{"release_id":19,"data":{"id":89679,"release_id":19,"source_id":"sgkb.business-industry.data-centre-industry","kind":"article","fingerprint":"3d0dbbbb0f2b6b927c454d2126ec87bb0456651eca6b170775118c1031cb74ac","title_en":"Data Centre Industry","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a","domain":"business-industry","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-08-21","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["data center industry","hyperscale data centres","DC-CFA","Green Data Centre Roadmap","data centre moratorium"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","document_type":"article","domain":"business-industry","entities":["sg.agency.edb","sg.agency.imda"],"facets":["business","current","geography","infrastructure","policy","statistics"],"geographic_scope":["national","international"],"jurisdiction":"SG","language":"en","last_verified":"2026-08-21","path":"business-industry\/data-centre-industry.md","related":["data-centre-industry-anchors","energy-and-power-grid","green-plan-2030","petrochemicals-industry","startup-ecosystem"],"sources":[{"accessed":"2026-08-08","title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-08","title":"IMDA \u2014 SG announces Green Data Centre Roadmap (29 May 2024)","url":"https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap"},{"accessed":"2026-08-08","title":"EDB \u2014 Launch of pilot Data Centre Call for Application (20 Jul 2022)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html"},{"accessed":"2026-08-08","title":"EDB \u2014 Four data centre proposals selected from pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"accessed":"2026-08-08","title":"EDB\/IMDA \u2014 Launch of second Data Centre Call for Application (1 Dec 2025)","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"},{"accessed":"2026-08-21","published":"2026-08-21","publisher":"Economic Development Board","tier":1,"title":"EDB \u2014 Four data centre proposals selected under DC-CFA2 (21 Aug 2026)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html"},{"accessed":"2026-08-08","title":"EDB \u2014 AWS to invest an additional S$12 billion in Singapore by 2028 (7 May 2024)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html"},{"accessed":"2026-08-08","title":"EDB \u2014 Jurong Island low-carbon data centre park announcement (2025)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html"},{"accessed":"2026-08-08","title":"EDB \u2014 Johnson Controls data centre tech hub (energy consumption figures)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html"},{"accessed":"2026-08-08","title":"EMA \u2014 Electricity Demand and Supply Outlook (2025)","url":"https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf"},{"accessed":"2026-08-08","title":"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)","url":"https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"},{"accessed":"2026-08-08","title":"The Business Times \u2014 Government awards 80 MW to four operators in pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot"}],"status":"verified","summary":"Singapore's data centre industry is a tightly regulated regional hub with operational capacity exceeding 1.4 gigawatts, governed since 2019 by a moratorium-turned-Call-for-Application model that ties new capacity to energy-efficiency and green-power requirements under IMDA and EDB oversight.","tags":["tech","energy","policy","investment","utilities","statistics"],"temporal_scope":"current","title":"Data Centre Industry","topics":["sgtopic.business","sgtopic.business.data-centres"],"volatility":"fast"},"date":"2026-08-21","domain":"business-industry","evidence_paths":["source\/business-industry\/data-centre-industry.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl","artefacts\/mentions.jsonl"],"expected_version":12,"input_hash":"6d3e52e7be7fa43c776b0a28d210fa1028f69b64bf0c7b3cb3543985cd545f46","kind":"article","lineage":[{"chunk_id":"sgkb.business-industry.data-centre-industry#overview","citation_urls":["https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html"],"content_sha256":"cb96bbb0af0cb1907b7719f4af6c6619be98ceed44c24dc811abb50c492a8f3e","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","section_sources":[{"accessed":"2026-08-08","title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-08","title":"EDB \u2014 Launch of pilot Data Centre Call for Application (20 Jul 2022)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html"}]},{"chunk_id":"sgkb.business-industry.data-centre-industry#singapore-as-a-regional-data-centre-hub","citation_urls":["https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html","https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot","https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"],"content_sha256":"736b1cc2eeb75dd0dca1522ba814e12b60181eaced9e626d98f101ebac7ce825","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","section_sources":[{"accessed":"2026-08-08","title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-08","title":"EDB \u2014 Four data centre proposals selected from pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"accessed":"2026-08-08","title":"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)","url":"https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"},{"accessed":"2026-08-08","title":"The Business Times \u2014 Government awards 80 MW to four operators in pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot"}]},{"chunk_id":"sgkb.business-industry.data-centre-industry#the-2019-moratorium-and-the-call-for-application-model","citation_urls":["https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html","https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot","https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf","https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html"],"content_sha256":"5dc11992154071a4081c15890a4d05c125b89ecc949aef39bd91aee1a5f6bdfb","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","section_sources":[{"accessed":"2026-08-08","title":"EDB \u2014 Launch of pilot Data Centre Call for Application (20 Jul 2022)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html"},{"accessed":"2026-08-08","title":"EDB \u2014 Four data centre proposals selected from pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"accessed":"2026-08-08","title":"EDB\/IMDA \u2014 Launch of second Data Centre Call for Application (1 Dec 2025)","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"},{"accessed":"2026-08-21","published":"2026-08-21","publisher":"Economic Development Board","tier":1,"title":"EDB \u2014 Four data centre proposals selected under DC-CFA2 (21 Aug 2026)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html"},{"accessed":"2026-08-08","title":"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)","url":"https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"},{"accessed":"2026-08-08","title":"The Business Times \u2014 Government awards 80 MW to four operators in pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot"}]},{"chunk_id":"sgkb.business-industry.data-centre-industry#green-data-centre-roadmap-and-sustainability-standards","citation_urls":["https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap","https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"],"content_sha256":"7b3b2303070793a40918286309785e282916eb47be6580638bdfc790c56742cb","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","section_sources":[{"accessed":"2026-08-08","title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-08","title":"IMDA \u2014 SG announces Green Data Centre Roadmap (29 May 2024)","url":"https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap"}]},{"chunk_id":"sgkb.business-industry.data-centre-industry#hyperscale-investment-and-the-jurong-island-expansion","citation_urls":["https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html","https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html","https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html"],"content_sha256":"be4608c4cb73ba42f977b5a375a1b804f4c3c6fc365b4b0e6307d2928c7019ea","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","section_sources":[{"accessed":"2026-08-08","title":"EDB \u2014 Four data centre proposals selected from pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"accessed":"2026-08-08","title":"EDB \u2014 AWS to invest an additional S$12 billion in Singapore by 2028 (7 May 2024)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html"},{"accessed":"2026-08-08","title":"EDB \u2014 Jurong Island low-carbon data centre park announcement (2025)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html"},{"accessed":"2026-08-08","title":"EDB \u2014 Johnson Controls data centre tech hub (energy consumption figures)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html"},{"accessed":"2026-08-08","title":"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)","url":"https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"}]},{"chunk_id":"sgkb.business-industry.data-centre-industry#power-demand-constraints-and-regional-spillover","citation_urls":["https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html","https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf","https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf","https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf","https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"],"content_sha256":"9ea6bc9e61eecd38099d138712928ca824eaa0bf483ad109364e07f2b74aa303","document_id":"sgkb.business-industry.data-centre-industry","document_sha256":"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0","section_sources":[{"accessed":"2026-08-08","title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"accessed":"2026-08-08","title":"EDB\/IMDA \u2014 Launch of second Data Centre Call for Application (1 Dec 2025)","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"},{"accessed":"2026-08-08","title":"EDB \u2014 Johnson Controls data centre tech hub (energy consumption figures)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html"},{"accessed":"2026-08-08","title":"EMA \u2014 Electricity Demand and Supply Outlook (2025)","url":"https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf"},{"accessed":"2026-08-08","title":"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)","url":"https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"}]}],"links":[{"relation":"related","target_id":"sgkb.data.data-centre-industry-anchors"},{"relation":"related","target_id":"sgkb.environment-sustainability.energy-and-power-grid"},{"relation":"related","target_id":"sgkb.environment-sustainability.green-plan-2030"},{"relation":"related","target_id":"sgkb.business-industry.petrochemicals-industry"},{"relation":"related","target_id":"sgkb.business-industry.startup-ecosystem"},{"relation":"topics","target_id":"sgtopic.business"},{"relation":"topics","target_id":"sgtopic.business.data-centres"},{"relation":"entities","target_id":"sg.agency.edb"},{"relation":"entities","target_id":"sg.agency.imda"},{"relation":"mentions","target_id":"sg.geo.island.jurong-island"},{"relation":"mentions","target_id":"my.federation.malaysia"},{"relation":"mentions","target_id":"sg.agency.bca"},{"relation":"mentions","target_id":"sg.company.singtel"},{"relation":"mentions","target_id":"sg.university.nus"}],"locales":{"en":{"markdown":"# Data Centre Industry\n\nSingapore's data centre industry is one of Southeast Asia's largest and most connectivity-dense digital-infrastructure clusters, hosting operational capacity exceeding 1.4 gigawatts as of 2024 and serving as the physical backbone for cloud computing, financial services, and artificial-intelligence workloads across the region ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). The sector sits at the intersection of Singapore's digital-economy ambitions \u2014 the digital economy contributed roughly 17% of gross domestic product in 2022 \u2014 and its land, power, and water constraints as a compact city-state ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf); see [startup ecosystem](\/en\/knowledge\/article\/sgkb.business-industry.startup-ecosystem) and [telco and internet](\/en\/knowledge\/article\/sgkb.daily-life.telco-and-internet)). Unlike many countries where data centre growth is largely market-driven, Singapore allocates new capacity through a government-managed Call for Application (CFA) exercise led by the Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA), making sustainability and strategic economic value explicit gatekeeping criteria; dated capacity awards and DC-CFA2 thresholds are tabulated in [data centre industry anchors](\/en\/knowledge\/dataset\/sgkb.data.data-centre-industry-anchors) ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)).\n\n## Singapore as a regional data centre hub\n\nSingapore's data centre industry draws on the country's broader position as a trusted business and digital hub: dense submarine-cable landings, strong intellectual-property protection, cross-border data-flow agreements, and a skilled technology workforce ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). As of 2024, Singapore's operational data centre capacity per capita exceeded that of Australia, China, Japan, South Korea, and the United Kingdom, and key markets such as Beijing, Hong Kong, Seoul, Sydney, and Tokyo ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). The Digital Connectivity Blueprint launched in June 2023 targets doubling submarine-cable landings over the following decade, reinforcing the connectivity case for hosting compute in Singapore rather than in lower-cost neighbouring markets ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\nThe industry spans colocation operators that rent rack space to enterprise tenants and hyperscale cloud providers that build and operate facilities for their own platforms. Major colocation and carrier-neutral operators with a Singapore footprint include Equinix, Digital Realty, Global Switch, Keppel Data Centres, ST Telemedia Global Data Centres, AirTrunk, Princeton Digital Group, and GDS Holdings, while hyperscale cloud regions are operated by Amazon Web Services (AWS), Microsoft Azure, and Google Cloud ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [Business Times DC-CFA pilot, accessed Aug 2026](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)). Facilities cluster in three main corridors: Jurong and Jurong East, Tai Seng, and the Loyang\u2013Tuas\u2013Changi belt near Changi and the eastern industrial estates. Singtel's data-centre unit Nxera and Keppel continue to expand within these zones, including Nxera's 58-megawatt DC Tuas facility targeted for operations by end-2026 ([ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)).\n\n## The 2019 moratorium and the Call for Application model\n\nSingapore's data centre industry entered a managed-growth phase in 2019 when the Government informed operators of a temporary pause on new data centre developments while EDB and IMDA reviewed how to reconcile digital-infrastructure demand with climate commitments under the Paris Agreement ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)). Projects already authorised before the pause could still proceed, but no fresh capacity allocations were made until the review concluded. The Minister for Trade and Industry announced in January 2023 that the sector review was complete, and in July 2022 EDB and IMDA launched a pilot Data Centre \u2013 Call for Application (DC-CFA) as the primary mechanism for allocating new capacity on a calibrated, sustainability-first basis ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)).\n\nThe pilot DC-CFA, which opened in July 2022, invited operators to submit proposals demonstrating state-of-the-art energy efficiency, decarbonisation pathways, contribution to Singapore's regional connectivity, and broader economic value ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)). In July 2023, after receiving more than 20 proposals, EDB and IMDA provisionally awarded about 80 megawatts of new critical IT load capacity to four winners: Equinix, GDS, Microsoft, and an AirTrunk\u2013ByteDance consortium ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [Business Times DC-CFA pilot, accessed Aug 2026](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)). The DC-CFA model replaced an open market in which any operator with land and power could build; since 2022, all new greenfield capacity must win a CFA allocation before proceeding.\n\nOn 1 December 2025, EDB and IMDA launched the second exercise (DC-CFA2), offering at least 200 megawatts of new capacity \u2014 with potentially more through innovative green-energy pathways \u2014 and tightening sustainability thresholds beyond the pilot round ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf); [ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). DC-CFA2 applicants must achieve a Power Usage Effectiveness (PUE) of 1.25 or better at 100% IT load, obtain Building and Construction Authority (BCA)\u2013IMDA Green Mark for Data Centres 2024 Platinum certification, deploy IT equipment meeting the Singapore Standard SS 715:2025 on data-centre IT energy efficiency, and source at least 50% of facility power from eligible green-energy pathways such as biomethane, low-carbon ammonia or hydrogen, novel fuel cells with carbon capture, or building-integrated photovoltaics ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)). Companies with uniquely differentiated strategic proposals may alternatively approach EDB through the Strategic Digital Infrastructure Scheme (SDIS) ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)).\n\nOn **21 August 2026**, EDB and IMDA announced that they had **provisionally allocated 200 MW of new capacity to four data-centre operators** through DC-CFA2 ([EDB, four data-centre proposals selected under DC-CFA2](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html), accessed 21 August 2026). This is a provisional allocation outcome, not proof that all four facilities are already operational; the earlier DC-CFA2 offer and its sustainability thresholds remain the policy context for interpreting the announcement.\n\n## Green Data Centre Roadmap and sustainability standards\n\nThe Green Data Centre Roadmap, launched by IMDA on 29 May 2024, sets the sector-wide sustainability framework that the CFA exercises implement in practice ([IMDA Green DC Roadmap press release, accessed Aug 2026](https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap)). The Roadmap aims to provide at least 300 megawatts of additional data centre capacity in the near term, with potentially another 200 megawatts and more unlocked through green-energy deployments, while pushing the entire installed base toward higher efficiency over a ten-year horizon ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). This sits within Singapore's wider [green plan 2030](\/en\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030) net-zero-by-2050 trajectory and complements EMA's energy-transition planning in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid).\n\nOn facility efficiency, IMDA targets all data centres in Singapore achieving PUE below 1.3 at 100% IT load within ten years of the Roadmap \u2014 a threshold current best-in-class designs can already meet ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). Singapore pioneered a Tropical Data Centre standard allowing facilities to run safely at higher ambient temperatures and humidity, reducing cooling energy in the equatorial climate, and the Roadmap refreshed the BCA\u2013IMDA Green Mark for Data Centres (GMDC) certification by end-2024 while introducing SS 715:2025 standards for IT equipment and liquid-cooling adoption by 2025 ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). As AI workloads push rack densities from roughly 8 kilowatts per rack in 2020 toward 20\u2013100 kilowatts per rack, the Roadmap encourages hybrid air- and liquid-cooling configurations and research through the Sustainable Tropical Data Centre Testbed at the National University of Singapore ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\nOn water, data centres are significant users: the median Water Usage Effectiveness (WUE) among large Singapore data centres (those consuming at least 60,000 cubic metres of water annually) was 2.2 cubic metres per megawatt-hour in 2021, and IMDA and the national water agency PUB target reducing sector WUE to 2.0 m\u00b3\/MWh or lower over ten years through cooling-tower optimisation and recycling ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). EDB offers co-funding through the Resource Efficiency Grant for Emissions and Investment Allowance for Emissions Reduction to support retrofitting existing facilities, while IMDA's Green Computing Funding Initiative allocated S$30 million from January 2024 for software-level energy-efficiency research ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\n## Hyperscale investment and the Jurong Island expansion\n\nHyperscale cloud providers anchor much of the demand driving Singapore's data centre pipeline. AWS announced in May 2024 plans to invest an additional S$12 billion in its existing Singapore cloud infrastructure from 2024 to 2028, bringing total planned investment in the AWS Asia Pacific (Singapore) Region to more than S$23 billion by 2028 \u2014 on top of S$11.5 billion invested from 2010 through 2023 \u2014 with an estimated S$23.7 billion contribution to Singapore GDP and roughly 12,300 full-time-equivalent jobs supported annually in the supply chain by 2028 ([EDB AWS investment, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html)). Microsoft was among the four pilot DC-CFA winners and continues expanding Azure infrastructure in Singapore as part of a broader Southeast Asia cloud and AI investment programme ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). Google Cloud operates an established cloud region in Singapore and continues capacity expansion alongside regional peers.\n\nA notable new site is on [Jurong Island](\/en\/knowledge\/article\/sgkb.business-industry.petrochemicals-industry), where EDB has reserved about 20 hectares for Singapore's largest low-carbon data centre park, with potential capacity of up to 700 megawatts to support AI-driven demand, integrated into the island's broader shift toward hydrogen, ammonia, and sustainable aviation fuel infrastructure ([EDB Jurong Island partnerships, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html)). Locating hyperscale capacity on Jurong Island allows operators to tap adjacent low-carbon energy pilots \u2014 including ammonia and hydrogen projects under EMA study \u2014 rather than drawing exclusively on the mainland natural-gas-dominated grid described in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid). Johnson Controls, a cooling-systems supplier, expanded its Singapore regional hub in 2025 citing Asia-Pacific data centre growth, reflecting the downstream industrial ecosystem the sector supports ([EDB Johnson Controls, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)).\n\n## Power demand, constraints, and regional spillover\n\nData centres are among Singapore's fastest-growing electricity consumers. As of 2025, data centres accounted for an estimated 7% of national energy consumption, a share projected to rise to 12% by 2030 as cloud and AI workloads expand ([EDB Johnson Controls, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)). Within the domestic information and communications sector, data centres represent about 82% of carbon emissions, making the sector's decarbonisation central to Singapore's digital sustainability goals ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). EMA's Electricity Demand and Supply Outlook (2025) projects system peak demand growing at a compound annual rate of 2.4%\u20134.8% from 2025 to 2034, with an upper-bound scenario explicitly incorporating additional demand from data centres and advanced manufacturing ([EMA Outlook 2025, accessed Aug 2026](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf)).\n\nSingapore's land scarcity, tropical cooling needs, and finite domestic renewable potential mean the CFA model deliberately caps how fast capacity can grow. The pilot round allocated only 80 megawatts from more than 20 bids; DC-CFA2 offers at least 200 megawatts but imposes stricter green-power sourcing that ties expansion to the pace of low-carbon energy infrastructure \u2014 including regional electricity imports that EMA is developing toward a 6-gigawatt low-carbon import target by 2035 ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf); see [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)). Analysts and industry observers note that hyperscale operators increasingly build bulk capacity in neighbouring Johor (Malaysia), Jakarta, and Bangkok where land and power are cheaper, while retaining Singapore for latency-sensitive, premium-tier workloads \u2014 a pattern that preserves Singapore's hub status without unconstrained local growth ([ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). The tension between Singapore's digital-economy ambitions and its [green plan 2030](\/en\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030) energy targets is therefore structural: the data centre industry can grow, but only as fast as efficiency gains and green-power supply allow under EDB and IMDA's allocation gatekeeping.","summary":"Singapore's data centre industry is a tightly regulated regional hub with operational capacity exceeding 1.4 gigawatts, governed since 2019 by a moratorium-turned-Call-for-Application model that ties new capacity to energy-efficiency and green-power requirements under IMDA and EDB oversight.","title":"Data Centre Industry"},"zh":{"markdown":"# \u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\n\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u4e1c\u5357\u4e9a\u6700\u5927\u3001\u8fde\u63a5\u6700\u5bc6\u96c6\u7684\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u96c6\u7fa4\u4e4b\u4e00\u3002\u622a\u81f3 2024 \u5e74\uff0c\u5176\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\uff0c\u4e3a\u6574\u4e2a\u533a\u57df\u7684\u4e91\u8ba1\u7b97\u3001\u91d1\u878d\u670d\u52a1\u548c\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u63d0\u4f9b\u5b9e\u4f53\u57fa\u7840\u8bbe\u65bd\u652f\u6491\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u8be5\u884c\u4e1a\u5904\u4e8e\u65b0\u52a0\u5761\u6570\u5b57\u7ecf\u6d4e\u96c4\u5fc3\u4e0e\u5176\u571f\u5730\u3001\u7535\u529b\u548c\u6c34\u8d44\u6e90\u9650\u5236\u7684\u4ea4\u6c47\u5904\uff1b2022 \u5e74\uff0c\u6570\u5b57\u7ecf\u6d4e\u7ea6\u5360\u56fd\u5185\u751f\u4ea7\u603b\u503c\u7684 17%\uff0c\u800c\u65b0\u52a0\u5761\u662f\u4e00\u4e2a\u9762\u79ef\u7d27\u51d1\u7684\u57ce\u90a6\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff1b\u53e6\u89c1[\u521d\u521b\u4f01\u4e1a\u751f\u6001\u7cfb\u7edf](\/zh\/knowledge\/article\/sgkb.business-industry.startup-ecosystem)\u548c[\u7535\u4fe1\u4e0e\u4e92\u8054\u7f51](\/zh\/knowledge\/article\/sgkb.daily-life.telco-and-internet)\uff09\u3002\u4e0e\u8bb8\u591a\u4e3b\u8981\u7531\u5e02\u573a\u63a8\u52a8\u6570\u636e\u4e2d\u5fc3\u589e\u957f\u7684\u56fd\u5bb6\u4e0d\u540c\uff0c\u65b0\u52a0\u5761\u901a\u8fc7\u7531\u7ecf\u6d4e\u53d1\u5c55\u5c40\uff08EDB\uff09\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\uff08IMDA\uff09\u4e3b\u5bfc\u7684\u653f\u5e9c\u7ba1\u7406\u578b\u7533\u8bf7\u5f81\u96c6\uff08CFA\uff09\u7a0b\u5e8f\u5206\u914d\u65b0\u589e\u5bb9\u91cf\uff0c\u5e76\u660e\u786e\u5c06\u53ef\u6301\u7eed\u6027\u548c\u6218\u7565\u7ecf\u6d4e\u4ef7\u503c\u5217\u4e3a\u51c6\u5165\u6807\u51c6\uff1b\u5e26\u65e5\u671f\u7684\u5bb9\u91cf\u5206\u914d\u7ed3\u679c\u548c DC-CFA2 \u95e8\u69db\u6c47\u603b\u4e8e[\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u57fa\u51c6\u6570\u636e](\/zh\/knowledge\/dataset\/sgkb.data.data-centre-industry-anchors)\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\n\n## \u65b0\u52a0\u5761\u4f5c\u4e3a\u533a\u57df\u6570\u636e\u4e2d\u5fc3\u67a2\u7ebd\n\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5f97\u76ca\u4e8e\u8be5\u56fd\u4f5c\u4e3a\u53ef\u4fe1\u8d56\u5546\u4e1a\u548c\u6570\u5b57\u67a2\u7ebd\u7684\u6574\u4f53\u5730\u4f4d\uff1a\u5bc6\u96c6\u7684\u6d77\u5e95\u7535\u7f06\u767b\u9646\u70b9\u3001\u5065\u5168\u7684\u77e5\u8bc6\u4ea7\u6743\u4fdd\u62a4\u3001\u8de8\u5883\u6570\u636e\u6d41\u52a8\u534f\u5b9a\uff0c\u4ee5\u53ca\u719f\u7ec3\u7684\u79d1\u6280\u4eba\u624d\u961f\u4f0d\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u622a\u81f3 2024 \u5e74\uff0c\u65b0\u52a0\u5761\u4eba\u5747\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7\u6fb3\u5927\u5229\u4e9a\u3001\u4e2d\u56fd\u3001\u65e5\u672c\u3001\u97e9\u56fd\u548c\u82f1\u56fd\uff0c\u4ee5\u53ca\u5317\u4eac\u3001\u9999\u6e2f\u3001\u9996\u5c14\u3001\u6089\u5c3c\u548c\u4e1c\u4eac\u7b49\u4e3b\u8981\u5e02\u573a\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u30022023 \u5e74\u516d\u6708\u542f\u52a8\u7684\u300a\u6570\u5b57\u8fde\u63a5\u84dd\u56fe\u300b\u76ee\u6807\u662f\u5728\u968f\u540e\u5341\u5e74\u5185\u5c06\u6d77\u5e95\u7535\u7f06\u767b\u9646\u70b9\u6570\u91cf\u7ffb\u500d\uff0c\u8fdb\u4e00\u6b65\u5de9\u56fa\u5c06\u8ba1\u7b97\u8bbe\u65bd\u8bbe\u4e8e\u65b0\u52a0\u5761\u3001\u800c\u975e\u6210\u672c\u8f83\u4f4e\u7684\u90bb\u8fd1\u5e02\u573a\u7684\u8fde\u63a5\u4f18\u52bf\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n\u8be5\u884c\u4e1a\u5305\u62ec\u5411\u4f01\u4e1a\u79df\u6237\u51fa\u79df\u673a\u67dc\u7a7a\u95f4\u7684\u6258\u7ba1\u670d\u52a1\u8fd0\u8425\u5546\uff0c\u4ee5\u53ca\u4e3a\u81ea\u6709\u5e73\u53f0\u5efa\u8bbe\u548c\u8fd0\u8425\u8bbe\u65bd\u7684\u8d85\u5927\u89c4\u6a21\u4e91\u670d\u52a1\u5546\u3002\u5728\u65b0\u52a0\u5761\u8bbe\u6709\u4e1a\u52a1\u7684\u4e3b\u8981\u6258\u7ba1\u670d\u52a1\u548c\u4e2d\u7acb\u8fd0\u8425\u5546\u5305\u62ec Equinix\u3001Digital Realty\u3001Global Switch\u3001Keppel Data Centres\u3001ST Telemedia Global Data Centres\u3001AirTrunk\u3001Princeton Digital Group \u548c GDS Holdings\uff1b\u8d85\u5927\u89c4\u6a21\u4e91\u533a\u57df\u5219\u7531 Amazon Web Services\uff08AWS\uff09\u3001Microsoft Azure \u548c Google Cloud \u8fd0\u8425\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u5546\u4e1a\u65f6\u62a5\u300b\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u8bd5\u70b9\u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)\uff09\u3002\u8bbe\u65bd\u4e3b\u8981\u96c6\u4e2d\u5728\u4e09\u6761\u8d70\u5eca\uff1a\u88d5\u5eca\u548c\u88d5\u5eca\u4e1c\u3001\u5927\u6210\uff0c\u4ee5\u53ca\u9760\u8fd1\u6a1f\u5b9c\u548c\u4e1c\u90e8\u5de5\u4e1a\u533a\u7684\u7f57\u592e\u2014\u5927\u58eb\u2014\u6a1f\u5b9c\u5730\u5e26\u3002\u65b0\u7535\u4fe1\u7684\u6570\u636e\u4e2d\u5fc3\u90e8\u95e8 Nxera \u548c Keppel \u6301\u7eed\u5728\u8fd9\u4e9b\u533a\u57df\u6269\u5c55\uff0c\u5305\u62ec Nxera \u7684 58 \u5146\u74e6 DC Tuas \u8bbe\u65bd\uff0c\u76ee\u6807\u662f\u5728 2026 \u5e74\u5e95\u6295\u5165\u8fd0\u8425\uff08[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002\n\n## 2019 \u5e74\u6682\u7f13\u5efa\u8bbe\u4e0e\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\n\n2019 \u5e74\uff0c\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u8fdb\u5165\u6709\u5e8f\u589e\u957f\u9636\u6bb5\u3002\u5f53\u65f6\u653f\u5e9c\u901a\u77e5\u8fd0\u8425\u5546\u6682\u65f6\u6682\u505c\u65b0\u7684\u6570\u636e\u4e2d\u5fc3\u5f00\u53d1\u9879\u76ee\uff0c\u540c\u65f6\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u5ba1\u67e5\u5982\u4f55\u534f\u8c03\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u9700\u6c42\u4e0e\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u4e0b\u7684\u6c14\u5019\u627f\u8bfa\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\u6682\u7f13\u63aa\u65bd\u5b9e\u65bd\u524d\u5df2\u83b7\u6279\u7684\u9879\u76ee\u4ecd\u53ef\u7ee7\u7eed\uff0c\u4f46\u5ba1\u67e5\u7ed3\u675f\u524d\u4e0d\u4f1a\u5206\u914d\u65b0\u7684\u5bb9\u91cf\u3002\u8d38\u5de5\u90e8\u957f\u4e8e 2023 \u5e74\u4e00\u6708\u5ba3\u5e03\u884c\u4e1a\u5ba1\u67e5\u5df2\u5b8c\u6210\uff1b\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e8e 2022 \u5e74\u4e03\u6708\u63a8\u51fa\u8bd5\u70b9\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff08DC-CFA\uff09\uff0c\u4f5c\u4e3a\u4ee5\u5ba1\u614e\u3001\u53ef\u6301\u7eed\u53d1\u5c55\u4f18\u5148\u7684\u65b9\u5f0f\u5206\u914d\u65b0\u589e\u5bb9\u91cf\u7684\u4e3b\u8981\u673a\u5236\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\n\n2022 \u5e74\u4e03\u6708\u5f00\u653e\u7684\u8bd5\u70b9 DC-CFA \u9080\u8bf7\u8fd0\u8425\u5546\u63d0\u4ea4\u65b9\u6848\uff0c\u5c55\u793a\u5176\u91c7\u7528\u5148\u8fdb\u80fd\u6e90\u6548\u7387\u6280\u672f\u3001\u8131\u78b3\u8def\u5f84\u3001\u5bf9\u65b0\u52a0\u5761\u533a\u57df\u8fde\u63a5\u7684\u8d21\u732e\u4ee5\u53ca\u66f4\u5e7f\u6cdb\u7ecf\u6d4e\u4ef7\u503c\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u30022023 \u5e74\u4e03\u6708\uff0c\u5728\u6536\u5230 20 \u591a\u4efd\u65b9\u6848\u540e\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u6682\u5b9a\u5411\u56db\u4e2a\u4f18\u9009\u9879\u76ee\u5206\u914d\u7ea6 80 \u5146\u74e6\u65b0\u589e\u5173\u952e IT \u8d1f\u8f7d\u5bb9\u91cf\uff1aEquinix\u3001GDS\u3001Microsoft\uff0c\u4ee5\u53ca AirTrunk\u2013ByteDance \u8054\u76df\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u5546\u4e1a\u65f6\u62a5\u300b\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u8bd5\u70b9\u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)\uff09\u3002DC-CFA \u6a21\u5f0f\u53d6\u4ee3\u4e86\u8fd0\u8425\u5546\u53ea\u8981\u62e5\u6709\u571f\u5730\u548c\u7535\u529b\u5373\u53ef\u5efa\u8bbe\u7684\u5f00\u653e\u5e02\u573a\uff1b\u81ea 2022 \u5e74\u8d77\uff0c\u6240\u6709\u65b0\u7684\u7eff\u5730\u9879\u76ee\u5bb9\u91cf\u90fd\u5fc5\u987b\u5148\u901a\u8fc7\u7533\u8bf7\u5f81\u96c6\u83b7\u5f97\u5206\u914d\uff0c\u65b9\u53ef\u63a8\u8fdb\u3002\n\n2025 \u5e74\u5341\u4e8c\u6708 1 \u65e5\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u542f\u52a8\u7b2c\u4e8c\u8f6e\u7533\u8bf7\uff08DC-CFA2\uff09\uff0c\u63d0\u4f9b\u81f3\u5c11 200 \u5146\u74e6\u65b0\u589e\u5bb9\u91cf\uff0c\u5e76\u53ef\u80fd\u901a\u8fc7\u521b\u65b0\u7eff\u8272\u80fd\u6e90\u8def\u5f84\u63d0\u4f9b\u66f4\u591a\u5bb9\u91cf\uff1b\u540c\u65f6\uff0c\u5176\u53ef\u6301\u7eed\u6027\u95e8\u69db\u4e5f\u6bd4\u8bd5\u70b9\u8f6e\u6b21\u66f4\u4e25\u683c\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff1b[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002DC-CFA2 \u7533\u8bf7\u8005\u5fc5\u987b\u5728 IT \u8d1f\u8f7d\u8fbe\u5230 100% \u65f6\u5b9e\u73b0 1.25 \u6216\u66f4\u4f4e\u7684\u7535\u80fd\u4f7f\u7528\u6548\u7387\uff08PUE\uff09\uff0c\u53d6\u5f97\u5efa\u8bbe\u5c40\u2014\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40 2024 \u5e74\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u8ba4\u8bc1\uff0c\u90e8\u7f72\u7b26\u5408\u65b0\u52a0\u5761\u6807\u51c6 SS 715:2025 \u6570\u636e\u4e2d\u5fc3 IT \u80fd\u6548\u8981\u6c42\u7684\u8bbe\u5907\uff0c\u5e76\u4ece\u7b26\u5408\u8d44\u683c\u7684\u7eff\u8272\u80fd\u6e90\u8def\u5f84\u4e2d\u53d6\u5f97\u81f3\u5c11 50% \u7684\u8bbe\u65bd\u7528\u7535\uff0c\u4f8b\u5982\u751f\u7269\u7532\u70f7\u3001\u4f4e\u78b3\u6c28\u6216\u6c22\u3001\u914d\u5907\u78b3\u6355\u96c6\u6280\u672f\u7684\u65b0\u578b\u71c3\u6599\u7535\u6c60\uff0c\u6216\u5efa\u7b51\u4e00\u4f53\u5316\u5149\u4f0f\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff09\u3002\u5177\u6709\u72ec\u7279\u5dee\u5f02\u5316\u6218\u7565\u65b9\u6848\u7684\u516c\u53f8\uff0c\u4e5f\u53ef\u4ee5\u901a\u8fc7\u6218\u7565\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u8ba1\u5212\uff08SDIS\uff09\u76f4\u63a5\u5411\u7ecf\u6d4e\u53d1\u5c55\u5c40\u63d0\u51fa\u7533\u8bf7\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff09\u3002\n\n2026 \u5e74 **\u516b\u6708 21 \u65e5**\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u5ba3\u5e03\uff0c\u901a\u8fc7 DC-CFA2 \u5df2\u5411\u56db\u5bb6\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5546**\u6682\u5b9a\u5206\u914d 200 \u5146\u74e6\u65b0\u589e\u5bb9\u91cf**\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\uff1aDC-CFA2 \u9009\u51fa\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u9879\u76ee](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 21 \u65e5\uff09\u3002\u8fd9\u662f\u6682\u5b9a\u5206\u914d\u7ed3\u679c\uff0c\u5e76\u4e0d\u4ee3\u8868\u56db\u5ea7\u8bbe\u65bd\u90fd\u5df2\u6295\u5165\u8fd0\u8425\uff1b\u5e94\u7ed3\u5408\u65e9\u524d DC-CFA2 \u63d0\u4f9b\u7684\u5bb9\u91cf\u53ca\u5176\u53ef\u6301\u7eed\u6027\u95e8\u69db\u6765\u7406\u89e3\u8fd9\u9879\u516c\u544a\u3002\n\n## \u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u4e0e\u53ef\u6301\u7eed\u6027\u6807\u51c6\n\n\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e8e 2024 \u5e74\u4e94\u6708 29 \u65e5\u63a8\u51fa\u300a\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u300b\uff0c\u4e3a\u5168\u884c\u4e1a\u8bbe\u5b9a\u53ef\u6301\u7eed\u6027\u6846\u67b6\uff0c\u5e76\u7531\u5404\u8f6e\u7533\u8bf7\u5f81\u96c6\u5728\u5b9e\u8df5\u4e2d\u843d\u5b9e\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u65b0\u95fb\u7a3f\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap)\uff09\u3002\u8def\u7ebf\u56fe\u65e8\u5728\u77ed\u671f\u5185\u65b0\u589e\u81f3\u5c11 300 \u5146\u74e6\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\uff0c\u5e76\u53ef\u80fd\u901a\u8fc7\u90e8\u7f72\u7eff\u8272\u80fd\u6e90\u518d\u91ca\u653e 200 \u5146\u74e6\u53ca\u66f4\u591a\u5bb9\u91cf\uff0c\u540c\u65f6\u5728\u5341\u5e74\u5185\u63a8\u52a8\u6240\u6709\u5df2\u5b89\u88c5\u8bbe\u65bd\u63d0\u9ad8\u6548\u7387\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u8fd9\u4e0e\u65b0\u52a0\u5761\u66f4\u5e7f\u6cdb\u7684[\u7eff\u8272\u8ba1\u5212 2030](\/zh\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030)\u53ca 2050 \u5e74\u51c0\u96f6\u6392\u653e\u8f68\u8ff9\u76f8\u5951\u5408\uff0c\u4e5f\u8865\u5145\u4e86\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u5728[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u9886\u57df\u7684\u80fd\u6e90\u8f6c\u578b\u89c4\u5212\u3002\n\n\u5728\u8bbe\u65bd\u6548\u7387\u65b9\u9762\uff0c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u76ee\u6807\u662f\uff0c\u8def\u7ebf\u56fe\u53d1\u5e03\u540e\u7684\u5341\u5e74\u5185\uff0c\u65b0\u52a0\u5761\u6240\u6709\u6570\u636e\u4e2d\u5fc3\u5728 IT \u8d1f\u8f7d\u8fbe\u5230 100% \u65f6\u5b9e\u73b0\u4f4e\u4e8e 1.3 \u7684 PUE\uff1b\u76ee\u524d\u9876\u5c16\u8bbe\u8ba1\u5df2\u80fd\u8fbe\u5230\u8fd9\u4e00\u95e8\u69db\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u65b0\u52a0\u5761\u7387\u5148\u5236\u5b9a\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6807\u51c6\uff0c\u5141\u8bb8\u8bbe\u65bd\u5728\u8f83\u9ad8\u73af\u5883\u6e29\u5ea6\u548c\u6e7f\u5ea6\u4e0b\u5b89\u5168\u8fd0\u884c\uff0c\u4ece\u800c\u51cf\u5c11\u8d64\u9053\u6c14\u5019\u4e0b\u7684\u5236\u51b7\u80fd\u8017\uff1b\u8def\u7ebf\u56fe\u8fd8\u8981\u6c42\u5728 2024 \u5e74\u5e95\u524d\u66f4\u65b0\u5efa\u8bbe\u5c40\u2014\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\uff08GMDC\uff09\u8ba4\u8bc1\uff0c\u5e76\u5728 2025 \u5e74\u524d\u63a8\u51fa IT \u8bbe\u5907\u6807\u51c6 SS 715:2025 \u548c\u6db2\u51b7\u5e94\u7528\u6807\u51c6\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u968f\u7740\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u63a8\u52a8\u673a\u67b6\u5bc6\u5ea6\u4ece 2020 \u5e74\u6bcf\u673a\u67b6\u7ea6 8 \u5343\u74e6\u5347\u81f3\u6bcf\u673a\u67b6 20\u2013100 \u5343\u74e6\uff0c\u8def\u7ebf\u56fe\u9f13\u52b1\u91c7\u7528\u98ce\u51b7\u4e0e\u6db2\u51b7\u6df7\u5408\u914d\u7f6e\uff0c\u5e76\u901a\u8fc7\u65b0\u52a0\u5761\u56fd\u7acb\u5927\u5b66\u7684\u53ef\u6301\u7eed\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6d4b\u8bd5\u5e73\u53f0\u5f00\u5c55\u7814\u7a76\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n\u6570\u636e\u4e2d\u5fc3\u662f\u91cd\u8981\u7528\u6c34\u6237\uff1a2021 \u5e74\uff0c\u65b0\u52a0\u5761\u5927\u578b\u6570\u636e\u4e2d\u5fc3\uff08\u5e74\u7528\u6c34\u91cf\u81f3\u5c11\u4e3a 60,000 \u7acb\u65b9\u7c73\uff09\u7684\u4e2d\u4f4d\u6c34\u8d44\u6e90\u4f7f\u7528\u6548\u7387\uff08WUE\uff09\u4e3a\u6bcf\u5146\u74e6\u65f6 2.2 \u7acb\u65b9\u7c73\uff1b\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e0e\u56fd\u5bb6\u6c34\u52a1\u673a\u6784\u516c\u7528\u4e8b\u4e1a\u5c40\u7684\u76ee\u6807\u662f\u5728\u5341\u5e74\u5185\u901a\u8fc7\u4f18\u5316\u51b7\u5374\u5854\u548c\u56de\u6536\u5229\u7528\uff0c\u5c06\u884c\u4e1a WUE \u964d\u81f3\u6bcf\u5146\u74e6\u65f6 2.0 \u7acb\u65b9\u7c73\u6216\u66f4\u4f4e\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u7ecf\u6d4e\u53d1\u5c55\u5c40\u901a\u8fc7\u51cf\u5c11\u6392\u653e\u8d44\u6e90\u6548\u7387\u6d25\u8d34\u548c\u51cf\u6392\u6295\u8d44\u6d25\u8d34\u63d0\u4f9b\u5171\u540c\u8d44\u52a9\uff0c\u4ee5\u652f\u6301\u73b0\u6709\u8bbe\u65bd\u6539\u9020\uff1b\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u7eff\u8272\u8ba1\u7b97\u8d44\u52a9\u8ba1\u5212\u81ea 2024 \u5e74\u4e00\u6708\u8d77\u62e8\u51fa 30 \u767e\u4e07\u65b0\u5143\uff0c\u652f\u6301\u8f6f\u4ef6\u5c42\u9762\u7684\u80fd\u6e90\u6548\u7387\u7814\u7a76\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n## \u8d85\u5927\u89c4\u6a21\u6295\u8d44\u4e0e\u88d5\u5eca\u5c9b\u6269\u5efa\n\n\u8d85\u5927\u89c4\u6a21\u4e91\u670d\u52a1\u5546\u662f\u63a8\u52a8\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u9879\u76ee\u50a8\u5907\u9700\u6c42\u7684\u91cd\u8981\u652f\u67f1\u3002AWS \u4e8e 2024 \u5e74\u4e94\u6708\u5ba3\u5e03\u8ba1\u5212\u5728 2024 \u5e74\u81f3 2028 \u5e74\u95f4\uff0c\u8ffd\u52a0\u6295\u8d44 12 \u5341\u4ebf\u65b0\u5143\u7528\u4e8e\u73b0\u6709\u65b0\u52a0\u5761\u4e91\u57fa\u7840\u8bbe\u65bd\uff0c\u4f7f AWS \u4e9a\u592a\u5730\u533a\uff08\u65b0\u52a0\u5761\uff09\u533a\u57df\u622a\u81f3 2028 \u5e74\u7684\u8ba1\u5212\u603b\u6295\u8d44\u8d85\u8fc7 23 \u5341\u4ebf\u65b0\u5143\uff1b\u8fd9\u7b14\u6295\u8d44\u662f\u5728 2010 \u5e74\u81f3 2023 \u5e74\u671f\u95f4\u5df2\u6295\u5165\u7684 11.5 \u5341\u4ebf\u65b0\u5143\u4e4b\u5916\u3002\u9884\u8ba1\u5230 2028 \u5e74\uff0c\u8be5\u6295\u8d44\u5c06\u4e3a\u65b0\u52a0\u5761\u56fd\u5185\u751f\u4ea7\u603b\u503c\u8d21\u732e 23.7 \u5341\u4ebf\u65b0\u5143\uff0c\u5e76\u6bcf\u5e74\u5728\u4f9b\u5e94\u94fe\u4e2d\u652f\u6301\u7ea6 12,300 \u4e2a\u5168\u804c\u7b49\u503c\u5de5\u4f5c\u5c97\u4f4d\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 AWS \u6295\u8d44\u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html)\uff09\u3002Microsoft \u662f\u8bd5\u70b9 DC-CFA \u7684\u56db\u4e2a\u4f18\u9009\u9879\u76ee\u4e4b\u4e00\uff0c\u5e76\u7ee7\u7eed\u6269\u5927\u5176\u5728\u65b0\u52a0\u5761\u7684 Azure \u57fa\u7840\u8bbe\u65bd\uff0c\u4f5c\u4e3a\u66f4\u5e7f\u6cdb\u7684\u4e1c\u5357\u4e9a\u4e91\u8ba1\u7b97\u548c\u4eba\u5de5\u667a\u80fd\u6295\u8d44\u8ba1\u5212\u7684\u4e00\u90e8\u5206\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002Google Cloud \u5728\u65b0\u52a0\u5761\u8fd0\u8425\u6210\u719f\u7684\u4e91\u533a\u57df\uff0c\u5e76\u4e0e\u533a\u57df\u540c\u884c\u4e00\u9053\u6301\u7eed\u6269\u5145\u5bb9\u91cf\u3002\n\n\u4e00\u5904\u503c\u5f97\u5173\u6ce8\u7684\u65b0\u5740\u4f4d\u4e8e[\u88d5\u5eca\u5c9b](\/zh\/knowledge\/article\/sgkb.business-industry.petrochemicals-industry)\u3002\u7ecf\u6d4e\u53d1\u5c55\u5c40\u5df2\u9884\u7559\u7ea6 20 \u516c\u9877\u571f\u5730\uff0c\u7528\u4e8e\u5efa\u8bbe\u65b0\u52a0\u5761\u6700\u5927\u7684\u4f4e\u78b3\u6570\u636e\u4e2d\u5fc3\u56ed\u533a\uff0c\u6f5c\u5728\u5bb9\u91cf\u9ad8\u8fbe 700 \u5146\u74e6\uff0c\u4ee5\u6ee1\u8db3\u4eba\u5de5\u667a\u80fd\u9a71\u52a8\u7684\u9700\u6c42\uff1b\u8be5\u56ed\u533a\u5c06\u878d\u5165\u5c9b\u4e0a\u66f4\u5e7f\u6cdb\u7684\u6c22\u3001\u6c28\u548c\u53ef\u6301\u7eed\u822a\u7a7a\u71c3\u6599\u57fa\u7840\u8bbe\u65bd\u8f6c\u578b\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u88d5\u5eca\u5c9b\u5408\u4f5c\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html)\uff09\u3002\u5c06\u8d85\u5927\u89c4\u6a21\u5bb9\u91cf\u8bbe\u4e8e\u88d5\u5eca\u5c9b\uff0c\u53ef\u8ba9\u8fd0\u8425\u5546\u5229\u7528\u90bb\u8fd1\u7684\u4f4e\u78b3\u80fd\u6e90\u8bd5\u70b9\u9879\u76ee\uff0c\u5305\u62ec\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u6b63\u5728\u7814\u7a76\u7684\u6c28\u548c\u6c22\u9879\u76ee\uff0c\u800c\u4e0d\u5fc5\u5b8c\u5168\u4f9d\u8d56[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u4e2d\u6240\u8ff0\u3001\u4ee5\u5929\u7136\u6c14\u4e3a\u4e3b\u7684\u672c\u5c9b\u7535\u7f51\u3002\u51b7\u5374\u7cfb\u7edf\u4f9b\u5e94\u5546 Johnson Controls \u4ee5\u4e9a\u592a\u5730\u533a\u6570\u636e\u4e2d\u5fc3\u589e\u957f\u4e3a\u7531\uff0c\u4e8e 2025 \u5e74\u6269\u5927\u5176\u65b0\u52a0\u5761\u533a\u57df\u67a2\u7ebd\uff0c\u53cd\u6620\u51fa\u8be5\u884c\u4e1a\u6240\u652f\u6491\u7684\u4e0b\u6e38\u4ea7\u4e1a\u751f\u6001\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 Johnson Controls \u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)\uff09\u3002\n\n## \u7535\u529b\u9700\u6c42\u3001\u9650\u5236\u4e0e\u533a\u57df\u5916\u6ea2\n\n\u6570\u636e\u4e2d\u5fc3\u662f\u65b0\u52a0\u5761\u7535\u529b\u6d88\u8017\u589e\u957f\u6700\u5feb\u7684\u884c\u4e1a\u4e4b\u4e00\u3002\u622a\u81f3 2025 \u5e74\uff0c\u6570\u636e\u4e2d\u5fc3\u4f30\u8ba1\u5360\u5168\u56fd\u80fd\u6e90\u6d88\u8017\u7684 7%\uff1b\u968f\u7740\u4e91\u8ba1\u7b97\u548c\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u6269\u5c55\uff0c\u9884\u8ba1\u5230 2030 \u5e74\u5c06\u5347\u81f3 12%\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 Johnson Controls \u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)\uff09\u3002\u5728\u672c\u5730\u8d44\u8baf\u4e0e\u901a\u4fe1\u884c\u4e1a\u5185\u90e8\uff0c\u6570\u636e\u4e2d\u5fc3\u7ea6\u5360\u78b3\u6392\u653e\u91cf\u7684 82%\uff0c\u56e0\u6b64\u8be5\u884c\u4e1a\u8131\u78b3\u5bf9\u65b0\u52a0\u5761\u6570\u5b57\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u81f3\u5173\u91cd\u8981\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u300a2025 \u5e74\u7535\u529b\u9700\u6c42\u4e0e\u4f9b\u5e94\u5c55\u671b\u300b\u9884\u6d4b\uff0c2025 \u5e74\u81f3 2034 \u5e74\u7cfb\u7edf\u5cf0\u503c\u9700\u6c42\u7684\u590d\u5408\u5e74\u589e\u957f\u7387\u4e3a 2.4%\u20134.8%\uff1b\u5176\u4e0a\u9650\u60c5\u666f\u660e\u786e\u7eb3\u5165\u6570\u636e\u4e2d\u5fc3\u548c\u5148\u8fdb\u5236\u9020\u4e1a\u65b0\u589e\u9700\u6c42\uff08[\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u300a2025 \u5e74\u5c55\u671b\u300b\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf)\uff09\u3002\n\n\u65b0\u52a0\u5761\u571f\u5730\u7a00\u7f3a\u3001\u70ed\u5e26\u6c14\u5019\u9700\u8981\u5236\u51b7\uff0c\u4e14\u672c\u5730\u53ef\u518d\u751f\u80fd\u6e90\u6f5c\u529b\u6709\u9650\uff0c\u56e0\u6b64\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u6709\u610f\u9650\u5236\u5bb9\u91cf\u589e\u957f\u901f\u5ea6\u3002\u8bd5\u70b9\u8f6e\u6b21\u4ece 20 \u591a\u4efd\u7ade\u6807\u65b9\u6848\u4e2d\u53ea\u5206\u914d\u4e86 80 \u5146\u74e6\uff1bDC-CFA2 \u63d0\u4f9b\u81f3\u5c11 200 \u5146\u74e6\uff0c\u4f46\u5bf9\u7eff\u8272\u7535\u529b\u6765\u6e90\u65bd\u52a0\u4e86\u66f4\u4e25\u683c\u8981\u6c42\uff0c\u4f7f\u6269\u5f20\u901f\u5ea6\u53d6\u51b3\u4e8e\u4f4e\u78b3\u80fd\u6e90\u57fa\u7840\u8bbe\u65bd\u7684\u5efa\u8bbe\u8fdb\u5ea6\uff0c\u5305\u62ec\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u4e3a 2035 \u5e74\u5b9e\u73b0 6 \u5409\u74e6\u4f4e\u78b3\u7535\u529b\u8fdb\u53e3\u76ee\u6807\u800c\u63a8\u8fdb\u7684\u533a\u57df\u7535\u529b\u8fdb\u53e3\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff1b\u53e6\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff09\u3002\u5206\u6790\u4eba\u58eb\u548c\u884c\u4e1a\u89c2\u5bdf\u8005\u6307\u51fa\uff0c\u8d85\u5927\u89c4\u6a21\u8fd0\u8425\u5546\u8d8a\u6765\u8d8a\u591a\u5730\u5728\u90bb\u8fd1\u7684\u9a6c\u6765\u897f\u4e9a\u67d4\u4f5b\u3001\u65b0\u52a0\u5761\u96c5\u52a0\u8fbe\u548c\u66fc\u8c37\u5efa\u8bbe\u5927\u89c4\u6a21\u5bb9\u91cf\uff0c\u56e0\u4e3a\u5f53\u5730\u571f\u5730\u548c\u7535\u529b\u66f4\u4fbf\u5b9c\uff1b\u540c\u65f6\u4fdd\u7559\u65b0\u52a0\u5761\u4ee5\u627f\u8f7d\u5bf9\u5ef6\u8fdf\u654f\u611f\u7684\u9ad8\u7aef\u5de5\u4f5c\u8d1f\u8f7d\u3002\u8fd9\u79cd\u6a21\u5f0f\u65e2\u7ef4\u6301\u4e86\u65b0\u52a0\u5761\u7684\u67a2\u7ebd\u5730\u4f4d\uff0c\u4e5f\u907f\u514d\u672c\u5730\u5bb9\u91cf\u4e0d\u53d7\u9650\u5236\u5730\u589e\u957f\uff08[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002\u56e0\u6b64\uff0c\u65b0\u52a0\u5761\u6570\u5b57\u7ecf\u6d4e\u96c4\u5fc3\u4e0e\u5176[\u7eff\u8272\u8ba1\u5212 2030](\/zh\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030)\u80fd\u6e90\u76ee\u6807\u4e4b\u95f4\u7684\u5f20\u529b\u662f\u7ed3\u6784\u6027\u7684\uff1a\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u53ef\u4ee5\u589e\u957f\uff0c\u4f46\u589e\u957f\u901f\u5ea6\u53ea\u80fd\u4e0e\u6548\u7387\u63d0\u5347\u548c\u7eff\u8272\u7535\u529b\u4f9b\u5e94\u76f8\u5339\u914d\uff0c\u5e76\u53d7\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u5206\u914d\u628a\u5173\u673a\u5236\u7ea6\u675f\u3002","summary":"\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u53d7\u5230\u4e25\u683c\u76d1\u7ba1\u7684\u533a\u57df\u67a2\u7ebd\uff0c\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\u3002\u81ea 2019 \u5e74\u8d77\uff0c\u8be5\u884c\u4e1a\u7531\u6682\u7f13\u5efa\u8bbe\u8f6c\u4e3a\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u7ba1\u7406\uff0c\u5728\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u548c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u7684\u76d1\u7763\u4e0b\uff0c\u5c06\u65b0\u589e\u5bb9\u91cf\u4e0e\u80fd\u6e90\u6548\u7387\u548c\u7eff\u8272\u7535\u529b\u8981\u6c42\u6302\u94a9\u3002","title":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a"}},"source_id":"sgkb.business-industry.data-centre-industry","status":"verified","summary_en":"Singapore's data centre industry is a tightly regulated regional hub with operational capacity exceeding 1.4 gigawatts, governed since 2019 by a moratorium-turned-Call-for-Application model that ties new capacity to energy-efficiency and green-power requirements under IMDA and EDB oversight.","summary_zh":"\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u53d7\u5230\u4e25\u683c\u76d1\u7ba1\u7684\u533a\u57df\u67a2\u7ebd\uff0c\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\u3002\u81ea 2019 \u5e74\u8d77\uff0c\u8be5\u884c\u4e1a\u7531\u6682\u7f13\u5efa\u8bbe\u8f6c\u4e3a\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u7ba1\u7406\uff0c\u5728\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u548c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u7684\u76d1\u7763\u4e0b\uff0c\u5c06\u65b0\u589e\u5bb9\u91cf\u4e0e\u80fd\u6e90\u6548\u7387\u548c\u7eff\u8272\u7535\u529b\u8981\u6c42\u6302\u94a9\u3002","title_en":"Data Centre Industry","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a","wiki":{"domain":"business-industry","last_verified":"2026-08-21","locales":{"en":{"markdown":"# Data Centre Industry\n\nSingapore's data centre industry is one of Southeast Asia's largest and most connectivity-dense digital-infrastructure clusters, hosting operational capacity exceeding 1.4 gigawatts as of 2024 and serving as the physical backbone for cloud computing, financial services, and artificial-intelligence workloads across the region ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). The sector sits at the intersection of Singapore's digital-economy ambitions \u2014 the digital economy contributed roughly 17% of gross domestic product in 2022 \u2014 and its land, power, and water constraints as a compact city-state ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf); see [startup ecosystem](\/en\/knowledge\/article\/sgkb.business-industry.startup-ecosystem) and [telco and internet](\/en\/knowledge\/article\/sgkb.daily-life.telco-and-internet)). Unlike many countries where data centre growth is largely market-driven, Singapore allocates new capacity through a government-managed Call for Application (CFA) exercise led by the Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA), making sustainability and strategic economic value explicit gatekeeping criteria; dated capacity awards and DC-CFA2 thresholds are tabulated in [data centre industry anchors](\/en\/knowledge\/dataset\/sgkb.data.data-centre-industry-anchors) ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)).\n\n## Singapore as a regional data centre hub\n\nSingapore's data centre industry draws on the country's broader position as a trusted business and digital hub: dense submarine-cable landings, strong intellectual-property protection, cross-border data-flow agreements, and a skilled technology workforce ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). As of 2024, Singapore's operational data centre capacity per capita exceeded that of Australia, China, Japan, South Korea, and the United Kingdom, and key markets such as Beijing, Hong Kong, Seoul, Sydney, and Tokyo ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). The Digital Connectivity Blueprint launched in June 2023 targets doubling submarine-cable landings over the following decade, reinforcing the connectivity case for hosting compute in Singapore rather than in lower-cost neighbouring markets ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\nThe industry spans colocation operators that rent rack space to enterprise tenants and hyperscale cloud providers that build and operate facilities for their own platforms. Major colocation and carrier-neutral operators with a Singapore footprint include Equinix, Digital Realty, Global Switch, Keppel Data Centres, ST Telemedia Global Data Centres, AirTrunk, Princeton Digital Group, and GDS Holdings, while hyperscale cloud regions are operated by Amazon Web Services (AWS), Microsoft Azure, and Google Cloud ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [Business Times DC-CFA pilot, accessed Aug 2026](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)). Facilities cluster in three main corridors: Jurong and Jurong East, Tai Seng, and the Loyang\u2013Tuas\u2013Changi belt near Changi and the eastern industrial estates. Singtel's data-centre unit Nxera and Keppel continue to expand within these zones, including Nxera's 58-megawatt DC Tuas facility targeted for operations by end-2026 ([ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)).\n\n## The 2019 moratorium and the Call for Application model\n\nSingapore's data centre industry entered a managed-growth phase in 2019 when the Government informed operators of a temporary pause on new data centre developments while EDB and IMDA reviewed how to reconcile digital-infrastructure demand with climate commitments under the Paris Agreement ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)). Projects already authorised before the pause could still proceed, but no fresh capacity allocations were made until the review concluded. The Minister for Trade and Industry announced in January 2023 that the sector review was complete, and in July 2022 EDB and IMDA launched a pilot Data Centre \u2013 Call for Application (DC-CFA) as the primary mechanism for allocating new capacity on a calibrated, sustainability-first basis ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)).\n\nThe pilot DC-CFA, which opened in July 2022, invited operators to submit proposals demonstrating state-of-the-art energy efficiency, decarbonisation pathways, contribution to Singapore's regional connectivity, and broader economic value ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)). In July 2023, after receiving more than 20 proposals, EDB and IMDA provisionally awarded about 80 megawatts of new critical IT load capacity to four winners: Equinix, GDS, Microsoft, and an AirTrunk\u2013ByteDance consortium ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [Business Times DC-CFA pilot, accessed Aug 2026](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)). The DC-CFA model replaced an open market in which any operator with land and power could build; since 2022, all new greenfield capacity must win a CFA allocation before proceeding.\n\nOn 1 December 2025, EDB and IMDA launched the second exercise (DC-CFA2), offering at least 200 megawatts of new capacity \u2014 with potentially more through innovative green-energy pathways \u2014 and tightening sustainability thresholds beyond the pilot round ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf); [ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). DC-CFA2 applicants must achieve a Power Usage Effectiveness (PUE) of 1.25 or better at 100% IT load, obtain Building and Construction Authority (BCA)\u2013IMDA Green Mark for Data Centres 2024 Platinum certification, deploy IT equipment meeting the Singapore Standard SS 715:2025 on data-centre IT energy efficiency, and source at least 50% of facility power from eligible green-energy pathways such as biomethane, low-carbon ammonia or hydrogen, novel fuel cells with carbon capture, or building-integrated photovoltaics ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)). Companies with uniquely differentiated strategic proposals may alternatively approach EDB through the Strategic Digital Infrastructure Scheme (SDIS) ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)).\n\nOn **21 August 2026**, EDB and IMDA announced that they had **provisionally allocated 200 MW of new capacity to four data-centre operators** through DC-CFA2 ([EDB, four data-centre proposals selected under DC-CFA2](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html), accessed 21 August 2026). This is a provisional allocation outcome, not proof that all four facilities are already operational; the earlier DC-CFA2 offer and its sustainability thresholds remain the policy context for interpreting the announcement.\n\n## Green Data Centre Roadmap and sustainability standards\n\nThe Green Data Centre Roadmap, launched by IMDA on 29 May 2024, sets the sector-wide sustainability framework that the CFA exercises implement in practice ([IMDA Green DC Roadmap press release, accessed Aug 2026](https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap)). The Roadmap aims to provide at least 300 megawatts of additional data centre capacity in the near term, with potentially another 200 megawatts and more unlocked through green-energy deployments, while pushing the entire installed base toward higher efficiency over a ten-year horizon ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). This sits within Singapore's wider [green plan 2030](\/en\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030) net-zero-by-2050 trajectory and complements EMA's energy-transition planning in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid).\n\nOn facility efficiency, IMDA targets all data centres in Singapore achieving PUE below 1.3 at 100% IT load within ten years of the Roadmap \u2014 a threshold current best-in-class designs can already meet ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). Singapore pioneered a Tropical Data Centre standard allowing facilities to run safely at higher ambient temperatures and humidity, reducing cooling energy in the equatorial climate, and the Roadmap refreshed the BCA\u2013IMDA Green Mark for Data Centres (GMDC) certification by end-2024 while introducing SS 715:2025 standards for IT equipment and liquid-cooling adoption by 2025 ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). As AI workloads push rack densities from roughly 8 kilowatts per rack in 2020 toward 20\u2013100 kilowatts per rack, the Roadmap encourages hybrid air- and liquid-cooling configurations and research through the Sustainable Tropical Data Centre Testbed at the National University of Singapore ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\nOn water, data centres are significant users: the median Water Usage Effectiveness (WUE) among large Singapore data centres (those consuming at least 60,000 cubic metres of water annually) was 2.2 cubic metres per megawatt-hour in 2021, and IMDA and the national water agency PUB target reducing sector WUE to 2.0 m\u00b3\/MWh or lower over ten years through cooling-tower optimisation and recycling ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). EDB offers co-funding through the Resource Efficiency Grant for Emissions and Investment Allowance for Emissions Reduction to support retrofitting existing facilities, while IMDA's Green Computing Funding Initiative allocated S$30 million from January 2024 for software-level energy-efficiency research ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\n## Hyperscale investment and the Jurong Island expansion\n\nHyperscale cloud providers anchor much of the demand driving Singapore's data centre pipeline. AWS announced in May 2024 plans to invest an additional S$12 billion in its existing Singapore cloud infrastructure from 2024 to 2028, bringing total planned investment in the AWS Asia Pacific (Singapore) Region to more than S$23 billion by 2028 \u2014 on top of S$11.5 billion invested from 2010 through 2023 \u2014 with an estimated S$23.7 billion contribution to Singapore GDP and roughly 12,300 full-time-equivalent jobs supported annually in the supply chain by 2028 ([EDB AWS investment, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html)). Microsoft was among the four pilot DC-CFA winners and continues expanding Azure infrastructure in Singapore as part of a broader Southeast Asia cloud and AI investment programme ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). Google Cloud operates an established cloud region in Singapore and continues capacity expansion alongside regional peers.\n\nA notable new site is on [Jurong Island](\/en\/knowledge\/article\/sgkb.business-industry.petrochemicals-industry), where EDB has reserved about 20 hectares for Singapore's largest low-carbon data centre park, with potential capacity of up to 700 megawatts to support AI-driven demand, integrated into the island's broader shift toward hydrogen, ammonia, and sustainable aviation fuel infrastructure ([EDB Jurong Island partnerships, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html)). Locating hyperscale capacity on Jurong Island allows operators to tap adjacent low-carbon energy pilots \u2014 including ammonia and hydrogen projects under EMA study \u2014 rather than drawing exclusively on the mainland natural-gas-dominated grid described in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid). Johnson Controls, a cooling-systems supplier, expanded its Singapore regional hub in 2025 citing Asia-Pacific data centre growth, reflecting the downstream industrial ecosystem the sector supports ([EDB Johnson Controls, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)).\n\n## Power demand, constraints, and regional spillover\n\nData centres are among Singapore's fastest-growing electricity consumers. As of 2025, data centres accounted for an estimated 7% of national energy consumption, a share projected to rise to 12% by 2030 as cloud and AI workloads expand ([EDB Johnson Controls, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)). Within the domestic information and communications sector, data centres represent about 82% of carbon emissions, making the sector's decarbonisation central to Singapore's digital sustainability goals ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). EMA's Electricity Demand and Supply Outlook (2025) projects system peak demand growing at a compound annual rate of 2.4%\u20134.8% from 2025 to 2034, with an upper-bound scenario explicitly incorporating additional demand from data centres and advanced manufacturing ([EMA Outlook 2025, accessed Aug 2026](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf)).\n\nSingapore's land scarcity, tropical cooling needs, and finite domestic renewable potential mean the CFA model deliberately caps how fast capacity can grow. The pilot round allocated only 80 megawatts from more than 20 bids; DC-CFA2 offers at least 200 megawatts but imposes stricter green-power sourcing that ties expansion to the pace of low-carbon energy infrastructure \u2014 including regional electricity imports that EMA is developing toward a 6-gigawatt low-carbon import target by 2035 ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf); see [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)). Analysts and industry observers note that hyperscale operators increasingly build bulk capacity in neighbouring Johor (Malaysia), Jakarta, and Bangkok where land and power are cheaper, while retaining Singapore for latency-sensitive, premium-tier workloads \u2014 a pattern that preserves Singapore's hub status without unconstrained local growth ([ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). The tension between Singapore's digital-economy ambitions and its [green plan 2030](\/en\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030) energy targets is therefore structural: the data centre industry can grow, but only as fast as efficiency gains and green-power supply allow under EDB and IMDA's allocation gatekeeping.","summary":"Singapore's data centre industry is a tightly regulated regional hub with operational capacity exceeding 1.4 gigawatts, governed since 2019 by a moratorium-turned-Call-for-Application model that ties new capacity to energy-efficiency and green-power requirements under IMDA and EDB oversight.","title":"Data Centre Industry"},"zh":{"markdown":"# \u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\n\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u4e1c\u5357\u4e9a\u6700\u5927\u3001\u8fde\u63a5\u6700\u5bc6\u96c6\u7684\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u96c6\u7fa4\u4e4b\u4e00\u3002\u622a\u81f3 2024 \u5e74\uff0c\u5176\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\uff0c\u4e3a\u6574\u4e2a\u533a\u57df\u7684\u4e91\u8ba1\u7b97\u3001\u91d1\u878d\u670d\u52a1\u548c\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u63d0\u4f9b\u5b9e\u4f53\u57fa\u7840\u8bbe\u65bd\u652f\u6491\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u8be5\u884c\u4e1a\u5904\u4e8e\u65b0\u52a0\u5761\u6570\u5b57\u7ecf\u6d4e\u96c4\u5fc3\u4e0e\u5176\u571f\u5730\u3001\u7535\u529b\u548c\u6c34\u8d44\u6e90\u9650\u5236\u7684\u4ea4\u6c47\u5904\uff1b2022 \u5e74\uff0c\u6570\u5b57\u7ecf\u6d4e\u7ea6\u5360\u56fd\u5185\u751f\u4ea7\u603b\u503c\u7684 17%\uff0c\u800c\u65b0\u52a0\u5761\u662f\u4e00\u4e2a\u9762\u79ef\u7d27\u51d1\u7684\u57ce\u90a6\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff1b\u53e6\u89c1[\u521d\u521b\u4f01\u4e1a\u751f\u6001\u7cfb\u7edf](\/zh\/knowledge\/article\/sgkb.business-industry.startup-ecosystem)\u548c[\u7535\u4fe1\u4e0e\u4e92\u8054\u7f51](\/zh\/knowledge\/article\/sgkb.daily-life.telco-and-internet)\uff09\u3002\u4e0e\u8bb8\u591a\u4e3b\u8981\u7531\u5e02\u573a\u63a8\u52a8\u6570\u636e\u4e2d\u5fc3\u589e\u957f\u7684\u56fd\u5bb6\u4e0d\u540c\uff0c\u65b0\u52a0\u5761\u901a\u8fc7\u7531\u7ecf\u6d4e\u53d1\u5c55\u5c40\uff08EDB\uff09\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\uff08IMDA\uff09\u4e3b\u5bfc\u7684\u653f\u5e9c\u7ba1\u7406\u578b\u7533\u8bf7\u5f81\u96c6\uff08CFA\uff09\u7a0b\u5e8f\u5206\u914d\u65b0\u589e\u5bb9\u91cf\uff0c\u5e76\u660e\u786e\u5c06\u53ef\u6301\u7eed\u6027\u548c\u6218\u7565\u7ecf\u6d4e\u4ef7\u503c\u5217\u4e3a\u51c6\u5165\u6807\u51c6\uff1b\u5e26\u65e5\u671f\u7684\u5bb9\u91cf\u5206\u914d\u7ed3\u679c\u548c DC-CFA2 \u95e8\u69db\u6c47\u603b\u4e8e[\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u57fa\u51c6\u6570\u636e](\/zh\/knowledge\/dataset\/sgkb.data.data-centre-industry-anchors)\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\n\n## \u65b0\u52a0\u5761\u4f5c\u4e3a\u533a\u57df\u6570\u636e\u4e2d\u5fc3\u67a2\u7ebd\n\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5f97\u76ca\u4e8e\u8be5\u56fd\u4f5c\u4e3a\u53ef\u4fe1\u8d56\u5546\u4e1a\u548c\u6570\u5b57\u67a2\u7ebd\u7684\u6574\u4f53\u5730\u4f4d\uff1a\u5bc6\u96c6\u7684\u6d77\u5e95\u7535\u7f06\u767b\u9646\u70b9\u3001\u5065\u5168\u7684\u77e5\u8bc6\u4ea7\u6743\u4fdd\u62a4\u3001\u8de8\u5883\u6570\u636e\u6d41\u52a8\u534f\u5b9a\uff0c\u4ee5\u53ca\u719f\u7ec3\u7684\u79d1\u6280\u4eba\u624d\u961f\u4f0d\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u622a\u81f3 2024 \u5e74\uff0c\u65b0\u52a0\u5761\u4eba\u5747\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7\u6fb3\u5927\u5229\u4e9a\u3001\u4e2d\u56fd\u3001\u65e5\u672c\u3001\u97e9\u56fd\u548c\u82f1\u56fd\uff0c\u4ee5\u53ca\u5317\u4eac\u3001\u9999\u6e2f\u3001\u9996\u5c14\u3001\u6089\u5c3c\u548c\u4e1c\u4eac\u7b49\u4e3b\u8981\u5e02\u573a\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u30022023 \u5e74\u516d\u6708\u542f\u52a8\u7684\u300a\u6570\u5b57\u8fde\u63a5\u84dd\u56fe\u300b\u76ee\u6807\u662f\u5728\u968f\u540e\u5341\u5e74\u5185\u5c06\u6d77\u5e95\u7535\u7f06\u767b\u9646\u70b9\u6570\u91cf\u7ffb\u500d\uff0c\u8fdb\u4e00\u6b65\u5de9\u56fa\u5c06\u8ba1\u7b97\u8bbe\u65bd\u8bbe\u4e8e\u65b0\u52a0\u5761\u3001\u800c\u975e\u6210\u672c\u8f83\u4f4e\u7684\u90bb\u8fd1\u5e02\u573a\u7684\u8fde\u63a5\u4f18\u52bf\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n\u8be5\u884c\u4e1a\u5305\u62ec\u5411\u4f01\u4e1a\u79df\u6237\u51fa\u79df\u673a\u67dc\u7a7a\u95f4\u7684\u6258\u7ba1\u670d\u52a1\u8fd0\u8425\u5546\uff0c\u4ee5\u53ca\u4e3a\u81ea\u6709\u5e73\u53f0\u5efa\u8bbe\u548c\u8fd0\u8425\u8bbe\u65bd\u7684\u8d85\u5927\u89c4\u6a21\u4e91\u670d\u52a1\u5546\u3002\u5728\u65b0\u52a0\u5761\u8bbe\u6709\u4e1a\u52a1\u7684\u4e3b\u8981\u6258\u7ba1\u670d\u52a1\u548c\u4e2d\u7acb\u8fd0\u8425\u5546\u5305\u62ec Equinix\u3001Digital Realty\u3001Global Switch\u3001Keppel Data Centres\u3001ST Telemedia Global Data Centres\u3001AirTrunk\u3001Princeton Digital Group \u548c GDS Holdings\uff1b\u8d85\u5927\u89c4\u6a21\u4e91\u533a\u57df\u5219\u7531 Amazon Web Services\uff08AWS\uff09\u3001Microsoft Azure \u548c Google Cloud \u8fd0\u8425\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u5546\u4e1a\u65f6\u62a5\u300b\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u8bd5\u70b9\u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)\uff09\u3002\u8bbe\u65bd\u4e3b\u8981\u96c6\u4e2d\u5728\u4e09\u6761\u8d70\u5eca\uff1a\u88d5\u5eca\u548c\u88d5\u5eca\u4e1c\u3001\u5927\u6210\uff0c\u4ee5\u53ca\u9760\u8fd1\u6a1f\u5b9c\u548c\u4e1c\u90e8\u5de5\u4e1a\u533a\u7684\u7f57\u592e\u2014\u5927\u58eb\u2014\u6a1f\u5b9c\u5730\u5e26\u3002\u65b0\u7535\u4fe1\u7684\u6570\u636e\u4e2d\u5fc3\u90e8\u95e8 Nxera \u548c Keppel \u6301\u7eed\u5728\u8fd9\u4e9b\u533a\u57df\u6269\u5c55\uff0c\u5305\u62ec Nxera \u7684 58 \u5146\u74e6 DC Tuas \u8bbe\u65bd\uff0c\u76ee\u6807\u662f\u5728 2026 \u5e74\u5e95\u6295\u5165\u8fd0\u8425\uff08[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002\n\n## 2019 \u5e74\u6682\u7f13\u5efa\u8bbe\u4e0e\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\n\n2019 \u5e74\uff0c\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u8fdb\u5165\u6709\u5e8f\u589e\u957f\u9636\u6bb5\u3002\u5f53\u65f6\u653f\u5e9c\u901a\u77e5\u8fd0\u8425\u5546\u6682\u65f6\u6682\u505c\u65b0\u7684\u6570\u636e\u4e2d\u5fc3\u5f00\u53d1\u9879\u76ee\uff0c\u540c\u65f6\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u5ba1\u67e5\u5982\u4f55\u534f\u8c03\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u9700\u6c42\u4e0e\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u4e0b\u7684\u6c14\u5019\u627f\u8bfa\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\u6682\u7f13\u63aa\u65bd\u5b9e\u65bd\u524d\u5df2\u83b7\u6279\u7684\u9879\u76ee\u4ecd\u53ef\u7ee7\u7eed\uff0c\u4f46\u5ba1\u67e5\u7ed3\u675f\u524d\u4e0d\u4f1a\u5206\u914d\u65b0\u7684\u5bb9\u91cf\u3002\u8d38\u5de5\u90e8\u957f\u4e8e 2023 \u5e74\u4e00\u6708\u5ba3\u5e03\u884c\u4e1a\u5ba1\u67e5\u5df2\u5b8c\u6210\uff1b\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e8e 2022 \u5e74\u4e03\u6708\u63a8\u51fa\u8bd5\u70b9\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff08DC-CFA\uff09\uff0c\u4f5c\u4e3a\u4ee5\u5ba1\u614e\u3001\u53ef\u6301\u7eed\u53d1\u5c55\u4f18\u5148\u7684\u65b9\u5f0f\u5206\u914d\u65b0\u589e\u5bb9\u91cf\u7684\u4e3b\u8981\u673a\u5236\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\n\n2022 \u5e74\u4e03\u6708\u5f00\u653e\u7684\u8bd5\u70b9 DC-CFA \u9080\u8bf7\u8fd0\u8425\u5546\u63d0\u4ea4\u65b9\u6848\uff0c\u5c55\u793a\u5176\u91c7\u7528\u5148\u8fdb\u80fd\u6e90\u6548\u7387\u6280\u672f\u3001\u8131\u78b3\u8def\u5f84\u3001\u5bf9\u65b0\u52a0\u5761\u533a\u57df\u8fde\u63a5\u7684\u8d21\u732e\u4ee5\u53ca\u66f4\u5e7f\u6cdb\u7ecf\u6d4e\u4ef7\u503c\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u30022023 \u5e74\u4e03\u6708\uff0c\u5728\u6536\u5230 20 \u591a\u4efd\u65b9\u6848\u540e\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u6682\u5b9a\u5411\u56db\u4e2a\u4f18\u9009\u9879\u76ee\u5206\u914d\u7ea6 80 \u5146\u74e6\u65b0\u589e\u5173\u952e IT \u8d1f\u8f7d\u5bb9\u91cf\uff1aEquinix\u3001GDS\u3001Microsoft\uff0c\u4ee5\u53ca AirTrunk\u2013ByteDance \u8054\u76df\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u5546\u4e1a\u65f6\u62a5\u300b\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u8bd5\u70b9\u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)\uff09\u3002DC-CFA \u6a21\u5f0f\u53d6\u4ee3\u4e86\u8fd0\u8425\u5546\u53ea\u8981\u62e5\u6709\u571f\u5730\u548c\u7535\u529b\u5373\u53ef\u5efa\u8bbe\u7684\u5f00\u653e\u5e02\u573a\uff1b\u81ea 2022 \u5e74\u8d77\uff0c\u6240\u6709\u65b0\u7684\u7eff\u5730\u9879\u76ee\u5bb9\u91cf\u90fd\u5fc5\u987b\u5148\u901a\u8fc7\u7533\u8bf7\u5f81\u96c6\u83b7\u5f97\u5206\u914d\uff0c\u65b9\u53ef\u63a8\u8fdb\u3002\n\n2025 \u5e74\u5341\u4e8c\u6708 1 \u65e5\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u542f\u52a8\u7b2c\u4e8c\u8f6e\u7533\u8bf7\uff08DC-CFA2\uff09\uff0c\u63d0\u4f9b\u81f3\u5c11 200 \u5146\u74e6\u65b0\u589e\u5bb9\u91cf\uff0c\u5e76\u53ef\u80fd\u901a\u8fc7\u521b\u65b0\u7eff\u8272\u80fd\u6e90\u8def\u5f84\u63d0\u4f9b\u66f4\u591a\u5bb9\u91cf\uff1b\u540c\u65f6\uff0c\u5176\u53ef\u6301\u7eed\u6027\u95e8\u69db\u4e5f\u6bd4\u8bd5\u70b9\u8f6e\u6b21\u66f4\u4e25\u683c\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff1b[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002DC-CFA2 \u7533\u8bf7\u8005\u5fc5\u987b\u5728 IT \u8d1f\u8f7d\u8fbe\u5230 100% \u65f6\u5b9e\u73b0 1.25 \u6216\u66f4\u4f4e\u7684\u7535\u80fd\u4f7f\u7528\u6548\u7387\uff08PUE\uff09\uff0c\u53d6\u5f97\u5efa\u8bbe\u5c40\u2014\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40 2024 \u5e74\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u8ba4\u8bc1\uff0c\u90e8\u7f72\u7b26\u5408\u65b0\u52a0\u5761\u6807\u51c6 SS 715:2025 \u6570\u636e\u4e2d\u5fc3 IT \u80fd\u6548\u8981\u6c42\u7684\u8bbe\u5907\uff0c\u5e76\u4ece\u7b26\u5408\u8d44\u683c\u7684\u7eff\u8272\u80fd\u6e90\u8def\u5f84\u4e2d\u53d6\u5f97\u81f3\u5c11 50% \u7684\u8bbe\u65bd\u7528\u7535\uff0c\u4f8b\u5982\u751f\u7269\u7532\u70f7\u3001\u4f4e\u78b3\u6c28\u6216\u6c22\u3001\u914d\u5907\u78b3\u6355\u96c6\u6280\u672f\u7684\u65b0\u578b\u71c3\u6599\u7535\u6c60\uff0c\u6216\u5efa\u7b51\u4e00\u4f53\u5316\u5149\u4f0f\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff09\u3002\u5177\u6709\u72ec\u7279\u5dee\u5f02\u5316\u6218\u7565\u65b9\u6848\u7684\u516c\u53f8\uff0c\u4e5f\u53ef\u4ee5\u901a\u8fc7\u6218\u7565\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u8ba1\u5212\uff08SDIS\uff09\u76f4\u63a5\u5411\u7ecf\u6d4e\u53d1\u5c55\u5c40\u63d0\u51fa\u7533\u8bf7\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff09\u3002\n\n2026 \u5e74 **\u516b\u6708 21 \u65e5**\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u5ba3\u5e03\uff0c\u901a\u8fc7 DC-CFA2 \u5df2\u5411\u56db\u5bb6\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5546**\u6682\u5b9a\u5206\u914d 200 \u5146\u74e6\u65b0\u589e\u5bb9\u91cf**\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\uff1aDC-CFA2 \u9009\u51fa\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u9879\u76ee](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 21 \u65e5\uff09\u3002\u8fd9\u662f\u6682\u5b9a\u5206\u914d\u7ed3\u679c\uff0c\u5e76\u4e0d\u4ee3\u8868\u56db\u5ea7\u8bbe\u65bd\u90fd\u5df2\u6295\u5165\u8fd0\u8425\uff1b\u5e94\u7ed3\u5408\u65e9\u524d DC-CFA2 \u63d0\u4f9b\u7684\u5bb9\u91cf\u53ca\u5176\u53ef\u6301\u7eed\u6027\u95e8\u69db\u6765\u7406\u89e3\u8fd9\u9879\u516c\u544a\u3002\n\n## \u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u4e0e\u53ef\u6301\u7eed\u6027\u6807\u51c6\n\n\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e8e 2024 \u5e74\u4e94\u6708 29 \u65e5\u63a8\u51fa\u300a\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u300b\uff0c\u4e3a\u5168\u884c\u4e1a\u8bbe\u5b9a\u53ef\u6301\u7eed\u6027\u6846\u67b6\uff0c\u5e76\u7531\u5404\u8f6e\u7533\u8bf7\u5f81\u96c6\u5728\u5b9e\u8df5\u4e2d\u843d\u5b9e\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u65b0\u95fb\u7a3f\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap)\uff09\u3002\u8def\u7ebf\u56fe\u65e8\u5728\u77ed\u671f\u5185\u65b0\u589e\u81f3\u5c11 300 \u5146\u74e6\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\uff0c\u5e76\u53ef\u80fd\u901a\u8fc7\u90e8\u7f72\u7eff\u8272\u80fd\u6e90\u518d\u91ca\u653e 200 \u5146\u74e6\u53ca\u66f4\u591a\u5bb9\u91cf\uff0c\u540c\u65f6\u5728\u5341\u5e74\u5185\u63a8\u52a8\u6240\u6709\u5df2\u5b89\u88c5\u8bbe\u65bd\u63d0\u9ad8\u6548\u7387\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u8fd9\u4e0e\u65b0\u52a0\u5761\u66f4\u5e7f\u6cdb\u7684[\u7eff\u8272\u8ba1\u5212 2030](\/zh\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030)\u53ca 2050 \u5e74\u51c0\u96f6\u6392\u653e\u8f68\u8ff9\u76f8\u5951\u5408\uff0c\u4e5f\u8865\u5145\u4e86\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u5728[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u9886\u57df\u7684\u80fd\u6e90\u8f6c\u578b\u89c4\u5212\u3002\n\n\u5728\u8bbe\u65bd\u6548\u7387\u65b9\u9762\uff0c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u76ee\u6807\u662f\uff0c\u8def\u7ebf\u56fe\u53d1\u5e03\u540e\u7684\u5341\u5e74\u5185\uff0c\u65b0\u52a0\u5761\u6240\u6709\u6570\u636e\u4e2d\u5fc3\u5728 IT \u8d1f\u8f7d\u8fbe\u5230 100% \u65f6\u5b9e\u73b0\u4f4e\u4e8e 1.3 \u7684 PUE\uff1b\u76ee\u524d\u9876\u5c16\u8bbe\u8ba1\u5df2\u80fd\u8fbe\u5230\u8fd9\u4e00\u95e8\u69db\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u65b0\u52a0\u5761\u7387\u5148\u5236\u5b9a\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6807\u51c6\uff0c\u5141\u8bb8\u8bbe\u65bd\u5728\u8f83\u9ad8\u73af\u5883\u6e29\u5ea6\u548c\u6e7f\u5ea6\u4e0b\u5b89\u5168\u8fd0\u884c\uff0c\u4ece\u800c\u51cf\u5c11\u8d64\u9053\u6c14\u5019\u4e0b\u7684\u5236\u51b7\u80fd\u8017\uff1b\u8def\u7ebf\u56fe\u8fd8\u8981\u6c42\u5728 2024 \u5e74\u5e95\u524d\u66f4\u65b0\u5efa\u8bbe\u5c40\u2014\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\uff08GMDC\uff09\u8ba4\u8bc1\uff0c\u5e76\u5728 2025 \u5e74\u524d\u63a8\u51fa IT \u8bbe\u5907\u6807\u51c6 SS 715:2025 \u548c\u6db2\u51b7\u5e94\u7528\u6807\u51c6\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u968f\u7740\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u63a8\u52a8\u673a\u67b6\u5bc6\u5ea6\u4ece 2020 \u5e74\u6bcf\u673a\u67b6\u7ea6 8 \u5343\u74e6\u5347\u81f3\u6bcf\u673a\u67b6 20\u2013100 \u5343\u74e6\uff0c\u8def\u7ebf\u56fe\u9f13\u52b1\u91c7\u7528\u98ce\u51b7\u4e0e\u6db2\u51b7\u6df7\u5408\u914d\u7f6e\uff0c\u5e76\u901a\u8fc7\u65b0\u52a0\u5761\u56fd\u7acb\u5927\u5b66\u7684\u53ef\u6301\u7eed\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6d4b\u8bd5\u5e73\u53f0\u5f00\u5c55\u7814\u7a76\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n\u6570\u636e\u4e2d\u5fc3\u662f\u91cd\u8981\u7528\u6c34\u6237\uff1a2021 \u5e74\uff0c\u65b0\u52a0\u5761\u5927\u578b\u6570\u636e\u4e2d\u5fc3\uff08\u5e74\u7528\u6c34\u91cf\u81f3\u5c11\u4e3a 60,000 \u7acb\u65b9\u7c73\uff09\u7684\u4e2d\u4f4d\u6c34\u8d44\u6e90\u4f7f\u7528\u6548\u7387\uff08WUE\uff09\u4e3a\u6bcf\u5146\u74e6\u65f6 2.2 \u7acb\u65b9\u7c73\uff1b\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e0e\u56fd\u5bb6\u6c34\u52a1\u673a\u6784\u516c\u7528\u4e8b\u4e1a\u5c40\u7684\u76ee\u6807\u662f\u5728\u5341\u5e74\u5185\u901a\u8fc7\u4f18\u5316\u51b7\u5374\u5854\u548c\u56de\u6536\u5229\u7528\uff0c\u5c06\u884c\u4e1a WUE \u964d\u81f3\u6bcf\u5146\u74e6\u65f6 2.0 \u7acb\u65b9\u7c73\u6216\u66f4\u4f4e\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u7ecf\u6d4e\u53d1\u5c55\u5c40\u901a\u8fc7\u51cf\u5c11\u6392\u653e\u8d44\u6e90\u6548\u7387\u6d25\u8d34\u548c\u51cf\u6392\u6295\u8d44\u6d25\u8d34\u63d0\u4f9b\u5171\u540c\u8d44\u52a9\uff0c\u4ee5\u652f\u6301\u73b0\u6709\u8bbe\u65bd\u6539\u9020\uff1b\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u7eff\u8272\u8ba1\u7b97\u8d44\u52a9\u8ba1\u5212\u81ea 2024 \u5e74\u4e00\u6708\u8d77\u62e8\u51fa 30 \u767e\u4e07\u65b0\u5143\uff0c\u652f\u6301\u8f6f\u4ef6\u5c42\u9762\u7684\u80fd\u6e90\u6548\u7387\u7814\u7a76\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n## \u8d85\u5927\u89c4\u6a21\u6295\u8d44\u4e0e\u88d5\u5eca\u5c9b\u6269\u5efa\n\n\u8d85\u5927\u89c4\u6a21\u4e91\u670d\u52a1\u5546\u662f\u63a8\u52a8\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u9879\u76ee\u50a8\u5907\u9700\u6c42\u7684\u91cd\u8981\u652f\u67f1\u3002AWS \u4e8e 2024 \u5e74\u4e94\u6708\u5ba3\u5e03\u8ba1\u5212\u5728 2024 \u5e74\u81f3 2028 \u5e74\u95f4\uff0c\u8ffd\u52a0\u6295\u8d44 12 \u5341\u4ebf\u65b0\u5143\u7528\u4e8e\u73b0\u6709\u65b0\u52a0\u5761\u4e91\u57fa\u7840\u8bbe\u65bd\uff0c\u4f7f AWS \u4e9a\u592a\u5730\u533a\uff08\u65b0\u52a0\u5761\uff09\u533a\u57df\u622a\u81f3 2028 \u5e74\u7684\u8ba1\u5212\u603b\u6295\u8d44\u8d85\u8fc7 23 \u5341\u4ebf\u65b0\u5143\uff1b\u8fd9\u7b14\u6295\u8d44\u662f\u5728 2010 \u5e74\u81f3 2023 \u5e74\u671f\u95f4\u5df2\u6295\u5165\u7684 11.5 \u5341\u4ebf\u65b0\u5143\u4e4b\u5916\u3002\u9884\u8ba1\u5230 2028 \u5e74\uff0c\u8be5\u6295\u8d44\u5c06\u4e3a\u65b0\u52a0\u5761\u56fd\u5185\u751f\u4ea7\u603b\u503c\u8d21\u732e 23.7 \u5341\u4ebf\u65b0\u5143\uff0c\u5e76\u6bcf\u5e74\u5728\u4f9b\u5e94\u94fe\u4e2d\u652f\u6301\u7ea6 12,300 \u4e2a\u5168\u804c\u7b49\u503c\u5de5\u4f5c\u5c97\u4f4d\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 AWS \u6295\u8d44\u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html)\uff09\u3002Microsoft \u662f\u8bd5\u70b9 DC-CFA \u7684\u56db\u4e2a\u4f18\u9009\u9879\u76ee\u4e4b\u4e00\uff0c\u5e76\u7ee7\u7eed\u6269\u5927\u5176\u5728\u65b0\u52a0\u5761\u7684 Azure \u57fa\u7840\u8bbe\u65bd\uff0c\u4f5c\u4e3a\u66f4\u5e7f\u6cdb\u7684\u4e1c\u5357\u4e9a\u4e91\u8ba1\u7b97\u548c\u4eba\u5de5\u667a\u80fd\u6295\u8d44\u8ba1\u5212\u7684\u4e00\u90e8\u5206\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002Google Cloud \u5728\u65b0\u52a0\u5761\u8fd0\u8425\u6210\u719f\u7684\u4e91\u533a\u57df\uff0c\u5e76\u4e0e\u533a\u57df\u540c\u884c\u4e00\u9053\u6301\u7eed\u6269\u5145\u5bb9\u91cf\u3002\n\n\u4e00\u5904\u503c\u5f97\u5173\u6ce8\u7684\u65b0\u5740\u4f4d\u4e8e[\u88d5\u5eca\u5c9b](\/zh\/knowledge\/article\/sgkb.business-industry.petrochemicals-industry)\u3002\u7ecf\u6d4e\u53d1\u5c55\u5c40\u5df2\u9884\u7559\u7ea6 20 \u516c\u9877\u571f\u5730\uff0c\u7528\u4e8e\u5efa\u8bbe\u65b0\u52a0\u5761\u6700\u5927\u7684\u4f4e\u78b3\u6570\u636e\u4e2d\u5fc3\u56ed\u533a\uff0c\u6f5c\u5728\u5bb9\u91cf\u9ad8\u8fbe 700 \u5146\u74e6\uff0c\u4ee5\u6ee1\u8db3\u4eba\u5de5\u667a\u80fd\u9a71\u52a8\u7684\u9700\u6c42\uff1b\u8be5\u56ed\u533a\u5c06\u878d\u5165\u5c9b\u4e0a\u66f4\u5e7f\u6cdb\u7684\u6c22\u3001\u6c28\u548c\u53ef\u6301\u7eed\u822a\u7a7a\u71c3\u6599\u57fa\u7840\u8bbe\u65bd\u8f6c\u578b\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u88d5\u5eca\u5c9b\u5408\u4f5c\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html)\uff09\u3002\u5c06\u8d85\u5927\u89c4\u6a21\u5bb9\u91cf\u8bbe\u4e8e\u88d5\u5eca\u5c9b\uff0c\u53ef\u8ba9\u8fd0\u8425\u5546\u5229\u7528\u90bb\u8fd1\u7684\u4f4e\u78b3\u80fd\u6e90\u8bd5\u70b9\u9879\u76ee\uff0c\u5305\u62ec\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u6b63\u5728\u7814\u7a76\u7684\u6c28\u548c\u6c22\u9879\u76ee\uff0c\u800c\u4e0d\u5fc5\u5b8c\u5168\u4f9d\u8d56[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u4e2d\u6240\u8ff0\u3001\u4ee5\u5929\u7136\u6c14\u4e3a\u4e3b\u7684\u672c\u5c9b\u7535\u7f51\u3002\u51b7\u5374\u7cfb\u7edf\u4f9b\u5e94\u5546 Johnson Controls \u4ee5\u4e9a\u592a\u5730\u533a\u6570\u636e\u4e2d\u5fc3\u589e\u957f\u4e3a\u7531\uff0c\u4e8e 2025 \u5e74\u6269\u5927\u5176\u65b0\u52a0\u5761\u533a\u57df\u67a2\u7ebd\uff0c\u53cd\u6620\u51fa\u8be5\u884c\u4e1a\u6240\u652f\u6491\u7684\u4e0b\u6e38\u4ea7\u4e1a\u751f\u6001\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 Johnson Controls \u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)\uff09\u3002\n\n## \u7535\u529b\u9700\u6c42\u3001\u9650\u5236\u4e0e\u533a\u57df\u5916\u6ea2\n\n\u6570\u636e\u4e2d\u5fc3\u662f\u65b0\u52a0\u5761\u7535\u529b\u6d88\u8017\u589e\u957f\u6700\u5feb\u7684\u884c\u4e1a\u4e4b\u4e00\u3002\u622a\u81f3 2025 \u5e74\uff0c\u6570\u636e\u4e2d\u5fc3\u4f30\u8ba1\u5360\u5168\u56fd\u80fd\u6e90\u6d88\u8017\u7684 7%\uff1b\u968f\u7740\u4e91\u8ba1\u7b97\u548c\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u6269\u5c55\uff0c\u9884\u8ba1\u5230 2030 \u5e74\u5c06\u5347\u81f3 12%\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 Johnson Controls \u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)\uff09\u3002\u5728\u672c\u5730\u8d44\u8baf\u4e0e\u901a\u4fe1\u884c\u4e1a\u5185\u90e8\uff0c\u6570\u636e\u4e2d\u5fc3\u7ea6\u5360\u78b3\u6392\u653e\u91cf\u7684 82%\uff0c\u56e0\u6b64\u8be5\u884c\u4e1a\u8131\u78b3\u5bf9\u65b0\u52a0\u5761\u6570\u5b57\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u81f3\u5173\u91cd\u8981\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u300a2025 \u5e74\u7535\u529b\u9700\u6c42\u4e0e\u4f9b\u5e94\u5c55\u671b\u300b\u9884\u6d4b\uff0c2025 \u5e74\u81f3 2034 \u5e74\u7cfb\u7edf\u5cf0\u503c\u9700\u6c42\u7684\u590d\u5408\u5e74\u589e\u957f\u7387\u4e3a 2.4%\u20134.8%\uff1b\u5176\u4e0a\u9650\u60c5\u666f\u660e\u786e\u7eb3\u5165\u6570\u636e\u4e2d\u5fc3\u548c\u5148\u8fdb\u5236\u9020\u4e1a\u65b0\u589e\u9700\u6c42\uff08[\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u300a2025 \u5e74\u5c55\u671b\u300b\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf)\uff09\u3002\n\n\u65b0\u52a0\u5761\u571f\u5730\u7a00\u7f3a\u3001\u70ed\u5e26\u6c14\u5019\u9700\u8981\u5236\u51b7\uff0c\u4e14\u672c\u5730\u53ef\u518d\u751f\u80fd\u6e90\u6f5c\u529b\u6709\u9650\uff0c\u56e0\u6b64\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u6709\u610f\u9650\u5236\u5bb9\u91cf\u589e\u957f\u901f\u5ea6\u3002\u8bd5\u70b9\u8f6e\u6b21\u4ece 20 \u591a\u4efd\u7ade\u6807\u65b9\u6848\u4e2d\u53ea\u5206\u914d\u4e86 80 \u5146\u74e6\uff1bDC-CFA2 \u63d0\u4f9b\u81f3\u5c11 200 \u5146\u74e6\uff0c\u4f46\u5bf9\u7eff\u8272\u7535\u529b\u6765\u6e90\u65bd\u52a0\u4e86\u66f4\u4e25\u683c\u8981\u6c42\uff0c\u4f7f\u6269\u5f20\u901f\u5ea6\u53d6\u51b3\u4e8e\u4f4e\u78b3\u80fd\u6e90\u57fa\u7840\u8bbe\u65bd\u7684\u5efa\u8bbe\u8fdb\u5ea6\uff0c\u5305\u62ec\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u4e3a 2035 \u5e74\u5b9e\u73b0 6 \u5409\u74e6\u4f4e\u78b3\u7535\u529b\u8fdb\u53e3\u76ee\u6807\u800c\u63a8\u8fdb\u7684\u533a\u57df\u7535\u529b\u8fdb\u53e3\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff1b\u53e6\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff09\u3002\u5206\u6790\u4eba\u58eb\u548c\u884c\u4e1a\u89c2\u5bdf\u8005\u6307\u51fa\uff0c\u8d85\u5927\u89c4\u6a21\u8fd0\u8425\u5546\u8d8a\u6765\u8d8a\u591a\u5730\u5728\u90bb\u8fd1\u7684\u9a6c\u6765\u897f\u4e9a\u67d4\u4f5b\u3001\u65b0\u52a0\u5761\u96c5\u52a0\u8fbe\u548c\u66fc\u8c37\u5efa\u8bbe\u5927\u89c4\u6a21\u5bb9\u91cf\uff0c\u56e0\u4e3a\u5f53\u5730\u571f\u5730\u548c\u7535\u529b\u66f4\u4fbf\u5b9c\uff1b\u540c\u65f6\u4fdd\u7559\u65b0\u52a0\u5761\u4ee5\u627f\u8f7d\u5bf9\u5ef6\u8fdf\u654f\u611f\u7684\u9ad8\u7aef\u5de5\u4f5c\u8d1f\u8f7d\u3002\u8fd9\u79cd\u6a21\u5f0f\u65e2\u7ef4\u6301\u4e86\u65b0\u52a0\u5761\u7684\u67a2\u7ebd\u5730\u4f4d\uff0c\u4e5f\u907f\u514d\u672c\u5730\u5bb9\u91cf\u4e0d\u53d7\u9650\u5236\u5730\u589e\u957f\uff08[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002\u56e0\u6b64\uff0c\u65b0\u52a0\u5761\u6570\u5b57\u7ecf\u6d4e\u96c4\u5fc3\u4e0e\u5176[\u7eff\u8272\u8ba1\u5212 2030](\/zh\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030)\u80fd\u6e90\u76ee\u6807\u4e4b\u95f4\u7684\u5f20\u529b\u662f\u7ed3\u6784\u6027\u7684\uff1a\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u53ef\u4ee5\u589e\u957f\uff0c\u4f46\u589e\u957f\u901f\u5ea6\u53ea\u80fd\u4e0e\u6548\u7387\u63d0\u5347\u548c\u7eff\u8272\u7535\u529b\u4f9b\u5e94\u76f8\u5339\u914d\uff0c\u5e76\u53d7\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u5206\u914d\u628a\u5173\u673a\u5236\u7ea6\u675f\u3002","summary":"\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u53d7\u5230\u4e25\u683c\u76d1\u7ba1\u7684\u533a\u57df\u67a2\u7ebd\uff0c\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\u3002\u81ea 2019 \u5e74\u8d77\uff0c\u8be5\u884c\u4e1a\u7531\u6682\u7f13\u5efa\u8bbe\u8f6c\u4e3a\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u7ba1\u7406\uff0c\u5728\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u548c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u7684\u76d1\u7763\u4e0b\uff0c\u5c06\u65b0\u589e\u5bb9\u91cf\u4e0e\u80fd\u6e90\u6548\u7387\u548c\u7eff\u8272\u7535\u529b\u8981\u6c42\u6302\u94a9\u3002","title":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a"}},"path":"business-industry\/data-centre-industry.md","related_source_ids":["sgkb.data.data-centre-industry-anchors","sgkb.environment-sustainability.energy-and-power-grid","sgkb.environment-sustainability.green-plan-2030","sgkb.business-industry.petrochemicals-industry","sgkb.business-industry.startup-ecosystem"],"source_hash":"6d3e52e7be7fa43c776b0a28d210fa1028f69b64bf0c7b3cb3543985cd545f46","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"IMDA \u2014 Green Data Centre Roadmap (May 2024)","url":"https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf"},{"title":"IMDA \u2014 SG announces Green Data Centre Roadmap (29 May 2024)","url":"https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap"},{"title":"EDB \u2014 Launch of pilot Data Centre Call for Application (20 Jul 2022)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html"},{"title":"EDB \u2014 Four data centre proposals selected from pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html"},{"title":"EDB\/IMDA \u2014 Launch of second Data Centre Call for Application (1 Dec 2025)","url":"https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf"},{"title":"EDB \u2014 Four data centre proposals selected under DC-CFA2 (21 Aug 2026)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html"},{"title":"EDB \u2014 AWS to invest an additional S$12 billion in Singapore by 2028 (7 May 2024)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html"},{"title":"EDB \u2014 Jurong Island low-carbon data centre park announcement (2025)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html"},{"title":"EDB \u2014 Johnson Controls data centre tech hub (energy consumption figures)","url":"https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html"},{"title":"EMA \u2014 Electricity Demand and Supply Outlook (2025)","url":"https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf"},{"title":"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)","url":"https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity"},{"title":"The Business Times \u2014 Government awards 80 MW to four operators in pilot DC-CFA (14 Jul 2023)","url":"https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot"}]}},"search_text":"Data Centre Industry\n\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\nSingapore's data centre industry is a tightly regulated regional hub with operational capacity exceeding 1.4 gigawatts, governed since 2019 by a moratorium-turned-Call-for-Application model that ties new capacity to energy-efficiency and green-power requirements under IMDA and EDB oversight.\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u53d7\u5230\u4e25\u683c\u76d1\u7ba1\u7684\u533a\u57df\u67a2\u7ebd\uff0c\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\u3002\u81ea 2019 \u5e74\u8d77\uff0c\u8be5\u884c\u4e1a\u7531\u6682\u7f13\u5efa\u8bbe\u8f6c\u4e3a\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u7ba1\u7406\uff0c\u5728\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u548c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u7684\u76d1\u7763\u4e0b\uff0c\u5c06\u65b0\u589e\u5bb9\u91cf\u4e0e\u80fd\u6e90\u6548\u7387\u548c\u7eff\u8272\u7535\u529b\u8981\u6c42\u6302\u94a9\u3002\n{\"aliases\":[\"data center industry\",\"hyperscale data centres\",\"DC-CFA\",\"Green Data Centre Roadmap\",\"data centre moratorium\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.business-industry.data-centre-industry\",\"document_sha256\":\"c58d465b592774129d66cfde3e28b783675deb36bf3ad331e8b1f68a61c2a3e0\",\"document_type\":\"article\",\"domain\":\"business-industry\",\"entities\":[\"sg.agency.edb\",\"sg.agency.imda\"],\"facets\":[\"business\",\"current\",\"geography\",\"infrastructure\",\"policy\",\"statistics\"],\"geographic_scope\":[\"national\",\"international\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-08-21\",\"path\":\"business-industry\\\/data-centre-industry.md\",\"related\":[\"data-centre-industry-anchors\",\"energy-and-power-grid\",\"green-plan-2030\",\"petrochemicals-industry\",\"startup-ecosystem\"],\"sources\":[{\"accessed\":\"2026-08-08\",\"title\":\"IMDA \u2014 Green Data Centre Roadmap (May 2024)\",\"url\":\"https:\\\/\\\/www.imda.gov.sg\\\/-\\\/media\\\/imda\\\/files\\\/how-we-can-help\\\/green-dc-roadmap\\\/green-dc-roadmap.pdf\"},{\"accessed\":\"2026-08-08\",\"title\":\"IMDA \u2014 SG announces Green Data Centre Roadmap (29 May 2024)\",\"url\":\"https:\\\/\\\/www.imda.gov.sg\\\/resources\\\/press-releases-factsheets-and-speeches\\\/press-releases\\\/2024\\\/sg-announces-green-data-centre-roadmap\"},{\"accessed\":\"2026-08-08\",\"title\":\"EDB \u2014 Launch of pilot Data Centre Call for Application (20 Jul 2022)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html\"},{\"accessed\":\"2026-08-08\",\"title\":\"EDB \u2014 Four data centre proposals selected from pilot DC-CFA (14 Jul 2023)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html\"},{\"accessed\":\"2026-08-08\",\"title\":\"EDB\\\/IMDA \u2014 Launch of second Data Centre Call for Application (1 Dec 2025)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/content\\\/dam\\\/edb-en\\\/about-edb\\\/media-releases\\\/news\\\/launch-of-second-data-centre-call-for-application\\\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf\"},{\"accessed\":\"2026-08-21\",\"published\":\"2026-08-21\",\"publisher\":\"Economic Development Board\",\"tier\":1,\"title\":\"EDB \u2014 Four data centre proposals selected under DC-CFA2 (21 Aug 2026)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html\"},{\"accessed\":\"2026-08-08\",\"title\":\"EDB \u2014 AWS to invest an additional S$12 billion in Singapore by 2028 (7 May 2024)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html\"},{\"accessed\":\"2026-08-08\",\"title\":\"EDB \u2014 Jurong Island low-carbon data centre park announcement (2025)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html\"},{\"accessed\":\"2026-08-08\",\"title\":\"EDB \u2014 Johnson Controls data centre tech hub (energy consumption figures)\",\"url\":\"https:\\\/\\\/www.edb.gov.sg\\\/en\\\/about-edb\\\/media-releases-publications\\\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html\"},{\"accessed\":\"2026-08-08\",\"title\":\"EMA \u2014 Electricity Demand and Supply Outlook (2025)\",\"url\":\"https:\\\/\\\/www.ema.gov.sg\\\/content\\\/dam\\\/corporate\\\/regulations\\\/policy-papers\\\/pdf-files\\\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf\"},{\"accessed\":\"2026-08-08\",\"title\":\"The Straits Times \u2014 EDB, IMDA launch second data centre capacity drive (1 Dec 2025)\",\"url\":\"https:\\\/\\\/www.straitstimes.com\\\/business\\\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity\"},{\"accessed\":\"2026-08-08\",\"title\":\"The Business Times \u2014 Government awards 80 MW to four operators in pilot DC-CFA (14 Jul 2023)\",\"url\":\"https:\\\/\\\/www.businesstimes.com.sg\\\/startups-tech\\\/technology\\\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot\"}],\"status\":\"verified\",\"summary\":\"Singapore's data centre industry is a tightly regulated regional hub with operational capacity exceeding 1.4 gigawatts, governed since 2019 by a moratorium-turned-Call-for-Application model that ties new capacity to energy-efficiency and green-power requirements under IMDA and EDB oversight.\",\"tags\":[\"tech\",\"energy\",\"policy\",\"investment\",\"utilities\",\"statistics\"],\"temporal_scope\":\"current\",\"title\":\"Data Centre Industry\",\"topics\":[\"sgtopic.business\",\"sgtopic.business.data-centres\"],\"volatility\":\"fast\"}\n# Data Centre Industry\n\nSingapore's data centre industry is one of Southeast Asia's largest and most connectivity-dense digital-infrastructure clusters, hosting operational capacity exceeding 1.4 gigawatts as of 2024 and serving as the physical backbone for cloud computing, financial services, and artificial-intelligence workloads across the region ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). The sector sits at the intersection of Singapore's digital-economy ambitions \u2014 the digital economy contributed roughly 17% of gross domestic product in 2022 \u2014 and its land, power, and water constraints as a compact city-state ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf); see [startup ecosystem](\/en\/knowledge\/article\/sgkb.business-industry.startup-ecosystem) and [telco and internet](\/en\/knowledge\/article\/sgkb.daily-life.telco-and-internet)). Unlike many countries where data centre growth is largely market-driven, Singapore allocates new capacity through a government-managed Call for Application (CFA) exercise led by the Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA), making sustainability and strategic economic value explicit gatekeeping criteria; dated capacity awards and DC-CFA2 thresholds are tabulated in [data centre industry anchors](\/en\/knowledge\/dataset\/sgkb.data.data-centre-industry-anchors) ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)).\n\n## Singapore as a regional data centre hub\n\nSingapore's data centre industry draws on the country's broader position as a trusted business and digital hub: dense submarine-cable landings, strong intellectual-property protection, cross-border data-flow agreements, and a skilled technology workforce ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). As of 2024, Singapore's operational data centre capacity per capita exceeded that of Australia, China, Japan, South Korea, and the United Kingdom, and key markets such as Beijing, Hong Kong, Seoul, Sydney, and Tokyo ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). The Digital Connectivity Blueprint launched in June 2023 targets doubling submarine-cable landings over the following decade, reinforcing the connectivity case for hosting compute in Singapore rather than in lower-cost neighbouring markets ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\nThe industry spans colocation operators that rent rack space to enterprise tenants and hyperscale cloud providers that build and operate facilities for their own platforms. Major colocation and carrier-neutral operators with a Singapore footprint include Equinix, Digital Realty, Global Switch, Keppel Data Centres, ST Telemedia Global Data Centres, AirTrunk, Princeton Digital Group, and GDS Holdings, while hyperscale cloud regions are operated by Amazon Web Services (AWS), Microsoft Azure, and Google Cloud ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [Business Times DC-CFA pilot, accessed Aug 2026](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)). Facilities cluster in three main corridors: Jurong and Jurong East, Tai Seng, and the Loyang\u2013Tuas\u2013Changi belt near Changi and the eastern industrial estates. Singtel's data-centre unit Nxera and Keppel continue to expand within these zones, including Nxera's 58-megawatt DC Tuas facility targeted for operations by end-2026 ([ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)).\n\n## The 2019 moratorium and the Call for Application model\n\nSingapore's data centre industry entered a managed-growth phase in 2019 when the Government informed operators of a temporary pause on new data centre developments while EDB and IMDA reviewed how to reconcile digital-infrastructure demand with climate commitments under the Paris Agreement ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)). Projects already authorised before the pause could still proceed, but no fresh capacity allocations were made until the review concluded. The Minister for Trade and Industry announced in January 2023 that the sector review was complete, and in July 2022 EDB and IMDA launched a pilot Data Centre \u2013 Call for Application (DC-CFA) as the primary mechanism for allocating new capacity on a calibrated, sustainability-first basis ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)).\n\nThe pilot DC-CFA, which opened in July 2022, invited operators to submit proposals demonstrating state-of-the-art energy efficiency, decarbonisation pathways, contribution to Singapore's regional connectivity, and broader economic value ([EDB DC-CFA launch, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)). In July 2023, after receiving more than 20 proposals, EDB and IMDA provisionally awarded about 80 megawatts of new critical IT load capacity to four winners: Equinix, GDS, Microsoft, and an AirTrunk\u2013ByteDance consortium ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [Business Times DC-CFA pilot, accessed Aug 2026](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)). The DC-CFA model replaced an open market in which any operator with land and power could build; since 2022, all new greenfield capacity must win a CFA allocation before proceeding.\n\nOn 1 December 2025, EDB and IMDA launched the second exercise (DC-CFA2), offering at least 200 megawatts of new capacity \u2014 with potentially more through innovative green-energy pathways \u2014 and tightening sustainability thresholds beyond the pilot round ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf); [ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). DC-CFA2 applicants must achieve a Power Usage Effectiveness (PUE) of 1.25 or better at 100% IT load, obtain Building and Construction Authority (BCA)\u2013IMDA Green Mark for Data Centres 2024 Platinum certification, deploy IT equipment meeting the Singapore Standard SS 715:2025 on data-centre IT energy efficiency, and source at least 50% of facility power from eligible green-energy pathways such as biomethane, low-carbon ammonia or hydrogen, novel fuel cells with carbon capture, or building-integrated photovoltaics ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)). Companies with uniquely differentiated strategic proposals may alternatively approach EDB through the Strategic Digital Infrastructure Scheme (SDIS) ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)).\n\nOn **21 August 2026**, EDB and IMDA announced that they had **provisionally allocated 200 MW of new capacity to four data-centre operators** through DC-CFA2 ([EDB, four data-centre proposals selected under DC-CFA2](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html), accessed 21 August 2026). This is a provisional allocation outcome, not proof that all four facilities are already operational; the earlier DC-CFA2 offer and its sustainability thresholds remain the policy context for interpreting the announcement.\n\n## Green Data Centre Roadmap and sustainability standards\n\nThe Green Data Centre Roadmap, launched by IMDA on 29 May 2024, sets the sector-wide sustainability framework that the CFA exercises implement in practice ([IMDA Green DC Roadmap press release, accessed Aug 2026](https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap)). The Roadmap aims to provide at least 300 megawatts of additional data centre capacity in the near term, with potentially another 200 megawatts and more unlocked through green-energy deployments, while pushing the entire installed base toward higher efficiency over a ten-year horizon ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). This sits within Singapore's wider [green plan 2030](\/en\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030) net-zero-by-2050 trajectory and complements EMA's energy-transition planning in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid).\n\nOn facility efficiency, IMDA targets all data centres in Singapore achieving PUE below 1.3 at 100% IT load within ten years of the Roadmap \u2014 a threshold current best-in-class designs can already meet ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). Singapore pioneered a Tropical Data Centre standard allowing facilities to run safely at higher ambient temperatures and humidity, reducing cooling energy in the equatorial climate, and the Roadmap refreshed the BCA\u2013IMDA Green Mark for Data Centres (GMDC) certification by end-2024 while introducing SS 715:2025 standards for IT equipment and liquid-cooling adoption by 2025 ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). As AI workloads push rack densities from roughly 8 kilowatts per rack in 2020 toward 20\u2013100 kilowatts per rack, the Roadmap encourages hybrid air- and liquid-cooling configurations and research through the Sustainable Tropical Data Centre Testbed at the National University of Singapore ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\nOn water, data centres are significant users: the median Water Usage Effectiveness (WUE) among large Singapore data centres (those consuming at least 60,000 cubic metres of water annually) was 2.2 cubic metres per megawatt-hour in 2021, and IMDA and the national water agency PUB target reducing sector WUE to 2.0 m\u00b3\/MWh or lower over ten years through cooling-tower optimisation and recycling ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). EDB offers co-funding through the Resource Efficiency Grant for Emissions and Investment Allowance for Emissions Reduction to support retrofitting existing facilities, while IMDA's Green Computing Funding Initiative allocated S$30 million from January 2024 for software-level energy-efficiency research ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)).\n\n## Hyperscale investment and the Jurong Island expansion\n\nHyperscale cloud providers anchor much of the demand driving Singapore's data centre pipeline. AWS announced in May 2024 plans to invest an additional S$12 billion in its existing Singapore cloud infrastructure from 2024 to 2028, bringing total planned investment in the AWS Asia Pacific (Singapore) Region to more than S$23 billion by 2028 \u2014 on top of S$11.5 billion invested from 2010 through 2023 \u2014 with an estimated S$23.7 billion contribution to Singapore GDP and roughly 12,300 full-time-equivalent jobs supported annually in the supply chain by 2028 ([EDB AWS investment, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html)). Microsoft was among the four pilot DC-CFA winners and continues expanding Azure infrastructure in Singapore as part of a broader Southeast Asia cloud and AI investment programme ([EDB four DC-CFA winners, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html); [ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). Google Cloud operates an established cloud region in Singapore and continues capacity expansion alongside regional peers.\n\nA notable new site is on [Jurong Island](\/en\/knowledge\/article\/sgkb.business-industry.petrochemicals-industry), where EDB has reserved about 20 hectares for Singapore's largest low-carbon data centre park, with potential capacity of up to 700 megawatts to support AI-driven demand, integrated into the island's broader shift toward hydrogen, ammonia, and sustainable aviation fuel infrastructure ([EDB Jurong Island partnerships, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html)). Locating hyperscale capacity on Jurong Island allows operators to tap adjacent low-carbon energy pilots \u2014 including ammonia and hydrogen projects under EMA study \u2014 rather than drawing exclusively on the mainland natural-gas-dominated grid described in [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid). Johnson Controls, a cooling-systems supplier, expanded its Singapore regional hub in 2025 citing Asia-Pacific data centre growth, reflecting the downstream industrial ecosystem the sector supports ([EDB Johnson Controls, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)).\n\n## Power demand, constraints, and regional spillover\n\nData centres are among Singapore's fastest-growing electricity consumers. As of 2025, data centres accounted for an estimated 7% of national energy consumption, a share projected to rise to 12% by 2030 as cloud and AI workloads expand ([EDB Johnson Controls, accessed Aug 2026](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)). Within the domestic information and communications sector, data centres represent about 82% of carbon emissions, making the sector's decarbonisation central to Singapore's digital sustainability goals ([IMDA Green DC Roadmap, accessed Aug 2026](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)). EMA's Electricity Demand and Supply Outlook (2025) projects system peak demand growing at a compound annual rate of 2.4%\u20134.8% from 2025 to 2034, with an upper-bound scenario explicitly incorporating additional demand from data centres and advanced manufacturing ([EMA Outlook 2025, accessed Aug 2026](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf)).\n\nSingapore's land scarcity, tropical cooling needs, and finite domestic renewable potential mean the CFA model deliberately caps how fast capacity can grow. The pilot round allocated only 80 megawatts from more than 20 bids; DC-CFA2 offers at least 200 megawatts but imposes stricter green-power sourcing that ties expansion to the pace of low-carbon energy infrastructure \u2014 including regional electricity imports that EMA is developing toward a 6-gigawatt low-carbon import target by 2035 ([EDB DC-CFA2 factsheet, accessed Aug 2026](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf); see [energy and power grid](\/en\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)). Analysts and industry observers note that hyperscale operators increasingly build bulk capacity in neighbouring Johor (Malaysia), Jakarta, and Bangkok where land and power are cheaper, while retaining Singapore for latency-sensitive, premium-tier workloads \u2014 a pattern that preserves Singapore's hub status without unconstrained local growth ([ST DC-CFA2, accessed Aug 2026](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)). The tension between Singapore's digital-economy ambitions and its [green plan 2030](\/en\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030) energy targets is therefore structural: the data centre industry can grow, but only as fast as efficiency gains and green-power supply allow under EDB and IMDA's allocation gatekeeping.\n# \u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\n\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u662f\u4e1c\u5357\u4e9a\u6700\u5927\u3001\u8fde\u63a5\u6700\u5bc6\u96c6\u7684\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u96c6\u7fa4\u4e4b\u4e00\u3002\u622a\u81f3 2024 \u5e74\uff0c\u5176\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7 1.4 \u5409\u74e6\uff0c\u4e3a\u6574\u4e2a\u533a\u57df\u7684\u4e91\u8ba1\u7b97\u3001\u91d1\u878d\u670d\u52a1\u548c\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u63d0\u4f9b\u5b9e\u4f53\u57fa\u7840\u8bbe\u65bd\u652f\u6491\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u8be5\u884c\u4e1a\u5904\u4e8e\u65b0\u52a0\u5761\u6570\u5b57\u7ecf\u6d4e\u96c4\u5fc3\u4e0e\u5176\u571f\u5730\u3001\u7535\u529b\u548c\u6c34\u8d44\u6e90\u9650\u5236\u7684\u4ea4\u6c47\u5904\uff1b2022 \u5e74\uff0c\u6570\u5b57\u7ecf\u6d4e\u7ea6\u5360\u56fd\u5185\u751f\u4ea7\u603b\u503c\u7684 17%\uff0c\u800c\u65b0\u52a0\u5761\u662f\u4e00\u4e2a\u9762\u79ef\u7d27\u51d1\u7684\u57ce\u90a6\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff1b\u53e6\u89c1[\u521d\u521b\u4f01\u4e1a\u751f\u6001\u7cfb\u7edf](\/zh\/knowledge\/article\/sgkb.business-industry.startup-ecosystem)\u548c[\u7535\u4fe1\u4e0e\u4e92\u8054\u7f51](\/zh\/knowledge\/article\/sgkb.daily-life.telco-and-internet)\uff09\u3002\u4e0e\u8bb8\u591a\u4e3b\u8981\u7531\u5e02\u573a\u63a8\u52a8\u6570\u636e\u4e2d\u5fc3\u589e\u957f\u7684\u56fd\u5bb6\u4e0d\u540c\uff0c\u65b0\u52a0\u5761\u901a\u8fc7\u7531\u7ecf\u6d4e\u53d1\u5c55\u5c40\uff08EDB\uff09\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\uff08IMDA\uff09\u4e3b\u5bfc\u7684\u653f\u5e9c\u7ba1\u7406\u578b\u7533\u8bf7\u5f81\u96c6\uff08CFA\uff09\u7a0b\u5e8f\u5206\u914d\u65b0\u589e\u5bb9\u91cf\uff0c\u5e76\u660e\u786e\u5c06\u53ef\u6301\u7eed\u6027\u548c\u6218\u7565\u7ecf\u6d4e\u4ef7\u503c\u5217\u4e3a\u51c6\u5165\u6807\u51c6\uff1b\u5e26\u65e5\u671f\u7684\u5bb9\u91cf\u5206\u914d\u7ed3\u679c\u548c DC-CFA2 \u95e8\u69db\u6c47\u603b\u4e8e[\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u57fa\u51c6\u6570\u636e](\/zh\/knowledge\/dataset\/sgkb.data.data-centre-industry-anchors)\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\n\n## \u65b0\u52a0\u5761\u4f5c\u4e3a\u533a\u57df\u6570\u636e\u4e2d\u5fc3\u67a2\u7ebd\n\n\u65b0\u52a0\u5761\u7684\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5f97\u76ca\u4e8e\u8be5\u56fd\u4f5c\u4e3a\u53ef\u4fe1\u8d56\u5546\u4e1a\u548c\u6570\u5b57\u67a2\u7ebd\u7684\u6574\u4f53\u5730\u4f4d\uff1a\u5bc6\u96c6\u7684\u6d77\u5e95\u7535\u7f06\u767b\u9646\u70b9\u3001\u5065\u5168\u7684\u77e5\u8bc6\u4ea7\u6743\u4fdd\u62a4\u3001\u8de8\u5883\u6570\u636e\u6d41\u52a8\u534f\u5b9a\uff0c\u4ee5\u53ca\u719f\u7ec3\u7684\u79d1\u6280\u4eba\u624d\u961f\u4f0d\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u622a\u81f3 2024 \u5e74\uff0c\u65b0\u52a0\u5761\u4eba\u5747\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5bb9\u91cf\u8d85\u8fc7\u6fb3\u5927\u5229\u4e9a\u3001\u4e2d\u56fd\u3001\u65e5\u672c\u3001\u97e9\u56fd\u548c\u82f1\u56fd\uff0c\u4ee5\u53ca\u5317\u4eac\u3001\u9999\u6e2f\u3001\u9996\u5c14\u3001\u6089\u5c3c\u548c\u4e1c\u4eac\u7b49\u4e3b\u8981\u5e02\u573a\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u30022023 \u5e74\u516d\u6708\u542f\u52a8\u7684\u300a\u6570\u5b57\u8fde\u63a5\u84dd\u56fe\u300b\u76ee\u6807\u662f\u5728\u968f\u540e\u5341\u5e74\u5185\u5c06\u6d77\u5e95\u7535\u7f06\u767b\u9646\u70b9\u6570\u91cf\u7ffb\u500d\uff0c\u8fdb\u4e00\u6b65\u5de9\u56fa\u5c06\u8ba1\u7b97\u8bbe\u65bd\u8bbe\u4e8e\u65b0\u52a0\u5761\u3001\u800c\u975e\u6210\u672c\u8f83\u4f4e\u7684\u90bb\u8fd1\u5e02\u573a\u7684\u8fde\u63a5\u4f18\u52bf\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n\u8be5\u884c\u4e1a\u5305\u62ec\u5411\u4f01\u4e1a\u79df\u6237\u51fa\u79df\u673a\u67dc\u7a7a\u95f4\u7684\u6258\u7ba1\u670d\u52a1\u8fd0\u8425\u5546\uff0c\u4ee5\u53ca\u4e3a\u81ea\u6709\u5e73\u53f0\u5efa\u8bbe\u548c\u8fd0\u8425\u8bbe\u65bd\u7684\u8d85\u5927\u89c4\u6a21\u4e91\u670d\u52a1\u5546\u3002\u5728\u65b0\u52a0\u5761\u8bbe\u6709\u4e1a\u52a1\u7684\u4e3b\u8981\u6258\u7ba1\u670d\u52a1\u548c\u4e2d\u7acb\u8fd0\u8425\u5546\u5305\u62ec Equinix\u3001Digital Realty\u3001Global Switch\u3001Keppel Data Centres\u3001ST Telemedia Global Data Centres\u3001AirTrunk\u3001Princeton Digital Group \u548c GDS Holdings\uff1b\u8d85\u5927\u89c4\u6a21\u4e91\u533a\u57df\u5219\u7531 Amazon Web Services\uff08AWS\uff09\u3001Microsoft Azure \u548c Google Cloud \u8fd0\u8425\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u5546\u4e1a\u65f6\u62a5\u300b\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u8bd5\u70b9\u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)\uff09\u3002\u8bbe\u65bd\u4e3b\u8981\u96c6\u4e2d\u5728\u4e09\u6761\u8d70\u5eca\uff1a\u88d5\u5eca\u548c\u88d5\u5eca\u4e1c\u3001\u5927\u6210\uff0c\u4ee5\u53ca\u9760\u8fd1\u6a1f\u5b9c\u548c\u4e1c\u90e8\u5de5\u4e1a\u533a\u7684\u7f57\u592e\u2014\u5927\u58eb\u2014\u6a1f\u5b9c\u5730\u5e26\u3002\u65b0\u7535\u4fe1\u7684\u6570\u636e\u4e2d\u5fc3\u90e8\u95e8 Nxera \u548c Keppel \u6301\u7eed\u5728\u8fd9\u4e9b\u533a\u57df\u6269\u5c55\uff0c\u5305\u62ec Nxera \u7684 58 \u5146\u74e6 DC Tuas \u8bbe\u65bd\uff0c\u76ee\u6807\u662f\u5728 2026 \u5e74\u5e95\u6295\u5165\u8fd0\u8425\uff08[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002\n\n## 2019 \u5e74\u6682\u7f13\u5efa\u8bbe\u4e0e\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\n\n2019 \u5e74\uff0c\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u8fdb\u5165\u6709\u5e8f\u589e\u957f\u9636\u6bb5\u3002\u5f53\u65f6\u653f\u5e9c\u901a\u77e5\u8fd0\u8425\u5546\u6682\u65f6\u6682\u505c\u65b0\u7684\u6570\u636e\u4e2d\u5fc3\u5f00\u53d1\u9879\u76ee\uff0c\u540c\u65f6\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u5ba1\u67e5\u5982\u4f55\u534f\u8c03\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u9700\u6c42\u4e0e\u300a\u5df4\u9ece\u534f\u5b9a\u300b\u4e0b\u7684\u6c14\u5019\u627f\u8bfa\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\u6682\u7f13\u63aa\u65bd\u5b9e\u65bd\u524d\u5df2\u83b7\u6279\u7684\u9879\u76ee\u4ecd\u53ef\u7ee7\u7eed\uff0c\u4f46\u5ba1\u67e5\u7ed3\u675f\u524d\u4e0d\u4f1a\u5206\u914d\u65b0\u7684\u5bb9\u91cf\u3002\u8d38\u5de5\u90e8\u957f\u4e8e 2023 \u5e74\u4e00\u6708\u5ba3\u5e03\u884c\u4e1a\u5ba1\u67e5\u5df2\u5b8c\u6210\uff1b\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e8e 2022 \u5e74\u4e03\u6708\u63a8\u51fa\u8bd5\u70b9\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff08DC-CFA\uff09\uff0c\u4f5c\u4e3a\u4ee5\u5ba1\u614e\u3001\u53ef\u6301\u7eed\u53d1\u5c55\u4f18\u5148\u7684\u65b9\u5f0f\u5206\u914d\u65b0\u589e\u5bb9\u91cf\u7684\u4e3b\u8981\u673a\u5236\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u3002\n\n2022 \u5e74\u4e03\u6708\u5f00\u653e\u7684\u8bd5\u70b9 DC-CFA \u9080\u8bf7\u8fd0\u8425\u5546\u63d0\u4ea4\u65b9\u6848\uff0c\u5c55\u793a\u5176\u91c7\u7528\u5148\u8fdb\u80fd\u6e90\u6548\u7387\u6280\u672f\u3001\u8131\u78b3\u8def\u5f84\u3001\u5bf9\u65b0\u52a0\u5761\u533a\u57df\u8fde\u63a5\u7684\u8d21\u732e\u4ee5\u53ca\u66f4\u5e7f\u6cdb\u7ecf\u6d4e\u4ef7\u503c\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u542f\u52a8\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html)\uff09\u30022023 \u5e74\u4e03\u6708\uff0c\u5728\u6536\u5230 20 \u591a\u4efd\u65b9\u6848\u540e\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u6682\u5b9a\u5411\u56db\u4e2a\u4f18\u9009\u9879\u76ee\u5206\u914d\u7ea6 80 \u5146\u74e6\u65b0\u589e\u5173\u952e IT \u8d1f\u8f7d\u5bb9\u91cf\uff1aEquinix\u3001GDS\u3001Microsoft\uff0c\u4ee5\u53ca AirTrunk\u2013ByteDance \u8054\u76df\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u5546\u4e1a\u65f6\u62a5\u300b\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u8bd5\u70b9\u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot)\uff09\u3002DC-CFA \u6a21\u5f0f\u53d6\u4ee3\u4e86\u8fd0\u8425\u5546\u53ea\u8981\u62e5\u6709\u571f\u5730\u548c\u7535\u529b\u5373\u53ef\u5efa\u8bbe\u7684\u5f00\u653e\u5e02\u573a\uff1b\u81ea 2022 \u5e74\u8d77\uff0c\u6240\u6709\u65b0\u7684\u7eff\u5730\u9879\u76ee\u5bb9\u91cf\u90fd\u5fc5\u987b\u5148\u901a\u8fc7\u7533\u8bf7\u5f81\u96c6\u83b7\u5f97\u5206\u914d\uff0c\u65b9\u53ef\u63a8\u8fdb\u3002\n\n2025 \u5e74\u5341\u4e8c\u6708 1 \u65e5\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u542f\u52a8\u7b2c\u4e8c\u8f6e\u7533\u8bf7\uff08DC-CFA2\uff09\uff0c\u63d0\u4f9b\u81f3\u5c11 200 \u5146\u74e6\u65b0\u589e\u5bb9\u91cf\uff0c\u5e76\u53ef\u80fd\u901a\u8fc7\u521b\u65b0\u7eff\u8272\u80fd\u6e90\u8def\u5f84\u63d0\u4f9b\u66f4\u591a\u5bb9\u91cf\uff1b\u540c\u65f6\uff0c\u5176\u53ef\u6301\u7eed\u6027\u95e8\u69db\u4e5f\u6bd4\u8bd5\u70b9\u8f6e\u6b21\u66f4\u4e25\u683c\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff1b[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002DC-CFA2 \u7533\u8bf7\u8005\u5fc5\u987b\u5728 IT \u8d1f\u8f7d\u8fbe\u5230 100% \u65f6\u5b9e\u73b0 1.25 \u6216\u66f4\u4f4e\u7684\u7535\u80fd\u4f7f\u7528\u6548\u7387\uff08PUE\uff09\uff0c\u53d6\u5f97\u5efa\u8bbe\u5c40\u2014\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40 2024 \u5e74\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\u767d\u91d1\u8ba4\u8bc1\uff0c\u90e8\u7f72\u7b26\u5408\u65b0\u52a0\u5761\u6807\u51c6 SS 715:2025 \u6570\u636e\u4e2d\u5fc3 IT \u80fd\u6548\u8981\u6c42\u7684\u8bbe\u5907\uff0c\u5e76\u4ece\u7b26\u5408\u8d44\u683c\u7684\u7eff\u8272\u80fd\u6e90\u8def\u5f84\u4e2d\u53d6\u5f97\u81f3\u5c11 50% \u7684\u8bbe\u65bd\u7528\u7535\uff0c\u4f8b\u5982\u751f\u7269\u7532\u70f7\u3001\u4f4e\u78b3\u6c28\u6216\u6c22\u3001\u914d\u5907\u78b3\u6355\u96c6\u6280\u672f\u7684\u65b0\u578b\u71c3\u6599\u7535\u6c60\uff0c\u6216\u5efa\u7b51\u4e00\u4f53\u5316\u5149\u4f0f\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff09\u3002\u5177\u6709\u72ec\u7279\u5dee\u5f02\u5316\u6218\u7565\u65b9\u6848\u7684\u516c\u53f8\uff0c\u4e5f\u53ef\u4ee5\u901a\u8fc7\u6218\u7565\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u8ba1\u5212\uff08SDIS\uff09\u76f4\u63a5\u5411\u7ecf\u6d4e\u53d1\u5c55\u5c40\u63d0\u51fa\u7533\u8bf7\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff09\u3002\n\n2026 \u5e74 **\u516b\u6708 21 \u65e5**\uff0c\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u5ba3\u5e03\uff0c\u901a\u8fc7 DC-CFA2 \u5df2\u5411\u56db\u5bb6\u6570\u636e\u4e2d\u5fc3\u8fd0\u8425\u5546**\u6682\u5b9a\u5206\u914d 200 \u5146\u74e6\u65b0\u589e\u5bb9\u91cf**\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\uff1aDC-CFA2 \u9009\u51fa\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u9879\u76ee](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-second-data-centre.html)\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708 21 \u65e5\uff09\u3002\u8fd9\u662f\u6682\u5b9a\u5206\u914d\u7ed3\u679c\uff0c\u5e76\u4e0d\u4ee3\u8868\u56db\u5ea7\u8bbe\u65bd\u90fd\u5df2\u6295\u5165\u8fd0\u8425\uff1b\u5e94\u7ed3\u5408\u65e9\u524d DC-CFA2 \u63d0\u4f9b\u7684\u5bb9\u91cf\u53ca\u5176\u53ef\u6301\u7eed\u6027\u95e8\u69db\u6765\u7406\u89e3\u8fd9\u9879\u516c\u544a\u3002\n\n## \u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u4e0e\u53ef\u6301\u7eed\u6027\u6807\u51c6\n\n\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e8e 2024 \u5e74\u4e94\u6708 29 \u65e5\u63a8\u51fa\u300a\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u300b\uff0c\u4e3a\u5168\u884c\u4e1a\u8bbe\u5b9a\u53ef\u6301\u7eed\u6027\u6846\u67b6\uff0c\u5e76\u7531\u5404\u8f6e\u7533\u8bf7\u5f81\u96c6\u5728\u5b9e\u8df5\u4e2d\u843d\u5b9e\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\u65b0\u95fb\u7a3f\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/resources\/press-releases-factsheets-and-speeches\/press-releases\/2024\/sg-announces-green-data-centre-roadmap)\uff09\u3002\u8def\u7ebf\u56fe\u65e8\u5728\u77ed\u671f\u5185\u65b0\u589e\u81f3\u5c11 300 \u5146\u74e6\u6570\u636e\u4e2d\u5fc3\u5bb9\u91cf\uff0c\u5e76\u53ef\u80fd\u901a\u8fc7\u90e8\u7f72\u7eff\u8272\u80fd\u6e90\u518d\u91ca\u653e 200 \u5146\u74e6\u53ca\u66f4\u591a\u5bb9\u91cf\uff0c\u540c\u65f6\u5728\u5341\u5e74\u5185\u63a8\u52a8\u6240\u6709\u5df2\u5b89\u88c5\u8bbe\u65bd\u63d0\u9ad8\u6548\u7387\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u8fd9\u4e0e\u65b0\u52a0\u5761\u66f4\u5e7f\u6cdb\u7684[\u7eff\u8272\u8ba1\u5212 2030](\/zh\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030)\u53ca 2050 \u5e74\u51c0\u96f6\u6392\u653e\u8f68\u8ff9\u76f8\u5951\u5408\uff0c\u4e5f\u8865\u5145\u4e86\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u5728[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u9886\u57df\u7684\u80fd\u6e90\u8f6c\u578b\u89c4\u5212\u3002\n\n\u5728\u8bbe\u65bd\u6548\u7387\u65b9\u9762\uff0c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u76ee\u6807\u662f\uff0c\u8def\u7ebf\u56fe\u53d1\u5e03\u540e\u7684\u5341\u5e74\u5185\uff0c\u65b0\u52a0\u5761\u6240\u6709\u6570\u636e\u4e2d\u5fc3\u5728 IT \u8d1f\u8f7d\u8fbe\u5230 100% \u65f6\u5b9e\u73b0\u4f4e\u4e8e 1.3 \u7684 PUE\uff1b\u76ee\u524d\u9876\u5c16\u8bbe\u8ba1\u5df2\u80fd\u8fbe\u5230\u8fd9\u4e00\u95e8\u69db\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u65b0\u52a0\u5761\u7387\u5148\u5236\u5b9a\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6807\u51c6\uff0c\u5141\u8bb8\u8bbe\u65bd\u5728\u8f83\u9ad8\u73af\u5883\u6e29\u5ea6\u548c\u6e7f\u5ea6\u4e0b\u5b89\u5168\u8fd0\u884c\uff0c\u4ece\u800c\u51cf\u5c11\u8d64\u9053\u6c14\u5019\u4e0b\u7684\u5236\u51b7\u80fd\u8017\uff1b\u8def\u7ebf\u56fe\u8fd8\u8981\u6c42\u5728 2024 \u5e74\u5e95\u524d\u66f4\u65b0\u5efa\u8bbe\u5c40\u2014\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u6570\u636e\u4e2d\u5fc3\u7eff\u8272\u6807\u5fd7\uff08GMDC\uff09\u8ba4\u8bc1\uff0c\u5e76\u5728 2025 \u5e74\u524d\u63a8\u51fa IT \u8bbe\u5907\u6807\u51c6 SS 715:2025 \u548c\u6db2\u51b7\u5e94\u7528\u6807\u51c6\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u968f\u7740\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u63a8\u52a8\u673a\u67b6\u5bc6\u5ea6\u4ece 2020 \u5e74\u6bcf\u673a\u67b6\u7ea6 8 \u5343\u74e6\u5347\u81f3\u6bcf\u673a\u67b6 20\u2013100 \u5343\u74e6\uff0c\u8def\u7ebf\u56fe\u9f13\u52b1\u91c7\u7528\u98ce\u51b7\u4e0e\u6db2\u51b7\u6df7\u5408\u914d\u7f6e\uff0c\u5e76\u901a\u8fc7\u65b0\u52a0\u5761\u56fd\u7acb\u5927\u5b66\u7684\u53ef\u6301\u7eed\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6d4b\u8bd5\u5e73\u53f0\u5f00\u5c55\u7814\u7a76\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n\u6570\u636e\u4e2d\u5fc3\u662f\u91cd\u8981\u7528\u6c34\u6237\uff1a2021 \u5e74\uff0c\u65b0\u52a0\u5761\u5927\u578b\u6570\u636e\u4e2d\u5fc3\uff08\u5e74\u7528\u6c34\u91cf\u81f3\u5c11\u4e3a 60,000 \u7acb\u65b9\u7c73\uff09\u7684\u4e2d\u4f4d\u6c34\u8d44\u6e90\u4f7f\u7528\u6548\u7387\uff08WUE\uff09\u4e3a\u6bcf\u5146\u74e6\u65f6 2.2 \u7acb\u65b9\u7c73\uff1b\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u4e0e\u56fd\u5bb6\u6c34\u52a1\u673a\u6784\u516c\u7528\u4e8b\u4e1a\u5c40\u7684\u76ee\u6807\u662f\u5728\u5341\u5e74\u5185\u901a\u8fc7\u4f18\u5316\u51b7\u5374\u5854\u548c\u56de\u6536\u5229\u7528\uff0c\u5c06\u884c\u4e1a WUE \u964d\u81f3\u6bcf\u5146\u74e6\u65f6 2.0 \u7acb\u65b9\u7c73\u6216\u66f4\u4f4e\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u7ecf\u6d4e\u53d1\u5c55\u5c40\u901a\u8fc7\u51cf\u5c11\u6392\u653e\u8d44\u6e90\u6548\u7387\u6d25\u8d34\u548c\u51cf\u6392\u6295\u8d44\u6d25\u8d34\u63d0\u4f9b\u5171\u540c\u8d44\u52a9\uff0c\u4ee5\u652f\u6301\u73b0\u6709\u8bbe\u65bd\u6539\u9020\uff1b\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u7eff\u8272\u8ba1\u7b97\u8d44\u52a9\u8ba1\u5212\u81ea 2024 \u5e74\u4e00\u6708\u8d77\u62e8\u51fa 30 \u767e\u4e07\u65b0\u5143\uff0c\u652f\u6301\u8f6f\u4ef6\u5c42\u9762\u7684\u80fd\u6e90\u6548\u7387\u7814\u7a76\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\n\n## \u8d85\u5927\u89c4\u6a21\u6295\u8d44\u4e0e\u88d5\u5eca\u5c9b\u6269\u5efa\n\n\u8d85\u5927\u89c4\u6a21\u4e91\u670d\u52a1\u5546\u662f\u63a8\u52a8\u65b0\u52a0\u5761\u6570\u636e\u4e2d\u5fc3\u9879\u76ee\u50a8\u5907\u9700\u6c42\u7684\u91cd\u8981\u652f\u67f1\u3002AWS \u4e8e 2024 \u5e74\u4e94\u6708\u5ba3\u5e03\u8ba1\u5212\u5728 2024 \u5e74\u81f3 2028 \u5e74\u95f4\uff0c\u8ffd\u52a0\u6295\u8d44 12 \u5341\u4ebf\u65b0\u5143\u7528\u4e8e\u73b0\u6709\u65b0\u52a0\u5761\u4e91\u57fa\u7840\u8bbe\u65bd\uff0c\u4f7f AWS \u4e9a\u592a\u5730\u533a\uff08\u65b0\u52a0\u5761\uff09\u533a\u57df\u622a\u81f3 2028 \u5e74\u7684\u8ba1\u5212\u603b\u6295\u8d44\u8d85\u8fc7 23 \u5341\u4ebf\u65b0\u5143\uff1b\u8fd9\u7b14\u6295\u8d44\u662f\u5728 2010 \u5e74\u81f3 2023 \u5e74\u671f\u95f4\u5df2\u6295\u5165\u7684 11.5 \u5341\u4ebf\u65b0\u5143\u4e4b\u5916\u3002\u9884\u8ba1\u5230 2028 \u5e74\uff0c\u8be5\u6295\u8d44\u5c06\u4e3a\u65b0\u52a0\u5761\u56fd\u5185\u751f\u4ea7\u603b\u503c\u8d21\u732e 23.7 \u5341\u4ebf\u65b0\u5143\uff0c\u5e76\u6bcf\u5e74\u5728\u4f9b\u5e94\u94fe\u4e2d\u652f\u6301\u7ea6 12,300 \u4e2a\u5168\u804c\u7b49\u503c\u5de5\u4f5c\u5c97\u4f4d\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 AWS \u6295\u8d44\u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html)\uff09\u3002Microsoft \u662f\u8bd5\u70b9 DC-CFA \u7684\u56db\u4e2a\u4f18\u9009\u9879\u76ee\u4e4b\u4e00\uff0c\u5e76\u7ee7\u7eed\u6269\u5927\u5176\u5728\u65b0\u52a0\u5761\u7684 Azure \u57fa\u7840\u8bbe\u65bd\uff0c\u4f5c\u4e3a\u66f4\u5e7f\u6cdb\u7684\u4e1c\u5357\u4e9a\u4e91\u8ba1\u7b97\u548c\u4eba\u5de5\u667a\u80fd\u6295\u8d44\u8ba1\u5212\u7684\u4e00\u90e8\u5206\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u516c\u5e03\u56db\u4e2a\u6570\u636e\u4e2d\u5fc3\u7533\u8bf7\u5f81\u96c6\u4f18\u9009\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html)\uff1b[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002Google Cloud \u5728\u65b0\u52a0\u5761\u8fd0\u8425\u6210\u719f\u7684\u4e91\u533a\u57df\uff0c\u5e76\u4e0e\u533a\u57df\u540c\u884c\u4e00\u9053\u6301\u7eed\u6269\u5145\u5bb9\u91cf\u3002\n\n\u4e00\u5904\u503c\u5f97\u5173\u6ce8\u7684\u65b0\u5740\u4f4d\u4e8e[\u88d5\u5eca\u5c9b](\/zh\/knowledge\/article\/sgkb.business-industry.petrochemicals-industry)\u3002\u7ecf\u6d4e\u53d1\u5c55\u5c40\u5df2\u9884\u7559\u7ea6 20 \u516c\u9877\u571f\u5730\uff0c\u7528\u4e8e\u5efa\u8bbe\u65b0\u52a0\u5761\u6700\u5927\u7684\u4f4e\u78b3\u6570\u636e\u4e2d\u5fc3\u56ed\u533a\uff0c\u6f5c\u5728\u5bb9\u91cf\u9ad8\u8fbe 700 \u5146\u74e6\uff0c\u4ee5\u6ee1\u8db3\u4eba\u5de5\u667a\u80fd\u9a71\u52a8\u7684\u9700\u6c42\uff1b\u8be5\u56ed\u533a\u5c06\u878d\u5165\u5c9b\u4e0a\u66f4\u5e7f\u6cdb\u7684\u6c22\u3001\u6c28\u548c\u53ef\u6301\u7eed\u822a\u7a7a\u71c3\u6599\u57fa\u7840\u8bbe\u65bd\u8f6c\u578b\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40\u88d5\u5eca\u5c9b\u5408\u4f5c\u9879\u76ee\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html)\uff09\u3002\u5c06\u8d85\u5927\u89c4\u6a21\u5bb9\u91cf\u8bbe\u4e8e\u88d5\u5eca\u5c9b\uff0c\u53ef\u8ba9\u8fd0\u8425\u5546\u5229\u7528\u90bb\u8fd1\u7684\u4f4e\u78b3\u80fd\u6e90\u8bd5\u70b9\u9879\u76ee\uff0c\u5305\u62ec\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u6b63\u5728\u7814\u7a76\u7684\u6c28\u548c\u6c22\u9879\u76ee\uff0c\u800c\u4e0d\u5fc5\u5b8c\u5168\u4f9d\u8d56[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\u4e2d\u6240\u8ff0\u3001\u4ee5\u5929\u7136\u6c14\u4e3a\u4e3b\u7684\u672c\u5c9b\u7535\u7f51\u3002\u51b7\u5374\u7cfb\u7edf\u4f9b\u5e94\u5546 Johnson Controls \u4ee5\u4e9a\u592a\u5730\u533a\u6570\u636e\u4e2d\u5fc3\u589e\u957f\u4e3a\u7531\uff0c\u4e8e 2025 \u5e74\u6269\u5927\u5176\u65b0\u52a0\u5761\u533a\u57df\u67a2\u7ebd\uff0c\u53cd\u6620\u51fa\u8be5\u884c\u4e1a\u6240\u652f\u6491\u7684\u4e0b\u6e38\u4ea7\u4e1a\u751f\u6001\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 Johnson Controls \u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)\uff09\u3002\n\n## \u7535\u529b\u9700\u6c42\u3001\u9650\u5236\u4e0e\u533a\u57df\u5916\u6ea2\n\n\u6570\u636e\u4e2d\u5fc3\u662f\u65b0\u52a0\u5761\u7535\u529b\u6d88\u8017\u589e\u957f\u6700\u5feb\u7684\u884c\u4e1a\u4e4b\u4e00\u3002\u622a\u81f3 2025 \u5e74\uff0c\u6570\u636e\u4e2d\u5fc3\u4f30\u8ba1\u5360\u5168\u56fd\u80fd\u6e90\u6d88\u8017\u7684 7%\uff1b\u968f\u7740\u4e91\u8ba1\u7b97\u548c\u4eba\u5de5\u667a\u80fd\u5de5\u4f5c\u8d1f\u8f7d\u6269\u5c55\uff0c\u9884\u8ba1\u5230 2030 \u5e74\u5c06\u5347\u81f3 12%\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 Johnson Controls \u516c\u544a\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/en\/about-edb\/media-releases-publications\/johnson-controls-expands-singapore-hub-for-data-centre-tech.html)\uff09\u3002\u5728\u672c\u5730\u8d44\u8baf\u4e0e\u901a\u4fe1\u884c\u4e1a\u5185\u90e8\uff0c\u6570\u636e\u4e2d\u5fc3\u7ea6\u5360\u78b3\u6392\u653e\u91cf\u7684 82%\uff0c\u56e0\u6b64\u8be5\u884c\u4e1a\u8131\u78b3\u5bf9\u65b0\u52a0\u5761\u6570\u5b57\u53ef\u6301\u7eed\u53d1\u5c55\u76ee\u6807\u81f3\u5173\u91cd\u8981\uff08[\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7eff\u8272\u6570\u636e\u4e2d\u5fc3\u8def\u7ebf\u56fe\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.imda.gov.sg\/-\/media\/imda\/files\/how-we-can-help\/green-dc-roadmap\/green-dc-roadmap.pdf)\uff09\u3002\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u300a2025 \u5e74\u7535\u529b\u9700\u6c42\u4e0e\u4f9b\u5e94\u5c55\u671b\u300b\u9884\u6d4b\uff0c2025 \u5e74\u81f3 2034 \u5e74\u7cfb\u7edf\u5cf0\u503c\u9700\u6c42\u7684\u590d\u5408\u5e74\u589e\u957f\u7387\u4e3a 2.4%\u20134.8%\uff1b\u5176\u4e0a\u9650\u60c5\u666f\u660e\u786e\u7eb3\u5165\u6570\u636e\u4e2d\u5fc3\u548c\u5148\u8fdb\u5236\u9020\u4e1a\u65b0\u589e\u9700\u6c42\uff08[\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u300a2025 \u5e74\u5c55\u671b\u300b\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.ema.gov.sg\/content\/dam\/corporate\/regulations\/policy-papers\/pdf-files\/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf)\uff09\u3002\n\n\u65b0\u52a0\u5761\u571f\u5730\u7a00\u7f3a\u3001\u70ed\u5e26\u6c14\u5019\u9700\u8981\u5236\u51b7\uff0c\u4e14\u672c\u5730\u53ef\u518d\u751f\u80fd\u6e90\u6f5c\u529b\u6709\u9650\uff0c\u56e0\u6b64\u7533\u8bf7\u5f81\u96c6\u6a21\u5f0f\u6709\u610f\u9650\u5236\u5bb9\u91cf\u589e\u957f\u901f\u5ea6\u3002\u8bd5\u70b9\u8f6e\u6b21\u4ece 20 \u591a\u4efd\u7ade\u6807\u65b9\u6848\u4e2d\u53ea\u5206\u914d\u4e86 80 \u5146\u74e6\uff1bDC-CFA2 \u63d0\u4f9b\u81f3\u5c11 200 \u5146\u74e6\uff0c\u4f46\u5bf9\u7eff\u8272\u7535\u529b\u6765\u6e90\u65bd\u52a0\u4e86\u66f4\u4e25\u683c\u8981\u6c42\uff0c\u4f7f\u6269\u5f20\u901f\u5ea6\u53d6\u51b3\u4e8e\u4f4e\u78b3\u80fd\u6e90\u57fa\u7840\u8bbe\u65bd\u7684\u5efa\u8bbe\u8fdb\u5ea6\uff0c\u5305\u62ec\u80fd\u6e90\u5e02\u573a\u7ba1\u7406\u5c40\u4e3a 2035 \u5e74\u5b9e\u73b0 6 \u5409\u74e6\u4f4e\u78b3\u7535\u529b\u8fdb\u53e3\u76ee\u6807\u800c\u63a8\u8fdb\u7684\u533a\u57df\u7535\u529b\u8fdb\u53e3\uff08[\u7ecf\u6d4e\u53d1\u5c55\u5c40 DC-CFA2 \u8bf4\u660e\u4e66\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.edb.gov.sg\/content\/dam\/edb-en\/about-edb\/media-releases\/news\/launch-of-second-data-centre-call-for-application\/Launch%20of%20second%20data%20centre-call%20for%20application.pdf)\uff1b\u53e6\u89c1[\u80fd\u6e90\u4e0e\u7535\u7f51](\/zh\/knowledge\/article\/sgkb.environment-sustainability.energy-and-power-grid)\uff09\u3002\u5206\u6790\u4eba\u58eb\u548c\u884c\u4e1a\u89c2\u5bdf\u8005\u6307\u51fa\uff0c\u8d85\u5927\u89c4\u6a21\u8fd0\u8425\u5546\u8d8a\u6765\u8d8a\u591a\u5730\u5728\u90bb\u8fd1\u7684\u9a6c\u6765\u897f\u4e9a\u67d4\u4f5b\u3001\u65b0\u52a0\u5761\u96c5\u52a0\u8fbe\u548c\u66fc\u8c37\u5efa\u8bbe\u5927\u89c4\u6a21\u5bb9\u91cf\uff0c\u56e0\u4e3a\u5f53\u5730\u571f\u5730\u548c\u7535\u529b\u66f4\u4fbf\u5b9c\uff1b\u540c\u65f6\u4fdd\u7559\u65b0\u52a0\u5761\u4ee5\u627f\u8f7d\u5bf9\u5ef6\u8fdf\u654f\u611f\u7684\u9ad8\u7aef\u5de5\u4f5c\u8d1f\u8f7d\u3002\u8fd9\u79cd\u6a21\u5f0f\u65e2\u7ef4\u6301\u4e86\u65b0\u52a0\u5761\u7684\u67a2\u7ebd\u5730\u4f4d\uff0c\u4e5f\u907f\u514d\u672c\u5730\u5bb9\u91cf\u4e0d\u53d7\u9650\u5236\u5730\u589e\u957f\uff08[\u300a\u6d77\u5ce1\u65f6\u62a5\u300bDC-CFA2 \u62a5\u9053\uff0c\u67e5\u9605\u4e8e 2026 \u5e74\u516b\u6708](https:\/\/www.straitstimes.com\/business\/edb-imda-launch-second-exercise-to-expand-data-centre-capacity)\uff09\u3002\u56e0\u6b64\uff0c\u65b0\u52a0\u5761\u6570\u5b57\u7ecf\u6d4e\u96c4\u5fc3\u4e0e\u5176[\u7eff\u8272\u8ba1\u5212 2030](\/zh\/knowledge\/article\/sgkb.environment-sustainability.green-plan-2030)\u80fd\u6e90\u76ee\u6807\u4e4b\u95f4\u7684\u5f20\u529b\u662f\u7ed3\u6784\u6027\u7684\uff1a\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u53ef\u4ee5\u589e\u957f\uff0c\u4f46\u589e\u957f\u901f\u5ea6\u53ea\u80fd\u4e0e\u6548\u7387\u63d0\u5347\u548c\u7eff\u8272\u7535\u529b\u4f9b\u5e94\u76f8\u5339\u914d\uff0c\u5e76\u53d7\u7ecf\u6d4e\u53d1\u5c55\u5c40\u548c\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40\u7684\u5206\u914d\u628a\u5173\u673a\u5236\u7ea6\u675f\u3002"},"related":[{"id":90246,"source_id":"sgkb.environment-sustainability.decarbonisation-technology-and-speed","kind":"article","title_en":"Decarbonisation technology and Singapore's SPEED programme","title_zh":"\u8131\u78b3\u6280\u672f\u4e0e\u65b0\u52a0\u5761 SPEED \u8ba1\u5212","assurance":null,"subtype":null},{"id":89683,"source_id":"sgkb.business-industry.digital-infrastructure-bill","kind":"article","title_en":"Digital Infrastructure Act 2026: scope and commencement","title_zh":"\u300a2026 \u5e74\u6570\u5b57\u57fa\u7840\u8bbe\u65bd\u6cd5\u300b\uff1a\u8303\u56f4\u4e0e\u751f\u6548","assurance":null,"subtype":null},{"id":90250,"source_id":"sgkb.environment-sustainability.energy-and-power-grid","kind":"article","title_en":"Energy and Power Grid","title_zh":"\u80fd\u6e90\u4e0e\u7535\u7f51","assurance":null,"subtype":null},{"id":90376,"source_id":"sgkb.foreign-relations.asean-submarine-cable-guidelines","kind":"article","title_en":"Enhanced ASEAN Guidelines for Submarine Cable Resilience and Repair","title_zh":"\u52a0\u5f3a\u7248\u4e1c\u76df\u6d77\u5e95\u7535\u7f06\u97e7\u6027\u4e0e\u4fee\u590d\u6307\u5357","assurance":null,"subtype":null},{"id":89704,"source_id":"sgkb.business-industry.futuregrid-accelerator","kind":"article","title_en":"FutureGrid Accelerator","title_zh":"FutureGrid Accelerator","assurance":null,"subtype":null},{"id":89751,"source_id":"sgkb.business-industry.petrochemicals-industry","kind":"article","title_en":"Petrochemicals and Chemicals","title_zh":"\u77f3\u6cb9\u5316\u5de5\u4e0e\u5316\u5b66\u54c1","assurance":null,"subtype":null},{"id":90258,"source_id":"sgkb.environment-sustainability.green-plan-2030","kind":"article","title_en":"Singapore Green Plan 2030","title_zh":"\u65b0\u52a0\u5761\u7eff\u8272\u53d1\u5c55\u84dd\u56fe 2030","assurance":null,"subtype":null},{"id":89796,"source_id":"sgkb.business-industry.ss-726-liquid-cooling-tropical-data-centres","kind":"article","title_en":"Singapore Standard SS 726:2026 \u2014 Liquid Cooling in Tropical Data Centres","title_zh":"\u65b0\u52a0\u5761\u6807\u51c6 SS 726:2026\u2014\u2014\u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6db2\u51b7","assurance":null,"subtype":null},{"id":89740,"source_id":"sgkb.business-industry.national-ai-strategy-and-governance","kind":"article","title_en":"Singapore's National AI Strategy and Governance","title_zh":"\u65b0\u52a0\u5761\u56fd\u5bb6\u4eba\u5de5\u667a\u80fd\u6218\u7565\u4e0e\u6cbb\u7406","assurance":null,"subtype":null},{"id":89787,"source_id":"sgkb.business-industry.singtel","kind":"article","title_en":"Singtel","title_zh":"Singtel","assurance":null,"subtype":null},{"id":89786,"source_id":"sgkb.business-industry.singtel-nvidia-centre-of-excellence-applied-ai","kind":"article","title_en":"Singtel\u2013NVIDIA Centre of Excellence for Applied AI","title_zh":"Singtel\u2013NVIDIA \u5e94\u7528\u4eba\u5de5\u667a\u80fd\u5353\u8d8a\u4e2d\u5fc3","assurance":null,"subtype":null},{"id":89797,"source_id":"sgkb.business-industry.startup-ecosystem","kind":"article","title_en":"Startup Ecosystem","title_zh":"\u521d\u521b\u4f01\u4e1a\u751f\u6001\u7cfb\u7edf","assurance":null,"subtype":null},{"id":89798,"source_id":"sgkb.business-industry.stmicroelectronics-singapore","kind":"article","title_en":"STMicroelectronics in Singapore","title_zh":"\u610f\u6cd5\u534a\u5bfc\u4f53\u5728\u65b0\u52a0\u5761","assurance":null,"subtype":null},{"id":89945,"source_id":"sgkb.data.data-centre-industry-anchors","kind":"dataset","title_en":"Data Centre Industry Anchors","title_zh":"\u6570\u636e\u4e2d\u5fc3\u884c\u4e1a\u5173\u952e\u6570\u636e","assurance":null,"subtype":null},{"id":90086,"source_id":"sgkb.data.ss-726-liquid-cooling-anchors","kind":"dataset","title_en":"SS 726:2026 Liquid Cooling in Tropical Data Centres Anchors","title_zh":"SS 726:2026 \u70ed\u5e26\u6570\u636e\u4e2d\u5fc3\u6db2\u51b7\u8981\u70b9","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":79646,"source_id":"my.federation.malaysia","kind":"entity","title_en":"Federation of Malaysia","title_zh":"\u9a6c\u6765\u897f\u4e9a\u8054\u90a6","assurance":null,"subtype":"federal-state"},{"id":79811,"source_id":"sg.agency.imda","kind":"entity","title_en":"Infocomm Media Development Authority","title_zh":"\u8d44\u8baf\u901a\u4fe1\u5a92\u4f53\u53d1\u5c55\u5c40","assurance":null,"subtype":"statutory-board"},{"id":83286,"source_id":"sg.university.nus","kind":"entity","title_en":"National University of Singapore","title_zh":"\u65b0\u52a0\u5761\u56fd\u7acb\u5927\u5b66","assurance":null,"subtype":"autonomous-university"},{"id":79800,"source_id":"sg.agency.edb","kind":"entity","title_en":"Singapore Economic Development Board","title_zh":"\u65b0\u52a0\u5761\u7ecf\u6d4e\u53d1\u5c55\u5c40","assurance":null,"subtype":"agency"},{"id":80085,"source_id":"sg.company.singtel","kind":"entity","title_en":"Singtel","title_zh":"\u65b0\u7535\u4fe1","assurance":null,"subtype":"telecommunications-company"},{"id":80319,"source_id":"sg.geo.island.jurong-island","kind":"geography","title_en":"Jurong Island","title_zh":"\u88d5\u5eca\u5c9b","assurance":null,"subtype":"island"},{"id":92016,"source_id":"sgtopic.business","kind":"topic","title_en":"Business and industry","title_zh":"\u5546\u4e1a\u4e0e\u5de5\u4e1a","assurance":null,"subtype":null},{"id":91973,"source_id":"sgtopic.business.data-centres","kind":"topic","title_en":"Data centres","title_zh":"\u6570\u636e\u4e2d\u5fc3","assurance":null,"subtype":null}]}