{"release_id":19,"data":{"id":90257,"release_id":19,"source_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","kind":"article","fingerprint":"02444fa151b301f7b901d2bac67810194f5c387b9c2e24398c8923b5c7042bd3","title_en":"Higher Green Mark Standard for Government Land Sales","title_zh":"\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6","domain":"environment-sustainability","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-10-24","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["Higher Green Mark GLS standard","GLS Green Mark standard","Green Mark Platinum Super Low Energy GLS"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","document_sha256":"fa4a70696b76dca6cb443afcf4622ba89748d7d5e941a31f5118010083b85db3","document_type":"article","domain":"environment-sustainability","entities":["sg.agency.bca","sg.agency.ura"],"facets":["current","infrastructure","law","policy"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-10-24","path":"environment-sustainability\/green-mark-standards-government-land-sales-2026.md","related":["mandatory-energy-improvement-regime","green-plan-2030","ura-and-master-plan"],"sources":[{"accessed":"2026-10-24","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)","url":"https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"}],"status":"verified","summary":"BCA requires buildings on applicable Government Land Sales sites to meet the Green Mark Platinum Super Low Energy rating with a Maintainability Badge, representing at least 60% better energy efficiency than the 2005 baseline.","tags":["policy","regulation","energy","scheme"],"temporal_scope":"current","title":"Higher Green Mark Standard for Government Land Sales","topics":["sgtopic.environment","sgtopic.environment.green-mark-standards-government-land-sales-2026"],"volatility":"fast"},"date":"2026-10-24","domain":"environment-sustainability","evidence_paths":["source\/environment-sustainability\/green-mark-standards-government-land-sales-2026.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl","artefacts\/mentions.jsonl"],"expected_version":12,"input_hash":"970302d8c290c37b0783f6e480635cb29d933bbcc86de5f9607658c813cfd52a","kind":"article","lineage":[{"chunk_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026#overview","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"],"content_sha256":"fcf8a4983a1e02ce849d36d171a1aeffbfdbe81bcebacfc553481609a5bce5d3","document_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","document_sha256":"fa4a70696b76dca6cb443afcf4622ba89748d7d5e941a31f5118010083b85db3","section_sources":[{"accessed":"2026-10-24","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)","url":"https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026#site-and-badge-requirements","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"],"content_sha256":"caf752652aa901e3374fdf38a98349e0219f24430bef02a805fff9ba96e14e6d","document_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","document_sha256":"fa4a70696b76dca6cb443afcf4622ba89748d7d5e941a31f5118010083b85db3","section_sources":[{"accessed":"2026-10-24","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)","url":"https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026#submission-and-clearance","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"],"content_sha256":"3df0c5f46d54e05ddc5b6e6c6232aeafe13c554e3249ee6927a93b2c48f344c3","document_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","document_sha256":"fa4a70696b76dca6cb443afcf4622ba89748d7d5e941a31f5118010083b85db3","section_sources":[{"accessed":"2026-10-24","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)","url":"https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"}]},{"chunk_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026#relationship-to-older-gls-standards","citation_urls":["https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"],"content_sha256":"b866d6d8350b338b5d280402e7d644dbf780dc38e380f710dba0f432cc8fbf82","document_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","document_sha256":"fa4a70696b76dca6cb443afcf4622ba89748d7d5e941a31f5118010083b85db3","section_sources":[{"accessed":"2026-10-24","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)","url":"https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"}]}],"links":[{"relation":"related","target_id":"sgkb.environment-sustainability.mandatory-energy-improvement-regime"},{"relation":"related","target_id":"sgkb.environment-sustainability.green-plan-2030"},{"relation":"related","target_id":"sgkb.geography-urban-planning.ura-and-master-plan"},{"relation":"topics","target_id":"sgtopic.environment"},{"relation":"topics","target_id":"sgtopic.environment.green-mark-standards-government-land-sales-2026"},{"relation":"entities","target_id":"sg.agency.bca"},{"relation":"entities","target_id":"sg.agency.ura"},{"relation":"mentions","target_id":"sg.scheme.green-mark-v7"}],"locales":{"en":{"markdown":"# Higher Green Mark Standard for Government Land Sales\n\nThe Building and Construction Authority (BCA) requires buildings on applicable **Government Land Sales (GLS)** sites to achieve the **Green Mark Platinum Super Low Energy rating with Maintainability Badge**. BCA describes this as at least **60% better energy efficiency than the 2005 baseline**. This requirement covers developments wholly or partly on GLS land sold on or after **30 June 2022**. The precise certification version is determined by the GLS tender-award letter; BCA says Green Mark Version 7 applies to applications submitted on or after **1 April 2027** ([BCA, page rechecked 24 October 2026; last updated 23 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)).\n\n## Site and badge requirements\n\nFor applicable GLS land sold on or after 30 June 2022, the prescribed standard is Green Mark Platinum (Super Low Energy) with the Maintainability Badge. Projects in Jurong Lake District and Marina South must also be on applicable GLS land sold on or after 2 December 2022 **and within the mapped red-boundary areas**: they require the Whole Life Carbon Badge, plus the Intelligence Badge in Jurong Lake District or the Health & Wellbeing Badge in Marina South ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). The extra badges are area-specific requirements; the general all-GLS requirement should not be confused with the more demanding district-specific combinations. Check BCA's maps and the GLS tender-award letter to identify the applicable certification package.\n\n## Submission and clearance\n\nBefore submitting building plans, the Qualified Person must apply to BCA for assessment and certification under the Green Mark scheme. The project submission must include the endorsed Green Mark application form or provisional certificate\/letter; the project must later provide the relevant provisional or full certificate for Temporary Occupation Permit clearance and the full certificate for Certificate of Statutory Completion clearance. After occupation, the project team must provide operational data to BCA to initiate verification for the full certificate ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). These are project compliance and certification steps, not a grant application.\n\n## Relationship to older GLS standards\n\nThe higher Platinum Super Low Energy standard is part of a staged GLS framework. BCA lists earlier requirements for land sold before 30 June 2022, including Green Mark GoldPLUS or Platinum standards in selected strategic areas and older certification versions tied to tender-award periods. The GLS land-sale threshold identifies the applicable scope, while the tender-award letter and the date of Green Mark application determine the certification version, including the Version 7 transition from 1 April 2027 ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). A building's requirement therefore depends on the land-sale date, mapped location, tender conditions and application date; the 60% figure is not a universal standard for every Singapore building.","summary":"BCA requires buildings on applicable Government Land Sales sites to meet the Green Mark Platinum Super Low Energy rating with a Maintainability Badge, representing at least 60% better energy efficiency than the 2005 baseline.","title":"Higher Green Mark Standard for Government Land Sales"},"zh":{"markdown":"# \u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u8981\u6c42\u9002\u7528\u7684**\u653f\u5e9c\u552e\u5730\u8ba1\u5212\uff08GLS\uff09**\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230**\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0**\u3002BCA \u5c06\u6b64\u63cf\u8ff0\u4e3a\u80fd\u6e90\u6548\u7387\u6bd4 **2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%**\u3002\u6b64\u8981\u6c42\u6db5\u76d6\u4e8e **2022 \u5e74\u516d\u6708 30 \u65e5**\u6216\u4e4b\u540e\u51fa\u552e\u7684\u5168\u90e8\u6216\u90e8\u5206\u4f4d\u4e8e GLS \u571f\u5730\u4e0a\u7684\u5f00\u53d1\u9879\u76ee\u3002\u5177\u4f53\u8ba4\u8bc1\u7248\u672c\u7531 GLS \u62db\u6807\u6388\u6807\u51fd\u786e\u5b9a\uff1bBCA \u8868\u793a\uff0c**2027 \u5e74\u56db\u6708 1 \u65e5**\u6216\u4e4b\u540e\u63d0\u4ea4\u7684\u7533\u8bf7\u9002\u7528\u7eff\u8272\u6807\u5fd7\u7b2c 7 \u7248\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5\uff1b\u6700\u540e\u66f4\u65b0\u4e8e 2026 \u5e74\u5341\u6708 23 \u65e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\n\n## \u5730\u6bb5\u548c\u5fbd\u7ae0\u8981\u6c42\n\n\u5bf9\u4e8e\u4e8e 2022 \u5e74\u516d\u6708 30 \u65e5\u6216\u4e4b\u540e\u51fa\u552e\u7684\u9002\u7528 GLS \u571f\u5730\uff0c\u89c4\u5b9a\u6807\u51c6\u4e3a\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\uff08\u8d85\u4f4e\u80fd\u8017\uff09\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\u3002\u88d5\u5eca\u6e56\u533a\u548c\u6ee8\u6d77\u5357\u533a\u7684\u9879\u76ee\u8fd8\u5fc5\u987b\u4f4d\u4e8e\u4e8e 2022 \u5e74\u5341\u4e8c\u6708 2 \u65e5\u6216\u4e4b\u540e\u51fa\u552e\u7684\u9002\u7528 GLS \u571f\u5730\u4e0a\uff0c**\u4e14\u4f4d\u4e8e\u5730\u56fe\u6240\u793a\u7684\u7ea2\u8272\u8fb9\u754c\u533a\u57df\u5185**\uff1a\u8fd9\u4e9b\u9879\u76ee\u987b\u83b7\u5f97\u5168\u751f\u547d\u5468\u671f\u78b3\u5fbd\u7ae0\uff0c\u4ee5\u53ca\u88d5\u5eca\u6e56\u533a\u7684\u667a\u80fd\u5fbd\u7ae0\u6216\u6ee8\u6d77\u5357\u533a\u7684\u5065\u5eb7\u4e0e\u798f\u7949\u5fbd\u7ae0\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u989d\u5916\u5fbd\u7ae0\u5c5e\u4e8e\u7279\u5b9a\u533a\u57df\u8981\u6c42\uff1b\u4e0d\u5e94\u5c06\u9002\u7528\u4e8e\u6240\u6709 GLS \u5730\u6bb5\u7684\u4e00\u822c\u8981\u6c42\u4e0e\u8981\u6c42\u66f4\u4e25\u683c\u7684\u5730\u533a\u7279\u5b9a\u7ec4\u5408\u6df7\u4e3a\u4e00\u8c08\u3002\u8bf7\u67e5\u9605 BCA \u5730\u56fe\u548c GLS \u62db\u6807\u6388\u6807\u51fd\uff0c\u4ee5\u786e\u5b9a\u9002\u7528\u7684\u8ba4\u8bc1\u7ec4\u5408\u3002\n\n## \u63d0\u4ea4\u548c clearance\n\n\u63d0\u4ea4\u5efa\u7b51\u56fe\u5219\u4e4b\u524d\uff0c\u5408\u683c\u4eba\u58eb\u5fc5\u987b\u5411 BCA \u7533\u8bf7\u6309\u7167\u7eff\u8272\u6807\u5fd7\u8ba1\u5212\u8fdb\u884c\u8bc4\u4f30\u548c\u8ba4\u8bc1\u3002\u9879\u76ee\u63d0\u4ea4\u6750\u6599\u5fc5\u987b\u5305\u62ec\u7ecf\u8ba4\u53ef\u7684\u7eff\u8272\u6807\u5fd7\u7533\u8bf7\u8868\u6216\u4e34\u65f6\u8bc1\u4e66\uff0f\u51fd\u4ef6\uff1b\u4e4b\u540e\uff0c\u9879\u76ee\u987b\u63d0\u4f9b\u76f8\u5173\u4e34\u65f6\u6216\u5b8c\u6574\u8bc1\u4e66\u4ee5\u529e\u7406\u4e34\u65f6\u5165\u4f19\u51c6\u8bc1 clearance\uff0c\u5e76\u63d0\u4f9b\u5b8c\u6574\u8bc1\u4e66\u4ee5\u529e\u7406\u6cd5\u5b9a\u5b8c\u5de5\u8bc1\u4e66 clearance\u3002\u5165\u4f19\u540e\uff0c\u9879\u76ee\u56e2\u961f\u5fc5\u987b\u5411 BCA \u63d0\u4f9b\u8fd0\u8425\u6570\u636e\uff0c\u4ee5\u542f\u52a8\u5b8c\u6574\u8bc1\u4e66\u7684\u6838\u9a8c\u7a0b\u5e8f\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u8fd9\u4e9b\u662f\u9879\u76ee\u5408\u89c4\u548c\u8ba4\u8bc1\u6b65\u9aa4\uff0c\u5e76\u975e\u8865\u52a9\u7533\u8bf7\u3002\n\n## \u4e0e\u8f83\u65e9 GLS \u6807\u51c6\u7684\u5173\u7cfb\n\n\u8f83\u9ad8\u7684\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u6807\u51c6\u662f\u5206\u9636\u6bb5\u63a8\u884c\u7684 GLS \u6846\u67b6\u7684\u4e00\u90e8\u5206\u3002BCA \u5217\u51fa\u4e86\u4e8e 2022 \u5e74\u516d\u6708 30 \u65e5\u4e4b\u524d\u51fa\u552e\u571f\u5730\u7684\u8f83\u65e9\u8981\u6c42\uff0c\u5305\u62ec\u7279\u5b9a\u6218\u7565\u533a\u57df\u7684\u7eff\u8272\u6807\u5fd7 GoldPLUS \u6216\u767d\u91d1\u7ea7\u6807\u51c6\uff0c\u4ee5\u53ca\u4e0e\u62db\u6807\u6388\u6807\u671f\u95f4\u76f8\u5173\u7684\u8f83\u65e9\u8ba4\u8bc1\u7248\u672c\u3002GLS \u571f\u5730\u51fa\u552e\u65e5\u671f\u95e8\u69db\u7528\u4e8e\u786e\u5b9a\u9002\u7528\u8303\u56f4\uff0c\u800c\u62db\u6807\u6388\u6807\u51fd\u548c\u7eff\u8272\u6807\u5fd7\u7533\u8bf7\u65e5\u671f\u51b3\u5b9a\u8ba4\u8bc1\u7248\u672c\uff0c\u5305\u62ec\u81ea 2027 \u5e74\u56db\u6708 1 \u65e5\u8d77\u8fc7\u6e21\u5230\u7b2c 7 \u7248\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u56e0\u6b64\uff0c\u5efa\u7b51\u9002\u7528\u7684\u8981\u6c42\u53d6\u51b3\u4e8e\u571f\u5730\u51fa\u552e\u65e5\u671f\u3001\u5730\u56fe\u6240\u793a\u4f4d\u7f6e\u3001\u62db\u6807\u6761\u4ef6\u548c\u7533\u8bf7\u65e5\u671f\uff1b60% \u7684\u6570\u5b57\u5e76\u975e\u9002\u7528\u4e8e\u65b0\u52a0\u5761\u6bcf\u680b\u5efa\u7b51\u7684\u901a\u7528\u6807\u51c6\u3002","summary":"\u5efa\u8bbe\u5c40\u8981\u6c42\u9002\u7528\u7684\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\uff0c\u5176\u80fd\u6e90\u6548\u7387\u987b\u6bd4 2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%\u3002","title":"\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6"}},"source_id":"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026","status":"verified","summary_en":"BCA requires buildings on applicable Government Land Sales sites to meet the Green Mark Platinum Super Low Energy rating with a Maintainability Badge, representing at least 60% better energy efficiency than the 2005 baseline.","summary_zh":"\u5efa\u8bbe\u5c40\u8981\u6c42\u9002\u7528\u7684\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\uff0c\u5176\u80fd\u6e90\u6548\u7387\u987b\u6bd4 2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%\u3002","title_en":"Higher Green Mark Standard for Government Land Sales","title_zh":"\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6","wiki":{"domain":"environment-sustainability","last_verified":"2026-10-24","locales":{"en":{"markdown":"# Higher Green Mark Standard for Government Land Sales\n\nThe Building and Construction Authority (BCA) requires buildings on applicable **Government Land Sales (GLS)** sites to achieve the **Green Mark Platinum Super Low Energy rating with Maintainability Badge**. BCA describes this as at least **60% better energy efficiency than the 2005 baseline**. This requirement covers developments wholly or partly on GLS land sold on or after **30 June 2022**. The precise certification version is determined by the GLS tender-award letter; BCA says Green Mark Version 7 applies to applications submitted on or after **1 April 2027** ([BCA, page rechecked 24 October 2026; last updated 23 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)).\n\n## Site and badge requirements\n\nFor applicable GLS land sold on or after 30 June 2022, the prescribed standard is Green Mark Platinum (Super Low Energy) with the Maintainability Badge. Projects in Jurong Lake District and Marina South must also be on applicable GLS land sold on or after 2 December 2022 **and within the mapped red-boundary areas**: they require the Whole Life Carbon Badge, plus the Intelligence Badge in Jurong Lake District or the Health & Wellbeing Badge in Marina South ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). The extra badges are area-specific requirements; the general all-GLS requirement should not be confused with the more demanding district-specific combinations. Check BCA's maps and the GLS tender-award letter to identify the applicable certification package.\n\n## Submission and clearance\n\nBefore submitting building plans, the Qualified Person must apply to BCA for assessment and certification under the Green Mark scheme. The project submission must include the endorsed Green Mark application form or provisional certificate\/letter; the project must later provide the relevant provisional or full certificate for Temporary Occupation Permit clearance and the full certificate for Certificate of Statutory Completion clearance. After occupation, the project team must provide operational data to BCA to initiate verification for the full certificate ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). These are project compliance and certification steps, not a grant application.\n\n## Relationship to older GLS standards\n\nThe higher Platinum Super Low Energy standard is part of a staged GLS framework. BCA lists earlier requirements for land sold before 30 June 2022, including Green Mark GoldPLUS or Platinum standards in selected strategic areas and older certification versions tied to tender-award periods. The GLS land-sale threshold identifies the applicable scope, while the tender-award letter and the date of Green Mark application determine the certification version, including the Version 7 transition from 1 April 2027 ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). A building's requirement therefore depends on the land-sale date, mapped location, tender conditions and application date; the 60% figure is not a universal standard for every Singapore building.","summary":"BCA requires buildings on applicable Government Land Sales sites to meet the Green Mark Platinum Super Low Energy rating with a Maintainability Badge, representing at least 60% better energy efficiency than the 2005 baseline.","title":"Higher Green Mark Standard for Government Land Sales"},"zh":{"markdown":"# \u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u8981\u6c42\u9002\u7528\u7684**\u653f\u5e9c\u552e\u5730\u8ba1\u5212\uff08GLS\uff09**\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230**\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0**\u3002BCA \u5c06\u6b64\u63cf\u8ff0\u4e3a\u80fd\u6e90\u6548\u7387\u6bd4 **2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%**\u3002\u6b64\u8981\u6c42\u6db5\u76d6\u4e8e **2022 \u5e74\u516d\u6708 30 \u65e5**\u6216\u4e4b\u540e\u51fa\u552e\u7684\u5168\u90e8\u6216\u90e8\u5206\u4f4d\u4e8e GLS \u571f\u5730\u4e0a\u7684\u5f00\u53d1\u9879\u76ee\u3002\u5177\u4f53\u8ba4\u8bc1\u7248\u672c\u7531 GLS \u62db\u6807\u6388\u6807\u51fd\u786e\u5b9a\uff1bBCA \u8868\u793a\uff0c**2027 \u5e74\u56db\u6708 1 \u65e5**\u6216\u4e4b\u540e\u63d0\u4ea4\u7684\u7533\u8bf7\u9002\u7528\u7eff\u8272\u6807\u5fd7\u7b2c 7 \u7248\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5\uff1b\u6700\u540e\u66f4\u65b0\u4e8e 2026 \u5e74\u5341\u6708 23 \u65e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\n\n## \u5730\u6bb5\u548c\u5fbd\u7ae0\u8981\u6c42\n\n\u5bf9\u4e8e\u4e8e 2022 \u5e74\u516d\u6708 30 \u65e5\u6216\u4e4b\u540e\u51fa\u552e\u7684\u9002\u7528 GLS \u571f\u5730\uff0c\u89c4\u5b9a\u6807\u51c6\u4e3a\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\uff08\u8d85\u4f4e\u80fd\u8017\uff09\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\u3002\u88d5\u5eca\u6e56\u533a\u548c\u6ee8\u6d77\u5357\u533a\u7684\u9879\u76ee\u8fd8\u5fc5\u987b\u4f4d\u4e8e\u4e8e 2022 \u5e74\u5341\u4e8c\u6708 2 \u65e5\u6216\u4e4b\u540e\u51fa\u552e\u7684\u9002\u7528 GLS \u571f\u5730\u4e0a\uff0c**\u4e14\u4f4d\u4e8e\u5730\u56fe\u6240\u793a\u7684\u7ea2\u8272\u8fb9\u754c\u533a\u57df\u5185**\uff1a\u8fd9\u4e9b\u9879\u76ee\u987b\u83b7\u5f97\u5168\u751f\u547d\u5468\u671f\u78b3\u5fbd\u7ae0\uff0c\u4ee5\u53ca\u88d5\u5eca\u6e56\u533a\u7684\u667a\u80fd\u5fbd\u7ae0\u6216\u6ee8\u6d77\u5357\u533a\u7684\u5065\u5eb7\u4e0e\u798f\u7949\u5fbd\u7ae0\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u989d\u5916\u5fbd\u7ae0\u5c5e\u4e8e\u7279\u5b9a\u533a\u57df\u8981\u6c42\uff1b\u4e0d\u5e94\u5c06\u9002\u7528\u4e8e\u6240\u6709 GLS \u5730\u6bb5\u7684\u4e00\u822c\u8981\u6c42\u4e0e\u8981\u6c42\u66f4\u4e25\u683c\u7684\u5730\u533a\u7279\u5b9a\u7ec4\u5408\u6df7\u4e3a\u4e00\u8c08\u3002\u8bf7\u67e5\u9605 BCA \u5730\u56fe\u548c GLS \u62db\u6807\u6388\u6807\u51fd\uff0c\u4ee5\u786e\u5b9a\u9002\u7528\u7684\u8ba4\u8bc1\u7ec4\u5408\u3002\n\n## \u63d0\u4ea4\u548c clearance\n\n\u63d0\u4ea4\u5efa\u7b51\u56fe\u5219\u4e4b\u524d\uff0c\u5408\u683c\u4eba\u58eb\u5fc5\u987b\u5411 BCA \u7533\u8bf7\u6309\u7167\u7eff\u8272\u6807\u5fd7\u8ba1\u5212\u8fdb\u884c\u8bc4\u4f30\u548c\u8ba4\u8bc1\u3002\u9879\u76ee\u63d0\u4ea4\u6750\u6599\u5fc5\u987b\u5305\u62ec\u7ecf\u8ba4\u53ef\u7684\u7eff\u8272\u6807\u5fd7\u7533\u8bf7\u8868\u6216\u4e34\u65f6\u8bc1\u4e66\uff0f\u51fd\u4ef6\uff1b\u4e4b\u540e\uff0c\u9879\u76ee\u987b\u63d0\u4f9b\u76f8\u5173\u4e34\u65f6\u6216\u5b8c\u6574\u8bc1\u4e66\u4ee5\u529e\u7406\u4e34\u65f6\u5165\u4f19\u51c6\u8bc1 clearance\uff0c\u5e76\u63d0\u4f9b\u5b8c\u6574\u8bc1\u4e66\u4ee5\u529e\u7406\u6cd5\u5b9a\u5b8c\u5de5\u8bc1\u4e66 clearance\u3002\u5165\u4f19\u540e\uff0c\u9879\u76ee\u56e2\u961f\u5fc5\u987b\u5411 BCA \u63d0\u4f9b\u8fd0\u8425\u6570\u636e\uff0c\u4ee5\u542f\u52a8\u5b8c\u6574\u8bc1\u4e66\u7684\u6838\u9a8c\u7a0b\u5e8f\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u8fd9\u4e9b\u662f\u9879\u76ee\u5408\u89c4\u548c\u8ba4\u8bc1\u6b65\u9aa4\uff0c\u5e76\u975e\u8865\u52a9\u7533\u8bf7\u3002\n\n## \u4e0e\u8f83\u65e9 GLS \u6807\u51c6\u7684\u5173\u7cfb\n\n\u8f83\u9ad8\u7684\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u6807\u51c6\u662f\u5206\u9636\u6bb5\u63a8\u884c\u7684 GLS \u6846\u67b6\u7684\u4e00\u90e8\u5206\u3002BCA \u5217\u51fa\u4e86\u4e8e 2022 \u5e74\u516d\u6708 30 \u65e5\u4e4b\u524d\u51fa\u552e\u571f\u5730\u7684\u8f83\u65e9\u8981\u6c42\uff0c\u5305\u62ec\u7279\u5b9a\u6218\u7565\u533a\u57df\u7684\u7eff\u8272\u6807\u5fd7 GoldPLUS \u6216\u767d\u91d1\u7ea7\u6807\u51c6\uff0c\u4ee5\u53ca\u4e0e\u62db\u6807\u6388\u6807\u671f\u95f4\u76f8\u5173\u7684\u8f83\u65e9\u8ba4\u8bc1\u7248\u672c\u3002GLS \u571f\u5730\u51fa\u552e\u65e5\u671f\u95e8\u69db\u7528\u4e8e\u786e\u5b9a\u9002\u7528\u8303\u56f4\uff0c\u800c\u62db\u6807\u6388\u6807\u51fd\u548c\u7eff\u8272\u6807\u5fd7\u7533\u8bf7\u65e5\u671f\u51b3\u5b9a\u8ba4\u8bc1\u7248\u672c\uff0c\u5305\u62ec\u81ea 2027 \u5e74\u56db\u6708 1 \u65e5\u8d77\u8fc7\u6e21\u5230\u7b2c 7 \u7248\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u56e0\u6b64\uff0c\u5efa\u7b51\u9002\u7528\u7684\u8981\u6c42\u53d6\u51b3\u4e8e\u571f\u5730\u51fa\u552e\u65e5\u671f\u3001\u5730\u56fe\u6240\u793a\u4f4d\u7f6e\u3001\u62db\u6807\u6761\u4ef6\u548c\u7533\u8bf7\u65e5\u671f\uff1b60% \u7684\u6570\u5b57\u5e76\u975e\u9002\u7528\u4e8e\u65b0\u52a0\u5761\u6bcf\u680b\u5efa\u7b51\u7684\u901a\u7528\u6807\u51c6\u3002","summary":"\u5efa\u8bbe\u5c40\u8981\u6c42\u9002\u7528\u7684\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\uff0c\u5176\u80fd\u6e90\u6548\u7387\u987b\u6bd4 2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%\u3002","title":"\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6"}},"path":"environment-sustainability\/green-mark-standards-government-land-sales-2026.md","related_source_ids":["sgkb.environment-sustainability.mandatory-energy-improvement-regime","sgkb.environment-sustainability.green-plan-2030","sgkb.geography-urban-planning.ura-and-master-plan"],"source_hash":"970302d8c290c37b0783f6e480635cb29d933bbcc86de5f9607658c813cfd52a","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)","url":"https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/"}]}},"search_text":"Higher Green Mark Standard for Government Land Sales\n\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6\nBCA requires buildings on applicable Government Land Sales sites to meet the Green Mark Platinum Super Low Energy rating with a Maintainability Badge, representing at least 60% better energy efficiency than the 2005 baseline.\n\u5efa\u8bbe\u5c40\u8981\u6c42\u9002\u7528\u7684\u653f\u5e9c\u552e\u5730\u8ba1\u5212\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\uff0c\u5176\u80fd\u6e90\u6548\u7387\u987b\u6bd4 2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%\u3002\n{\"aliases\":[\"Higher Green Mark GLS standard\",\"GLS Green Mark standard\",\"Green Mark Platinum Super Low Energy GLS\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.environment-sustainability.green-mark-standards-government-land-sales-2026\",\"document_sha256\":\"fa4a70696b76dca6cb443afcf4622ba89748d7d5e941a31f5118010083b85db3\",\"document_type\":\"article\",\"domain\":\"environment-sustainability\",\"entities\":[\"sg.agency.bca\",\"sg.agency.ura\"],\"facets\":[\"current\",\"infrastructure\",\"law\",\"policy\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-10-24\",\"path\":\"environment-sustainability\\\/green-mark-standards-government-land-sales-2026.md\",\"related\":[\"mandatory-energy-improvement-regime\",\"green-plan-2030\",\"ura-and-master-plan\"],\"sources\":[{\"accessed\":\"2026-10-24\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Mandatory Higher Green Mark Standard for Government Land Sales (GLS)\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/sustainability\\\/legislation-on-environmental-sustainability-for-buildings\\\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\\\/government-land-sales\\\/\"}],\"status\":\"verified\",\"summary\":\"BCA requires buildings on applicable Government Land Sales sites to meet the Green Mark Platinum Super Low Energy rating with a Maintainability Badge, representing at least 60% better energy efficiency than the 2005 baseline.\",\"tags\":[\"policy\",\"regulation\",\"energy\",\"scheme\"],\"temporal_scope\":\"current\",\"title\":\"Higher Green Mark Standard for Government Land Sales\",\"topics\":[\"sgtopic.environment\",\"sgtopic.environment.green-mark-standards-government-land-sales-2026\"],\"volatility\":\"fast\"}\n# Higher Green Mark Standard for Government Land Sales\n\nThe Building and Construction Authority (BCA) requires buildings on applicable **Government Land Sales (GLS)** sites to achieve the **Green Mark Platinum Super Low Energy rating with Maintainability Badge**. BCA describes this as at least **60% better energy efficiency than the 2005 baseline**. This requirement covers developments wholly or partly on GLS land sold on or after **30 June 2022**. The precise certification version is determined by the GLS tender-award letter; BCA says Green Mark Version 7 applies to applications submitted on or after **1 April 2027** ([BCA, page rechecked 24 October 2026; last updated 23 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)).\n\n## Site and badge requirements\n\nFor applicable GLS land sold on or after 30 June 2022, the prescribed standard is Green Mark Platinum (Super Low Energy) with the Maintainability Badge. Projects in Jurong Lake District and Marina South must also be on applicable GLS land sold on or after 2 December 2022 **and within the mapped red-boundary areas**: they require the Whole Life Carbon Badge, plus the Intelligence Badge in Jurong Lake District or the Health & Wellbeing Badge in Marina South ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). The extra badges are area-specific requirements; the general all-GLS requirement should not be confused with the more demanding district-specific combinations. Check BCA's maps and the GLS tender-award letter to identify the applicable certification package.\n\n## Submission and clearance\n\nBefore submitting building plans, the Qualified Person must apply to BCA for assessment and certification under the Green Mark scheme. The project submission must include the endorsed Green Mark application form or provisional certificate\/letter; the project must later provide the relevant provisional or full certificate for Temporary Occupation Permit clearance and the full certificate for Certificate of Statutory Completion clearance. After occupation, the project team must provide operational data to BCA to initiate verification for the full certificate ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). These are project compliance and certification steps, not a grant application.\n\n## Relationship to older GLS standards\n\nThe higher Platinum Super Low Energy standard is part of a staged GLS framework. BCA lists earlier requirements for land sold before 30 June 2022, including Green Mark GoldPLUS or Platinum standards in selected strategic areas and older certification versions tied to tender-award periods. The GLS land-sale threshold identifies the applicable scope, while the tender-award letter and the date of Green Mark application determine the certification version, including the Version 7 transition from 1 April 2027 ([BCA, page rechecked 24 October 2026](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)). A building's requirement therefore depends on the land-sale date, mapped location, tender conditions and application date; the 60% figure is not a universal standard for every Singapore building.\n# \u653f\u5e9c\u552e\u5730\u8ba1\u5212\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6\n\n\u5efa\u8bbe\u5c40\uff08BCA\uff09\u8981\u6c42\u9002\u7528\u7684**\u653f\u5e9c\u552e\u5730\u8ba1\u5212\uff08GLS\uff09**\u5730\u6bb5\u4e0a\u7684\u5efa\u7b51\u8fbe\u5230**\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u8bc4\u7ea7\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0**\u3002BCA \u5c06\u6b64\u63cf\u8ff0\u4e3a\u80fd\u6e90\u6548\u7387\u6bd4 **2005 \u5e74\u57fa\u51c6\u81f3\u5c11\u9ad8 60%**\u3002\u6b64\u8981\u6c42\u6db5\u76d6\u4e8e **2022 \u5e74\u516d\u6708 30 \u65e5**\u6216\u4e4b\u540e\u51fa\u552e\u7684\u5168\u90e8\u6216\u90e8\u5206\u4f4d\u4e8e GLS \u571f\u5730\u4e0a\u7684\u5f00\u53d1\u9879\u76ee\u3002\u5177\u4f53\u8ba4\u8bc1\u7248\u672c\u7531 GLS \u62db\u6807\u6388\u6807\u51fd\u786e\u5b9a\uff1bBCA \u8868\u793a\uff0c**2027 \u5e74\u56db\u6708 1 \u65e5**\u6216\u4e4b\u540e\u63d0\u4ea4\u7684\u7533\u8bf7\u9002\u7528\u7eff\u8272\u6807\u5fd7\u7b2c 7 \u7248\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5\uff1b\u6700\u540e\u66f4\u65b0\u4e8e 2026 \u5e74\u5341\u6708 23 \u65e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\n\n## \u5730\u6bb5\u548c\u5fbd\u7ae0\u8981\u6c42\n\n\u5bf9\u4e8e\u4e8e 2022 \u5e74\u516d\u6708 30 \u65e5\u6216\u4e4b\u540e\u51fa\u552e\u7684\u9002\u7528 GLS \u571f\u5730\uff0c\u89c4\u5b9a\u6807\u51c6\u4e3a\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u7ea7\uff08\u8d85\u4f4e\u80fd\u8017\uff09\u5e76\u83b7\u5f97\u53ef\u7ef4\u62a4\u6027\u5fbd\u7ae0\u3002\u88d5\u5eca\u6e56\u533a\u548c\u6ee8\u6d77\u5357\u533a\u7684\u9879\u76ee\u8fd8\u5fc5\u987b\u4f4d\u4e8e\u4e8e 2022 \u5e74\u5341\u4e8c\u6708 2 \u65e5\u6216\u4e4b\u540e\u51fa\u552e\u7684\u9002\u7528 GLS \u571f\u5730\u4e0a\uff0c**\u4e14\u4f4d\u4e8e\u5730\u56fe\u6240\u793a\u7684\u7ea2\u8272\u8fb9\u754c\u533a\u57df\u5185**\uff1a\u8fd9\u4e9b\u9879\u76ee\u987b\u83b7\u5f97\u5168\u751f\u547d\u5468\u671f\u78b3\u5fbd\u7ae0\uff0c\u4ee5\u53ca\u88d5\u5eca\u6e56\u533a\u7684\u667a\u80fd\u5fbd\u7ae0\u6216\u6ee8\u6d77\u5357\u533a\u7684\u5065\u5eb7\u4e0e\u798f\u7949\u5fbd\u7ae0\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u989d\u5916\u5fbd\u7ae0\u5c5e\u4e8e\u7279\u5b9a\u533a\u57df\u8981\u6c42\uff1b\u4e0d\u5e94\u5c06\u9002\u7528\u4e8e\u6240\u6709 GLS \u5730\u6bb5\u7684\u4e00\u822c\u8981\u6c42\u4e0e\u8981\u6c42\u66f4\u4e25\u683c\u7684\u5730\u533a\u7279\u5b9a\u7ec4\u5408\u6df7\u4e3a\u4e00\u8c08\u3002\u8bf7\u67e5\u9605 BCA \u5730\u56fe\u548c GLS \u62db\u6807\u6388\u6807\u51fd\uff0c\u4ee5\u786e\u5b9a\u9002\u7528\u7684\u8ba4\u8bc1\u7ec4\u5408\u3002\n\n## \u63d0\u4ea4\u548c clearance\n\n\u63d0\u4ea4\u5efa\u7b51\u56fe\u5219\u4e4b\u524d\uff0c\u5408\u683c\u4eba\u58eb\u5fc5\u987b\u5411 BCA \u7533\u8bf7\u6309\u7167\u7eff\u8272\u6807\u5fd7\u8ba1\u5212\u8fdb\u884c\u8bc4\u4f30\u548c\u8ba4\u8bc1\u3002\u9879\u76ee\u63d0\u4ea4\u6750\u6599\u5fc5\u987b\u5305\u62ec\u7ecf\u8ba4\u53ef\u7684\u7eff\u8272\u6807\u5fd7\u7533\u8bf7\u8868\u6216\u4e34\u65f6\u8bc1\u4e66\uff0f\u51fd\u4ef6\uff1b\u4e4b\u540e\uff0c\u9879\u76ee\u987b\u63d0\u4f9b\u76f8\u5173\u4e34\u65f6\u6216\u5b8c\u6574\u8bc1\u4e66\u4ee5\u529e\u7406\u4e34\u65f6\u5165\u4f19\u51c6\u8bc1 clearance\uff0c\u5e76\u63d0\u4f9b\u5b8c\u6574\u8bc1\u4e66\u4ee5\u529e\u7406\u6cd5\u5b9a\u5b8c\u5de5\u8bc1\u4e66 clearance\u3002\u5165\u4f19\u540e\uff0c\u9879\u76ee\u56e2\u961f\u5fc5\u987b\u5411 BCA \u63d0\u4f9b\u8fd0\u8425\u6570\u636e\uff0c\u4ee5\u542f\u52a8\u5b8c\u6574\u8bc1\u4e66\u7684\u6838\u9a8c\u7a0b\u5e8f\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u8fd9\u4e9b\u662f\u9879\u76ee\u5408\u89c4\u548c\u8ba4\u8bc1\u6b65\u9aa4\uff0c\u5e76\u975e\u8865\u52a9\u7533\u8bf7\u3002\n\n## \u4e0e\u8f83\u65e9 GLS \u6807\u51c6\u7684\u5173\u7cfb\n\n\u8f83\u9ad8\u7684\u767d\u91d1\u7ea7\u8d85\u4f4e\u80fd\u8017\u6807\u51c6\u662f\u5206\u9636\u6bb5\u63a8\u884c\u7684 GLS \u6846\u67b6\u7684\u4e00\u90e8\u5206\u3002BCA \u5217\u51fa\u4e86\u4e8e 2022 \u5e74\u516d\u6708 30 \u65e5\u4e4b\u524d\u51fa\u552e\u571f\u5730\u7684\u8f83\u65e9\u8981\u6c42\uff0c\u5305\u62ec\u7279\u5b9a\u6218\u7565\u533a\u57df\u7684\u7eff\u8272\u6807\u5fd7 GoldPLUS \u6216\u767d\u91d1\u7ea7\u6807\u51c6\uff0c\u4ee5\u53ca\u4e0e\u62db\u6807\u6388\u6807\u671f\u95f4\u76f8\u5173\u7684\u8f83\u65e9\u8ba4\u8bc1\u7248\u672c\u3002GLS \u571f\u5730\u51fa\u552e\u65e5\u671f\u95e8\u69db\u7528\u4e8e\u786e\u5b9a\u9002\u7528\u8303\u56f4\uff0c\u800c\u62db\u6807\u6388\u6807\u51fd\u548c\u7eff\u8272\u6807\u5fd7\u7533\u8bf7\u65e5\u671f\u51b3\u5b9a\u8ba4\u8bc1\u7248\u672c\uff0c\u5305\u62ec\u81ea 2027 \u5e74\u56db\u6708 1 \u65e5\u8d77\u8fc7\u6e21\u5230\u7b2c 7 \u7248\uff08[BCA\uff0c\u9875\u9762\u4e8e 2026 \u5e74\u5341\u6708 24 \u65e5\u91cd\u65b0\u6838\u67e5](https:\/\/www1.bca.gov.sg\/sustainability\/legislation-on-environmental-sustainability-for-buildings\/new-buildings-and-existing-buildings-undergoing-major-additions-and-alterations\/government-land-sales\/)\uff09\u3002\u56e0\u6b64\uff0c\u5efa\u7b51\u9002\u7528\u7684\u8981\u6c42\u53d6\u51b3\u4e8e\u571f\u5730\u51fa\u552e\u65e5\u671f\u3001\u5730\u56fe\u6240\u793a\u4f4d\u7f6e\u3001\u62db\u6807\u6761\u4ef6\u548c\u7533\u8bf7\u65e5\u671f\uff1b60% \u7684\u6570\u5b57\u5e76\u975e\u9002\u7528\u4e8e\u65b0\u52a0\u5761\u6bcf\u680b\u5efa\u7b51\u7684\u901a\u7528\u6807\u51c6\u3002"},"related":[{"id":90256,"source_id":"sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic","kind":"article","title_en":"Green Buildings Innovation Cluster (GBIC)","title_zh":"\u7eff\u8272\u5efa\u7b51\u521b\u65b0\u96c6\u7fa4\uff08GBIC\uff09","assurance":null,"subtype":null},{"id":90414,"source_id":"sgkb.geography-urban-planning.green-mark-version-7-2026","kind":"article","title_en":"Green Mark Version 7.0","title_zh":"\u7eff\u8272\u6807\u5fd7 7.0 \u7248","assurance":null,"subtype":null},{"id":90262,"source_id":"sgkb.environment-sustainability.mandatory-energy-improvement-regime","kind":"article","title_en":"Mandatory Energy Improvement Regime","title_zh":"\u5f3a\u5236\u80fd\u6e90\u6539\u8fdb\u5236\u5ea6","assurance":null,"subtype":null},{"id":90425,"source_id":"sgkb.geography-urban-planning.periodic-energy-audit-pea-2026","kind":"article","title_en":"Mandatory Submission of Periodic Energy Audits","title_zh":"\u5f3a\u5236\u63d0\u4ea4\u5b9a\u671f\u80fd\u6e90\u5ba1\u8ba1\u62a5\u544a","assurance":null,"subtype":null},{"id":90258,"source_id":"sgkb.environment-sustainability.green-plan-2030","kind":"article","title_en":"Singapore Green Plan 2030","title_zh":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030","assurance":null,"subtype":null},{"id":90437,"source_id":"sgkb.geography-urban-planning.ura-and-master-plan","kind":"article","title_en":"URA and the Master Plan","title_zh":"\u5e02\u533a\u91cd\u5efa\u5c40\u4e0e\u603b\u4f53\u89c4\u5212","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":82600,"source_id":"sg.scheme.green-mark-v7","kind":"entity","title_en":"Green Mark Version 7.0","title_zh":"Green Mark \u7b2c 7.0 \u7248","assurance":null,"subtype":"building-environmental-certification-scheme"},{"id":79892,"source_id":"sg.agency.ura","kind":"entity","title_en":"Urban Redevelopment Authority","title_zh":"\u5e02\u533a\u91cd\u5efa\u5c40","assurance":null,"subtype":"agency"},{"id":92466,"source_id":"sgtopic.environment","kind":"topic","title_en":"Environment and sustainability","title_zh":"\u73af\u5883\u4e0e\u53ef\u6301\u7eed\u53d1\u5c55","assurance":null,"subtype":null},{"id":92462,"source_id":"sgtopic.environment.green-mark-standards-government-land-sales-2026","kind":"topic","title_en":"Higher Green Mark Standard for Government Land Sales","title_zh":"\u653f\u5e9c\u552e\u5730\u9879\u76ee\u91c7\u7528\u66f4\u9ad8\u7684\u7eff\u8272\u6807\u5fd7\u6807\u51c6","assurance":null,"subtype":null}]}