{"release_id":19,"data":{"id":89654,"release_id":19,"source_id":"sgkb.business-industry.beta-catalyst-programme","kind":"article","fingerprint":"8256b32b35296e04761b9603bc5c00350e6ba76ba9b0f53db76c0f89671db210","title_en":"Built Environment Technology Alliance (BETA) Catalyst Programme","title_zh":"\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212","domain":"business-industry","status":"verified","assurance":null,"subtype":null,"lat":null,"lon":null,"date":"2026-10-22","payload":{"bundle_sha256":"45bf7e4a6e04877a9385caa9d5613e31f964959fced55c1117ce10170e4f73ce","checks":{"citations":"passed","translation":"passed"},"data":{"aliases":["BETA Catalyst Programme","BETA Catalyst","Built Environment Technology Alliance Catalyst"],"aliases_i18n":[],"classification_confidence":"medium","classification_source":"domain-default","document_id":"sgkb.business-industry.beta-catalyst-programme","document_sha256":"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47","document_type":"article","domain":"business-industry","entities":["sg.programme.beta-catalyst","sg.agency.bca"],"facets":["business","current","infrastructure","policy"],"geographic_scope":["national"],"jurisdiction":"SG","language":"en","last_verified":"2026-10-22","path":"business-industry\/beta-catalyst-programme.md","related":["research-policy-and-funding","decarbonisation-technology-and-speed","green-buildings-innovation-cluster-gbic"],"sources":[{"accessed":"2026-10-22","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Built Environment Technology Alliance (BETA)","url":"https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"},{"accessed":"2026-10-22","published":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Next Phase of Research and Innovation Funding Initiatives","url":"https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/"}],"status":"verified","summary":"BCA's BETA Catalyst Programme supports industry-led built-environment research and innovation partnerships with public research performers, including qualifying projects at TRL 4\u20137 with up to 50% co-funding and a maximum three-year duration.","tags":["policy","scheme","construction","tech"],"temporal_scope":"current","title":"Built Environment Technology Alliance (BETA) Catalyst Programme","topics":["sgtopic.business","sgtopic.business.beta-catalyst-programme"],"volatility":"fast"},"date":"2026-10-22","domain":"business-industry","evidence_paths":["source\/business-industry\/beta-catalyst-programme.md","artefacts\/retrieval-chunks.jsonl","artefacts\/document-classification.jsonl","artefacts\/mentions.jsonl"],"expected_version":12,"input_hash":"86d7cebf155370d4ed5c24ee70a1ae53910f61ad22f4a671f86a640098bb25de","kind":"article","lineage":[{"chunk_id":"sgkb.business-industry.beta-catalyst-programme#overview","citation_urls":["https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"],"content_sha256":"3a293b0e974f374e5b16086703e3633e89883a7cac317a0a690813fca56c73b6","document_id":"sgkb.business-industry.beta-catalyst-programme","document_sha256":"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47","section_sources":[{"accessed":"2026-10-22","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Built Environment Technology Alliance (BETA)","url":"https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"}]},{"chunk_id":"sgkb.business-industry.beta-catalyst-programme#purpose-and-transformation-areas","citation_urls":["https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"],"content_sha256":"55879ff9dc8e18d3be77ffb9aabc3108b3b5d525331e039fecbf00f25103a0fe","document_id":"sgkb.business-industry.beta-catalyst-programme","document_sha256":"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47","section_sources":[{"accessed":"2026-10-22","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Built Environment Technology Alliance (BETA)","url":"https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"}]},{"chunk_id":"sgkb.business-industry.beta-catalyst-programme#eligible-partnerships-and-project-boundary","citation_urls":["https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"],"content_sha256":"0c6d26dd0456cc58675a15861599a24e86737ebc72ce65979986a705d6984eca","document_id":"sgkb.business-industry.beta-catalyst-programme","document_sha256":"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47","section_sources":[{"accessed":"2026-10-22","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Built Environment Technology Alliance (BETA)","url":"https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"}]},{"chunk_id":"sgkb.business-industry.beta-catalyst-programme#co-funding-and-application-process","citation_urls":["https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"],"content_sha256":"3acb664b27750dd0c825eaf7f60a1c76f3bf64fae4d6beb933ce93becdda3e3f","document_id":"sgkb.business-industry.beta-catalyst-programme","document_sha256":"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47","section_sources":[{"accessed":"2026-10-22","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Built Environment Technology Alliance (BETA)","url":"https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"}]},{"chunk_id":"sgkb.business-industry.beta-catalyst-programme#relationship-to-the-2026-rie2030-announcement","citation_urls":["https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/"],"content_sha256":"46093064f88ccd68e3b27b52ba6eb3bb59f3ba8f9fab61f78e187238d42b7da5","document_id":"sgkb.business-industry.beta-catalyst-programme","document_sha256":"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47","section_sources":[{"accessed":"2026-10-22","published":"2026-09-02","publisher":"Building and Construction Authority","tier":1,"title":"BCA \u2014 Next Phase of Research and Innovation Funding Initiatives","url":"https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/"}]}],"links":[{"relation":"related","target_id":"sgkb.science-research.research-policy-and-funding"},{"relation":"related","target_id":"sgkb.environment-sustainability.decarbonisation-technology-and-speed"},{"relation":"related","target_id":"sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic"},{"relation":"topics","target_id":"sgtopic.business"},{"relation":"topics","target_id":"sgtopic.business.beta-catalyst-programme"},{"relation":"entities","target_id":"sg.programme.beta-catalyst"},{"relation":"entities","target_id":"sg.agency.bca"},{"relation":"mentions","target_id":"sg.programme.rie2030"},{"relation":"mentions","target_id":"sg.work.wong-shih-yaw-transformation"}],"locales":{"en":{"markdown":"# Built Environment Technology Alliance (BETA) Catalyst Programme\n\nThe **Built Environment Technology Alliance (BETA) Catalyst Programme** is a\nBuilding and Construction Authority (BCA) initiative for industry-led research\nand innovation in Singapore's built-environment sector. It supports firms and\npublic research performers in co-developing solutions that can move from\nresearch into commercial and industry use; it is not a general business grant\nor a substitute for project approvals and regulatory compliance ([BCA, BETA\nCatalyst Programme, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Purpose and transformation areas\n\nBCA says BETA was launched in **2020** to build built-environment capability by\nencouraging stakeholders to share strengths and resources. Eligible projects\nmust address at least one Built Environment Industry Transformation Map area:\n**Integrated Planning and Design**, **Advanced Manufacturing and Assembly**, or\n**Sustainable Urban Systems**. Participating firms must also show that the\nproject aligns with their business goals and can uplift the sector or wider\ninnovation ecosystem. The alliance model is intended to connect firms that\nunderstand operational needs with research performers that can develop and test\ntechnical solutions; participation therefore concerns a defined project\npartnership rather than membership alone or a standalone technology showcase\n([BCA, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Eligible partnerships and project boundary\n\nProjects must be led by an alliance or team of built-environment-related\ncompanies and public research performers, such as local universities or\nresearch institutes. BCA describes the expected commercialisation range as\n**Technology Readiness Level 4 to 7**, and a supported project must not exceed\n**three years**. These conditions describe the programme's project screen; they\ndo not mean that every built-environment technology at those readiness levels\nwill be approved. The project boundary also keeps BETA focused on translation\nand adoption: a proposal must connect the research work to a built-environment\nproblem and a credible pathway to use, rather than merely describe an early\nresearch idea ([BCA, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Co-funding and application process\n\nQualifying projects can receive up to **50% co-funding** of qualifying costs,\nmatched dollar-for-dollar with cash contributions from participating firms. BCA\ncaps co-funding at **30%** for projects involving non-Singaporean private\nentities as research performers. Applications are accepted year-round and are\nassessed through peer review, a proposal presentation to an evaluation panel,\nand budget scrubbing where applicable. BCA says a typical application takes\n**four to six months** from proposal submission to issuance of a Letter of\nAward, depending on completeness and clarity. Interested firms are directed to\napproach BCA for programme guidance, including help identifying research\npartners and navigating relevant regulations; that conversation does not\nreplace the formal assessment or create an entitlement to funding ([BCA,\naccessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Relationship to the 2026 RIE2030 announcement\n\nOn **2 September 2026**, BCA announced that BETA Catalyst and the **Cities of\nTomorrow R&D Programme** had secured an additional **S$112 million** in funding\ninitiatives over the next five years under RIE2030. BCA linked the next phase to\npriorities including safer and more productive demolition, building-lifespan\nand maintenance modelling, embodied-carbon and energy-efficiency improvements,\nand translation of research into industry adoption. The S$112 million is a\nprogramme-level commitment across the named initiatives, not an automatic\naward or per-company entitlement. The announcement therefore provides\nstrategic and funding context for BETA's next phase while leaving individual\nproject selection subject to the BETA Catalyst process and its published\ncriteria ([BCA, 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/)).","summary":"BCA's BETA Catalyst Programme supports industry-led built-environment research and innovation partnerships with public research performers, including qualifying projects at TRL 4\u20137 with up to 50% co-funding and a maximum three-year duration.","title":"Built Environment Technology Alliance (BETA) Catalyst Programme"},"zh":{"markdown":"# \u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212\n\n**\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212**\u662f\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\uff08BCA\uff09\u4e3a\u5efa\u6210\u73af\u5883\u9886\u57df\u4e1a\u754c\u4e3b\u5bfc\u7684\u7814\u7a76\u4e0e\u521b\u65b0\u63a8\u51fa\u7684\u8ba1\u5212\u3002\u8be5\u8ba1\u5212\u652f\u6301\u4f01\u4e1a\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5171\u540c\u5f00\u53d1\u89e3\u51b3\u65b9\u6848\uff0c\u63a8\u52a8\u7814\u7a76\u6210\u679c\u6295\u5165\u5546\u4e1a\u548c\u884c\u4e1a\u5e94\u7528\uff1b\u5b83\u5e76\u975e\u4e00\u822c\u5546\u4e1a\u8865\u52a9\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u9879\u76ee\u5ba1\u6279\u548c\u76d1\u7ba1\u5408\u89c4\u8981\u6c42\uff08[BCA\uff0cBETA \u50ac\u5316\u8ba1\u5212\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u76ee\u7684\u548c\u8f6c\u578b\u9886\u57df\n\nBCA \u8868\u793a\uff0cBETA \u4e8e **2020 \u5e74**\u63a8\u51fa\uff0c\u65e8\u5728\u9f13\u52b1\u5229\u76ca\u76f8\u5173\u65b9\u5206\u4eab\u4f18\u52bf\u548c\u8d44\u6e90\uff0c\u589e\u5f3a\u5efa\u6210\u73af\u5883\u9886\u57df\u7684\u80fd\u529b\u3002\u7b26\u5408\u6761\u4ef6\u7684\u9879\u76ee\u5fc5\u987b\u81f3\u5c11\u6d89\u53ca\u5efa\u6210\u73af\u5883\u4ea7\u4e1a\u8f6c\u578b\u84dd\u56fe\u7684\u4e00\u4e2a\u9886\u57df\uff1a**\u7efc\u5408\u89c4\u5212\u4e0e\u8bbe\u8ba1**\u3001**\u5148\u8fdb\u5236\u9020\u4e0e\u88c5\u914d**\u6216**\u53ef\u6301\u7eed\u57ce\u5e02\u7cfb\u7edf**\u3002\u53c2\u4e0e\u4f01\u4e1a\u8fd8\u5fc5\u987b\u8bc1\u660e\u9879\u76ee\u7b26\u5408\u5176\u4e1a\u52a1\u76ee\u6807\uff0c\u5e76\u80fd\u63d0\u5347\u8be5\u9886\u57df\u6216\u66f4\u5e7f\u6cdb\u7684\u521b\u65b0\u751f\u6001\u7cfb\u7edf\u3002\u8054\u76df\u6a21\u5f0f\u65e8\u5728\u8fde\u63a5\u4e86\u89e3\u8fd0\u8425\u9700\u6c42\u7684\u4f01\u4e1a\u4e0e\u80fd\u591f\u5f00\u53d1\u548c\u6d4b\u8bd5\u6280\u672f\u89e3\u51b3\u65b9\u6848\u7684\u7814\u7a76\u673a\u6784\uff1b\u56e0\u6b64\uff0c\u53c2\u4e0e\u662f\u9488\u5bf9\u4e00\u9879\u660e\u786e\u7684\u5408\u4f5c\u9879\u76ee\uff0c\u800c\u975e\u4ec5\u4ec5\u6210\u4e3a\u4f1a\u5458\u6216\u5355\u72ec\u5c55\u793a\u6280\u672f\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u7b26\u5408\u6761\u4ef6\u7684\u5408\u4f5c\u5173\u7cfb\u548c\u9879\u76ee\u8303\u56f4\n\n\u9879\u76ee\u5fc5\u987b\u7531\u5efa\u6210\u73af\u5883\u76f8\u5173\u4f01\u4e1a\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u7ec4\u6210\u7684\u8054\u76df\u6216\u56e2\u961f\u9886\u5bfc\uff0c\u4f8b\u5982\u672c\u5730\u5927\u5b66\u6216\u7814\u7a76\u9662\u3002BCA \u8bf4\u660e\uff0c\u9884\u671f\u7684\u5546\u4e1a\u5316\u8303\u56f4\u4e3a**\u6280\u672f\u51c6\u5907\u6c34\u5e73 4 \u81f3 7 \u7ea7**\uff0c\u53d7\u652f\u6301\u9879\u76ee\u7684\u671f\u9650\u4e0d\u5f97\u8d85\u8fc7**\u4e09\u5e74**\u3002\u8fd9\u4e9b\u6761\u4ef6\u7528\u4e8e\u7b5b\u9009\u8ba1\u5212\u9879\u76ee\uff1b\u8fd9\u5e76\u4e0d\u610f\u5473\u7740\u6240\u6709\u8fbe\u5230\u8fd9\u4e9b\u51c6\u5907\u6c34\u5e73\u7684\u5efa\u6210\u73af\u5883\u6280\u672f\u90fd\u4f1a\u83b7\u6279\u3002\u9879\u76ee\u8303\u56f4\u4e5f\u4f7f BETA \u805a\u7126\u4e8e\u6210\u679c\u8f6c\u5316\u548c\u5e94\u7528\uff1a\u63d0\u6848\u5fc5\u987b\u5c06\u7814\u7a76\u5de5\u4f5c\u4e0e\u5efa\u6210\u73af\u5883\u95ee\u9898\u53ca\u53ef\u4fe1\u7684\u5e94\u7528\u8def\u5f84\u8054\u7cfb\u8d77\u6765\uff0c\u800c\u4e0d\u80fd\u53ea\u662f\u63cf\u8ff0\u4e00\u4e2a\u65e9\u671f\u7814\u7a76\u6784\u60f3\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u5171\u540c\u8d44\u52a9\u548c\u7533\u8bf7\u6d41\u7a0b\n\n\u7b26\u5408\u6761\u4ef6\u7684\u9879\u76ee\u53ef\u83b7\u5f97\u5408\u683c\u8d39\u7528\u6700\u9ad8**50% \u7684\u5171\u540c\u8d44\u52a9**\uff0c\u7531\u53c2\u4e0e\u4f01\u4e1a\u4ee5\u73b0\u91d1\u6309\u7b49\u989d\u914d\u5bf9\u51fa\u8d44\u3002\u5bf9\u4e8e\u7531\u975e\u65b0\u52a0\u5761\u79c1\u4eba\u5b9e\u4f53\u62c5\u4efb\u7814\u7a76\u673a\u6784\u7684\u9879\u76ee\uff0cBCA \u5c06\u5171\u540c\u8d44\u52a9\u6bd4\u4f8b\u4e0a\u9650\u8bbe\u4e3a**30%**\u3002\u5168\u5e74\u5747\u63a5\u53d7\u7533\u8bf7\uff0c\u8bc4\u4f30\u6d41\u7a0b\u5305\u62ec\u540c\u884c\u8bc4\u5ba1\u3001\u5411\u8bc4\u4f30\u5c0f\u7ec4\u9648\u8ff0\u63d0\u6848\uff0c\u4ee5\u53ca\u5728\u9002\u7528\u60c5\u51b5\u4e0b\u8fdb\u884c\u9884\u7b97\u5ba1\u67e5\u3002BCA \u8868\u793a\uff0c\u4ece\u63d0\u4ea4\u63d0\u6848\u5230\u53d1\u51fa\u6388\u4e88\u51fd\uff0c\u4e00\u822c\u9700\u8981**\u56db\u81f3\u516d\u4e2a\u6708**\uff0c\u5177\u4f53\u65f6\u95f4\u53d6\u51b3\u4e8e\u6750\u6599\u7684\u5b8c\u6574\u6027\u548c\u6e05\u6670\u5ea6\u3002BCA \u9f13\u52b1\u6709\u610f\u53c2\u4e0e\u7684\u4f01\u4e1a\u8054\u7cfb\u8be5\u5c40\u83b7\u53d6\u8ba1\u5212\u6307\u5f15\uff0c\u5305\u62ec\u534f\u52a9\u5bfb\u627e\u7814\u7a76\u5408\u4f5c\u4f19\u4f34\u53ca\u4e86\u89e3\u76f8\u5173\u6cd5\u89c4\uff1b\u6b64\u7c7b\u6c9f\u901a\u4e0d\u80fd\u66ff\u4ee3\u6b63\u5f0f\u8bc4\u4f30\uff0c\u4e5f\u4e0d\u6784\u6210\u83b7\u5f97\u8d44\u52a9\u7684\u6743\u5229\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u4e0e 2026 \u5e74 RIE2030 \u516c\u544a\u7684\u5173\u7cfb\n\n**2026 \u5e74\u4e5d\u6708 2 \u65e5**\uff0cBCA \u5ba3\u5e03\uff0cBETA \u50ac\u5316\u8ba1\u5212\u548c**\u660e\u65e5\u57ce\u5e02\u7814\u53d1\u8ba1\u5212**\u5728 RIE2030 \u6846\u67b6\u4e0b\uff0c\u83b7\u5f97\u672a\u6765\u4e94\u5e74\u989d\u5916 **112 \u767e\u4e07\u65b0\u5143**\u7684\u8d44\u52a9\u8ba1\u5212\u3002BCA \u5c06\u4e0b\u4e00\u9636\u6bb5\u4e0e\u82e5\u5e72\u91cd\u70b9\u8054\u7cfb\u8d77\u6765\uff0c\u5305\u62ec\u66f4\u5b89\u5168\u3001\u66f4\u9ad8\u6548\u7684\u62c6\u9664\u4f5c\u4e1a\uff0c\u5efa\u7b51\u5bff\u547d\u548c\u7ef4\u62a4\u5efa\u6a21\uff0c\u9690\u542b\u78b3\u548c\u80fd\u6e90\u6548\u7387\u6539\u8fdb\uff0c\u4ee5\u53ca\u63a8\u52a8\u7814\u7a76\u6210\u679c\u8f6c\u5316\u5e76\u4e3a\u4e1a\u754c\u91c7\u7528\u3002\u8fd9 **112 \u767e\u4e07\u65b0\u5143**\u662f\u4e0a\u8ff0\u5404\u8ba1\u5212\u5c42\u9762\u7684\u627f\u8bfa\uff0c\u5e76\u975e\u81ea\u52a8\u6388\u4e88\u4efb\u4f55\u4f01\u4e1a\u6216\u8d4b\u4e88\u5355\u4e2a\u4f01\u4e1a\u83b7\u5f97\u8d44\u52a9\u7684\u6743\u5229\u3002\u56e0\u6b64\uff0c\u8be5\u516c\u544a\u4e3a BETA \u4e0b\u4e00\u9636\u6bb5\u63d0\u4f9b\u4e86\u6218\u7565\u548c\u8d44\u52a9\u80cc\u666f\uff0c\u800c\u4e2a\u522b\u9879\u76ee\u4ecd\u987b\u6309\u7167 BETA \u50ac\u5316\u8ba1\u5212\u6d41\u7a0b\u548c\u516c\u5e03\u7684\u6807\u51c6\u63a5\u53d7\u9074\u9009\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/)\uff09\u3002","summary":"BCA \u7684 BETA \u50ac\u5316\u8ba1\u5212\u652f\u6301\u7531\u4e1a\u754c\u4e3b\u5bfc\u3001\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5408\u4f5c\u5f00\u5c55\u7684\u5efa\u6210\u73af\u5883\u7814\u7a76\u4e0e\u521b\u65b0\u9879\u76ee\uff0c\u5305\u62ec\u7b26\u5408\u6761\u4ef6\u3001\u6280\u672f\u51c6\u5907\u6c34\u5e73\u4e3a 4\u20137 \u7ea7\u3001\u6700\u9ad8\u53ef\u83b7 50% \u5171\u540c\u8d44\u52a9\u4e14\u6700\u957f\u4e3a\u4e09\u5e74\u7684\u9879\u76ee\u3002","title":"\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212"}},"source_id":"sgkb.business-industry.beta-catalyst-programme","status":"verified","summary_en":"BCA's BETA Catalyst Programme supports industry-led built-environment research and innovation partnerships with public research performers, including qualifying projects at TRL 4\u20137 with up to 50% co-funding and a maximum three-year duration.","summary_zh":"BCA \u7684 BETA \u50ac\u5316\u8ba1\u5212\u652f\u6301\u7531\u4e1a\u754c\u4e3b\u5bfc\u3001\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5408\u4f5c\u5f00\u5c55\u7684\u5efa\u6210\u73af\u5883\u7814\u7a76\u4e0e\u521b\u65b0\u9879\u76ee\uff0c\u5305\u62ec\u7b26\u5408\u6761\u4ef6\u3001\u6280\u672f\u51c6\u5907\u6c34\u5e73\u4e3a 4\u20137 \u7ea7\u3001\u6700\u9ad8\u53ef\u83b7 50% \u5171\u540c\u8d44\u52a9\u4e14\u6700\u957f\u4e3a\u4e09\u5e74\u7684\u9879\u76ee\u3002","title_en":"Built Environment Technology Alliance (BETA) Catalyst Programme","title_zh":"\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212","wiki":{"domain":"business-industry","last_verified":"2026-10-22","locales":{"en":{"markdown":"# Built Environment Technology Alliance (BETA) Catalyst Programme\n\nThe **Built Environment Technology Alliance (BETA) Catalyst Programme** is a\nBuilding and Construction Authority (BCA) initiative for industry-led research\nand innovation in Singapore's built-environment sector. It supports firms and\npublic research performers in co-developing solutions that can move from\nresearch into commercial and industry use; it is not a general business grant\nor a substitute for project approvals and regulatory compliance ([BCA, BETA\nCatalyst Programme, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Purpose and transformation areas\n\nBCA says BETA was launched in **2020** to build built-environment capability by\nencouraging stakeholders to share strengths and resources. Eligible projects\nmust address at least one Built Environment Industry Transformation Map area:\n**Integrated Planning and Design**, **Advanced Manufacturing and Assembly**, or\n**Sustainable Urban Systems**. Participating firms must also show that the\nproject aligns with their business goals and can uplift the sector or wider\ninnovation ecosystem. The alliance model is intended to connect firms that\nunderstand operational needs with research performers that can develop and test\ntechnical solutions; participation therefore concerns a defined project\npartnership rather than membership alone or a standalone technology showcase\n([BCA, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Eligible partnerships and project boundary\n\nProjects must be led by an alliance or team of built-environment-related\ncompanies and public research performers, such as local universities or\nresearch institutes. BCA describes the expected commercialisation range as\n**Technology Readiness Level 4 to 7**, and a supported project must not exceed\n**three years**. These conditions describe the programme's project screen; they\ndo not mean that every built-environment technology at those readiness levels\nwill be approved. The project boundary also keeps BETA focused on translation\nand adoption: a proposal must connect the research work to a built-environment\nproblem and a credible pathway to use, rather than merely describe an early\nresearch idea ([BCA, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Co-funding and application process\n\nQualifying projects can receive up to **50% co-funding** of qualifying costs,\nmatched dollar-for-dollar with cash contributions from participating firms. BCA\ncaps co-funding at **30%** for projects involving non-Singaporean private\nentities as research performers. Applications are accepted year-round and are\nassessed through peer review, a proposal presentation to an evaluation panel,\nand budget scrubbing where applicable. BCA says a typical application takes\n**four to six months** from proposal submission to issuance of a Letter of\nAward, depending on completeness and clarity. Interested firms are directed to\napproach BCA for programme guidance, including help identifying research\npartners and navigating relevant regulations; that conversation does not\nreplace the formal assessment or create an entitlement to funding ([BCA,\naccessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Relationship to the 2026 RIE2030 announcement\n\nOn **2 September 2026**, BCA announced that BETA Catalyst and the **Cities of\nTomorrow R&D Programme** had secured an additional **S$112 million** in funding\ninitiatives over the next five years under RIE2030. BCA linked the next phase to\npriorities including safer and more productive demolition, building-lifespan\nand maintenance modelling, embodied-carbon and energy-efficiency improvements,\nand translation of research into industry adoption. The S$112 million is a\nprogramme-level commitment across the named initiatives, not an automatic\naward or per-company entitlement. The announcement therefore provides\nstrategic and funding context for BETA's next phase while leaving individual\nproject selection subject to the BETA Catalyst process and its published\ncriteria ([BCA, 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/)).","summary":"BCA's BETA Catalyst Programme supports industry-led built-environment research and innovation partnerships with public research performers, including qualifying projects at TRL 4\u20137 with up to 50% co-funding and a maximum three-year duration.","title":"Built Environment Technology Alliance (BETA) Catalyst Programme"},"zh":{"markdown":"# \u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212\n\n**\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212**\u662f\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\uff08BCA\uff09\u4e3a\u5efa\u6210\u73af\u5883\u9886\u57df\u4e1a\u754c\u4e3b\u5bfc\u7684\u7814\u7a76\u4e0e\u521b\u65b0\u63a8\u51fa\u7684\u8ba1\u5212\u3002\u8be5\u8ba1\u5212\u652f\u6301\u4f01\u4e1a\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5171\u540c\u5f00\u53d1\u89e3\u51b3\u65b9\u6848\uff0c\u63a8\u52a8\u7814\u7a76\u6210\u679c\u6295\u5165\u5546\u4e1a\u548c\u884c\u4e1a\u5e94\u7528\uff1b\u5b83\u5e76\u975e\u4e00\u822c\u5546\u4e1a\u8865\u52a9\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u9879\u76ee\u5ba1\u6279\u548c\u76d1\u7ba1\u5408\u89c4\u8981\u6c42\uff08[BCA\uff0cBETA \u50ac\u5316\u8ba1\u5212\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u76ee\u7684\u548c\u8f6c\u578b\u9886\u57df\n\nBCA \u8868\u793a\uff0cBETA \u4e8e **2020 \u5e74**\u63a8\u51fa\uff0c\u65e8\u5728\u9f13\u52b1\u5229\u76ca\u76f8\u5173\u65b9\u5206\u4eab\u4f18\u52bf\u548c\u8d44\u6e90\uff0c\u589e\u5f3a\u5efa\u6210\u73af\u5883\u9886\u57df\u7684\u80fd\u529b\u3002\u7b26\u5408\u6761\u4ef6\u7684\u9879\u76ee\u5fc5\u987b\u81f3\u5c11\u6d89\u53ca\u5efa\u6210\u73af\u5883\u4ea7\u4e1a\u8f6c\u578b\u84dd\u56fe\u7684\u4e00\u4e2a\u9886\u57df\uff1a**\u7efc\u5408\u89c4\u5212\u4e0e\u8bbe\u8ba1**\u3001**\u5148\u8fdb\u5236\u9020\u4e0e\u88c5\u914d**\u6216**\u53ef\u6301\u7eed\u57ce\u5e02\u7cfb\u7edf**\u3002\u53c2\u4e0e\u4f01\u4e1a\u8fd8\u5fc5\u987b\u8bc1\u660e\u9879\u76ee\u7b26\u5408\u5176\u4e1a\u52a1\u76ee\u6807\uff0c\u5e76\u80fd\u63d0\u5347\u8be5\u9886\u57df\u6216\u66f4\u5e7f\u6cdb\u7684\u521b\u65b0\u751f\u6001\u7cfb\u7edf\u3002\u8054\u76df\u6a21\u5f0f\u65e8\u5728\u8fde\u63a5\u4e86\u89e3\u8fd0\u8425\u9700\u6c42\u7684\u4f01\u4e1a\u4e0e\u80fd\u591f\u5f00\u53d1\u548c\u6d4b\u8bd5\u6280\u672f\u89e3\u51b3\u65b9\u6848\u7684\u7814\u7a76\u673a\u6784\uff1b\u56e0\u6b64\uff0c\u53c2\u4e0e\u662f\u9488\u5bf9\u4e00\u9879\u660e\u786e\u7684\u5408\u4f5c\u9879\u76ee\uff0c\u800c\u975e\u4ec5\u4ec5\u6210\u4e3a\u4f1a\u5458\u6216\u5355\u72ec\u5c55\u793a\u6280\u672f\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u7b26\u5408\u6761\u4ef6\u7684\u5408\u4f5c\u5173\u7cfb\u548c\u9879\u76ee\u8303\u56f4\n\n\u9879\u76ee\u5fc5\u987b\u7531\u5efa\u6210\u73af\u5883\u76f8\u5173\u4f01\u4e1a\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u7ec4\u6210\u7684\u8054\u76df\u6216\u56e2\u961f\u9886\u5bfc\uff0c\u4f8b\u5982\u672c\u5730\u5927\u5b66\u6216\u7814\u7a76\u9662\u3002BCA \u8bf4\u660e\uff0c\u9884\u671f\u7684\u5546\u4e1a\u5316\u8303\u56f4\u4e3a**\u6280\u672f\u51c6\u5907\u6c34\u5e73 4 \u81f3 7 \u7ea7**\uff0c\u53d7\u652f\u6301\u9879\u76ee\u7684\u671f\u9650\u4e0d\u5f97\u8d85\u8fc7**\u4e09\u5e74**\u3002\u8fd9\u4e9b\u6761\u4ef6\u7528\u4e8e\u7b5b\u9009\u8ba1\u5212\u9879\u76ee\uff1b\u8fd9\u5e76\u4e0d\u610f\u5473\u7740\u6240\u6709\u8fbe\u5230\u8fd9\u4e9b\u51c6\u5907\u6c34\u5e73\u7684\u5efa\u6210\u73af\u5883\u6280\u672f\u90fd\u4f1a\u83b7\u6279\u3002\u9879\u76ee\u8303\u56f4\u4e5f\u4f7f BETA \u805a\u7126\u4e8e\u6210\u679c\u8f6c\u5316\u548c\u5e94\u7528\uff1a\u63d0\u6848\u5fc5\u987b\u5c06\u7814\u7a76\u5de5\u4f5c\u4e0e\u5efa\u6210\u73af\u5883\u95ee\u9898\u53ca\u53ef\u4fe1\u7684\u5e94\u7528\u8def\u5f84\u8054\u7cfb\u8d77\u6765\uff0c\u800c\u4e0d\u80fd\u53ea\u662f\u63cf\u8ff0\u4e00\u4e2a\u65e9\u671f\u7814\u7a76\u6784\u60f3\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u5171\u540c\u8d44\u52a9\u548c\u7533\u8bf7\u6d41\u7a0b\n\n\u7b26\u5408\u6761\u4ef6\u7684\u9879\u76ee\u53ef\u83b7\u5f97\u5408\u683c\u8d39\u7528\u6700\u9ad8**50% \u7684\u5171\u540c\u8d44\u52a9**\uff0c\u7531\u53c2\u4e0e\u4f01\u4e1a\u4ee5\u73b0\u91d1\u6309\u7b49\u989d\u914d\u5bf9\u51fa\u8d44\u3002\u5bf9\u4e8e\u7531\u975e\u65b0\u52a0\u5761\u79c1\u4eba\u5b9e\u4f53\u62c5\u4efb\u7814\u7a76\u673a\u6784\u7684\u9879\u76ee\uff0cBCA \u5c06\u5171\u540c\u8d44\u52a9\u6bd4\u4f8b\u4e0a\u9650\u8bbe\u4e3a**30%**\u3002\u5168\u5e74\u5747\u63a5\u53d7\u7533\u8bf7\uff0c\u8bc4\u4f30\u6d41\u7a0b\u5305\u62ec\u540c\u884c\u8bc4\u5ba1\u3001\u5411\u8bc4\u4f30\u5c0f\u7ec4\u9648\u8ff0\u63d0\u6848\uff0c\u4ee5\u53ca\u5728\u9002\u7528\u60c5\u51b5\u4e0b\u8fdb\u884c\u9884\u7b97\u5ba1\u67e5\u3002BCA \u8868\u793a\uff0c\u4ece\u63d0\u4ea4\u63d0\u6848\u5230\u53d1\u51fa\u6388\u4e88\u51fd\uff0c\u4e00\u822c\u9700\u8981**\u56db\u81f3\u516d\u4e2a\u6708**\uff0c\u5177\u4f53\u65f6\u95f4\u53d6\u51b3\u4e8e\u6750\u6599\u7684\u5b8c\u6574\u6027\u548c\u6e05\u6670\u5ea6\u3002BCA \u9f13\u52b1\u6709\u610f\u53c2\u4e0e\u7684\u4f01\u4e1a\u8054\u7cfb\u8be5\u5c40\u83b7\u53d6\u8ba1\u5212\u6307\u5f15\uff0c\u5305\u62ec\u534f\u52a9\u5bfb\u627e\u7814\u7a76\u5408\u4f5c\u4f19\u4f34\u53ca\u4e86\u89e3\u76f8\u5173\u6cd5\u89c4\uff1b\u6b64\u7c7b\u6c9f\u901a\u4e0d\u80fd\u66ff\u4ee3\u6b63\u5f0f\u8bc4\u4f30\uff0c\u4e5f\u4e0d\u6784\u6210\u83b7\u5f97\u8d44\u52a9\u7684\u6743\u5229\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u4e0e 2026 \u5e74 RIE2030 \u516c\u544a\u7684\u5173\u7cfb\n\n**2026 \u5e74\u4e5d\u6708 2 \u65e5**\uff0cBCA \u5ba3\u5e03\uff0cBETA \u50ac\u5316\u8ba1\u5212\u548c**\u660e\u65e5\u57ce\u5e02\u7814\u53d1\u8ba1\u5212**\u5728 RIE2030 \u6846\u67b6\u4e0b\uff0c\u83b7\u5f97\u672a\u6765\u4e94\u5e74\u989d\u5916 **112 \u767e\u4e07\u65b0\u5143**\u7684\u8d44\u52a9\u8ba1\u5212\u3002BCA \u5c06\u4e0b\u4e00\u9636\u6bb5\u4e0e\u82e5\u5e72\u91cd\u70b9\u8054\u7cfb\u8d77\u6765\uff0c\u5305\u62ec\u66f4\u5b89\u5168\u3001\u66f4\u9ad8\u6548\u7684\u62c6\u9664\u4f5c\u4e1a\uff0c\u5efa\u7b51\u5bff\u547d\u548c\u7ef4\u62a4\u5efa\u6a21\uff0c\u9690\u542b\u78b3\u548c\u80fd\u6e90\u6548\u7387\u6539\u8fdb\uff0c\u4ee5\u53ca\u63a8\u52a8\u7814\u7a76\u6210\u679c\u8f6c\u5316\u5e76\u4e3a\u4e1a\u754c\u91c7\u7528\u3002\u8fd9 **112 \u767e\u4e07\u65b0\u5143**\u662f\u4e0a\u8ff0\u5404\u8ba1\u5212\u5c42\u9762\u7684\u627f\u8bfa\uff0c\u5e76\u975e\u81ea\u52a8\u6388\u4e88\u4efb\u4f55\u4f01\u4e1a\u6216\u8d4b\u4e88\u5355\u4e2a\u4f01\u4e1a\u83b7\u5f97\u8d44\u52a9\u7684\u6743\u5229\u3002\u56e0\u6b64\uff0c\u8be5\u516c\u544a\u4e3a BETA \u4e0b\u4e00\u9636\u6bb5\u63d0\u4f9b\u4e86\u6218\u7565\u548c\u8d44\u52a9\u80cc\u666f\uff0c\u800c\u4e2a\u522b\u9879\u76ee\u4ecd\u987b\u6309\u7167 BETA \u50ac\u5316\u8ba1\u5212\u6d41\u7a0b\u548c\u516c\u5e03\u7684\u6807\u51c6\u63a5\u53d7\u9074\u9009\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/)\uff09\u3002","summary":"BCA \u7684 BETA \u50ac\u5316\u8ba1\u5212\u652f\u6301\u7531\u4e1a\u754c\u4e3b\u5bfc\u3001\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5408\u4f5c\u5f00\u5c55\u7684\u5efa\u6210\u73af\u5883\u7814\u7a76\u4e0e\u521b\u65b0\u9879\u76ee\uff0c\u5305\u62ec\u7b26\u5408\u6761\u4ef6\u3001\u6280\u672f\u51c6\u5907\u6c34\u5e73\u4e3a 4\u20137 \u7ea7\u3001\u6700\u9ad8\u53ef\u83b7 50% \u5171\u540c\u8d44\u52a9\u4e14\u6700\u957f\u4e3a\u4e09\u5e74\u7684\u9879\u76ee\u3002","title":"\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212"}},"path":"business-industry\/beta-catalyst-programme.md","related_source_ids":["sgkb.science-research.research-policy-and-funding","sgkb.environment-sustainability.decarbonisation-technology-and-speed","sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic"],"source_hash":"86d7cebf155370d4ed5c24ee70a1ae53910f61ad22f4a671f86a640098bb25de","source_revision":"094b7bf3a1ab75da7b1952ee33089c1733835fe6","sources":[{"title":"BCA \u2014 Built Environment Technology Alliance (BETA)","url":"https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/"},{"title":"BCA \u2014 Next Phase of Research and Innovation Funding Initiatives","url":"https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/"}]}},"search_text":"Built Environment Technology Alliance (BETA) Catalyst Programme\n\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212\nBCA's BETA Catalyst Programme supports industry-led built-environment research and innovation partnerships with public research performers, including qualifying projects at TRL 4\u20137 with up to 50% co-funding and a maximum three-year duration.\nBCA \u7684 BETA \u50ac\u5316\u8ba1\u5212\u652f\u6301\u7531\u4e1a\u754c\u4e3b\u5bfc\u3001\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5408\u4f5c\u5f00\u5c55\u7684\u5efa\u6210\u73af\u5883\u7814\u7a76\u4e0e\u521b\u65b0\u9879\u76ee\uff0c\u5305\u62ec\u7b26\u5408\u6761\u4ef6\u3001\u6280\u672f\u51c6\u5907\u6c34\u5e73\u4e3a 4\u20137 \u7ea7\u3001\u6700\u9ad8\u53ef\u83b7 50% \u5171\u540c\u8d44\u52a9\u4e14\u6700\u957f\u4e3a\u4e09\u5e74\u7684\u9879\u76ee\u3002\n{\"aliases\":[\"BETA Catalyst Programme\",\"BETA Catalyst\",\"Built Environment Technology Alliance Catalyst\"],\"aliases_i18n\":[],\"classification_confidence\":\"medium\",\"classification_source\":\"domain-default\",\"document_id\":\"sgkb.business-industry.beta-catalyst-programme\",\"document_sha256\":\"ed99864e56a03f8087d90ce26e8e8be7504b966e4fa2fdad582800781d480a47\",\"document_type\":\"article\",\"domain\":\"business-industry\",\"entities\":[\"sg.programme.beta-catalyst\",\"sg.agency.bca\"],\"facets\":[\"business\",\"current\",\"infrastructure\",\"policy\"],\"geographic_scope\":[\"national\"],\"jurisdiction\":\"SG\",\"language\":\"en\",\"last_verified\":\"2026-10-22\",\"path\":\"business-industry\\\/beta-catalyst-programme.md\",\"related\":[\"research-policy-and-funding\",\"decarbonisation-technology-and-speed\",\"green-buildings-innovation-cluster-gbic\"],\"sources\":[{\"accessed\":\"2026-10-22\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Built Environment Technology Alliance (BETA)\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/grants-and-funded-programmes\\\/built-environment-technology-alliance-beta-programme-catalyst-funding\\\/\"},{\"accessed\":\"2026-10-22\",\"published\":\"2026-09-02\",\"publisher\":\"Building and Construction Authority\",\"tier\":1,\"title\":\"BCA \u2014 Next Phase of Research and Innovation Funding Initiatives\",\"url\":\"https:\\\/\\\/www1.bca.gov.sg\\\/resources\\\/newsroom\\\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\\\/\"}],\"status\":\"verified\",\"summary\":\"BCA's BETA Catalyst Programme supports industry-led built-environment research and innovation partnerships with public research performers, including qualifying projects at TRL 4\u20137 with up to 50% co-funding and a maximum three-year duration.\",\"tags\":[\"policy\",\"scheme\",\"construction\",\"tech\"],\"temporal_scope\":\"current\",\"title\":\"Built Environment Technology Alliance (BETA) Catalyst Programme\",\"topics\":[\"sgtopic.business\",\"sgtopic.business.beta-catalyst-programme\"],\"volatility\":\"fast\"}\n# Built Environment Technology Alliance (BETA) Catalyst Programme\n\nThe **Built Environment Technology Alliance (BETA) Catalyst Programme** is a\nBuilding and Construction Authority (BCA) initiative for industry-led research\nand innovation in Singapore's built-environment sector. It supports firms and\npublic research performers in co-developing solutions that can move from\nresearch into commercial and industry use; it is not a general business grant\nor a substitute for project approvals and regulatory compliance ([BCA, BETA\nCatalyst Programme, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Purpose and transformation areas\n\nBCA says BETA was launched in **2020** to build built-environment capability by\nencouraging stakeholders to share strengths and resources. Eligible projects\nmust address at least one Built Environment Industry Transformation Map area:\n**Integrated Planning and Design**, **Advanced Manufacturing and Assembly**, or\n**Sustainable Urban Systems**. Participating firms must also show that the\nproject aligns with their business goals and can uplift the sector or wider\ninnovation ecosystem. The alliance model is intended to connect firms that\nunderstand operational needs with research performers that can develop and test\ntechnical solutions; participation therefore concerns a defined project\npartnership rather than membership alone or a standalone technology showcase\n([BCA, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Eligible partnerships and project boundary\n\nProjects must be led by an alliance or team of built-environment-related\ncompanies and public research performers, such as local universities or\nresearch institutes. BCA describes the expected commercialisation range as\n**Technology Readiness Level 4 to 7**, and a supported project must not exceed\n**three years**. These conditions describe the programme's project screen; they\ndo not mean that every built-environment technology at those readiness levels\nwill be approved. The project boundary also keeps BETA focused on translation\nand adoption: a proposal must connect the research work to a built-environment\nproblem and a credible pathway to use, rather than merely describe an early\nresearch idea ([BCA, accessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Co-funding and application process\n\nQualifying projects can receive up to **50% co-funding** of qualifying costs,\nmatched dollar-for-dollar with cash contributions from participating firms. BCA\ncaps co-funding at **30%** for projects involving non-Singaporean private\nentities as research performers. Applications are accepted year-round and are\nassessed through peer review, a proposal presentation to an evaluation panel,\nand budget scrubbing where applicable. BCA says a typical application takes\n**four to six months** from proposal submission to issuance of a Letter of\nAward, depending on completeness and clarity. Interested firms are directed to\napproach BCA for programme guidance, including help identifying research\npartners and navigating relevant regulations; that conversation does not\nreplace the formal assessment or create an entitlement to funding ([BCA,\naccessed 22 October 2026](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)).\n\n## Relationship to the 2026 RIE2030 announcement\n\nOn **2 September 2026**, BCA announced that BETA Catalyst and the **Cities of\nTomorrow R&D Programme** had secured an additional **S$112 million** in funding\ninitiatives over the next five years under RIE2030. BCA linked the next phase to\npriorities including safer and more productive demolition, building-lifespan\nand maintenance modelling, embodied-carbon and energy-efficiency improvements,\nand translation of research into industry adoption. The S$112 million is a\nprogramme-level commitment across the named initiatives, not an automatic\naward or per-company entitlement. The announcement therefore provides\nstrategic and funding context for BETA's next phase while leaving individual\nproject selection subject to the BETA Catalyst process and its published\ncriteria ([BCA, 2 September 2026](https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/)).\n# \u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212\n\n**\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212**\u662f\u65b0\u52a0\u5761\u5efa\u8bbe\u5c40\uff08BCA\uff09\u4e3a\u5efa\u6210\u73af\u5883\u9886\u57df\u4e1a\u754c\u4e3b\u5bfc\u7684\u7814\u7a76\u4e0e\u521b\u65b0\u63a8\u51fa\u7684\u8ba1\u5212\u3002\u8be5\u8ba1\u5212\u652f\u6301\u4f01\u4e1a\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u5171\u540c\u5f00\u53d1\u89e3\u51b3\u65b9\u6848\uff0c\u63a8\u52a8\u7814\u7a76\u6210\u679c\u6295\u5165\u5546\u4e1a\u548c\u884c\u4e1a\u5e94\u7528\uff1b\u5b83\u5e76\u975e\u4e00\u822c\u5546\u4e1a\u8865\u52a9\uff0c\u4e5f\u4e0d\u80fd\u66ff\u4ee3\u9879\u76ee\u5ba1\u6279\u548c\u76d1\u7ba1\u5408\u89c4\u8981\u6c42\uff08[BCA\uff0cBETA \u50ac\u5316\u8ba1\u5212\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u76ee\u7684\u548c\u8f6c\u578b\u9886\u57df\n\nBCA \u8868\u793a\uff0cBETA \u4e8e **2020 \u5e74**\u63a8\u51fa\uff0c\u65e8\u5728\u9f13\u52b1\u5229\u76ca\u76f8\u5173\u65b9\u5206\u4eab\u4f18\u52bf\u548c\u8d44\u6e90\uff0c\u589e\u5f3a\u5efa\u6210\u73af\u5883\u9886\u57df\u7684\u80fd\u529b\u3002\u7b26\u5408\u6761\u4ef6\u7684\u9879\u76ee\u5fc5\u987b\u81f3\u5c11\u6d89\u53ca\u5efa\u6210\u73af\u5883\u4ea7\u4e1a\u8f6c\u578b\u84dd\u56fe\u7684\u4e00\u4e2a\u9886\u57df\uff1a**\u7efc\u5408\u89c4\u5212\u4e0e\u8bbe\u8ba1**\u3001**\u5148\u8fdb\u5236\u9020\u4e0e\u88c5\u914d**\u6216**\u53ef\u6301\u7eed\u57ce\u5e02\u7cfb\u7edf**\u3002\u53c2\u4e0e\u4f01\u4e1a\u8fd8\u5fc5\u987b\u8bc1\u660e\u9879\u76ee\u7b26\u5408\u5176\u4e1a\u52a1\u76ee\u6807\uff0c\u5e76\u80fd\u63d0\u5347\u8be5\u9886\u57df\u6216\u66f4\u5e7f\u6cdb\u7684\u521b\u65b0\u751f\u6001\u7cfb\u7edf\u3002\u8054\u76df\u6a21\u5f0f\u65e8\u5728\u8fde\u63a5\u4e86\u89e3\u8fd0\u8425\u9700\u6c42\u7684\u4f01\u4e1a\u4e0e\u80fd\u591f\u5f00\u53d1\u548c\u6d4b\u8bd5\u6280\u672f\u89e3\u51b3\u65b9\u6848\u7684\u7814\u7a76\u673a\u6784\uff1b\u56e0\u6b64\uff0c\u53c2\u4e0e\u662f\u9488\u5bf9\u4e00\u9879\u660e\u786e\u7684\u5408\u4f5c\u9879\u76ee\uff0c\u800c\u975e\u4ec5\u4ec5\u6210\u4e3a\u4f1a\u5458\u6216\u5355\u72ec\u5c55\u793a\u6280\u672f\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u7b26\u5408\u6761\u4ef6\u7684\u5408\u4f5c\u5173\u7cfb\u548c\u9879\u76ee\u8303\u56f4\n\n\u9879\u76ee\u5fc5\u987b\u7531\u5efa\u6210\u73af\u5883\u76f8\u5173\u4f01\u4e1a\u4e0e\u516c\u5171\u7814\u7a76\u673a\u6784\u7ec4\u6210\u7684\u8054\u76df\u6216\u56e2\u961f\u9886\u5bfc\uff0c\u4f8b\u5982\u672c\u5730\u5927\u5b66\u6216\u7814\u7a76\u9662\u3002BCA \u8bf4\u660e\uff0c\u9884\u671f\u7684\u5546\u4e1a\u5316\u8303\u56f4\u4e3a**\u6280\u672f\u51c6\u5907\u6c34\u5e73 4 \u81f3 7 \u7ea7**\uff0c\u53d7\u652f\u6301\u9879\u76ee\u7684\u671f\u9650\u4e0d\u5f97\u8d85\u8fc7**\u4e09\u5e74**\u3002\u8fd9\u4e9b\u6761\u4ef6\u7528\u4e8e\u7b5b\u9009\u8ba1\u5212\u9879\u76ee\uff1b\u8fd9\u5e76\u4e0d\u610f\u5473\u7740\u6240\u6709\u8fbe\u5230\u8fd9\u4e9b\u51c6\u5907\u6c34\u5e73\u7684\u5efa\u6210\u73af\u5883\u6280\u672f\u90fd\u4f1a\u83b7\u6279\u3002\u9879\u76ee\u8303\u56f4\u4e5f\u4f7f BETA \u805a\u7126\u4e8e\u6210\u679c\u8f6c\u5316\u548c\u5e94\u7528\uff1a\u63d0\u6848\u5fc5\u987b\u5c06\u7814\u7a76\u5de5\u4f5c\u4e0e\u5efa\u6210\u73af\u5883\u95ee\u9898\u53ca\u53ef\u4fe1\u7684\u5e94\u7528\u8def\u5f84\u8054\u7cfb\u8d77\u6765\uff0c\u800c\u4e0d\u80fd\u53ea\u662f\u63cf\u8ff0\u4e00\u4e2a\u65e9\u671f\u7814\u7a76\u6784\u60f3\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u5171\u540c\u8d44\u52a9\u548c\u7533\u8bf7\u6d41\u7a0b\n\n\u7b26\u5408\u6761\u4ef6\u7684\u9879\u76ee\u53ef\u83b7\u5f97\u5408\u683c\u8d39\u7528\u6700\u9ad8**50% \u7684\u5171\u540c\u8d44\u52a9**\uff0c\u7531\u53c2\u4e0e\u4f01\u4e1a\u4ee5\u73b0\u91d1\u6309\u7b49\u989d\u914d\u5bf9\u51fa\u8d44\u3002\u5bf9\u4e8e\u7531\u975e\u65b0\u52a0\u5761\u79c1\u4eba\u5b9e\u4f53\u62c5\u4efb\u7814\u7a76\u673a\u6784\u7684\u9879\u76ee\uff0cBCA \u5c06\u5171\u540c\u8d44\u52a9\u6bd4\u4f8b\u4e0a\u9650\u8bbe\u4e3a**30%**\u3002\u5168\u5e74\u5747\u63a5\u53d7\u7533\u8bf7\uff0c\u8bc4\u4f30\u6d41\u7a0b\u5305\u62ec\u540c\u884c\u8bc4\u5ba1\u3001\u5411\u8bc4\u4f30\u5c0f\u7ec4\u9648\u8ff0\u63d0\u6848\uff0c\u4ee5\u53ca\u5728\u9002\u7528\u60c5\u51b5\u4e0b\u8fdb\u884c\u9884\u7b97\u5ba1\u67e5\u3002BCA \u8868\u793a\uff0c\u4ece\u63d0\u4ea4\u63d0\u6848\u5230\u53d1\u51fa\u6388\u4e88\u51fd\uff0c\u4e00\u822c\u9700\u8981**\u56db\u81f3\u516d\u4e2a\u6708**\uff0c\u5177\u4f53\u65f6\u95f4\u53d6\u51b3\u4e8e\u6750\u6599\u7684\u5b8c\u6574\u6027\u548c\u6e05\u6670\u5ea6\u3002BCA \u9f13\u52b1\u6709\u610f\u53c2\u4e0e\u7684\u4f01\u4e1a\u8054\u7cfb\u8be5\u5c40\u83b7\u53d6\u8ba1\u5212\u6307\u5f15\uff0c\u5305\u62ec\u534f\u52a9\u5bfb\u627e\u7814\u7a76\u5408\u4f5c\u4f19\u4f34\u53ca\u4e86\u89e3\u76f8\u5173\u6cd5\u89c4\uff1b\u6b64\u7c7b\u6c9f\u901a\u4e0d\u80fd\u66ff\u4ee3\u6b63\u5f0f\u8bc4\u4f30\uff0c\u4e5f\u4e0d\u6784\u6210\u83b7\u5f97\u8d44\u52a9\u7684\u6743\u5229\uff08[BCA\uff0c\u67e5\u9605\u65e5\u671f\uff1a2026 \u5e74\u5341\u6708 22 \u65e5](https:\/\/www1.bca.gov.sg\/grants-and-funded-programmes\/built-environment-technology-alliance-beta-programme-catalyst-funding\/)\uff09\u3002\n\n## \u4e0e 2026 \u5e74 RIE2030 \u516c\u544a\u7684\u5173\u7cfb\n\n**2026 \u5e74\u4e5d\u6708 2 \u65e5**\uff0cBCA \u5ba3\u5e03\uff0cBETA \u50ac\u5316\u8ba1\u5212\u548c**\u660e\u65e5\u57ce\u5e02\u7814\u53d1\u8ba1\u5212**\u5728 RIE2030 \u6846\u67b6\u4e0b\uff0c\u83b7\u5f97\u672a\u6765\u4e94\u5e74\u989d\u5916 **112 \u767e\u4e07\u65b0\u5143**\u7684\u8d44\u52a9\u8ba1\u5212\u3002BCA \u5c06\u4e0b\u4e00\u9636\u6bb5\u4e0e\u82e5\u5e72\u91cd\u70b9\u8054\u7cfb\u8d77\u6765\uff0c\u5305\u62ec\u66f4\u5b89\u5168\u3001\u66f4\u9ad8\u6548\u7684\u62c6\u9664\u4f5c\u4e1a\uff0c\u5efa\u7b51\u5bff\u547d\u548c\u7ef4\u62a4\u5efa\u6a21\uff0c\u9690\u542b\u78b3\u548c\u80fd\u6e90\u6548\u7387\u6539\u8fdb\uff0c\u4ee5\u53ca\u63a8\u52a8\u7814\u7a76\u6210\u679c\u8f6c\u5316\u5e76\u4e3a\u4e1a\u754c\u91c7\u7528\u3002\u8fd9 **112 \u767e\u4e07\u65b0\u5143**\u662f\u4e0a\u8ff0\u5404\u8ba1\u5212\u5c42\u9762\u7684\u627f\u8bfa\uff0c\u5e76\u975e\u81ea\u52a8\u6388\u4e88\u4efb\u4f55\u4f01\u4e1a\u6216\u8d4b\u4e88\u5355\u4e2a\u4f01\u4e1a\u83b7\u5f97\u8d44\u52a9\u7684\u6743\u5229\u3002\u56e0\u6b64\uff0c\u8be5\u516c\u544a\u4e3a BETA \u4e0b\u4e00\u9636\u6bb5\u63d0\u4f9b\u4e86\u6218\u7565\u548c\u8d44\u52a9\u80cc\u666f\uff0c\u800c\u4e2a\u522b\u9879\u76ee\u4ecd\u987b\u6309\u7167 BETA \u50ac\u5316\u8ba1\u5212\u6d41\u7a0b\u548c\u516c\u5e03\u7684\u6807\u51c6\u63a5\u53d7\u9074\u9009\uff08[BCA\uff0c2026 \u5e74\u4e5d\u6708 2 \u65e5](https:\/\/www1.bca.gov.sg\/resources\/newsroom\/next-phase-of-research-and-innovation-funding-initiatives--refreshed-green-mark-and-new-accreditation-scheme-drive-singapore-s-built-environment-forward\/)\uff09\u3002"},"related":[{"id":89657,"source_id":"sgkb.business-industry.built-environment-accelerate-to-market-programme","kind":"article","title_en":"Built Environment Accelerate to Market Programme","title_zh":"\u5efa\u6210\u73af\u5883\u52a0\u901f\u5e02\u573a\u8ba1\u5212","assurance":null,"subtype":null},{"id":90718,"source_id":"sgkb.science-research.cities-of-tomorrow-rd-programme","kind":"article","title_en":"Cities of Tomorrow R&D Programme","title_zh":"\u672a\u6765\u57ce\u5e02\u7814\u53d1\u8ba1\u5212","assurance":null,"subtype":null},{"id":90246,"source_id":"sgkb.environment-sustainability.decarbonisation-technology-and-speed","kind":"article","title_en":"Decarbonisation technology and Singapore's SPEED programme","title_zh":"\u8131\u78b3\u6280\u672f\u4e0e\u65b0\u52a0\u5761 SPEED \u8ba1\u5212","assurance":null,"subtype":null},{"id":90256,"source_id":"sgkb.environment-sustainability.green-buildings-innovation-cluster-gbic","kind":"article","title_en":"Green Buildings Innovation Cluster (GBIC)","title_zh":"\u7eff\u8272\u5efa\u7b51\u521b\u65b0\u96c6\u7fa4\uff08GBIC\uff09","assurance":null,"subtype":null},{"id":90737,"source_id":"sgkb.science-research.research-policy-and-funding","kind":"article","title_en":"Research Policy and Funding","title_zh":"\u7814\u7a76\u653f\u7b56\u4e0e\u8d44\u52a9","assurance":null,"subtype":null},{"id":89763,"source_id":"sgkb.business-industry.resourcing-evaluation-guide-2026","kind":"article","title_en":"Resourcing Evaluation Guide for Public-Sector Construction Consultancy Tenders","title_zh":"\u516c\u5171\u90e8\u95e8\u5efa\u7b51\u54a8\u8be2\u62db\u6807\u8d44\u6e90\u914d\u7f6e\u8bc4\u4f30\u6307\u5357","assurance":null,"subtype":null},{"id":79783,"source_id":"sg.agency.bca","kind":"entity","title_en":"Building and Construction Authority","title_zh":"\u5efa\u8bbe\u5c40","assurance":null,"subtype":"agency"},{"id":82367,"source_id":"sg.programme.beta-catalyst","kind":"entity","title_en":"Built Environment Technology Alliance (BETA) Catalyst Programme","title_zh":"\u5efa\u6210\u73af\u5883\u6280\u672f\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212","assurance":null,"subtype":"built-environment-technology-translation-programme"},{"id":82464,"source_id":"sg.programme.rie2030","kind":"entity","title_en":"Research, Innovation and Enterprise 2030 Plan","title_zh":"\u7814\u7a76\u3001\u521b\u65b0\u4e0e\u4f01\u4e1a 2030 \u8ba1\u5212","assurance":null,"subtype":"national-research-innovation-enterprise-plan"},{"id":83946,"source_id":"sg.work.wong-shih-yaw-transformation","kind":"entity","title_en":"Transformation (Wong Shih Yaw, 1989)","title_zh":"\u8f6c\u53d8\uff08Wong Shih Yaw\uff0c1989\uff09","assurance":null,"subtype":"artwork"},{"id":91948,"source_id":"sgtopic.business.beta-catalyst-programme","kind":"topic","title_en":"Built Environment Technology Alliance (BETA) Catalyst Programme","title_zh":"\u5efa\u7b51\u73af\u5883\u79d1\u6280\u8054\u76df\uff08BETA\uff09\u50ac\u5316\u8ba1\u5212","assurance":null,"subtype":null},{"id":92016,"source_id":"sgtopic.business","kind":"topic","title_en":"Business and industry","title_zh":"\u5546\u4e1a\u4e0e\u5de5\u4e1a","assurance":null,"subtype":null}]}