u51c0\u96f6\u6392\u653e\u957f\u671f\u613f\u666f\u7684\u5de5\u5177\uff08[greenplan.gov.sg \u6982\u89c8\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/overview\/); [MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/)\uff09\u3002\u8fd9\u662f\u4e00\u9879\u5168\u56fd\u534f\u8c03\u8ba1\u5212\uff0c\u800c\u975e\u5355\u4e00\u6cd5\u89c4\uff1a\u5404\u90e8\u95e8\u548c\u673a\u6784\u8d1f\u8d23\u5404\u81ea\u7684\u9879\u76ee\uff0c\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u54c1\u724c\u53ca\u76ee\u6807\u7f51\u7ad9\u5219\u6c47\u96c6\u516c\u5f00\u8fdb\u5c55\u60c5\u51b5\u3002\u5b9e\u4f53\u5929\u6c14\u4e0e\u5730\u7406\u73af\u5883\u89c1[\u81ea\u7136\u5730\u7406\u4e0e\u6c14\u5019](\/zh\/knowledge\/article\/sgkb.geography-urban-planning.physical-geography-and-climate)\uff1b\u7535\u529b\u7cfb\u7edf\u8fd0\u884c\u673a\u5236\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff1b\u6d77\u5cb8\u7ebf\u9002\u5e94\u63aa\u65bd\u89c1[\u6d77\u5cb8\u9632\u62a4](\/zh\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection)\u2014\u2014\u672c\u6587\u805a\u7126\u56fd\u5bb6\u6c14\u5019\u653f\u7b56\u4e0e\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u76ee\u6807\u6846\u67b6\u3002\n\n## \u4e94\u5927\u652f\u67f1\u53ca\u8ba1\u5212\u7684\u7ec4\u7ec7\u65b9\u5f0f\n\n\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u4e94\u5927\u652f\u67f1\u662f\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u3001\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u3001\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u3001\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u548c\u201c\u97e7\u6027\u672a\u6765\u201d\uff08[greenplan.gov.sg\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/)\uff09\u3002\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u6db5\u76d6\u516c\u56ed\u3001\u6811\u6728\u548c\u7eff\u8272\u7a7a\u95f4\u7684\u53ef\u8fbe\u6027\u3002\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u6db5\u76d6\u592a\u9633\u80fd\u53ca\u5176\u4ed6\u66f4\u6e05\u6d01\u7684\u7535\u529b\u3001\u66f4\u52a0\u7eff\u8272\u7684\u5efa\u7b51\u4e0e\u57ce\u9547\uff0c\u4ee5\u53ca\u8f6c\u5411\u4f7f\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u7684\u8f66\u8f86\u3001\u822a\u7a7a\u5730\u52e4\u4f5c\u4e1a\u548c\u6e2f\u53e3\u8239\u8247\u3002\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u6db5\u76d6\u5bb6\u5ead\u7528\u6c34\u4e0e\u5e9f\u5f03\u7269\u5904\u7406\u4e60\u60ef\u3001\u516c\u5171\u4ea4\u901a\u548c\u6d3b\u8dc3\u51fa\u884c\u7684\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\uff0c\u4ee5\u53ca\u5b66\u6821\u7684\u78b3\u8db3\u8ff9\u3002\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u6db5\u76d6\u6295\u8d44\u8d28\u91cf\u3001\u88d5\u5eca\u5c9b\u7684\u80fd\u6e90\u4e0e\u5316\u5de5\u8f6c\u578b\u3001\u7eff\u8272\u91d1\u878d\u4e0e\u78b3\u670d\u52a1\u3001\u65c5\u6e38\u4e1a\u548c\u4f01\u4e1a\u80fd\u529b\u3002\u201c\u97e7\u6027\u672a\u6765\u201d\u6db5\u76d6\u6d77\u5cb8\u4e0e\u9632\u6d2a\u89c4\u5212\uff0c\u4ee5\u53ca\u201c30 by 30\u201d\u672c\u5730\u7cae\u98df\u76ee\u6807\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u516c\u5f00\u5ba3\u4f20\u5e38\u5f3a\u8c03\u4e00\u4efd\u7b80\u77ed\u76ee\u6807\u6e05\u5355\u2014\u2014\u591a\u79cd\u690d\u4e00\u767e\u4e07\u68f5\u6811\u3001\u6269\u5927\u592a\u9633\u80fd\u90e8\u7f72\u3001\u5230 2030 \u5e74\u5c06\u9001\u5f80\u586b\u57cb\u573a\u7684\u5e9f\u5f03\u7269\u51cf\u5c11 30%\u3001\u5230 2030 \u5e74\u8ba9\u81f3\u5c11 20% \u7684\u5b66\u6821\u5b9e\u73b0\u78b3\u4e2d\u548c\uff0c\u4ee5\u53ca\u81ea 2030 \u5e74\u8d77\u8981\u6c42\u6240\u6709\u65b0\u6ce8\u518c\u7684\u6c7d\u8f66\u548c\u5fb7\u58eb\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u8f66\u578b\u2014\u2014\u4f46\u5b98\u65b9\u76ee\u6807\u9875\u9762\u5185\u5bb9\u66f4\u8be6\u5c3d\uff0c\u82e5\u5bf9\u5177\u4f53\u6570\u5b57\u6709\u4e89\u8bae\uff0c\u5e94\u4f18\u5148\u53c2\u8003\u8be5\u9875\u9762\uff08[greenplan.gov.sg\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/); [greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\n\n## \u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u4e0e\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u76ee\u6807\n\n\u5728\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u652f\u67f1\u4e0b\uff0c\u65b0\u52a0\u5761\u7684\u76ee\u6807\u662f\u5230 2030 \u5e74\uff0c\u76f8\u8f83\u4e8e 2020\u20132030 \u5e74\u8def\u5f84\u5c06\u5e74\u5ea6\u690d\u6811\u901f\u5ea6\u63d0\u9ad8\u4e00\u500d\uff0c\u4ece\u800c\u591a\u79cd\u690d\u4e00\u767e\u4e07\u68f5\u6811\uff1b\u4e0e 2020 \u5e74\u57fa\u51c6\u76f8\u6bd4\uff0c\u5c06\u81ea\u7136\u516c\u56ed\u7528\u5730\u9762\u79ef\u589e\u52a0\u8d85\u8fc7 50%\uff1b\u5e76\u8ba9\u6bcf\u6237\u5bb6\u5ead\u6b65\u884c 10 \u5206\u949f\u5373\u53ef\u5230\u8fbe\u516c\u56ed\u3002\u6b64\u5916\uff0c\u8ba1\u5212\u8fd8\u8bbe\u6709 2026 \u5e74\u7684\u9636\u6bb5\u6027\u516c\u56ed\u5f00\u53d1\u76ee\u6807\uff0c\u4ee5\u53ca\u5230 2035 \u5e74\u589e\u52a0 1,000 \u516c\u9877\u7eff\u5730\u7684\u76ee\u6807\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u5c06\u8d44\u6e90\u4f7f\u7528\u76ee\u6807\u4e0e\u51fa\u884c\u53ca\u5b66\u6821\u76ee\u6807\u76f8\u7ed3\u5408\u3002\u5230 2030 \u5e74\uff0c\u5bb6\u5ead\u4eba\u5747\u65e5\u7528\u6c34\u91cf\u987b\u964d\u81f3 130 \u5347\uff1b\u89e3\u8bfb\u8fd9\u4e00\u6570\u5b57\u65f6\u5e94\u7ed3\u5408[\u6c34\u8d44\u6e90\u6545\u4e8b](\/zh\/knowledge\/article\/sgkb.environment-sustainability.water-story)\uff0c\u800c\u4e0d\u5e94\u5c06\u5176\u89c6\u4e3a\u4e00\u9879\u72ec\u7acb\u7684\u6c34\u5b89\u5168\u8ba1\u5212\u3002\u9001\u5f80\u586b\u57cb\u573a\u7684\u5e9f\u5f03\u7269\u987b\u5728 2026 \u5e74\u524d\u6309\u4eba\u5747\u6bcf\u65e5\u8ba1\u7b97\u51cf\u5c11 20%\uff0c\u5230 2030 \u5e74\u51cf\u5c11 30%\uff1b\u8fd9\u4e5f\u662f\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u4e0e\u711a\u5316\u53ca[\u5b9e\u9a6c\u9ad8](\/zh\/knowledge\/article\/sgkb.environment-sustainability.semakau-and-waste)\u7cfb\u7edf\u76f8\u8854\u63a5\u7684\u73af\u8282\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5728\u901a\u52e4\u65b9\u9762\uff0c\u8ba1\u5212\u76ee\u6807\u662f\u5230 2030 \u5e74\uff0c\u516c\u5171\u4ea4\u901a\uff08\u94c1\u8def\u4e0e\u5df4\u58eb\uff09\u5728\u9ad8\u5cf0\u65f6\u6bb5\u7684\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\u8fbe\u5230 75%\uff0c\u5230 2040 \u5e74\u5347\u81f3 80% \u4ee5\u4e0a\uff1b\u5230 2040 \u5e74\uff0c\u516c\u5171\u3001\u6d3b\u8dc3\u548c\u5171\u4eab\u51fa\u884c\u65b9\u5f0f\u5408\u8ba1\u5360\u9ad8\u5cf0\u65f6\u6bb5\u51fa\u884c\u7684\u5341\u5206\u4e4b\u4e5d\u3002\u914d\u5957\u8bbe\u65bd\u5305\u62ec\uff1a\u5230 2030 \u5e74\uff0c\u7535\u52a8\u5df4\u58eb\u5360\u516c\u5171\u5df4\u58eb\u8f66\u961f\u7684\u4e00\u534a\uff1b\u5230 2040 \u5e74\uff0c\u4ee5\u66f4\u6e05\u6d01\u80fd\u6e90\u5df4\u58eb\u53d6\u4ee3\u67f4\u6cb9\u5df4\u58eb\uff1b\u5230 2030 \u5e74\u4ee3\u521d\u5c06\u94c1\u8def\u7f51\u6269\u5c55\u81f3 360 \u516c\u91cc\uff1b\u4ee5\u53ca\u5c06\u811a\u8e0f\u8f66\u9053\u6269\u5c55\u81f3\u7ea6 1,300 \u516c\u91cc\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5b66\u6821\u987b\u5728 2030 \u5e74\u524d\u5c06\u51c0\u78b3\u6392\u653e\u51cf\u5c11\u4e09\u5206\u4e4b\u4e8c\uff0c\u5e76\u81f3\u5c11\u8ba9 20% \u7684\u5b66\u6821\u5b9e\u73b0\u78b3\u4e2d\u548c\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u8fd9\u4e9b\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\u4e0e\u94c1\u8def\u76ee\u6807\u4e0e[\u516c\u5171\u4ea4\u901a\u7cfb\u7edf](\/zh\/knowledge\/article\/sgkb.transport.public-transport-system)\u548c[\u672a\u6765\u94c1\u8def\u9879\u76ee](\/zh\/knowledge\/article\/sgkb.transport.future-rail-projects)\u89c4\u5212\u76f8\u4e92\u5173\u8054\uff1b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u89c4\u5b9a\u76ee\u6807\uff0c\u4ea4\u901a\u673a\u6784\u8d1f\u8d23\u94c1\u8def\u7ebf\u8def\u548c\u5df4\u58eb\u3002\n\n## \u201c\u80fd\u6e90\u91cd\u7f6e\u201d\uff1a\u592a\u9633\u80fd\u3001\u8fdb\u53e3\u80fd\u6e90\u3001\u5efa\u7b51\u4e0e\u8f66\u8f86\n\n\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u662f\u6700\u5bb9\u6613\u53d7\u5230\u76ee\u6807\u4fee\u8ba2\u5f71\u54cd\u7684\u652f\u67f1\uff0c\u56e0\u4e3a\u65b0\u52a0\u5761\u53ef\u7528\u7684\u56fd\u5185\u53ef\u518d\u751f\u80fd\u6e90\u9009\u9879\u6709\u9650\u3002\u592a\u9633\u80fd\u4ecd\u662f\u65b0\u52a0\u5761\u4e3b\u8981\u7684\u56fd\u5185\u7535\u529b\u53ef\u518d\u751f\u80fd\u6e90\uff1a\u65b0\u52a0\u5761\u5728 2025 \u5e74\u8fbe\u5230 2 GWp \u7684\u88c5\u673a\u5bb9\u91cf\uff0c\u6bd4\u539f\u5b9a\u201c\u5230 2030 \u5e74\u81f3\u5c11\u8fbe\u5230 2 GWp\u201d\u7684\u91cc\u7a0b\u7891\u63d0\u524d\u4e94\u5e74\u5b9e\u73b0\uff1b\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\uff08EMA\uff09\u4e8e 2026 \u5e74\u4e09\u6708 2 \u65e5\u5c06 2030 \u5e74\u592a\u9633\u80fd\u90e8\u7f72\u76ee\u6807\u63d0\u9ad8\u81f3 3 GWp\uff0c\u5e76\u6307\u51fa 3 GWp \u6bcf\u5e74\u53ef\u53d1\u7535\u7ea6 2,800 GWh\uff0c\u8db3\u4ee5\u4f9b\u5e94\u7ea6\u4e94\u5341\u4e07\u6237\u5bb6\u5ead\uff08[EMA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff09\u3002\u4e00\u4e9b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u5728\u8be5\u516c\u544a\u53d1\u5e03\u540e\u4ecd\u5217\u51fa\u65e7\u7684\u201c\u5230 2030 \u5e74\u81f3\u5c11\u8fbe\u5230 2 GWp\u201d\u63aa\u8f9e\uff0c\u56e0\u6b64\u8bfb\u8005\u5e94\u4ee5 EMA \u4e8e 2026 \u5e74\u4e09\u6708\u53d1\u5e03\u7684\u516c\u544a\u4e3a\u5f53\u524d\u592a\u9633\u80fd\u76ee\u6807\uff0c\u5e76\u5c06\u4ecd\u672a\u66f4\u65b0\u7684\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u5185\u5bb9\u89c6\u4e3a\u8fc7\u65f6\u4fe1\u606f\uff08[\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002EMA \u8fd8\u6307\u51fa\uff0c\u5230 2050 \u5e74\uff0c\u592a\u9633\u80fd\u73b0\u5b9e\u4e2d\u53ea\u80fd\u6ee1\u8db3\u65b0\u52a0\u5761\u9884\u8ba1\u80fd\u6e90\u9700\u6c42\u7684\u7ea6 10%\uff0c\u56e0\u6b64\u540c\u4e00\u652f\u67f1\u4e5f\u5f3a\u8c03\u533a\u57df\u7535\u529b\u8fdb\u53e3\uff08[EMA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff09\u3002\u4e00\u4e9b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u4ecd\u5f15\u7528\u8f83\u65e9\u7684\u201c\u5230 2035 \u5e74\u8fdb\u53e3\u6700\u591a 4 GW\u201d\u7684\u76ee\u6807\uff1bEMA \u7684\u533a\u57df\u7535\u7f51\u9875\u9762\uff08\u4e8e 2025 \u5e74\u5341\u6708\u66f4\u65b0\uff09\u5217\u51fa\u7684\u5f53\u524d\u76ee\u6807\u662f\u5230 2035 \u5e74\u8fdb\u53e3\u7ea6 **6 GW** \u4f4e\u78b3\u7535\u529b\u2014\u2014\u5c4a\u65f6\u7ea6\u5360\u9884\u8ba1\u80fd\u6e90\u9700\u6c42\u7684\u4e09\u5206\u4e4b\u4e00\u2014\u2014\u56e0\u6b64\u8bfb\u8005\u5e94\u4ee5 6 GW \u4e3a\u5f53\u524d\u76ee\u6807\uff0c\u5e76\u5c06\u4ecd\u672a\u66f4\u65b0\u7684\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u4e2d 4 GW \u7684\u5185\u5bb9\u89c6\u4e3a\u5df2\u88ab\u53d6\u4ee3\uff08[EMA \u533a\u57df\u7535\u7f51\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids); [\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); \u5e02\u573a\u4e0e\u7535\u7f51\u8be6\u60c5\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff09\u3002\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u5217\u51fa\u7684\u80fd\u6e90\u50a8\u5b58\u76ee\u6807\u5305\u62ec\uff1a\u5df2\u4e8e 2022 \u5e74\u5341\u4e8c\u6708\u6807\u8bb0\u4e3a\u5b8c\u6210\u7684 200 MWh \u50a8\u80fd\u7cfb\u7edf\uff08ESS\uff09\u90e8\u7f72\u76ee\u6807\uff0c\u4ee5\u53ca\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u9875\u9762\u63d0\u5230\u7684\u88d5\u5eca\u5c9b 285 MWh \u7cfb\u7edf\uff0c\u540c\u65f6\u8fd8\u5305\u62ec\u6c22\u80fd\u548c\u6548\u7387\u66f4\u9ad8\u7684\u71c3\u6c14\u53d1\u7535\u5382\uff08[\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5230 2030 \u5e74\uff0c\u6309\u603b\u697c\u9762\u9762\u79ef\u8ba1\u7b97\uff0c80% \u7684\u5efa\u7b51\u987b\u8fbe\u5230\u7eff\u8272\u6807\u51c6\uff1b\u4ece 2030 \u5e74\u8d77\uff0c80% \u7684\u65b0\u5efa\u7b51\u987b\u8fbe\u5230\u8d85\u4f4e\u80fd\u8017\u6807\u51c6\uff1b\u6700\u4f18\u7684\u7eff\u8272\u5efa\u7b51\u987b\u6bd4 2005 \u5e74\u6c34\u5e73\u8282\u80fd 80%\uff1b\u73b0\u6709\u5efa\u5c4b\u53d1\u5c55\u5c40\uff08HDB\uff09\u5e02\u9547\u987b\u5728 2030 \u5e74\u524d\u5c06\u80fd\u8017\u51cf\u5c11 15%\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5728\u8f66\u8f86\u65b9\u9762\uff0c\u81ea 2025 \u5e74\u8d77\u505c\u6b62\u65b0\u6ce8\u518c\u67f4\u6cb9\u6c7d\u8f66\u548c\u5fb7\u58eb\uff1b\u4ece 2030 \u5e74\u8d77\uff0c\u6240\u6709\u65b0\u6ce8\u518c\u6c7d\u8f66\u548c\u5fb7\u58eb\u987b\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u8f66\u578b\uff1b\u5230 2030 \u5e74\u8bbe\u7acb 60,000 \u4e2a\u7535\u52a8\u6c7d\u8f66\u5145\u7535\u70b9\uff1b\u5230 2025 \u5e74\u8ba9\u6240\u6709\u5efa\u5c4b\u53d1\u5c55\u5c40\u5e02\u9547\u5177\u5907\u7535\u52a8\u6c7d\u8f66\u5c31\u7eea\u6761\u4ef6\uff1b\u5230 2040 \u5e74\u8ba9\u6240\u6709\u8f66\u8f86\u4f7f\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u4ece 2030 \u5e74\u8d77\uff0c\u9002\u7528\u4e8e\u6a1f\u5b9c\u673a\u573a\u7a7a\u4fa7\u8f66\u8f86\u4ee5\u53ca\u65b0\u52a0\u5761\u6e2f\u53e3\u6c34\u57df\u65b0\u6e2f\u53e3\u8239\u8247\u7684\u89c4\u5b9a\u4e5f\u8981\u6c42\u5176\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\n\n## \u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u3001\u201c\u97e7\u6027\u672a\u6765\u201d\u4e0e\u201c30 by 30\u201d\u7cae\u98df\u76ee\u6807\n\n\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u652f\u67f1\u7684\u65b9\u5411\u6027\u8f83\u5f3a\uff0c\u800c\u975e\u4e00\u4efd\u5305\u542b\u5355\u4e00\u6570\u503c\u5173\u952e\u7ee9\u6548\u6307\u6807\u7684\u6e05\u5355\uff1a\u65b0\u52a0\u5761\u5e0c\u671b\u5438\u5f15\u5728\u80fd\u6e90\u4e0e\u78b3\u6548\u7387\u65b9\u9762\u8fbe\u5230\u4e1a\u754c\u9886\u5148\u6c34\u5e73\u7684\u65b0\u6295\u8d44\uff1b\u5c06\u88d5\u5eca\u5c9b\u6253\u9020\u4e3a\u53ef\u6301\u7eed\u80fd\u6e90\u4e0e\u5316\u5de5\u56ed\u533a\uff1b\u5c06\u65b0\u52a0\u5761\u5b9a\u4f4d\u4e3a\u53ef\u6301\u7eed\u65c5\u6e38\u76ee\u7684\u5730\u3001\u670d\u52a1\u4e9a\u6d32\u8f6c\u578b\u7684\u7eff\u8272\u91d1\u878d\u4e0e\u78b3\u670d\u52a1\u67a2\u7ebd\uff0c\u4ee5\u53ca\u53ef\u6301\u7eed\u89e3\u51b3\u65b9\u6848\u533a\u57df\u4e2d\u5fc3\uff0c\u540c\u65f6\u57f9\u80b2\u672c\u5730\u4f01\u4e1a\u628a\u63e1\u8fd9\u4e9b\u5e02\u573a\u673a\u9047\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u201c\u97e7\u6027\u672a\u6765\u201d\u5c06\u6c14\u5019\u9002\u5e94\u4e0e\u7cae\u98df\u5b89\u5168\u8054\u7cfb\u8d77\u6765\u3002\u5230 2030 \u5e74\uff0c\u987b\u5b8c\u6210\u5e02\u533a\u2014\u4e1c\u6d77\u5cb8\u3001\u897f\u5317\u6d77\u5cb8\uff08\u6797\u539d\u6e2f\u548c\u53cc\u6eaa\u52a0\u682a\uff09\u53ca\u88d5\u5eca\u5c9b\u7684\u6d77\u5cb8\u9632\u62a4\u89c4\u5212\u2014\u2014\u8fd9\u662f\u8fdb\u5165[\u6d77\u5cb8\u9632\u62a4](\/zh\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection)\u4e2d\u8be6\u8ff0\u7684\u91cd\u5927\u6d77\u5cb8\u5de5\u7a0b\u4e4b\u524d\u7684\u89c4\u5212\u6b65\u9aa4\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u540c\u4e00\u652f\u67f1\u8fd8\u5305\u542b\u519c\u4e1a\u98df\u54c1\u9886\u57df\u7684\u201c30 by 30\u201d\u76ee\u6807\uff1a\u63d0\u5347\u80fd\u529b\u4e0e\u4ea7\u80fd\uff0c\u5230 2030 \u5e74\u5728\u672c\u5730\u4ee5\u53ef\u6301\u7eed\u65b9\u5f0f\u751f\u4ea7\u65b0\u52a0\u5761 30% \u7684\u8425\u517b\u9700\u6c42\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u8fd9\u4e00\u7cae\u98df\u76ee\u6807\u7ecf\u5e38\u5728\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u54c1\u724c\u4ee5\u5916\u88ab\u5f15\u7528\u2014\u2014\u5305\u62ec\u5728[\u7ecf\u6d4e\u6982\u89c8](\/zh\/knowledge\/article\/sgkb.economy-finance.economy-overview)\u4e2d\u2014\u2014\u4f46\u5b83\u5728\u53ef\u6301\u7eed\u53d1\u5c55\u8bae\u7a0b\u4e2d\u7684\u89c4\u8303\u6027\u5f52\u5c5e\u9875\u9762\u662f\u672c\u6587\u3002\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u672c\u8eab\u65e0\u6cd5\u6d88\u9664\u7684\u533a\u57df\u73af\u5883\u98ce\u9669\uff0c\u7279\u522b\u662f[\u8de8\u5883\u70df\u973e](\/zh\/knowledge\/article\/sgkb.environment-sustainability.haze)\uff0c\u4ecd\u5c5e\u4e8e\u72ec\u7acb\u7684\u5916\u4ea4\u4e0e\u6cd5\u89c4\u8f68\u9053\uff0c\u5373\u4f7f\u56fd\u5185\u51cf\u6392\u4e0e\u7eff\u5316\u9879\u76ee\u4e0d\u65ad\u52a0\u5feb\u4ea6\u7136\u3002\n\n## 2050 \u5e74\u51c0\u96f6\u6392\u653e\u30012030 \u5e74\u56fd\u5bb6\u81ea\u4e3b\u8d21\u732e\u4e0e\u78b3\u7a0e\n\n\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u5341\u5e74\u76ee\u6807\u5904\u4e8e\u4e00\u6761\u66f4\u957f\u671f\u7684\u6c14\u5019\u53d1\u5c55\u8f68\u8ff9\u4e4b\u4e0b\u3002\u8be5\u8f68\u8ff9\u4e8e 2022 \u5e74\u5341\u6708\u516c\u5e03\uff1a\u65b0\u52a0\u5761\u5c06\u628a 2050 \u5e74\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4f5c\u4e3a\u5176\u300a\u957f\u671f\u4f4e\u6392\u653e\u53d1\u5c55\u6218\u7565\u300b\uff0c\u5e76\u4fee\u8ba2 2030 \u5e74\u56fd\u5bb6\u81ea\u4e3b\u8d21\u732e\uff0c\u627f\u8bfa\u5728\u6392\u653e\u8f83\u65e9\u8fbe\u5cf0\u540e\u4e8e 2030 \u5e74\u5c06\u6392\u653e\u91cf\u51cf\u81f3\u7ea6 60 MtCO2e\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002MSE \u660e\u786e\u8868\u793a\uff0c\u8fd9\u4e9b\u627f\u8bfa\u4ee5\u6c22\u80fd\u548c\u78b3\u6355\u96c6\u7b49\u65b9\u6848\u5728\u6280\u672f\u4e0e\u7ecf\u6d4e\u4e0a\u7684\u53ef\u884c\u6027\uff0c\u4ee5\u53ca\u5305\u62ec\u78b3\u4fe1\u7528\u548c\u53ef\u518d\u751f\u7535\u529b\u8fdb\u53e3\u5728\u5185\u7684\u56fd\u9645\u5408\u4f5c\u4e3a\u524d\u63d0\u2014\u2014\u8fd9\u5766\u7387\u627f\u8ba4\uff0c\u7f3a\u4e4f\u66ff\u4ee3\u80fd\u6e90\u6761\u4ef6\u7684\u57ce\u90a6\u4e0d\u80fd\u5c06\u56fd\u5185\u592a\u9633\u80fd\u89c6\u4e3a\u8db3\u591f\u7684\u89e3\u51b3\u65b9\u6848\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002\u516c\u5171\u90e8\u95e8\u7684 GreenGov.SG \u8ba1\u5212\u76ee\u6807\u662f\u5728 2045 \u5e74\u5de6\u53f3\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\uff0c\u524d\u63d0\u540c\u6837\u662f\u6280\u672f\u4e0e\u5408\u4f5c\u6761\u4ef6\uff1b\u88d5\u5eca\u6e56\u533a\u7684\u76ee\u6807\u662f\u65b0\u5f00\u53d1\u9879\u76ee\u5728\u76f8\u8fd1\u65f6\u95f4\u8303\u56f4\u5185\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002\u5168\u7ecf\u6d4e\u8303\u56f4\u5185\u7684\u4e3b\u8981\u4ef7\u683c\u4fe1\u53f7\u662f\u300a2018 \u5e74\u78b3\u5b9a\u4ef7\u6cd5\u4ee4\u300b\u4e0b\u7684\u78b3\u7a0e\uff0c\u9002\u7528\u4e8e\u5e74\u5ea6\u76f4\u63a5\u6e29\u5ba4\u6c14\u4f53\u6392\u653e\u91cf\u81f3\u5c11\u4e3a 25,000 tCO2e \u7684\u5de5\u4e1a\u8bbe\u65bd\u30022019 \u5e74\u81f3 2023 \u5e74\u7684\u521d\u59cb\u7a0e\u7387\u4e3a\u6bcf\u5428 5 \u65b0\u5143\u540e\uff0c2024\u20132025 \u5e74\u7a0e\u7387\u4e3a\u6bcf\u5428 25 \u65b0\u5143\uff0c2026\u20132027 \u5e74\u4e3a\u6bcf\u5428 45 \u65b0\u5143\uff0c\u76ee\u6807\u662f\u5728 2030 \u5e74\u8fbe\u5230\u6bcf\u5428 50\u201380 \u65b0\u5143\uff1b\u81ea 2024 \u5e74\u8d77\uff0c\u5e94\u7a0e\u8bbe\u65bd\u53ef\u4f7f\u7528\u7b26\u5408\u6761\u4ef6\u7684\u56fd\u9645\u78b3\u4fe1\u7528\u62b5\u6d88\u6700\u591a 5% \u7684\u5e94\u7a0e\u6392\u653e\u91cf\uff08[NEA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX)\uff1b\u53e6\u89c1[\u5e74\u5ea6\u7a0e\u7387](\/zh\/knowledge\/dataset\/sgkb.data.annual-rates)\uff09\u3002\u56e0\u6b64\uff0c\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7ed3\u5408\u4e86\u9879\u76ee\u76ee\u6807\u3001\u57fa\u7840\u8bbe\u65bd\u5efa\u8bbe\u548c\u9010\u6b65\u4e0a\u8c03\u7684\u78b3\u4ef7\uff0c\u5e76\u975e\u4f9d\u9760\u5355\u4e00\u624b\u6bb5\uff1b\u6b63\u5982 2026 \u5e74\u63d0\u9ad8\u592a\u9633\u80fd\u76ee\u6807\u6240\u793a\uff0c\u5f53\u5404\u673a\u6784\u5728\u5341\u5e74\u4e2d\u671f\u4fee\u8ba2\u76ee\u6807\u65f6\uff0c\u76f8\u5173\u6570\u5b57\u4e5f\u4f1a\u53d8\u5316\u3002","summary":"\u65b0\u52a0\u5761\u5728 2020\u5e74\u4ee3\u7684\u6c14\u5019\u653f\u7b56\u4e3b\u8981\u901a\u8fc7\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u843d\u5b9e\u2014\u2014\u8fd9\u9879\u4e8e 2021 \u5e74\u63a8\u51fa\u3001\u8bbe\u6709\u4e94\u5927\u652f\u67f1\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u7684\u8ba1\u5212\u2014\u2014\u5e76\u4ee5\u56fd\u5bb6\u627f\u8bfa\u5b9e\u73b0\u6392\u653e\u8fbe\u5cf0\u53ca\u4e8e 2050 \u5e74\u524d\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4e3a\u57fa\u7840\u3002","title":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030"}},"source_id":"sgkb.environment-sustainability.green-plan-2030","status":"verified","summary_en":"Singapore's climate policy for the 2020s is delivered mainly through the Singapore Green Plan 2030 \u2014 five-pillar sustainability targets launched in 2021 \u2014 under national pledges of emissions peaking and net zero by 2050.","summary_zh":"\u65b0\u52a0\u5761\u5728 2020\u5e74\u4ee3\u7684\u6c14\u5019\u653f\u7b56\u4e3b\u8981\u901a\u8fc7\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u843d\u5b9e\u2014\u2014\u8fd9\u9879\u4e8e 2021 \u5e74\u63a8\u51fa\u3001\u8bbe\u6709\u4e94\u5927\u652f\u67f1\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u7684\u8ba1\u5212\u2014\u2014\u5e76\u4ee5\u56fd\u5bb6\u627f\u8bfa\u5b9e\u73b0\u6392\u653e\u8fbe\u5cf0\u53ca\u4e8e 2050 \u5e74\u524d\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4e3a\u57fa\u7840\u3002","title_en":"Singapore Green Plan 2030","title_zh":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030","wiki":{"domain":"environment-sustainability","last_verified":"2026-08-10","locales":{"en":{"markdown":"# Singapore Green Plan 2030\n\nThe Singapore Green Plan 2030 is Singapore's whole-of-nation sustainability and climate-delivery agenda for the decade to 2030. Launched in February 2021 and spearheaded by five ministries \u2014 Sustainability and the Environment (MSE), Trade and Industry (MTI), Transport (MOT), National Development (MND), and Education (MOE) \u2014 it packs concrete sector targets into five pillars and frames them as delivery vehicles for Singapore's Paris Agreement commitments and its long-term aspiration of net zero emissions by 2050 ([greenplan.gov.sg overview, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/overview\/); [MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/)). It is a coordinating national plan rather than a single statute: individual ministries and agencies own the programmes, while the Green Plan brand and targets site collect the public scorecard. Physical weather and geography sit in [physical geography and climate](\/en\/knowledge\/article\/sgkb.geography-urban-planning.physical-geography-and-climate); power-system mechanics sit in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid); shoreline adaptation sits in [coastal protection](\/en\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection) \u2014 this article owns the national climate-policy and Green Plan target frame.\n\n## Five pillars and how the plan is organised\n\nThe Green Plan's five pillars are City in Nature, Energy Reset, Sustainable Living, Green Economy, and Resilient Future ([greenplan.gov.sg, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/)). City in Nature covers parks, trees, and access to green space. Energy Reset covers solar and other cleaner power, greener buildings and towns, and the shift to cleaner-energy vehicles, aviation ground operations, and harbour craft. Sustainable Living covers household water and waste habits, public and active transport modal share, and schools' carbon footprint. Green Economy covers investment quality, Jurong Island's energy-and-chemicals transition, green finance and carbon services, tourism, and enterprise capability. Resilient Future covers coastal and flood protection planning and the \"30 by 30\" local food goal ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Headline public messaging often highlights a short list \u2014 plant one million more trees, raise solar deployment, cut waste to landfill by 30% by 2030, make at least 20% of schools carbon-neutral by 2030, and require cleaner-energy models for all new car and taxi registrations from 2030 \u2014 but the official targets page is denser and should be preferred when a figure is contested ([greenplan.gov.sg, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/); [greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)).\n\n## City in Nature and Sustainable Living targets\n\nUnder City in Nature, Singapore aims by 2030 to double the annual tree-planting rate relative to the 2020\u20132030 pathway so that one million more trees are planted, increase nature parks' land area by over 50% from the 2020 baseline, and put every household within a 10-minute walk of a park; intermediate 2026 park-development targets and a 2035 goal of adding 1,000 ha of green spaces sit alongside those ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Sustainable Living pairs resource-use targets with mobility and schools. Household water consumption is to fall to 130 litres per capita per day by 2030 \u2014 a figure that should be read with [water story](\/en\/knowledge\/article\/sgkb.environment-sustainability.water-story) rather than treated as a free-standing water-security plan. Waste sent to landfill is to fall 20% per capita per day by 2026 and 30% by 2030, which is the Green Plan's bridge into the incineration-and-[Semakau](\/en\/knowledge\/article\/sgkb.environment-sustainability.semakau-and-waste) system ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). On commuting, the plan targets 75% mass public transport (rail and bus) peak-period modal share by 2030, rising above 80% by 2040, with public, active and shared modes accounting for nine in ten peak-period journeys by 2040; supporting hardware includes electric buses making up half the public bus fleet by 2030, diesel buses replaced with cleaner-energy buses by 2040, the rail network expanded to 360 km by the early 2030s, and cycling paths expanded to around 1,300 km ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Schools are to cut net carbon emissions by two-thirds by 2030, with at least 20% carbon-neutral ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). These modal-share and rail goals intersect [public transport system](\/en\/knowledge\/article\/sgkb.transport.public-transport-system) and the [future rail projects](\/en\/knowledge\/article\/sgkb.transport.future-rail-projects) pipeline; the Green Plan states the destinations, while transport agencies own the lines and buses.\n\n## Energy Reset: solar, imports, buildings, and vehicles\n\nEnergy Reset is the pillar most exposed to target revisions because Singapore's domestic renewable options are narrow. Solar remains the main domestic renewable for electricity: Singapore hit 2 GWp of installed capacity in 2025 \u2014 meeting the earlier \"at least 2 GWp by 2030\" milestone five years early \u2014 and the Energy Market Authority raised the 2030 solar deployment target to 3 GWp on 2 March 2026, stating that 3 GWp could generate about 2,800 GWh a year, enough for roughly half a million households ([EMA, accessed Aug 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)). Some Green Plan pages still list the older \"at least 2 GWp by 2030\" wording even after that announcement, so readers should treat EMA's March 2026 release as the current solar target and treat lagging Green Plan copy as stale ([Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). EMA also notes that solar can realistically cover only around 10% of Singapore's projected energy needs by 2050, which is why the same pillar emphasises regional power imports ([EMA, accessed Aug 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)). Some Green Plan pages still cite an earlier \"up to 4 GW by 2035\" import ambition; EMA's Regional Power Grids page (updated October 2025) states the current target as around **6 GW** of low-carbon electricity by 2035 \u2014 about one-third of projected energy demand then \u2014 so readers should treat the 6 GW figure as current and the lagging 4 GW Green Plan copy as superseded ([EMA Regional Power Grids, accessed Aug 2026](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids); [Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); see [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid) for market and grid detail). Energy storage targets on Green Plan pages include a 200 MWh ESS deployment target marked achieved in December 2022 and a 285 MWh Jurong Island system cited on the Energy Reset page, alongside hydrogen and more efficient gas-fired plant ([Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Buildings are to be 80% green by Gross Floor Area by 2030, with 80% of new buildings Super Low Energy from 2030 and best-in-class green buildings 80% more energy-efficient than 2005 levels; existing HDB towns are to cut energy use 15% by 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). On vehicles, new diesel car and taxi registrations cease from 2025, all new car and taxi registrations are to be cleaner-energy models from 2030, 60,000 EV charging points are targeted by 2030, all HDB towns are to be EV-ready by 2025, and all vehicles are to run on cleaner energy by 2040 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Parallel cleaner-energy rules apply to Changi airside vehicles and to new harbour craft in Singapore port waters from 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)).\n\n## Green Economy, Resilient Future, and the 30-by-30 food goal\n\nThe Green Economy pillar is directional rather than a single numeric KPI sheet: Singapore wants new investments that are best-in-class on energy and carbon efficiency; Jurong Island positioned as a sustainable energy and chemicals park; and Singapore positioned as a sustainable tourism destination, a green-finance and carbon-services hub for Asia's transition, and a regional centre for sustainability solutions, while grooming local enterprises to capture those markets ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Resilient Future ties climate adaptation to food security. By 2030, coastal protection plans are to be completed for City-East Coast, the North-West Coast (Lim Chu Kang and Sungei Kadut), and Jurong Island \u2014 the planning step that precedes heavy coastal engineering detailed in [coastal protection](\/en\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection) ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). The same pillar carries the agri-food \"30 by 30\" goal: build capability and capacity to produce 30% of Singapore's nutritional needs locally and sustainably by 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). That food target is frequently cited outside the Green Plan brand \u2014 including in [economy overview](\/en\/knowledge\/article\/sgkb.economy-finance.economy-overview) \u2014 but its canonical home in the sustainability agenda is here. Regional environmental risk that the Green Plan does not itself extinguish, notably [transboundary haze](\/en\/knowledge\/article\/sgkb.environment-sustainability.haze), remains a separate diplomatic and statutory track even as domestic emissions and greening programmes accelerate.\n\n## Net zero 2050, the 2030 NDC, and the carbon tax\n\nThe Green Plan's decade targets sit under a longer climate trajectory announced in October 2022: net zero emissions by 2050 as Singapore's Long-Term Low-Emissions Development Strategy, and a revised 2030 Nationally Determined Contribution to reduce emissions to around 60 MtCO2e in 2030 after peaking earlier ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). MSE stated explicitly that those pledges are contingent on technological and economic viability of options such as hydrogen and carbon capture, and on international cooperation including carbon credits and renewable electricity imports \u2014 a frank acknowledgment that an alternative-energy-disadvantaged city-state cannot treat domestic solar as sufficient ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). The public sector's GreenGov.SG track aims for net zero around 2045, contingent on the same technology and cooperation conditions; Jurong Lake District aims for net zero for new developments around the same horizon ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). The main economy-wide price signal is the carbon tax under the Carbon Pricing Act 2018, applied to industrial facilities with annual direct GHG emissions of at least 25,000 tCO2e. After an introductory S$5\/t period from 2019 to 2023, the rate is S$25\/t in 2024\u20132025 and S$45\/t in 2026\u20132027, with a view to S$50\u201380\/t by 2030; from 2024, taxable facilities may offset up to 5% of taxable emissions with eligible international carbon credits ([NEA, accessed Aug 2026](https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX); see also [annual rates](\/en\/knowledge\/dataset\/sgkb.data.annual-rates)). The Green Plan therefore combines programme targets, infrastructure build-outs, and a rising carbon price \u2014 not a single lever \u2014 and its numbers move when agencies revise ambitions mid-decade, as the 2026 solar-target lift shows.","summary":"Singapore's climate policy for the 2020s is delivered mainly through the Singapore Green Plan 2030 \u2014 five-pillar sustainability targets launched in 2021 \u2014 under national pledges of emissions peaking and net zero by 2050.","title":"Singapore Green Plan 2030"},"zh":{"markdown":"# \u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\n\n\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u662f\u65b0\u52a0\u5761\u9762\u5411 2030\u5e74\u7684\u5168\u793e\u4f1a\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u6c14\u5019\u884c\u52a8\u8bae\u7a0b\u3002\u8be5\u8ba1\u5212\u4e8e 2021 \u5e74\u4e8c\u6708\u63a8\u51fa\uff0c\u7531\u4e94\u4e2a\u90e8\u95e8\u7275\u5934\u2014\u2014\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u73af\u5883\u90e8\uff08MSE\uff09\u3001\u8d38\u6613\u4e0e\u5de5\u4e1a\u90e8\uff08MTI\uff09\u3001\u4ea4\u901a\u90e8\uff08MOT\uff09\u3001\u56fd\u5bb6\u53d1\u5c55\u90e8\uff08MND\uff09\u548c\u6559\u80b2\u90e8\uff08MOE\uff09\u2014\u2014\u5c06\u5177\u4f53\u7684\u884c\u4e1a\u76ee\u6807\u7eb3\u5165\u4e94\u5927\u652f\u67f1\uff0c\u5e76\u5c06\u5176\u5b9a\u4f4d\u4e3a\u843d\u5b9e\u65b0\u52a0\u5761\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u627f\u8bfa\u53ca\u5b9e\u73b0 2050 \u5e74\u51c0\u96f6\u6392\u653e\u957f\u671f\u613f\u666f\u7684\u5de5\u5177\uff08[greenplan.gov.sg \u6982\u89c8\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/overview\/); [MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/)\uff09\u3002\u8fd9\u662f\u4e00\u9879\u5168\u56fd\u534f\u8c03\u8ba1\u5212\uff0c\u800c\u975e\u5355\u4e00\u6cd5\u89c4\uff1a\u5404\u90e8\u95e8\u548c\u673a\u6784\u8d1f\u8d23\u5404\u81ea\u7684\u9879\u76ee\uff0c\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u54c1\u724c\u53ca\u76ee\u6807\u7f51\u7ad9\u5219\u6c47\u96c6\u516c\u5f00\u8fdb\u5c55\u60c5\u51b5\u3002\u5b9e\u4f53\u5929\u6c14\u4e0e\u5730\u7406\u73af\u5883\u89c1[\u81ea\u7136\u5730\u7406\u4e0e\u6c14\u5019](\/zh\/knowledge\/article\/sgkb.geography-urban-planning.physical-geography-and-climate)\uff1b\u7535\u529b\u7cfb\u7edf\u8fd0\u884c\u673a\u5236\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff1b\u6d77\u5cb8\u7ebf\u9002\u5e94\u63aa\u65bd\u89c1[\u6d77\u5cb8\u9632\u62a4](\/zh\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection)\u2014\u2014\u672c\u6587\u805a\u7126\u56fd\u5bb6\u6c14\u5019\u653f\u7b56\u4e0e\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u76ee\u6807\u6846\u67b6\u3002\n\n## \u4e94\u5927\u652f\u67f1\u53ca\u8ba1\u5212\u7684\u7ec4\u7ec7\u65b9\u5f0f\n\n\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u4e94\u5927\u652f\u67f1\u662f\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u3001\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u3001\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u3001\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u548c\u201c\u97e7\u6027\u672a\u6765\u201d\uff08[greenplan.gov.sg\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/)\uff09\u3002\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u6db5\u76d6\u516c\u56ed\u3001\u6811\u6728\u548c\u7eff\u8272\u7a7a\u95f4\u7684\u53ef\u8fbe\u6027\u3002\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u6db5\u76d6\u592a\u9633\u80fd\u53ca\u5176\u4ed6\u66f4\u6e05\u6d01\u7684\u7535\u529b\u3001\u66f4\u52a0\u7eff\u8272\u7684\u5efa\u7b51\u4e0e\u57ce\u9547\uff0c\u4ee5\u53ca\u8f6c\u5411\u4f7f\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u7684\u8f66\u8f86\u3001\u822a\u7a7a\u5730\u52e4\u4f5c\u4e1a\u548c\u6e2f\u53e3\u8239\u8247\u3002\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u6db5\u76d6\u5bb6\u5ead\u7528\u6c34\u4e0e\u5e9f\u5f03\u7269\u5904\u7406\u4e60\u60ef\u3001\u516c\u5171\u4ea4\u901a\u548c\u6d3b\u8dc3\u51fa\u884c\u7684\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\uff0c\u4ee5\u53ca\u5b66\u6821\u7684\u78b3\u8db3\u8ff9\u3002\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u6db5\u76d6\u6295\u8d44\u8d28\u91cf\u3001\u88d5\u5eca\u5c9b\u7684\u80fd\u6e90\u4e0e\u5316\u5de5\u8f6c\u578b\u3001\u7eff\u8272\u91d1\u878d\u4e0e\u78b3\u670d\u52a1\u3001\u65c5\u6e38\u4e1a\u548c\u4f01\u4e1a\u80fd\u529b\u3002\u201c\u97e7\u6027\u672a\u6765\u201d\u6db5\u76d6\u6d77\u5cb8\u4e0e\u9632\u6d2a\u89c4\u5212\uff0c\u4ee5\u53ca\u201c30 by 30\u201d\u672c\u5730\u7cae\u98df\u76ee\u6807\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u516c\u5f00\u5ba3\u4f20\u5e38\u5f3a\u8c03\u4e00\u4efd\u7b80\u77ed\u76ee\u6807\u6e05\u5355\u2014\u2014\u591a\u79cd\u690d\u4e00\u767e\u4e07\u68f5\u6811\u3001\u6269\u5927\u592a\u9633\u80fd\u90e8\u7f72\u3001\u5230 2030 \u5e74\u5c06\u9001\u5f80\u586b\u57cb\u573a\u7684\u5e9f\u5f03\u7269\u51cf\u5c11 30%\u3001\u5230 2030 \u5e74\u8ba9\u81f3\u5c11 20% \u7684\u5b66\u6821\u5b9e\u73b0\u78b3\u4e2d\u548c\uff0c\u4ee5\u53ca\u81ea 2030 \u5e74\u8d77\u8981\u6c42\u6240\u6709\u65b0\u6ce8\u518c\u7684\u6c7d\u8f66\u548c\u5fb7\u58eb\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u8f66\u578b\u2014\u2014\u4f46\u5b98\u65b9\u76ee\u6807\u9875\u9762\u5185\u5bb9\u66f4\u8be6\u5c3d\uff0c\u82e5\u5bf9\u5177\u4f53\u6570\u5b57\u6709\u4e89\u8bae\uff0c\u5e94\u4f18\u5148\u53c2\u8003\u8be5\u9875\u9762\uff08[greenplan.gov.sg\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/); [greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\n\n## \u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u4e0e\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u76ee\u6807\n\n\u5728\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u652f\u67f1\u4e0b\uff0c\u65b0\u52a0\u5761\u7684\u76ee\u6807\u662f\u5230 2030 \u5e74\uff0c\u76f8\u8f83\u4e8e 2020\u20132030 \u5e74\u8def\u5f84\u5c06\u5e74\u5ea6\u690d\u6811\u901f\u5ea6\u63d0\u9ad8\u4e00\u500d\uff0c\u4ece\u800c\u591a\u79cd\u690d\u4e00\u767e\u4e07\u68f5\u6811\uff1b\u4e0e 2020 \u5e74\u57fa\u51c6\u76f8\u6bd4\uff0c\u5c06\u81ea\u7136\u516c\u56ed\u7528\u5730\u9762\u79ef\u589e\u52a0\u8d85\u8fc7 50%\uff1b\u5e76\u8ba9\u6bcf\u6237\u5bb6\u5ead\u6b65\u884c 10 \u5206\u949f\u5373\u53ef\u5230\u8fbe\u516c\u56ed\u3002\u6b64\u5916\uff0c\u8ba1\u5212\u8fd8\u8bbe\u6709 2026 \u5e74\u7684\u9636\u6bb5\u6027\u516c\u56ed\u5f00\u53d1\u76ee\u6807\uff0c\u4ee5\u53ca\u5230 2035 \u5e74\u589e\u52a0 1,000 \u516c\u9877\u7eff\u5730\u7684\u76ee\u6807\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u5c06\u8d44\u6e90\u4f7f\u7528\u76ee\u6807\u4e0e\u51fa\u884c\u53ca\u5b66\u6821\u76ee\u6807\u76f8\u7ed3\u5408\u3002\u5230 2030 \u5e74\uff0c\u5bb6\u5ead\u4eba\u5747\u65e5\u7528\u6c34\u91cf\u987b\u964d\u81f3 130 \u5347\uff1b\u89e3\u8bfb\u8fd9\u4e00\u6570\u5b57\u65f6\u5e94\u7ed3\u5408[\u6c34\u8d44\u6e90\u6545\u4e8b](\/zh\/knowledge\/article\/sgkb.environment-sustainability.water-story)\uff0c\u800c\u4e0d\u5e94\u5c06\u5176\u89c6\u4e3a\u4e00\u9879\u72ec\u7acb\u7684\u6c34\u5b89\u5168\u8ba1\u5212\u3002\u9001\u5f80\u586b\u57cb\u573a\u7684\u5e9f\u5f03\u7269\u987b\u5728 2026 \u5e74\u524d\u6309\u4eba\u5747\u6bcf\u65e5\u8ba1\u7b97\u51cf\u5c11 20%\uff0c\u5230 2030 \u5e74\u51cf\u5c11 30%\uff1b\u8fd9\u4e5f\u662f\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u4e0e\u711a\u5316\u53ca[\u5b9e\u9a6c\u9ad8](\/zh\/knowledge\/article\/sgkb.environment-sustainability.semakau-and-waste)\u7cfb\u7edf\u76f8\u8854\u63a5\u7684\u73af\u8282\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5728\u901a\u52e4\u65b9\u9762\uff0c\u8ba1\u5212\u76ee\u6807\u662f\u5230 2030 \u5e74\uff0c\u516c\u5171\u4ea4\u901a\uff08\u94c1\u8def\u4e0e\u5df4\u58eb\uff09\u5728\u9ad8\u5cf0\u65f6\u6bb5\u7684\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\u8fbe\u5230 75%\uff0c\u5230 2040 \u5e74\u5347\u81f3 80% \u4ee5\u4e0a\uff1b\u5230 2040 \u5e74\uff0c\u516c\u5171\u3001\u6d3b\u8dc3\u548c\u5171\u4eab\u51fa\u884c\u65b9\u5f0f\u5408\u8ba1\u5360\u9ad8\u5cf0\u65f6\u6bb5\u51fa\u884c\u7684\u5341\u5206\u4e4b\u4e5d\u3002\u914d\u5957\u8bbe\u65bd\u5305\u62ec\uff1a\u5230 2030 \u5e74\uff0c\u7535\u52a8\u5df4\u58eb\u5360\u516c\u5171\u5df4\u58eb\u8f66\u961f\u7684\u4e00\u534a\uff1b\u5230 2040 \u5e74\uff0c\u4ee5\u66f4\u6e05\u6d01\u80fd\u6e90\u5df4\u58eb\u53d6\u4ee3\u67f4\u6cb9\u5df4\u58eb\uff1b\u5230 2030 \u5e74\u4ee3\u521d\u5c06\u94c1\u8def\u7f51\u6269\u5c55\u81f3 360 \u516c\u91cc\uff1b\u4ee5\u53ca\u5c06\u811a\u8e0f\u8f66\u9053\u6269\u5c55\u81f3\u7ea6 1,300 \u516c\u91cc\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5b66\u6821\u987b\u5728 2030 \u5e74\u524d\u5c06\u51c0\u78b3\u6392\u653e\u51cf\u5c11\u4e09\u5206\u4e4b\u4e8c\uff0c\u5e76\u81f3\u5c11\u8ba9 20% \u7684\u5b66\u6821\u5b9e\u73b0\u78b3\u4e2d\u548c\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u8fd9\u4e9b\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\u4e0e\u94c1\u8def\u76ee\u6807\u4e0e[\u516c\u5171\u4ea4\u901a\u7cfb\u7edf](\/zh\/knowledge\/article\/sgkb.transport.public-transport-system)\u548c[\u672a\u6765\u94c1\u8def\u9879\u76ee](\/zh\/knowledge\/article\/sgkb.transport.future-rail-projects)\u89c4\u5212\u76f8\u4e92\u5173\u8054\uff1b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u89c4\u5b9a\u76ee\u6807\uff0c\u4ea4\u901a\u673a\u6784\u8d1f\u8d23\u94c1\u8def\u7ebf\u8def\u548c\u5df4\u58eb\u3002\n\n## \u201c\u80fd\u6e90\u91cd\u7f6e\u201d\uff1a\u592a\u9633\u80fd\u3001\u8fdb\u53e3\u80fd\u6e90\u3001\u5efa\u7b51\u4e0e\u8f66\u8f86\n\n\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u662f\u6700\u5bb9\u6613\u53d7\u5230\u76ee\u6807\u4fee\u8ba2\u5f71\u54cd\u7684\u652f\u67f1\uff0c\u56e0\u4e3a\u65b0\u52a0\u5761\u53ef\u7528\u7684\u56fd\u5185\u53ef\u518d\u751f\u80fd\u6e90\u9009\u9879\u6709\u9650\u3002\u592a\u9633\u80fd\u4ecd\u662f\u65b0\u52a0\u5761\u4e3b\u8981\u7684\u56fd\u5185\u7535\u529b\u53ef\u518d\u751f\u80fd\u6e90\uff1a\u65b0\u52a0\u5761\u5728 2025 \u5e74\u8fbe\u5230 2 GWp \u7684\u88c5\u673a\u5bb9\u91cf\uff0c\u6bd4\u539f\u5b9a\u201c\u5230 2030 \u5e74\u81f3\u5c11\u8fbe\u5230 2 GWp\u201d\u7684\u91cc\u7a0b\u7891\u63d0\u524d\u4e94\u5e74\u5b9e\u73b0\uff1b\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\uff08EMA\uff09\u4e8e 2026 \u5e74\u4e09\u6708 2 \u65e5\u5c06 2030 \u5e74\u592a\u9633\u80fd\u90e8\u7f72\u76ee\u6807\u63d0\u9ad8\u81f3 3 GWp\uff0c\u5e76\u6307\u51fa 3 GWp \u6bcf\u5e74\u53ef\u53d1\u7535\u7ea6 2,800 GWh\uff0c\u8db3\u4ee5\u4f9b\u5e94\u7ea6\u4e94\u5341\u4e07\u6237\u5bb6\u5ead\uff08[EMA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff09\u3002\u4e00\u4e9b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u5728\u8be5\u516c\u544a\u53d1\u5e03\u540e\u4ecd\u5217\u51fa\u65e7\u7684\u201c\u5230 2030 \u5e74\u81f3\u5c11\u8fbe\u5230 2 GWp\u201d\u63aa\u8f9e\uff0c\u56e0\u6b64\u8bfb\u8005\u5e94\u4ee5 EMA \u4e8e 2026 \u5e74\u4e09\u6708\u53d1\u5e03\u7684\u516c\u544a\u4e3a\u5f53\u524d\u592a\u9633\u80fd\u76ee\u6807\uff0c\u5e76\u5c06\u4ecd\u672a\u66f4\u65b0\u7684\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u5185\u5bb9\u89c6\u4e3a\u8fc7\u65f6\u4fe1\u606f\uff08[\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002EMA \u8fd8\u6307\u51fa\uff0c\u5230 2050 \u5e74\uff0c\u592a\u9633\u80fd\u73b0\u5b9e\u4e2d\u53ea\u80fd\u6ee1\u8db3\u65b0\u52a0\u5761\u9884\u8ba1\u80fd\u6e90\u9700\u6c42\u7684\u7ea6 10%\uff0c\u56e0\u6b64\u540c\u4e00\u652f\u67f1\u4e5f\u5f3a\u8c03\u533a\u57df\u7535\u529b\u8fdb\u53e3\uff08[EMA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff09\u3002\u4e00\u4e9b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u4ecd\u5f15\u7528\u8f83\u65e9\u7684\u201c\u5230 2035 \u5e74\u8fdb\u53e3\u6700\u591a 4 GW\u201d\u7684\u76ee\u6807\uff1bEMA \u7684\u533a\u57df\u7535\u7f51\u9875\u9762\uff08\u4e8e 2025 \u5e74\u5341\u6708\u66f4\u65b0\uff09\u5217\u51fa\u7684\u5f53\u524d\u76ee\u6807\u662f\u5230 2035 \u5e74\u8fdb\u53e3\u7ea6 **6 GW** \u4f4e\u78b3\u7535\u529b\u2014\u2014\u5c4a\u65f6\u7ea6\u5360\u9884\u8ba1\u80fd\u6e90\u9700\u6c42\u7684\u4e09\u5206\u4e4b\u4e00\u2014\u2014\u56e0\u6b64\u8bfb\u8005\u5e94\u4ee5 6 GW \u4e3a\u5f53\u524d\u76ee\u6807\uff0c\u5e76\u5c06\u4ecd\u672a\u66f4\u65b0\u7684\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u4e2d 4 GW \u7684\u5185\u5bb9\u89c6\u4e3a\u5df2\u88ab\u53d6\u4ee3\uff08[EMA \u533a\u57df\u7535\u7f51\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids); [\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); \u5e02\u573a\u4e0e\u7535\u7f51\u8be6\u60c5\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff09\u3002\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u5217\u51fa\u7684\u80fd\u6e90\u50a8\u5b58\u76ee\u6807\u5305\u62ec\uff1a\u5df2\u4e8e 2022 \u5e74\u5341\u4e8c\u6708\u6807\u8bb0\u4e3a\u5b8c\u6210\u7684 200 MWh \u50a8\u80fd\u7cfb\u7edf\uff08ESS\uff09\u90e8\u7f72\u76ee\u6807\uff0c\u4ee5\u53ca\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u9875\u9762\u63d0\u5230\u7684\u88d5\u5eca\u5c9b 285 MWh \u7cfb\u7edf\uff0c\u540c\u65f6\u8fd8\u5305\u62ec\u6c22\u80fd\u548c\u6548\u7387\u66f4\u9ad8\u7684\u71c3\u6c14\u53d1\u7535\u5382\uff08[\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5230 2030 \u5e74\uff0c\u6309\u603b\u697c\u9762\u9762\u79ef\u8ba1\u7b97\uff0c80% \u7684\u5efa\u7b51\u987b\u8fbe\u5230\u7eff\u8272\u6807\u51c6\uff1b\u4ece 2030 \u5e74\u8d77\uff0c80% \u7684\u65b0\u5efa\u7b51\u987b\u8fbe\u5230\u8d85\u4f4e\u80fd\u8017\u6807\u51c6\uff1b\u6700\u4f18\u7684\u7eff\u8272\u5efa\u7b51\u987b\u6bd4 2005 \u5e74\u6c34\u5e73\u8282\u80fd 80%\uff1b\u73b0\u6709\u5efa\u5c4b\u53d1\u5c55\u5c40\uff08HDB\uff09\u5e02\u9547\u987b\u5728 2030 \u5e74\u524d\u5c06\u80fd\u8017\u51cf\u5c11 15%\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5728\u8f66\u8f86\u65b9\u9762\uff0c\u81ea 2025 \u5e74\u8d77\u505c\u6b62\u65b0\u6ce8\u518c\u67f4\u6cb9\u6c7d\u8f66\u548c\u5fb7\u58eb\uff1b\u4ece 2030 \u5e74\u8d77\uff0c\u6240\u6709\u65b0\u6ce8\u518c\u6c7d\u8f66\u548c\u5fb7\u58eb\u987b\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u8f66\u578b\uff1b\u5230 2030 \u5e74\u8bbe\u7acb 60,000 \u4e2a\u7535\u52a8\u6c7d\u8f66\u5145\u7535\u70b9\uff1b\u5230 2025 \u5e74\u8ba9\u6240\u6709\u5efa\u5c4b\u53d1\u5c55\u5c40\u5e02\u9547\u5177\u5907\u7535\u52a8\u6c7d\u8f66\u5c31\u7eea\u6761\u4ef6\uff1b\u5230 2040 \u5e74\u8ba9\u6240\u6709\u8f66\u8f86\u4f7f\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u4ece 2030 \u5e74\u8d77\uff0c\u9002\u7528\u4e8e\u6a1f\u5b9c\u673a\u573a\u7a7a\u4fa7\u8f66\u8f86\u4ee5\u53ca\u65b0\u52a0\u5761\u6e2f\u53e3\u6c34\u57df\u65b0\u6e2f\u53e3\u8239\u8247\u7684\u89c4\u5b9a\u4e5f\u8981\u6c42\u5176\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\n\n## \u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u3001\u201c\u97e7\u6027\u672a\u6765\u201d\u4e0e\u201c30 by 30\u201d\u7cae\u98df\u76ee\u6807\n\n\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u652f\u67f1\u7684\u65b9\u5411\u6027\u8f83\u5f3a\uff0c\u800c\u975e\u4e00\u4efd\u5305\u542b\u5355\u4e00\u6570\u503c\u5173\u952e\u7ee9\u6548\u6307\u6807\u7684\u6e05\u5355\uff1a\u65b0\u52a0\u5761\u5e0c\u671b\u5438\u5f15\u5728\u80fd\u6e90\u4e0e\u78b3\u6548\u7387\u65b9\u9762\u8fbe\u5230\u4e1a\u754c\u9886\u5148\u6c34\u5e73\u7684\u65b0\u6295\u8d44\uff1b\u5c06\u88d5\u5eca\u5c9b\u6253\u9020\u4e3a\u53ef\u6301\u7eed\u80fd\u6e90\u4e0e\u5316\u5de5\u56ed\u533a\uff1b\u5c06\u65b0\u52a0\u5761\u5b9a\u4f4d\u4e3a\u53ef\u6301\u7eed\u65c5\u6e38\u76ee\u7684\u5730\u3001\u670d\u52a1\u4e9a\u6d32\u8f6c\u578b\u7684\u7eff\u8272\u91d1\u878d\u4e0e\u78b3\u670d\u52a1\u67a2\u7ebd\uff0c\u4ee5\u53ca\u53ef\u6301\u7eed\u89e3\u51b3\u65b9\u6848\u533a\u57df\u4e2d\u5fc3\uff0c\u540c\u65f6\u57f9\u80b2\u672c\u5730\u4f01\u4e1a\u628a\u63e1\u8fd9\u4e9b\u5e02\u573a\u673a\u9047\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u201c\u97e7\u6027\u672a\u6765\u201d\u5c06\u6c14\u5019\u9002\u5e94\u4e0e\u7cae\u98df\u5b89\u5168\u8054\u7cfb\u8d77\u6765\u3002\u5230 2030 \u5e74\uff0c\u987b\u5b8c\u6210\u5e02\u533a\u2014\u4e1c\u6d77\u5cb8\u3001\u897f\u5317\u6d77\u5cb8\uff08\u6797\u539d\u6e2f\u548c\u53cc\u6eaa\u52a0\u682a\uff09\u53ca\u88d5\u5eca\u5c9b\u7684\u6d77\u5cb8\u9632\u62a4\u89c4\u5212\u2014\u2014\u8fd9\u662f\u8fdb\u5165[\u6d77\u5cb8\u9632\u62a4](\/zh\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection)\u4e2d\u8be6\u8ff0\u7684\u91cd\u5927\u6d77\u5cb8\u5de5\u7a0b\u4e4b\u524d\u7684\u89c4\u5212\u6b65\u9aa4\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u540c\u4e00\u652f\u67f1\u8fd8\u5305\u542b\u519c\u4e1a\u98df\u54c1\u9886\u57df\u7684\u201c30 by 30\u201d\u76ee\u6807\uff1a\u63d0\u5347\u80fd\u529b\u4e0e\u4ea7\u80fd\uff0c\u5230 2030 \u5e74\u5728\u672c\u5730\u4ee5\u53ef\u6301\u7eed\u65b9\u5f0f\u751f\u4ea7\u65b0\u52a0\u5761 30% \u7684\u8425\u517b\u9700\u6c42\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u8fd9\u4e00\u7cae\u98df\u76ee\u6807\u7ecf\u5e38\u5728\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u54c1\u724c\u4ee5\u5916\u88ab\u5f15\u7528\u2014\u2014\u5305\u62ec\u5728[\u7ecf\u6d4e\u6982\u89c8](\/zh\/knowledge\/article\/sgkb.economy-finance.economy-overview)\u4e2d\u2014\u2014\u4f46\u5b83\u5728\u53ef\u6301\u7eed\u53d1\u5c55\u8bae\u7a0b\u4e2d\u7684\u89c4\u8303\u6027\u5f52\u5c5e\u9875\u9762\u662f\u672c\u6587\u3002\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u672c\u8eab\u65e0\u6cd5\u6d88\u9664\u7684\u533a\u57df\u73af\u5883\u98ce\u9669\uff0c\u7279\u522b\u662f[\u8de8\u5883\u70df\u973e](\/zh\/knowledge\/article\/sgkb.environment-sustainability.haze)\uff0c\u4ecd\u5c5e\u4e8e\u72ec\u7acb\u7684\u5916\u4ea4\u4e0e\u6cd5\u89c4\u8f68\u9053\uff0c\u5373\u4f7f\u56fd\u5185\u51cf\u6392\u4e0e\u7eff\u5316\u9879\u76ee\u4e0d\u65ad\u52a0\u5feb\u4ea6\u7136\u3002\n\n## 2050 \u5e74\u51c0\u96f6\u6392\u653e\u30012030 \u5e74\u56fd\u5bb6\u81ea\u4e3b\u8d21\u732e\u4e0e\u78b3\u7a0e\n\n\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u5341\u5e74\u76ee\u6807\u5904\u4e8e\u4e00\u6761\u66f4\u957f\u671f\u7684\u6c14\u5019\u53d1\u5c55\u8f68\u8ff9\u4e4b\u4e0b\u3002\u8be5\u8f68\u8ff9\u4e8e 2022 \u5e74\u5341\u6708\u516c\u5e03\uff1a\u65b0\u52a0\u5761\u5c06\u628a 2050 \u5e74\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4f5c\u4e3a\u5176\u300a\u957f\u671f\u4f4e\u6392\u653e\u53d1\u5c55\u6218\u7565\u300b\uff0c\u5e76\u4fee\u8ba2 2030 \u5e74\u56fd\u5bb6\u81ea\u4e3b\u8d21\u732e\uff0c\u627f\u8bfa\u5728\u6392\u653e\u8f83\u65e9\u8fbe\u5cf0\u540e\u4e8e 2030 \u5e74\u5c06\u6392\u653e\u91cf\u51cf\u81f3\u7ea6 60 MtCO2e\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002MSE \u660e\u786e\u8868\u793a\uff0c\u8fd9\u4e9b\u627f\u8bfa\u4ee5\u6c22\u80fd\u548c\u78b3\u6355\u96c6\u7b49\u65b9\u6848\u5728\u6280\u672f\u4e0e\u7ecf\u6d4e\u4e0a\u7684\u53ef\u884c\u6027\uff0c\u4ee5\u53ca\u5305\u62ec\u78b3\u4fe1\u7528\u548c\u53ef\u518d\u751f\u7535\u529b\u8fdb\u53e3\u5728\u5185\u7684\u56fd\u9645\u5408\u4f5c\u4e3a\u524d\u63d0\u2014\u2014\u8fd9\u5766\u7387\u627f\u8ba4\uff0c\u7f3a\u4e4f\u66ff\u4ee3\u80fd\u6e90\u6761\u4ef6\u7684\u57ce\u90a6\u4e0d\u80fd\u5c06\u56fd\u5185\u592a\u9633\u80fd\u89c6\u4e3a\u8db3\u591f\u7684\u89e3\u51b3\u65b9\u6848\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002\u516c\u5171\u90e8\u95e8\u7684 GreenGov.SG \u8ba1\u5212\u76ee\u6807\u662f\u5728 2045 \u5e74\u5de6\u53f3\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\uff0c\u524d\u63d0\u540c\u6837\u662f\u6280\u672f\u4e0e\u5408\u4f5c\u6761\u4ef6\uff1b\u88d5\u5eca\u6e56\u533a\u7684\u76ee\u6807\u662f\u65b0\u5f00\u53d1\u9879\u76ee\u5728\u76f8\u8fd1\u65f6\u95f4\u8303\u56f4\u5185\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002\u5168\u7ecf\u6d4e\u8303\u56f4\u5185\u7684\u4e3b\u8981\u4ef7\u683c\u4fe1\u53f7\u662f\u300a2018 \u5e74\u78b3\u5b9a\u4ef7\u6cd5\u4ee4\u300b\u4e0b\u7684\u78b3\u7a0e\uff0c\u9002\u7528\u4e8e\u5e74\u5ea6\u76f4\u63a5\u6e29\u5ba4\u6c14\u4f53\u6392\u653e\u91cf\u81f3\u5c11\u4e3a 25,000 tCO2e \u7684\u5de5\u4e1a\u8bbe\u65bd\u30022019 \u5e74\u81f3 2023 \u5e74\u7684\u521d\u59cb\u7a0e\u7387\u4e3a\u6bcf\u5428 5 \u65b0\u5143\u540e\uff0c2024\u20132025 \u5e74\u7a0e\u7387\u4e3a\u6bcf\u5428 25 \u65b0\u5143\uff0c2026\u20132027 \u5e74\u4e3a\u6bcf\u5428 45 \u65b0\u5143\uff0c\u76ee\u6807\u662f\u5728 2030 \u5e74\u8fbe\u5230\u6bcf\u5428 50\u201380 \u65b0\u5143\uff1b\u81ea 2024 \u5e74\u8d77\uff0c\u5e94\u7a0e\u8bbe\u65bd\u53ef\u4f7f\u7528\u7b26\u5408\u6761\u4ef6\u7684\u56fd\u9645\u78b3\u4fe1\u7528\u62b5\u6d88\u6700\u591a 5% \u7684\u5e94\u7a0e\u6392\u653e\u91cf\uff08[NEA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX)\uff1b\u53e6\u89c1[\u5e74\u5ea6\u7a0e\u7387](\/zh\/knowledge\/dataset\/sgkb.data.annual-rates)\uff09\u3002\u56e0\u6b64\uff0c\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7ed3\u5408\u4e86\u9879\u76ee\u76ee\u6807\u3001\u57fa\u7840\u8bbe\u65bd\u5efa\u8bbe\u548c\u9010\u6b65\u4e0a\u8c03\u7684\u78b3\u4ef7\uff0c\u5e76\u975e\u4f9d\u9760\u5355\u4e00\u624b\u6bb5\uff1b\u6b63\u5982 2026 \u5e74\u63d0\u9ad8\u592a\u9633\u80fd\u76ee\u6807\u6240\u793a\uff0c\u5f53\u5404\u673a\u6784\u5728\u5341\u5e74\u4e2d\u671f\u4fee\u8ba2\u76ee\u6807\u65f6\uff0c\u76f8\u5173\u6570\u5b57\u4e5f\u4f1a\u53d8\u5316\u3002","summary":"\u65b0\u52a0\u5761\u5728 2020\u5e74\u4ee3\u7684\u6c14\u5019\u653f\u7b56\u4e3b\u8981\u901a\u8fc7\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u843d\u5b9e\u2014\u2014\u8fd9\u9879\u4e8e 2021 \u5e74\u63a8\u51fa\u3001\u8bbe\u6709\u4e94\u5927\u652f\u67f1\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u7684\u8ba1\u5212\u2014\u2014\u5e76\u4ee5\u56fd\u5bb6\u627f\u8bfa\u5b9e\u73b0\u6392\u653e\u8fbe\u5cf0\u53ca\u4e8e 2050 \u5e74\u524d\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4e3a\u57fa\u7840\u3002","title":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030"}},"path":"environment-sustainability\/green-plan-2030.md","related_source_ids":["sgkb.data.annual-rates","sgkb.data.climate-policy-anchors","sgkb.environment-sustainability.coastal-protection","sgkb.environment-sustainability.energy-and-power-grid","sgkb.data.green-plan-anchors"],"source_hash":"f094a5836137f594f39700347936123ff816742cbebd135d5929d5bc86d64fb4","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"Singapore Green Plan 2030 \u2014 Home","url":"https:\/\/www.greenplan.gov.sg\/"},{"title":"Singapore Green Plan 2030 \u2014 Overview","url":"https:\/\/www.greenplan.gov.sg\/overview\/"},{"title":"Singapore Green Plan 2030 \u2014 Our Targets","url":"https:\/\/www.greenplan.gov.sg\/targets\/"},{"title":"Singapore Green Plan 2030 \u2014 Energy Reset","url":"https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/"},{"title":"MSE \u2014 Singapore Green Plan 2030","url":"https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/"},{"title":"MSE \u2014 Net zero by 2050 and revised 2030 NDC (25 Oct 2022)","url":"https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/"},{"title":"EMA \u2014 Solar target raised to 3 GWp by 2030 (2 Mar 2026)","url":"https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030"},{"title":"EMA \u2014 Regional Power Grids","url":"https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids"},{"title":"NEA \u2014 Carbon Tax","url":"https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX"}]}},"search_text":"Singapore Green Plan 2030\n\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\nSingapore's climate policy for the 2020s is delivered mainly through the Singapore Green Plan 2030 \u2014 five-pillar sustainability targets launched in 2021 \u2014 under national pledges of emissions peaking and net zero by 2050.\n\u65b0\u52a0\u5761\u5728 2020\u5e74\u4ee3\u7684\u6c14\u5019\u653f\u7b56\u4e3b\u8981\u901a\u8fc7\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u843d\u5b9e\u2014\u2014\u8fd9\u9879\u4e8e 2021 \u5e74\u63a8\u51fa\u3001\u8bbe\u6709\u4e94\u5927\u652f\u67f1\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u7684\u8ba1\u5212\u2014\u2014\u5e76\u4ee5\u56fd\u5bb6\u627f\u8bfa\u5b9e\u73b0\u6392\u653e\u8fbe\u5cf0\u53ca\u4e8e 2050 \u5e74\u524d\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4e3a\u57fa\u7840\u3002\n{\"aliases\":[\"Green Plan\",\"Green Plan 2030\",\"Singapore current carbon tax rate\",\"carbon tax per tonne Singapore\",\"carbon tax facility threshold\",\"SGP 2030\",\"Singapore Green Plan\",\"climate policy\",\"net zero 2050\",\"NDC\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.environment-sustainability.green-plan-2030\",\"document_sha256\":\"6f825c79028330c14dd800ea554653f43c05a8126e72222666e04b7702398ecf\",\"document_type\":\"article\",\"domain\":\"environment-sustainability\",\"entities\":[\"sg.scheme.singapore-green-plan-2030\",\"sg.agency.mse\",\"sg.agency.ema\",\"sg.statute.carbon-pricing-act\"],\"facets\":[\"current\",\"policy\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-08-10\",\"path\":\"environment-sustainability\\\/green-plan-2030.md\",\"related\":[\"annual-rates\",\"climate-policy-anchors\",\"coastal-protection\",\"energy-and-power-grid\",\"green-plan-anchors\"],\"sources\":[{\"accessed\":\"2026-08-08\",\"title\":\"Singapore Green Plan 2030 \u2014 Home\",\"url\":\"https:\\\/\\\/www.greenplan.gov.sg\\\/\"},{\"accessed\":\"2026-08-08\",\"title\":\"Singapore Green Plan 2030 \u2014 Overview\",\"url\":\"https:\\\/\\\/www.greenplan.gov.sg\\\/overview\\\/\"},{\"accessed\":\"2026-08-08\",\"title\":\"Singapore Green Plan 2030 \u2014 Our Targets\",\"url\":\"https:\\\/\\\/www.greenplan.gov.sg\\\/targets\\\/\"},{\"accessed\":\"2026-08-08\",\"title\":\"Singapore Green Plan 2030 \u2014 Energy Reset\",\"url\":\"https:\\\/\\\/www.greenplan.gov.sg\\\/key-focus-areas\\\/energy-reset\\\/\"},{\"accessed\":\"2026-08-08\",\"title\":\"MSE \u2014 Singapore Green Plan 2030\",\"url\":\"https:\\\/\\\/www.mse.gov.sg\\\/resources\\\/sgp-2030\\\/\"},{\"accessed\":\"2026-08-08\",\"title\":\"MSE \u2014 Net zero by 2050 and revised 2030 NDC (25 Oct 2022)\",\"url\":\"https:\\\/\\\/www.mse.gov.sg\\\/latest-news\\\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\\\/\"},{\"accessed\":\"2026-08-08\",\"title\":\"EMA \u2014 Solar target raised to 3 GWp by 2030 (2 Mar 2026)\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/news-events\\\/news\\\/media-releases\\\/2026\\\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030\"},{\"accessed\":\"2026-08-08\",\"title\":\"EMA \u2014 Regional Power Grids\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/our-energy-story\\\/energy-supply\\\/regional-power-grids\"},{\"accessed\":\"2026-08-08\",\"title\":\"NEA \u2014 Carbon Tax\",\"url\":\"https:\\\/\\\/www.nea.gov.sg\\\/OUR-SERVICES\\\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\\\/CLIMATE-CHANGE\\\/CARBON-TAX\"}],\"status\":\"verified\",\"summary\":\"Singapore's climate policy for the 2020s is delivered mainly through the Singapore Green Plan 2030 \u2014 five-pillar sustainability targets launched in 2021 \u2014 under national pledges of emissions peaking and net zero by 2050.\",\"tags\":[\"climate\",\"policy\",\"energy\",\"waste\",\"nature\"],\"temporal_scope\":\"current\",\"title\":\"Singapore Green Plan 2030\",\"topics\":[\"sgtopic.environment\",\"sgtopic.environment.climate\",\"sgtopic.environment.green-plan\"],\"volatility\":\"fast\"}\n# Singapore Green Plan 2030\n\nThe Singapore Green Plan 2030 is Singapore's whole-of-nation sustainability and climate-delivery agenda for the decade to 2030. Launched in February 2021 and spearheaded by five ministries \u2014 Sustainability and the Environment (MSE), Trade and Industry (MTI), Transport (MOT), National Development (MND), and Education (MOE) \u2014 it packs concrete sector targets into five pillars and frames them as delivery vehicles for Singapore's Paris Agreement commitments and its long-term aspiration of net zero emissions by 2050 ([greenplan.gov.sg overview, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/overview\/); [MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/)). It is a coordinating national plan rather than a single statute: individual ministries and agencies own the programmes, while the Green Plan brand and targets site collect the public scorecard. Physical weather and geography sit in [physical geography and climate](\/en\/knowledge\/article\/sgkb.geography-urban-planning.physical-geography-and-climate); power-system mechanics sit in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid); shoreline adaptation sits in [coastal protection](\/en\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection) \u2014 this article owns the national climate-policy and Green Plan target frame.\n\n## Five pillars and how the plan is organised\n\nThe Green Plan's five pillars are City in Nature, Energy Reset, Sustainable Living, Green Economy, and Resilient Future ([greenplan.gov.sg, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/)). City in Nature covers parks, trees, and access to green space. Energy Reset covers solar and other cleaner power, greener buildings and towns, and the shift to cleaner-energy vehicles, aviation ground operations, and harbour craft. Sustainable Living covers household water and waste habits, public and active transport modal share, and schools' carbon footprint. Green Economy covers investment quality, Jurong Island's energy-and-chemicals transition, green finance and carbon services, tourism, and enterprise capability. Resilient Future covers coastal and flood protection planning and the \"30 by 30\" local food goal ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Headline public messaging often highlights a short list \u2014 plant one million more trees, raise solar deployment, cut waste to landfill by 30% by 2030, make at least 20% of schools carbon-neutral by 2030, and require cleaner-energy models for all new car and taxi registrations from 2030 \u2014 but the official targets page is denser and should be preferred when a figure is contested ([greenplan.gov.sg, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/); [greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)).\n\n## City in Nature and Sustainable Living targets\n\nUnder City in Nature, Singapore aims by 2030 to double the annual tree-planting rate relative to the 2020\u20132030 pathway so that one million more trees are planted, increase nature parks' land area by over 50% from the 2020 baseline, and put every household within a 10-minute walk of a park; intermediate 2026 park-development targets and a 2035 goal of adding 1,000 ha of green spaces sit alongside those ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Sustainable Living pairs resource-use targets with mobility and schools. Household water consumption is to fall to 130 litres per capita per day by 2030 \u2014 a figure that should be read with [water story](\/en\/knowledge\/article\/sgkb.environment-sustainability.water-story) rather than treated as a free-standing water-security plan. Waste sent to landfill is to fall 20% per capita per day by 2026 and 30% by 2030, which is the Green Plan's bridge into the incineration-and-[Semakau](\/en\/knowledge\/article\/sgkb.environment-sustainability.semakau-and-waste) system ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). On commuting, the plan targets 75% mass public transport (rail and bus) peak-period modal share by 2030, rising above 80% by 2040, with public, active and shared modes accounting for nine in ten peak-period journeys by 2040; supporting hardware includes electric buses making up half the public bus fleet by 2030, diesel buses replaced with cleaner-energy buses by 2040, the rail network expanded to 360 km by the early 2030s, and cycling paths expanded to around 1,300 km ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Schools are to cut net carbon emissions by two-thirds by 2030, with at least 20% carbon-neutral ([greenplan.gov.sg targets, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). These modal-share and rail goals intersect [public transport system](\/en\/knowledge\/article\/sgkb.transport.public-transport-system) and the [future rail projects](\/en\/knowledge\/article\/sgkb.transport.future-rail-projects) pipeline; the Green Plan states the destinations, while transport agencies own the lines and buses.\n\n## Energy Reset: solar, imports, buildings, and vehicles\n\nEnergy Reset is the pillar most exposed to target revisions because Singapore's domestic renewable options are narrow. Solar remains the main domestic renewable for electricity: Singapore hit 2 GWp of installed capacity in 2025 \u2014 meeting the earlier \"at least 2 GWp by 2030\" milestone five years early \u2014 and the Energy Market Authority raised the 2030 solar deployment target to 3 GWp on 2 March 2026, stating that 3 GWp could generate about 2,800 GWh a year, enough for roughly half a million households ([EMA, accessed Aug 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)). Some Green Plan pages still list the older \"at least 2 GWp by 2030\" wording even after that announcement, so readers should treat EMA's March 2026 release as the current solar target and treat lagging Green Plan copy as stale ([Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). EMA also notes that solar can realistically cover only around 10% of Singapore's projected energy needs by 2050, which is why the same pillar emphasises regional power imports ([EMA, accessed Aug 2026](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)). Some Green Plan pages still cite an earlier \"up to 4 GW by 2035\" import ambition; EMA's Regional Power Grids page (updated October 2025) states the current target as around **6 GW** of low-carbon electricity by 2035 \u2014 about one-third of projected energy demand then \u2014 so readers should treat the 6 GW figure as current and the lagging 4 GW Green Plan copy as superseded ([EMA Regional Power Grids, accessed Aug 2026](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids); [Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); see [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid) for market and grid detail). Energy storage targets on Green Plan pages include a 200 MWh ESS deployment target marked achieved in December 2022 and a 285 MWh Jurong Island system cited on the Energy Reset page, alongside hydrogen and more efficient gas-fired plant ([Energy Reset page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Buildings are to be 80% green by Gross Floor Area by 2030, with 80% of new buildings Super Low Energy from 2030 and best-in-class green buildings 80% more energy-efficient than 2005 levels; existing HDB towns are to cut energy use 15% by 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). On vehicles, new diesel car and taxi registrations cease from 2025, all new car and taxi registrations are to be cleaner-energy models from 2030, 60,000 EV charging points are targeted by 2030, all HDB towns are to be EV-ready by 2025, and all vehicles are to run on cleaner energy by 2040 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Parallel cleaner-energy rules apply to Changi airside vehicles and to new harbour craft in Singapore port waters from 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)).\n\n## Green Economy, Resilient Future, and the 30-by-30 food goal\n\nThe Green Economy pillar is directional rather than a single numeric KPI sheet: Singapore wants new investments that are best-in-class on energy and carbon efficiency; Jurong Island positioned as a sustainable energy and chemicals park; and Singapore positioned as a sustainable tourism destination, a green-finance and carbon-services hub for Asia's transition, and a regional centre for sustainability solutions, while grooming local enterprises to capture those markets ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). Resilient Future ties climate adaptation to food security. By 2030, coastal protection plans are to be completed for City-East Coast, the North-West Coast (Lim Chu Kang and Sungei Kadut), and Jurong Island \u2014 the planning step that precedes heavy coastal engineering detailed in [coastal protection](\/en\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection) ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). The same pillar carries the agri-food \"30 by 30\" goal: build capability and capacity to produce 30% of Singapore's nutritional needs locally and sustainably by 2030 ([targets page, accessed Aug 2026](https:\/\/www.greenplan.gov.sg\/targets\/)). That food target is frequently cited outside the Green Plan brand \u2014 including in [economy overview](\/en\/knowledge\/article\/sgkb.economy-finance.economy-overview) \u2014 but its canonical home in the sustainability agenda is here. Regional environmental risk that the Green Plan does not itself extinguish, notably [transboundary haze](\/en\/knowledge\/article\/sgkb.environment-sustainability.haze), remains a separate diplomatic and statutory track even as domestic emissions and greening programmes accelerate.\n\n## Net zero 2050, the 2030 NDC, and the carbon tax\n\nThe Green Plan's decade targets sit under a longer climate trajectory announced in October 2022: net zero emissions by 2050 as Singapore's Long-Term Low-Emissions Development Strategy, and a revised 2030 Nationally Determined Contribution to reduce emissions to around 60 MtCO2e in 2030 after peaking earlier ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). MSE stated explicitly that those pledges are contingent on technological and economic viability of options such as hydrogen and carbon capture, and on international cooperation including carbon credits and renewable electricity imports \u2014 a frank acknowledgment that an alternative-energy-disadvantaged city-state cannot treat domestic solar as sufficient ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). The public sector's GreenGov.SG track aims for net zero around 2045, contingent on the same technology and cooperation conditions; Jurong Lake District aims for net zero for new developments around the same horizon ([MSE, accessed Aug 2026](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)). The main economy-wide price signal is the carbon tax under the Carbon Pricing Act 2018, applied to industrial facilities with annual direct GHG emissions of at least 25,000 tCO2e. After an introductory S$5\/t period from 2019 to 2023, the rate is S$25\/t in 2024\u20132025 and S$45\/t in 2026\u20132027, with a view to S$50\u201380\/t by 2030; from 2024, taxable facilities may offset up to 5% of taxable emissions with eligible international carbon credits ([NEA, accessed Aug 2026](https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX); see also [annual rates](\/en\/knowledge\/dataset\/sgkb.data.annual-rates)). The Green Plan therefore combines programme targets, infrastructure build-outs, and a rising carbon price \u2014 not a single lever \u2014 and its numbers move when agencies revise ambitions mid-decade, as the 2026 solar-target lift shows.\n# \u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\n\n\u300a\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030\u300b\u662f\u65b0\u52a0\u5761\u9762\u5411 2030\u5e74\u7684\u5168\u793e\u4f1a\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u6c14\u5019\u884c\u52a8\u8bae\u7a0b\u3002\u8be5\u8ba1\u5212\u4e8e 2021 \u5e74\u4e8c\u6708\u63a8\u51fa\uff0c\u7531\u4e94\u4e2a\u90e8\u95e8\u7275\u5934\u2014\u2014\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u73af\u5883\u90e8\uff08MSE\uff09\u3001\u8d38\u6613\u4e0e\u5de5\u4e1a\u90e8\uff08MTI\uff09\u3001\u4ea4\u901a\u90e8\uff08MOT\uff09\u3001\u56fd\u5bb6\u53d1\u5c55\u90e8\uff08MND\uff09\u548c\u6559\u80b2\u90e8\uff08MOE\uff09\u2014\u2014\u5c06\u5177\u4f53\u7684\u884c\u4e1a\u76ee\u6807\u7eb3\u5165\u4e94\u5927\u652f\u67f1\uff0c\u5e76\u5c06\u5176\u5b9a\u4f4d\u4e3a\u843d\u5b9e\u65b0\u52a0\u5761\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u627f\u8bfa\u53ca\u5b9e\u73b0 2050 \u5e74\u51c0\u96f6\u6392\u653e\u957f\u671f\u613f\u666f\u7684\u5de5\u5177\uff08[greenplan.gov.sg \u6982\u89c8\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/overview\/); [MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/resources\/sgp-2030\/)\uff09\u3002\u8fd9\u662f\u4e00\u9879\u5168\u56fd\u534f\u8c03\u8ba1\u5212\uff0c\u800c\u975e\u5355\u4e00\u6cd5\u89c4\uff1a\u5404\u90e8\u95e8\u548c\u673a\u6784\u8d1f\u8d23\u5404\u81ea\u7684\u9879\u76ee\uff0c\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u54c1\u724c\u53ca\u76ee\u6807\u7f51\u7ad9\u5219\u6c47\u96c6\u516c\u5f00\u8fdb\u5c55\u60c5\u51b5\u3002\u5b9e\u4f53\u5929\u6c14\u4e0e\u5730\u7406\u73af\u5883\u89c1[\u81ea\u7136\u5730\u7406\u4e0e\u6c14\u5019](\/zh\/knowledge\/article\/sgkb.geography-urban-planning.physical-geography-and-climate)\uff1b\u7535\u529b\u7cfb\u7edf\u8fd0\u884c\u673a\u5236\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff1b\u6d77\u5cb8\u7ebf\u9002\u5e94\u63aa\u65bd\u89c1[\u6d77\u5cb8\u9632\u62a4](\/zh\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection)\u2014\u2014\u672c\u6587\u805a\u7126\u56fd\u5bb6\u6c14\u5019\u653f\u7b56\u4e0e\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u76ee\u6807\u6846\u67b6\u3002\n\n## \u4e94\u5927\u652f\u67f1\u53ca\u8ba1\u5212\u7684\u7ec4\u7ec7\u65b9\u5f0f\n\n\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u4e94\u5927\u652f\u67f1\u662f\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u3001\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u3001\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u3001\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u548c\u201c\u97e7\u6027\u672a\u6765\u201d\uff08[greenplan.gov.sg\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/)\uff09\u3002\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u6db5\u76d6\u516c\u56ed\u3001\u6811\u6728\u548c\u7eff\u8272\u7a7a\u95f4\u7684\u53ef\u8fbe\u6027\u3002\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u6db5\u76d6\u592a\u9633\u80fd\u53ca\u5176\u4ed6\u66f4\u6e05\u6d01\u7684\u7535\u529b\u3001\u66f4\u52a0\u7eff\u8272\u7684\u5efa\u7b51\u4e0e\u57ce\u9547\uff0c\u4ee5\u53ca\u8f6c\u5411\u4f7f\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u7684\u8f66\u8f86\u3001\u822a\u7a7a\u5730\u52e4\u4f5c\u4e1a\u548c\u6e2f\u53e3\u8239\u8247\u3002\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u6db5\u76d6\u5bb6\u5ead\u7528\u6c34\u4e0e\u5e9f\u5f03\u7269\u5904\u7406\u4e60\u60ef\u3001\u516c\u5171\u4ea4\u901a\u548c\u6d3b\u8dc3\u51fa\u884c\u7684\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\uff0c\u4ee5\u53ca\u5b66\u6821\u7684\u78b3\u8db3\u8ff9\u3002\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u6db5\u76d6\u6295\u8d44\u8d28\u91cf\u3001\u88d5\u5eca\u5c9b\u7684\u80fd\u6e90\u4e0e\u5316\u5de5\u8f6c\u578b\u3001\u7eff\u8272\u91d1\u878d\u4e0e\u78b3\u670d\u52a1\u3001\u65c5\u6e38\u4e1a\u548c\u4f01\u4e1a\u80fd\u529b\u3002\u201c\u97e7\u6027\u672a\u6765\u201d\u6db5\u76d6\u6d77\u5cb8\u4e0e\u9632\u6d2a\u89c4\u5212\uff0c\u4ee5\u53ca\u201c30 by 30\u201d\u672c\u5730\u7cae\u98df\u76ee\u6807\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u516c\u5f00\u5ba3\u4f20\u5e38\u5f3a\u8c03\u4e00\u4efd\u7b80\u77ed\u76ee\u6807\u6e05\u5355\u2014\u2014\u591a\u79cd\u690d\u4e00\u767e\u4e07\u68f5\u6811\u3001\u6269\u5927\u592a\u9633\u80fd\u90e8\u7f72\u3001\u5230 2030 \u5e74\u5c06\u9001\u5f80\u586b\u57cb\u573a\u7684\u5e9f\u5f03\u7269\u51cf\u5c11 30%\u3001\u5230 2030 \u5e74\u8ba9\u81f3\u5c11 20% \u7684\u5b66\u6821\u5b9e\u73b0\u78b3\u4e2d\u548c\uff0c\u4ee5\u53ca\u81ea 2030 \u5e74\u8d77\u8981\u6c42\u6240\u6709\u65b0\u6ce8\u518c\u7684\u6c7d\u8f66\u548c\u5fb7\u58eb\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u8f66\u578b\u2014\u2014\u4f46\u5b98\u65b9\u76ee\u6807\u9875\u9762\u5185\u5bb9\u66f4\u8be6\u5c3d\uff0c\u82e5\u5bf9\u5177\u4f53\u6570\u5b57\u6709\u4e89\u8bae\uff0c\u5e94\u4f18\u5148\u53c2\u8003\u8be5\u9875\u9762\uff08[greenplan.gov.sg\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/); [greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\n\n## \u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u4e0e\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u76ee\u6807\n\n\u5728\u201c\u81ea\u7136\u4e2d\u7684\u57ce\u5e02\u201d\u652f\u67f1\u4e0b\uff0c\u65b0\u52a0\u5761\u7684\u76ee\u6807\u662f\u5230 2030 \u5e74\uff0c\u76f8\u8f83\u4e8e 2020\u20132030 \u5e74\u8def\u5f84\u5c06\u5e74\u5ea6\u690d\u6811\u901f\u5ea6\u63d0\u9ad8\u4e00\u500d\uff0c\u4ece\u800c\u591a\u79cd\u690d\u4e00\u767e\u4e07\u68f5\u6811\uff1b\u4e0e 2020 \u5e74\u57fa\u51c6\u76f8\u6bd4\uff0c\u5c06\u81ea\u7136\u516c\u56ed\u7528\u5730\u9762\u79ef\u589e\u52a0\u8d85\u8fc7 50%\uff1b\u5e76\u8ba9\u6bcf\u6237\u5bb6\u5ead\u6b65\u884c 10 \u5206\u949f\u5373\u53ef\u5230\u8fbe\u516c\u56ed\u3002\u6b64\u5916\uff0c\u8ba1\u5212\u8fd8\u8bbe\u6709 2026 \u5e74\u7684\u9636\u6bb5\u6027\u516c\u56ed\u5f00\u53d1\u76ee\u6807\uff0c\u4ee5\u53ca\u5230 2035 \u5e74\u589e\u52a0 1,000 \u516c\u9877\u7eff\u5730\u7684\u76ee\u6807\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u201c\u53ef\u6301\u7eed\u751f\u6d3b\u201d\u5c06\u8d44\u6e90\u4f7f\u7528\u76ee\u6807\u4e0e\u51fa\u884c\u53ca\u5b66\u6821\u76ee\u6807\u76f8\u7ed3\u5408\u3002\u5230 2030 \u5e74\uff0c\u5bb6\u5ead\u4eba\u5747\u65e5\u7528\u6c34\u91cf\u987b\u964d\u81f3 130 \u5347\uff1b\u89e3\u8bfb\u8fd9\u4e00\u6570\u5b57\u65f6\u5e94\u7ed3\u5408[\u6c34\u8d44\u6e90\u6545\u4e8b](\/zh\/knowledge\/article\/sgkb.environment-sustainability.water-story)\uff0c\u800c\u4e0d\u5e94\u5c06\u5176\u89c6\u4e3a\u4e00\u9879\u72ec\u7acb\u7684\u6c34\u5b89\u5168\u8ba1\u5212\u3002\u9001\u5f80\u586b\u57cb\u573a\u7684\u5e9f\u5f03\u7269\u987b\u5728 2026 \u5e74\u524d\u6309\u4eba\u5747\u6bcf\u65e5\u8ba1\u7b97\u51cf\u5c11 20%\uff0c\u5230 2030 \u5e74\u51cf\u5c11 30%\uff1b\u8fd9\u4e5f\u662f\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u4e0e\u711a\u5316\u53ca[\u5b9e\u9a6c\u9ad8](\/zh\/knowledge\/article\/sgkb.environment-sustainability.semakau-and-waste)\u7cfb\u7edf\u76f8\u8854\u63a5\u7684\u73af\u8282\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5728\u901a\u52e4\u65b9\u9762\uff0c\u8ba1\u5212\u76ee\u6807\u662f\u5230 2030 \u5e74\uff0c\u516c\u5171\u4ea4\u901a\uff08\u94c1\u8def\u4e0e\u5df4\u58eb\uff09\u5728\u9ad8\u5cf0\u65f6\u6bb5\u7684\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\u8fbe\u5230 75%\uff0c\u5230 2040 \u5e74\u5347\u81f3 80% \u4ee5\u4e0a\uff1b\u5230 2040 \u5e74\uff0c\u516c\u5171\u3001\u6d3b\u8dc3\u548c\u5171\u4eab\u51fa\u884c\u65b9\u5f0f\u5408\u8ba1\u5360\u9ad8\u5cf0\u65f6\u6bb5\u51fa\u884c\u7684\u5341\u5206\u4e4b\u4e5d\u3002\u914d\u5957\u8bbe\u65bd\u5305\u62ec\uff1a\u5230 2030 \u5e74\uff0c\u7535\u52a8\u5df4\u58eb\u5360\u516c\u5171\u5df4\u58eb\u8f66\u961f\u7684\u4e00\u534a\uff1b\u5230 2040 \u5e74\uff0c\u4ee5\u66f4\u6e05\u6d01\u80fd\u6e90\u5df4\u58eb\u53d6\u4ee3\u67f4\u6cb9\u5df4\u58eb\uff1b\u5230 2030 \u5e74\u4ee3\u521d\u5c06\u94c1\u8def\u7f51\u6269\u5c55\u81f3 360 \u516c\u91cc\uff1b\u4ee5\u53ca\u5c06\u811a\u8e0f\u8f66\u9053\u6269\u5c55\u81f3\u7ea6 1,300 \u516c\u91cc\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5b66\u6821\u987b\u5728 2030 \u5e74\u524d\u5c06\u51c0\u78b3\u6392\u653e\u51cf\u5c11\u4e09\u5206\u4e4b\u4e8c\uff0c\u5e76\u81f3\u5c11\u8ba9 20% \u7684\u5b66\u6821\u5b9e\u73b0\u78b3\u4e2d\u548c\uff08[greenplan.gov.sg \u76ee\u6807\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u8fd9\u4e9b\u51fa\u884c\u65b9\u5f0f\u5360\u6bd4\u4e0e\u94c1\u8def\u76ee\u6807\u4e0e[\u516c\u5171\u4ea4\u901a\u7cfb\u7edf](\/zh\/knowledge\/article\/sgkb.transport.public-transport-system)\u548c[\u672a\u6765\u94c1\u8def\u9879\u76ee](\/zh\/knowledge\/article\/sgkb.transport.future-rail-projects)\u89c4\u5212\u76f8\u4e92\u5173\u8054\uff1b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u89c4\u5b9a\u76ee\u6807\uff0c\u4ea4\u901a\u673a\u6784\u8d1f\u8d23\u94c1\u8def\u7ebf\u8def\u548c\u5df4\u58eb\u3002\n\n## \u201c\u80fd\u6e90\u91cd\u7f6e\u201d\uff1a\u592a\u9633\u80fd\u3001\u8fdb\u53e3\u80fd\u6e90\u3001\u5efa\u7b51\u4e0e\u8f66\u8f86\n\n\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u662f\u6700\u5bb9\u6613\u53d7\u5230\u76ee\u6807\u4fee\u8ba2\u5f71\u54cd\u7684\u652f\u67f1\uff0c\u56e0\u4e3a\u65b0\u52a0\u5761\u53ef\u7528\u7684\u56fd\u5185\u53ef\u518d\u751f\u80fd\u6e90\u9009\u9879\u6709\u9650\u3002\u592a\u9633\u80fd\u4ecd\u662f\u65b0\u52a0\u5761\u4e3b\u8981\u7684\u56fd\u5185\u7535\u529b\u53ef\u518d\u751f\u80fd\u6e90\uff1a\u65b0\u52a0\u5761\u5728 2025 \u5e74\u8fbe\u5230 2 GWp \u7684\u88c5\u673a\u5bb9\u91cf\uff0c\u6bd4\u539f\u5b9a\u201c\u5230 2030 \u5e74\u81f3\u5c11\u8fbe\u5230 2 GWp\u201d\u7684\u91cc\u7a0b\u7891\u63d0\u524d\u4e94\u5e74\u5b9e\u73b0\uff1b\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\uff08EMA\uff09\u4e8e 2026 \u5e74\u4e09\u6708 2 \u65e5\u5c06 2030 \u5e74\u592a\u9633\u80fd\u90e8\u7f72\u76ee\u6807\u63d0\u9ad8\u81f3 3 GWp\uff0c\u5e76\u6307\u51fa 3 GWp \u6bcf\u5e74\u53ef\u53d1\u7535\u7ea6 2,800 GWh\uff0c\u8db3\u4ee5\u4f9b\u5e94\u7ea6\u4e94\u5341\u4e07\u6237\u5bb6\u5ead\uff08[EMA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff09\u3002\u4e00\u4e9b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u5728\u8be5\u516c\u544a\u53d1\u5e03\u540e\u4ecd\u5217\u51fa\u65e7\u7684\u201c\u5230 2030 \u5e74\u81f3\u5c11\u8fbe\u5230 2 GWp\u201d\u63aa\u8f9e\uff0c\u56e0\u6b64\u8bfb\u8005\u5e94\u4ee5 EMA \u4e8e 2026 \u5e74\u4e09\u6708\u53d1\u5e03\u7684\u516c\u544a\u4e3a\u5f53\u524d\u592a\u9633\u80fd\u76ee\u6807\uff0c\u5e76\u5c06\u4ecd\u672a\u66f4\u65b0\u7684\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u5185\u5bb9\u89c6\u4e3a\u8fc7\u65f6\u4fe1\u606f\uff08[\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002EMA \u8fd8\u6307\u51fa\uff0c\u5230 2050 \u5e74\uff0c\u592a\u9633\u80fd\u73b0\u5b9e\u4e2d\u53ea\u80fd\u6ee1\u8db3\u65b0\u52a0\u5761\u9884\u8ba1\u80fd\u6e90\u9700\u6c42\u7684\u7ea6 10%\uff0c\u56e0\u6b64\u540c\u4e00\u652f\u67f1\u4e5f\u5f3a\u8c03\u533a\u57df\u7535\u529b\u8fdb\u53e3\uff08[EMA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/news-events\/news\/media-releases\/2026\/Singapore-to-Accelerate-Solar-Deployment-to-Meet-3-GWp-Solar-Target-by-2030)\uff09\u3002\u4e00\u4e9b\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u4ecd\u5f15\u7528\u8f83\u65e9\u7684\u201c\u5230 2035 \u5e74\u8fdb\u53e3\u6700\u591a 4 GW\u201d\u7684\u76ee\u6807\uff1bEMA \u7684\u533a\u57df\u7535\u7f51\u9875\u9762\uff08\u4e8e 2025 \u5e74\u5341\u6708\u66f4\u65b0\uff09\u5217\u51fa\u7684\u5f53\u524d\u76ee\u6807\u662f\u5230 2035 \u5e74\u8fdb\u53e3\u7ea6 **6 GW** \u4f4e\u78b3\u7535\u529b\u2014\u2014\u5c4a\u65f6\u7ea6\u5360\u9884\u8ba1\u80fd\u6e90\u9700\u6c42\u7684\u4e09\u5206\u4e4b\u4e00\u2014\u2014\u56e0\u6b64\u8bfb\u8005\u5e94\u4ee5 6 GW \u4e3a\u5f53\u524d\u76ee\u6807\uff0c\u5e76\u5c06\u4ecd\u672a\u66f4\u65b0\u7684\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u4e2d 4 GW \u7684\u5185\u5bb9\u89c6\u4e3a\u5df2\u88ab\u53d6\u4ee3\uff08[EMA \u533a\u57df\u7535\u7f51\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/our-energy-story\/energy-supply\/regional-power-grids); [\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); \u5e02\u573a\u4e0e\u7535\u7f51\u8be6\u60c5\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff09\u3002\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u9875\u9762\u5217\u51fa\u7684\u80fd\u6e90\u50a8\u5b58\u76ee\u6807\u5305\u62ec\uff1a\u5df2\u4e8e 2022 \u5e74\u5341\u4e8c\u6708\u6807\u8bb0\u4e3a\u5b8c\u6210\u7684 200 MWh \u50a8\u80fd\u7cfb\u7edf\uff08ESS\uff09\u90e8\u7f72\u76ee\u6807\uff0c\u4ee5\u53ca\u201c\u80fd\u6e90\u91cd\u7f6e\u201d\u9875\u9762\u63d0\u5230\u7684\u88d5\u5eca\u5c9b 285 MWh \u7cfb\u7edf\uff0c\u540c\u65f6\u8fd8\u5305\u62ec\u6c22\u80fd\u548c\u6548\u7387\u66f4\u9ad8\u7684\u71c3\u6c14\u53d1\u7535\u5382\uff08[\u80fd\u6e90\u91cd\u7f6e\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/key-focus-areas\/energy-reset\/); [\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5230 2030 \u5e74\uff0c\u6309\u603b\u697c\u9762\u9762\u79ef\u8ba1\u7b97\uff0c80% \u7684\u5efa\u7b51\u987b\u8fbe\u5230\u7eff\u8272\u6807\u51c6\uff1b\u4ece 2030 \u5e74\u8d77\uff0c80% \u7684\u65b0\u5efa\u7b51\u987b\u8fbe\u5230\u8d85\u4f4e\u80fd\u8017\u6807\u51c6\uff1b\u6700\u4f18\u7684\u7eff\u8272\u5efa\u7b51\u987b\u6bd4 2005 \u5e74\u6c34\u5e73\u8282\u80fd 80%\uff1b\u73b0\u6709\u5efa\u5c4b\u53d1\u5c55\u5c40\uff08HDB\uff09\u5e02\u9547\u987b\u5728 2030 \u5e74\u524d\u5c06\u80fd\u8017\u51cf\u5c11 15%\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u5728\u8f66\u8f86\u65b9\u9762\uff0c\u81ea 2025 \u5e74\u8d77\u505c\u6b62\u65b0\u6ce8\u518c\u67f4\u6cb9\u6c7d\u8f66\u548c\u5fb7\u58eb\uff1b\u4ece 2030 \u5e74\u8d77\uff0c\u6240\u6709\u65b0\u6ce8\u518c\u6c7d\u8f66\u548c\u5fb7\u58eb\u987b\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\u8f66\u578b\uff1b\u5230 2030 \u5e74\u8bbe\u7acb 60,000 \u4e2a\u7535\u52a8\u6c7d\u8f66\u5145\u7535\u70b9\uff1b\u5230 2025 \u5e74\u8ba9\u6240\u6709\u5efa\u5c4b\u53d1\u5c55\u5c40\u5e02\u9547\u5177\u5907\u7535\u52a8\u6c7d\u8f66\u5c31\u7eea\u6761\u4ef6\uff1b\u5230 2040 \u5e74\u8ba9\u6240\u6709\u8f66\u8f86\u4f7f\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u4ece 2030 \u5e74\u8d77\uff0c\u9002\u7528\u4e8e\u6a1f\u5b9c\u673a\u573a\u7a7a\u4fa7\u8f66\u8f86\u4ee5\u53ca\u65b0\u52a0\u5761\u6e2f\u53e3\u6c34\u57df\u65b0\u6e2f\u53e3\u8239\u8247\u7684\u89c4\u5b9a\u4e5f\u8981\u6c42\u5176\u91c7\u7528\u66f4\u6e05\u6d01\u80fd\u6e90\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\n\n## \u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u3001\u201c\u97e7\u6027\u672a\u6765\u201d\u4e0e\u201c30 by 30\u201d\u7cae\u98df\u76ee\u6807\n\n\u201c\u7eff\u8272\u7ecf\u6d4e\u201d\u652f\u67f1\u7684\u65b9\u5411\u6027\u8f83\u5f3a\uff0c\u800c\u975e\u4e00\u4efd\u5305\u542b\u5355\u4e00\u6570\u503c\u5173\u952e\u7ee9\u6548\u6307\u6807\u7684\u6e05\u5355\uff1a\u65b0\u52a0\u5761\u5e0c\u671b\u5438\u5f15\u5728\u80fd\u6e90\u4e0e\u78b3\u6548\u7387\u65b9\u9762\u8fbe\u5230\u4e1a\u754c\u9886\u5148\u6c34\u5e73\u7684\u65b0\u6295\u8d44\uff1b\u5c06\u88d5\u5eca\u5c9b\u6253\u9020\u4e3a\u53ef\u6301\u7eed\u80fd\u6e90\u4e0e\u5316\u5de5\u56ed\u533a\uff1b\u5c06\u65b0\u52a0\u5761\u5b9a\u4f4d\u4e3a\u53ef\u6301\u7eed\u65c5\u6e38\u76ee\u7684\u5730\u3001\u670d\u52a1\u4e9a\u6d32\u8f6c\u578b\u7684\u7eff\u8272\u91d1\u878d\u4e0e\u78b3\u670d\u52a1\u67a2\u7ebd\uff0c\u4ee5\u53ca\u53ef\u6301\u7eed\u89e3\u51b3\u65b9\u6848\u533a\u57df\u4e2d\u5fc3\uff0c\u540c\u65f6\u57f9\u80b2\u672c\u5730\u4f01\u4e1a\u628a\u63e1\u8fd9\u4e9b\u5e02\u573a\u673a\u9047\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u201c\u97e7\u6027\u672a\u6765\u201d\u5c06\u6c14\u5019\u9002\u5e94\u4e0e\u7cae\u98df\u5b89\u5168\u8054\u7cfb\u8d77\u6765\u3002\u5230 2030 \u5e74\uff0c\u987b\u5b8c\u6210\u5e02\u533a\u2014\u4e1c\u6d77\u5cb8\u3001\u897f\u5317\u6d77\u5cb8\uff08\u6797\u539d\u6e2f\u548c\u53cc\u6eaa\u52a0\u682a\uff09\u53ca\u88d5\u5eca\u5c9b\u7684\u6d77\u5cb8\u9632\u62a4\u89c4\u5212\u2014\u2014\u8fd9\u662f\u8fdb\u5165[\u6d77\u5cb8\u9632\u62a4](\/zh\/knowledge\/article\/sgkb.environment-sustainability.coastal-protection)\u4e2d\u8be6\u8ff0\u7684\u91cd\u5927\u6d77\u5cb8\u5de5\u7a0b\u4e4b\u524d\u7684\u89c4\u5212\u6b65\u9aa4\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u540c\u4e00\u652f\u67f1\u8fd8\u5305\u542b\u519c\u4e1a\u98df\u54c1\u9886\u57df\u7684\u201c30 by 30\u201d\u76ee\u6807\uff1a\u63d0\u5347\u80fd\u529b\u4e0e\u4ea7\u80fd\uff0c\u5230 2030 \u5e74\u5728\u672c\u5730\u4ee5\u53ef\u6301\u7eed\u65b9\u5f0f\u751f\u4ea7\u65b0\u52a0\u5761 30% \u7684\u8425\u517b\u9700\u6c42\uff08[\u76ee\u6807\u9875\u9762\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.greenplan.gov.sg\/targets\/)\uff09\u3002\u8fd9\u4e00\u7cae\u98df\u76ee\u6807\u7ecf\u5e38\u5728\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u54c1\u724c\u4ee5\u5916\u88ab\u5f15\u7528\u2014\u2014\u5305\u62ec\u5728[\u7ecf\u6d4e\u6982\u89c8](\/zh\/knowledge\/article\/sgkb.economy-finance.economy-overview)\u4e2d\u2014\u2014\u4f46\u5b83\u5728\u53ef\u6301\u7eed\u53d1\u5c55\u8bae\u7a0b\u4e2d\u7684\u89c4\u8303\u6027\u5f52\u5c5e\u9875\u9762\u662f\u672c\u6587\u3002\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u672c\u8eab\u65e0\u6cd5\u6d88\u9664\u7684\u533a\u57df\u73af\u5883\u98ce\u9669\uff0c\u7279\u522b\u662f[\u8de8\u5883\u70df\u973e](\/zh\/knowledge\/article\/sgkb.environment-sustainability.haze)\uff0c\u4ecd\u5c5e\u4e8e\u72ec\u7acb\u7684\u5916\u4ea4\u4e0e\u6cd5\u89c4\u8f68\u9053\uff0c\u5373\u4f7f\u56fd\u5185\u51cf\u6392\u4e0e\u7eff\u5316\u9879\u76ee\u4e0d\u65ad\u52a0\u5feb\u4ea6\u7136\u3002\n\n## 2050 \u5e74\u51c0\u96f6\u6392\u653e\u30012030 \u5e74\u56fd\u5bb6\u81ea\u4e3b\u8d21\u732e\u4e0e\u78b3\u7a0e\n\n\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7684\u5341\u5e74\u76ee\u6807\u5904\u4e8e\u4e00\u6761\u66f4\u957f\u671f\u7684\u6c14\u5019\u53d1\u5c55\u8f68\u8ff9\u4e4b\u4e0b\u3002\u8be5\u8f68\u8ff9\u4e8e 2022 \u5e74\u5341\u6708\u516c\u5e03\uff1a\u65b0\u52a0\u5761\u5c06\u628a 2050 \u5e74\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\u4f5c\u4e3a\u5176\u300a\u957f\u671f\u4f4e\u6392\u653e\u53d1\u5c55\u6218\u7565\u300b\uff0c\u5e76\u4fee\u8ba2 2030 \u5e74\u56fd\u5bb6\u81ea\u4e3b\u8d21\u732e\uff0c\u627f\u8bfa\u5728\u6392\u653e\u8f83\u65e9\u8fbe\u5cf0\u540e\u4e8e 2030 \u5e74\u5c06\u6392\u653e\u91cf\u51cf\u81f3\u7ea6 60 MtCO2e\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002MSE \u660e\u786e\u8868\u793a\uff0c\u8fd9\u4e9b\u627f\u8bfa\u4ee5\u6c22\u80fd\u548c\u78b3\u6355\u96c6\u7b49\u65b9\u6848\u5728\u6280\u672f\u4e0e\u7ecf\u6d4e\u4e0a\u7684\u53ef\u884c\u6027\uff0c\u4ee5\u53ca\u5305\u62ec\u78b3\u4fe1\u7528\u548c\u53ef\u518d\u751f\u7535\u529b\u8fdb\u53e3\u5728\u5185\u7684\u56fd\u9645\u5408\u4f5c\u4e3a\u524d\u63d0\u2014\u2014\u8fd9\u5766\u7387\u627f\u8ba4\uff0c\u7f3a\u4e4f\u66ff\u4ee3\u80fd\u6e90\u6761\u4ef6\u7684\u57ce\u90a6\u4e0d\u80fd\u5c06\u56fd\u5185\u592a\u9633\u80fd\u89c6\u4e3a\u8db3\u591f\u7684\u89e3\u51b3\u65b9\u6848\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002\u516c\u5171\u90e8\u95e8\u7684 GreenGov.SG \u8ba1\u5212\u76ee\u6807\u662f\u5728 2045 \u5e74\u5de6\u53f3\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\uff0c\u524d\u63d0\u540c\u6837\u662f\u6280\u672f\u4e0e\u5408\u4f5c\u6761\u4ef6\uff1b\u88d5\u5eca\u6e56\u533a\u7684\u76ee\u6807\u662f\u65b0\u5f00\u53d1\u9879\u76ee\u5728\u76f8\u8fd1\u65f6\u95f4\u8303\u56f4\u5185\u5b9e\u73b0\u51c0\u96f6\u6392\u653e\uff08[MSE\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.mse.gov.sg\/latest-news\/press-release-on-singapore-commits-to-achieve-net-zero-emissions-by-2050\/)\uff09\u3002\u5168\u7ecf\u6d4e\u8303\u56f4\u5185\u7684\u4e3b\u8981\u4ef7\u683c\u4fe1\u53f7\u662f\u300a2018 \u5e74\u78b3\u5b9a\u4ef7\u6cd5\u4ee4\u300b\u4e0b\u7684\u78b3\u7a0e\uff0c\u9002\u7528\u4e8e\u5e74\u5ea6\u76f4\u63a5\u6e29\u5ba4\u6c14\u4f53\u6392\u653e\u91cf\u81f3\u5c11\u4e3a 25,000 tCO2e \u7684\u5de5\u4e1a\u8bbe\u65bd\u30022019 \u5e74\u81f3 2023 \u5e74\u7684\u521d\u59cb\u7a0e\u7387\u4e3a\u6bcf\u5428 5 \u65b0\u5143\u540e\uff0c2024\u20132025 \u5e74\u7a0e\u7387\u4e3a\u6bcf\u5428 25 \u65b0\u5143\uff0c2026\u20132027 \u5e74\u4e3a\u6bcf\u5428 45 \u65b0\u5143\uff0c\u76ee\u6807\u662f\u5728 2030 \u5e74\u8fbe\u5230\u6bcf\u5428 50\u201380 \u65b0\u5143\uff1b\u81ea 2024 \u5e74\u8d77\uff0c\u5e94\u7a0e\u8bbe\u65bd\u53ef\u4f7f\u7528\u7b26\u5408\u6761\u4ef6\u7684\u56fd\u9645\u78b3\u4fe1\u7528\u62b5\u6d88\u6700\u591a 5% \u7684\u5e94\u7a0e\u6392\u653e\u91cf\uff08[NEA\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.nea.gov.sg\/OUR-SERVICES\/CLIMATE-CHANGE-ENERGY-EFFICIENCY\/CLIMATE-CHANGE\/CARBON-TAX)\uff1b\u53e6\u89c1[\u5e74\u5ea6\u7a0e\u7387](\/zh\/knowledge\/dataset\/sgkb.data.annual-rates)\uff09\u3002\u56e0\u6b64\uff0c\u7eff\u8272\u53d1\u5c55\u84dd\u56fe\u7ed3\u5408\u4e86\u9879\u76ee\u76ee\u6807\u3001\u57fa\u7840\u8bbe\u65bd\u5efa\u8bbe\u548c\u9010\u6b65\u4e0a\u8c03\u7684\u78b3\u4ef7\uff0c\u5e76\u975e\u4f9d\u9760\u5355\u4e00\u624b\u6bb5\uff1b\u6b63\u5982 2026 \u5e74\u63d0\u9ad8\u592a\u9633\u80fd\u76ee\u6807\u6240\u793a\uff0c\u5f53\u5404\u673a\u6784\u5728\u5341\u5e74\u4e2d\u671f\u4fee\u8ba2\u76ee\u6807\u65f6\uff0c\u76f8\u5173\u6570\u5b57\u4e5f\u4f1a\u53d8\u5316\u3002"},"related":[{"id":90240,"source_id":"sgkb.environment-sustainability.city-in-nature-research-programme","kind":"article","title_en":"City in Nature Research Programme","title_zh":"\u81ea\u7136\u4e4b\u57ce\u7814\u7a76\u8ba1\u5212","assurance":null,"subtype":null},{"id":90245,"source_id":"sgkb.environment-sustainability.coastal-protection","kind":"article","title_en":"Coastal Protection","title_zh":"\u6d77\u5cb8\u9632\u62a4","assurance":null,"subtype":null},{"id":89679,"source_id":"sgkb.business-industry.data-centre-industry","kind":"article","title_en":"Data Centre Industry","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a","assurance":null,"subtype":null},{"id":90246,"source_id":"sgkb.environment-sustainability.decarbonisation-technology-and-speed","kind":"article","title_en":"Decarbonisation technology and Singapore's SPEED programme","title_zh":"\u8131\u78b3\u6280\u672f\u4e0e\u65b0\u52a0\u5761 SPEED \u8ba1\u5212","assurance":null,"subtype":null},{"id":89688,"source_id":"sgkb.business-industry.electronics-and-semiconductors","kind":"article","title_en":"Electronics and Semiconductors","title_zh":"\u7535\u5b50\u548c\u534a\u5bfc\u4f53","assurance":null,"subtype":null},{"id":90250,"source_id":"sgkb.environment-sustainability.energy-and-power-grid","kind":"article","title_en":"Energy and Power Grid","title_zh":"\u80fd\u6e90\u4e0e\u7535\u7f51","assurance":null,"subtype":null},{"id":90771,"source_id":"sgkb.tourism-attractions.f1-singapore-grand-prix","kind":"article","title_en":"Formula 1 Singapore Grand Prix","title_zh":"\u4e00\u7ea7\u65b9\u7a0b\u5f0f\uff08Formula 1\uff09\u65b0\u52a0\u5761\u5927\u5956\u8d5b","assurance":null,"subtype":null},{"id":90772,"source_id":"sgkb.tourism-attractions.gardens-by-the-bay","kind":"article","title_en":"Gardens by the Bay","title_zh":"\u6ee8\u6d77\u6e7e\u82b1\u56ed","assurance":null,"subtype":null},{"id":89713,"source_id":"sgkb.business-industry.green-economy-regulatory-initiative","kind":"article","title_en":"Green Economy Regulatory Initiative","title_zh":"\u7eff\u8272\u7ecf\u6d4e\u76d1\u7ba1\u5021\u8bae","assurance":null,"subtype":null},{"id":90257,"source_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","kind":"article","title_en":"Higher Green Mark Standard for Government Land Sales","title_zh":"\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6","assurance":null,"subtype":null},{"id":90262,"source_id":"sgkb.environment-sustainability.mandatory-energy-improvement-regime","kind":"article","title_en":"Mandatory Energy Improvement Regime","title_zh":"\u5f3a\u5236\u80fd\u6e90\u6539\u8fdb\u5236\u5ea6","assurance":null,"subtype":null},{"id":90267,"source_id":"sgkb.environment-sustainability.nature-reserves-and-biodiversity","kind":"article","title_en":"Nature Reserves and Biodiversity","title_zh":"\u81ea\u7136\u4fdd\u62a4\u533a\u4e0e\u751f\u7269\u591a\u6837\u6027","assurance":null,"subtype":null},{"id":89751,"source_id":"sgkb.business-industry.petrochemicals-industry","kind":"article","title_en":"Petrochemicals and Chemicals","title_zh":"\u77f3\u6cb9\u5316\u5de5\u4e0e\u5316\u5b66\u54c1","assurance":null,"subtype":null},{"id":90426,"source_id":"sgkb.geography-urban-planning.physical-geography-and-climate","kind":"article","title_en":"Physical Geography and Climate","title_zh":"\u81ea\u7136\u5730\u7406\u4e0e\u6c14\u5019","assurance":null,"subtype":null},{"id":90271,"source_id":"sgkb.environment-sustainability.semakau-and-waste","kind":"article","title_en":"Semakau and Singapore's Waste System","title_zh":"\u5b9e\u9a6c\u9ad8\u4e0e\u65b0\u52a0\u5761\u7684\u5e9f\u5f03\u7269\u7cfb\u7edf","assurance":null,"subtype":null},{"id":90273,"source_id":"sgkb.environment-sustainability.singapore-article-6-cooperation","kind":"article","title_en":"Singapore Article 6 Carbon Markets Cooperation","title_zh":"\u65b0\u52a0\u5761\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u7b2c 6 \u6761\u78b3\u5e02\u573a\u5408\u4f5c","assurance":null,"subtype":null},{"id":90274,"source_id":"sgkb.environment-sustainability.singapore-carbon-markets-programme","kind":"article","title_en":"Singapore Carbon Markets Programme","title_zh":"\u65b0\u52a0\u5761\u78b3\u5e02\u573a\u8ba1\u5212","assurance":null,"subtype":null},{"id":90276,"source_id":"sgkb.environment-sustainability.singapore-environment-council","kind":"article","title_en":"Singapore Environment Council","title_zh":"\u65b0\u52a0\u5761\u73af\u5883\u7406\u4e8b\u4f1a","assurance":null,"subtype":null},{"id":90277,"source_id":"sgkb.environment-sustainability.singapore-environmental-achievement-awards-2026","kind":"article","title_en":"Singapore Environmental Achievement Awards 2026","title_zh":"2026 \u5e74\u65b0\u52a0\u5761\u73af\u5883\u6210\u5c31\u5956","assurance":null,"subtype":null},{"id":90255,"source_id":"sgkb.environment-sustainability.green-building-public-engagement-survey-2020","kind":"article","title_en":"Singapore Green Building Public Engagement Survey 2020","title_zh":"2020 \u5e74\u65b0\u52a0\u5761\u7eff\u8272\u5efa\u7b51\u516c\u4f17\u53c2\u4e0e\u8c03\u67e5","assurance":null,"subtype":null},{"id":90265,"source_id":"sgkb.environment-sustainability.national-adaptation-plan","kind":"article","title_en":"Singapore National Adaptation Plan","title_zh":"\u65b0\u52a0\u5761\u56fd\u5bb6\u6c14\u5019\u9002\u5e94\u8ba1\u5212","assurance":null,"subtype":null},{"id":89801,"source_id":"sgkb.business-industry.sustainable-aviation-fuel-levy-2027","kind":"article","title_en":"Singapore Sustainable Aviation Fuel Levy","title_zh":"\u65b0\u52a0\u5761\u53ef\u6301\u7eed\u822a\u7a7a\u71c3\u6599\u5f81\u8d39","assurance":null,"subtype":null},{"id":90395,"source_id":"sgkb.foreign-relations.sparks-pacific-resilience-knowledge-sharing","kind":"article","title_en":"Singapore-Pacific Resilience and Knowledge Sharing (SPARKS)","title_zh":"\u65b0\u52a0\u5761\u2014\u592a\u5e73\u6d0b\u97e7\u6027\u4e0e\u77e5\u8bc6\u5171\u4eab\u8ba1\u5212\uff08SPARKS\uff09","assurance":null,"subtype":null},{"id":90266,"source_id":"sgkb.environment-sustainability.national-sea-level-programme","kind":"article","title_en":"Singapore's National Sea Level Programme","title_zh":"\u65b0\u52a0\u5761\u56fd\u5bb6\u6d77\u5e73\u9762\u8ba1\u5212","assurance":null,"subtype":null},{"id":90284,"source_id":"sgkb.environment-sustainability.weather-science-research-programme","kind":"article","title_en":"Singapore's Weather Science Research Programme","title_zh":"\u65b0\u52a0\u5761\u6c14\u8c61\u79d1\u5b66\u7814\u7a76\u8ba1\u5212","assurance":null,"subtype":null},{"id":90259,"source_id":"sgkb.environment-sustainability.haze","kind":"article","title_en":"Transboundary Haze","title_zh":"\u8de8\u5883\u70df\u973e","assurance":null,"subtype":null},{"id":90280,"source_id":"sgkb.environment-sustainability.transmission-code-domestic-solar-pv","kind":"article","title_en":"Transmission Code Requirements for Domestic Solar PV","title_zh":"\u56fd\u5185\u592a\u9633\u80fd\u5149\u4f0f\u7684\u8f93\u7535\u89c4\u8303\u8981\u6c42","assurance":null,"subtype":null},{"id":90283,"source_id":"sgkb.environment-sustainability.water-story","kind":"article","title_en":"Water Story","title_zh":"\u6c34\u8d44\u6e90\u6545\u4e8b","assurance":null,"subtype":null},{"id":89907,"source_id":"sgkb.data.annual-rates","kind":"dataset","title_en":"Annual Rates","title_zh":"\u5e74\u5ea6\u8d39\u7387","assurance":null,"subtype":null},{"id":89931,"source_id":"sgkb.data.climate-policy-anchors","kind":"dataset","title_en":"Climate Policy and Carbon Tax Anchors","title_zh":"\u6c14\u5019\u653f\u7b56\u4e0e\u78b3\u7a0e\u57fa\u51c6","assurance":null,"subtype":null},{"id":89932,"source_id":"sgkb.data.coastal-protection-anchors","kind":"dataset","title_en":"Coastal Protection Programme Anchors","title_zh":"\u6d77\u5cb8\u9632\u62a4\u8ba1\u5212\u57fa\u51c6","assurance":null,"subtype":null},{"id":89945,"source_id":"sgkb.data.data-centre-industry-anchors","kind":"dataset","title_en":"Data Centre Industry Anchors","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e","assurance":null,"subtype":null},{"id":89980,"source_id":"sgkb.data.green-plan-anchors","kind":"dataset","title_en":"Green Plan 2030 Programme Anchors","title_zh":"\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030 \u8ba1\u5212\u652f\u67f1","assurance":null,"subtype":null},{"id":90032,"source_id":"sgkb.data.nature-biodiversity-anchors","kind":"dataset","title_en":"Nature Reserves and Biodiversity Anchors","title_zh":"\u81ea\u7136\u4fdd\u62a4\u533a\u4e0e\u751f\u7269\u591a\u6837\u6027\u57fa\u51c6","assurance":null,"subtype":null},{"id":90041,"source_id":"sgkb.data.petrochemicals-anchors","kind":"dataset","title_en":"Petrochemicals and Energy & Chemicals Anchors","title_zh":"\u77f3\u6cb9\u5316\u5de5\u4e0e\u80fd\u6e90\u548c\u5316\u5de5\u4ea7\u4e1a\u5173\u952e\u6570\u636e","assurance":null,"subtype":null},{"id":83226,"source_id":"sg.statute.carbon-pricing-act","kind":"entity","title_en":"Carbon Pricing Act 2018","title_zh":"\u78b3\u5b9a\u4ef7\u6cd5\u4ee4 2018","assurance":null,"subtype":"statute"},{"id":79802,"source_id":"sg.agency.ema","kind":"entity","title_en":"Energy Market Authority","title_zh":"\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40","assurance":null,"subtype":"government-agency"},{"id":79838,"source_id":"sg.agency.mse","kind":"entity","title_en":"Ministry of Sustainability and the Environment","title_zh":"\u6c38\u7eed\u53d1\u5c55\u4e0e\u73af\u5883\u90e8","assurance":null,"subtype":"ministry"},{"id":82178,"source_id":"sg.place.semakau-landfill","kind":"entity","title_en":"Semakau Landfill","title_zh":"\u5b9e\u9a6c\u9ad8\u5783\u573e\u57cb\u7f6e\u573a","assurance":null,"subtype":"offshore-landfill"},{"id":82661,"source_id":"sg.scheme.singapore-green-plan-2030","kind":"entity","title_en":"Singapore Green Plan 2030","title_zh":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030","assurance":null,"subtype":"national-sustainability-plan"},{"id":89851,"source_id":"sgkb.current-affairs.2026-01-carbon-tax-rate","kind":"event-note","title_en":"Carbon Tax S$45 per tCO2e (Emissions Year 2026)","title_zh":"\u78b3\u7a0e\u6bcf\u5428 tCO2e 45 \u65b0\u5143\uff082026 \u6392\u653e\u5e74\u5ea6\uff09","assurance":null,"subtype":null},{"id":80319,"source_id":"sg.geo.island.jurong-island","kind":"geography","title_en":"Jurong Island","title_zh":"\u88d5\u5eca\u5c9b","assurance":null,"subtype":"island"},{"id":92450,"source_id":"sgtopic.environment.climate","kind":"topic","title_en":"Climate and climate change","title_zh":"\u6c14\u5019\u4e0e\u6c14\u5019\u53d8\u5316","assurance":null,"subtype":null},{"id":92466,"source_id":"sgtopic.environment","kind":"topic","title_en":"Environment and sustainability","title_zh":"\u73af\u5883\u4e0e\u53ef\u6301\u7eed\u53d1\u5c55","assurance":null,"subtype":null},{"id":92463,"source_id":"sgtopic.environment.green-plan","kind":"topic","title_en":"Green Plan 2030","title_zh":"\u7eff\u8272\u8ba1\u5212 2030 \u5e74","assurance":null,"subtype":null}]}