Data Centre Industry

<h1>Data Centre Industry</h1> <p>Singapore's data centre industry is one of Southeast Asia's largest and most connectivity-dense digital-infrastructure clusters, hosting operational capacity exceeding 1.4 gigawatts as of 2024 and serving as the physical backbone for cloud computing, financial services, and artificial-intelligence workloads across the region (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). The sector sits at the intersection of Singapore's digital-economy ambitions — the digital economy contributed roughly 17% of gross domestic product in 2022 — and its land, power, and water constraints as a compact city-state (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>; see <a href="/en/knowledge/article/sgkb.business-industry.startup-ecosystem">startup ecosystem</a> and <a href="/en/knowledge/article/sgkb.daily-life.telco-and-internet">telco and internet</a>). Unlike many countries where data centre growth is largely market-driven, Singapore allocates new capacity through a government-managed Call for Application (CFA) exercise led by the Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA), making sustainability and strategic economic value explicit gatekeeping criteria; dated capacity awards and DC-CFA2 thresholds are tabulated in <a href="/en/knowledge/dataset/sgkb.data.data-centre-industry-anchors">data centre industry anchors</a> (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html">EDB DC-CFA launch, accessed Aug 2026</a>).</p> <h2>Singapore as a regional data centre hub</h2> <p>Singapore's data centre industry draws on the country's broader position as a trusted business and digital hub: dense submarine-cable landings, strong intellectual-property protection, cross-border data-flow agreements, and a skilled technology workforce (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). As of 2024, Singapore's operational data centre capacity per capita exceeded that of Australia, China, Japan, South Korea, and the United Kingdom, and key markets such as Beijing, Hong Kong, Seoul, Sydney, and Tokyo (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). The Digital Connectivity Blueprint launched in June 2023 targets doubling submarine-cable landings over the following decade, reinforcing the connectivity case for hosting compute in Singapore rather than in lower-cost neighbouring markets (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>).</p> <p>The industry spans colocation operators that rent rack space to enterprise tenants and hyperscale cloud providers that build and operate facilities for their own platforms. Major colocation and carrier-neutral operators with a Singapore footprint include Equinix, Digital Realty, Global Switch, Keppel Data Centres, ST Telemedia Global Data Centres, AirTrunk, Princeton Digital Group, and GDS Holdings, while hyperscale cloud regions are operated by Amazon Web Services (AWS), Microsoft Azure, and Google Cloud (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html">EDB four DC-CFA winners, accessed Aug 2026</a>; <a href="https://www.businesstimes.com.sg/startups-tech/technology/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot">Business Times DC-CFA pilot, accessed Aug 2026</a>). Facilities cluster in three main corridors: Jurong and Jurong East, Tai Seng, and the Loyang–Tuas–Changi belt near Changi and the eastern industrial estates. Singtel's data-centre unit Nxera and Keppel continue to expand within these zones, including Nxera's 58-megawatt DC Tuas facility targeted for operations by end-2026 (<a href="https://www.straitstimes.com/business/edb-imda-launch-second-exercise-to-expand-data-centre-capacity">ST DC-CFA2, accessed Aug 2026</a>).</p> <h2>The 2019 moratorium and the Call for Application model</h2> <p>Singapore's data centre industry entered a managed-growth phase in 2019 when the Government informed operators of a temporary pause on new data centre developments while EDB and IMDA reviewed how to reconcile digital-infrastructure demand with climate commitments under the Paris Agreement (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html">EDB DC-CFA launch, accessed Aug 2026</a>). Projects already authorised before the pause could still proceed, but no fresh capacity allocations were made until the review concluded. The Minister for Trade and Industry announced in January 2023 that the sector review was complete, and in July 2022 EDB and IMDA launched a pilot Data Centre – Call for Application (DC-CFA) as the primary mechanism for allocating new capacity on a calibrated, sustainability-first basis (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html">EDB DC-CFA launch, accessed Aug 2026</a>).</p> <p>The pilot DC-CFA, which opened in July 2022, invited operators to submit proposals demonstrating state-of-the-art energy efficiency, decarbonisation pathways, contribution to Singapore's regional connectivity, and broader economic value (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/edb-and-imda-launch-pilot-data-centre-call-for-application-to-support-sustainable-growth-of-data-centres.html">EDB DC-CFA launch, accessed Aug 2026</a>). In July 2023, after receiving more than 20 proposals, EDB and IMDA provisionally awarded about 80 megawatts of new critical IT load capacity to four winners: Equinix, GDS, Microsoft, and an AirTrunk–ByteDance consortium (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html">EDB four DC-CFA winners, accessed Aug 2026</a>; <a href="https://www.businesstimes.com.sg/startups-tech/technology/government-awards-80-mw-new-capacity-4-data-centre-operators-pilot">Business Times DC-CFA pilot, accessed Aug 2026</a>). The DC-CFA model replaced an open market in which any operator with land and power could build; since 2022, all new greenfield capacity must win a CFA allocation before proceeding.</p> <p>On 1 December 2025, EDB and IMDA launched the second exercise (DC-CFA2), offering at least 200 megawatts of new capacity — with potentially more through innovative green-energy pathways — and tightening sustainability thresholds beyond the pilot round (<a href="https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf">EDB DC-CFA2 factsheet, accessed Aug 2026</a>; <a href="https://www.straitstimes.com/business/edb-imda-launch-second-exercise-to-expand-data-centre-capacity">ST DC-CFA2, accessed Aug 2026</a>). DC-CFA2 applicants must achieve a Power Usage Effectiveness (PUE) of 1.25 or better at 100% IT load, obtain Building and Construction Authority (BCA)–IMDA Green Mark for Data Centres 2024 Platinum certification, deploy IT equipment meeting the Singapore Standard SS 715:2025 on data-centre IT energy efficiency, and source at least 50% of facility power from eligible green-energy pathways such as biomethane, low-carbon ammonia or hydrogen, novel fuel cells with carbon capture, or building-integrated photovoltaics (<a href="https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf">EDB DC-CFA2 factsheet, accessed Aug 2026</a>). Companies with uniquely differentiated strategic proposals may alternatively approach EDB through the Strategic Digital Infrastructure Scheme (SDIS) (<a href="https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf">EDB DC-CFA2 factsheet, accessed Aug 2026</a>).</p> <p>On <strong>21 August 2026</strong>, EDB and IMDA announced that they had <strong>provisionally allocated 200 MW of new capacity to four data-centre operators</strong> through DC-CFA2 (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html">EDB, four data-centre proposals selected under DC-CFA2</a>, accessed 21 August 2026). This is a provisional allocation outcome, not proof that all four facilities are already operational; the earlier DC-CFA2 offer and its sustainability thresholds remain the policy context for interpreting the announcement.</p> <h2>Green Data Centre Roadmap and sustainability standards</h2> <p>The Green Data Centre Roadmap, launched by IMDA on 29 May 2024, sets the sector-wide sustainability framework that the CFA exercises implement in practice (<a href="https://www.imda.gov.sg/resources/press-releases-factsheets-and-speeches/press-releases/2024/sg-announces-green-data-centre-roadmap">IMDA Green DC Roadmap press release, accessed Aug 2026</a>). The Roadmap aims to provide at least 300 megawatts of additional data centre capacity in the near term, with potentially another 200 megawatts and more unlocked through green-energy deployments, while pushing the entire installed base toward higher efficiency over a ten-year horizon (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). This sits within Singapore's wider <a href="/en/knowledge/article/sgkb.environment-sustainability.green-plan-2030">green plan 2030</a> net-zero-by-2050 trajectory and complements EMA's energy-transition planning in <a href="/en/knowledge/article/sgkb.environment-sustainability.energy-and-power-grid">energy and power grid</a>.</p> <p>On facility efficiency, IMDA targets all data centres in Singapore achieving PUE below 1.3 at 100% IT load within ten years of the Roadmap — a threshold current best-in-class designs can already meet (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). Singapore pioneered a Tropical Data Centre standard allowing facilities to run safely at higher ambient temperatures and humidity, reducing cooling energy in the equatorial climate, and the Roadmap refreshed the BCA–IMDA Green Mark for Data Centres (GMDC) certification by end-2024 while introducing SS 715:2025 standards for IT equipment and liquid-cooling adoption by 2025 (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). As AI workloads push rack densities from roughly 8 kilowatts per rack in 2020 toward 20–100 kilowatts per rack, the Roadmap encourages hybrid air- and liquid-cooling configurations and research through the Sustainable Tropical Data Centre Testbed at the National University of Singapore (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>).</p> <p>On water, data centres are significant users: the median Water Usage Effectiveness (WUE) among large Singapore data centres (those consuming at least 60,000 cubic metres of water annually) was 2.2 cubic metres per megawatt-hour in 2021, and IMDA and the national water agency PUB target reducing sector WUE to 2.0 m³/MWh or lower over ten years through cooling-tower optimisation and recycling (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). EDB offers co-funding through the Resource Efficiency Grant for Emissions and Investment Allowance for Emissions Reduction to support retrofitting existing facilities, while IMDA's Green Computing Funding Initiative allocated S$30 million from January 2024 for software-level energy-efficiency research (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>).</p> <h2>Hyperscale investment and the Jurong Island expansion</h2> <p>Hyperscale cloud providers anchor much of the demand driving Singapore's data centre pipeline. AWS announced in May 2024 plans to invest an additional S$12 billion in its existing Singapore cloud infrastructure from 2024 to 2028, bringing total planned investment in the AWS Asia Pacific (Singapore) Region to more than S$23 billion by 2028 — on top of S$11.5 billion invested from 2010 through 2023 — with an estimated S$23.7 billion contribution to Singapore GDP and roughly 12,300 full-time-equivalent jobs supported annually in the supply chain by 2028 (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/aws-to-invest-an-additional-12billion-in-singapore-by-2028.html">EDB AWS investment, accessed Aug 2026</a>). Microsoft was among the four pilot DC-CFA winners and continues expanding Azure infrastructure in Singapore as part of a broader Southeast Asia cloud and AI investment programme (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-pilot-data-centre-call-for-application.html">EDB four DC-CFA winners, accessed Aug 2026</a>; <a href="https://www.straitstimes.com/business/edb-imda-launch-second-exercise-to-expand-data-centre-capacity">ST DC-CFA2, accessed Aug 2026</a>). Google Cloud operates an established cloud region in Singapore and continues capacity expansion alongside regional peers.</p> <p>A notable new site is on <a href="/en/knowledge/article/sgkb.business-industry.petrochemicals-industry">Jurong Island</a>, where EDB has reserved about 20 hectares for Singapore's largest low-carbon data centre park, with potential capacity of up to 700 megawatts to support AI-driven demand, integrated into the island's broader shift toward hydrogen, ammonia, and sustainable aviation fuel infrastructure (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/jurong-island-marks-25-years-with-new-low-carbon-partnerships.html">EDB Jurong Island partnerships, accessed Aug 2026</a>). Locating hyperscale capacity on Jurong Island allows operators to tap adjacent low-carbon energy pilots — including ammonia and hydrogen projects under EMA study — rather than drawing exclusively on the mainland natural-gas-dominated grid described in <a href="/en/knowledge/article/sgkb.environment-sustainability.energy-and-power-grid">energy and power grid</a>. Johnson Controls, a cooling-systems supplier, expanded its Singapore regional hub in 2025 citing Asia-Pacific data centre growth, reflecting the downstream industrial ecosystem the sector supports (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/johnson-controls-expands-singapore-hub-for-data-centre-tech.html">EDB Johnson Controls, accessed Aug 2026</a>).</p> <h2>Power demand, constraints, and regional spillover</h2> <p>Data centres are among Singapore's fastest-growing electricity consumers. As of 2025, data centres accounted for an estimated 7% of national energy consumption, a share projected to rise to 12% by 2030 as cloud and AI workloads expand (<a href="https://www.edb.gov.sg/en/about-edb/media-releases-publications/johnson-controls-expands-singapore-hub-for-data-centre-tech.html">EDB Johnson Controls, accessed Aug 2026</a>). Within the domestic information and communications sector, data centres represent about 82% of carbon emissions, making the sector's decarbonisation central to Singapore's digital sustainability goals (<a href="https://www.imda.gov.sg/-/media/imda/files/how-we-can-help/green-dc-roadmap/green-dc-roadmap.pdf">IMDA Green DC Roadmap, accessed Aug 2026</a>). EMA's Electricity Demand and Supply Outlook (2025) projects system peak demand growing at a compound annual rate of 2.4%–4.8% from 2025 to 2034, with an upper-bound scenario explicitly incorporating additional demand from data centres and advanced manufacturing (<a href="https://www.ema.gov.sg/content/dam/corporate/regulations/policy-papers/pdf-files/EMA-Regulations-Policies-Info-Paper-On-Electricity-Demand-And-Supply-Outlook-2025.pdf">EMA Outlook 2025, accessed Aug 2026</a>).</p> <p>Singapore's land scarcity, tropical cooling needs, and finite domestic renewable potential mean the CFA model deliberately caps how fast capacity can grow. The pilot round allocated only 80 megawatts from more than 20 bids; DC-CFA2 offers at least 200 megawatts but imposes stricter green-power sourcing that ties expansion to the pace of low-carbon energy infrastructure — including regional electricity imports that EMA is developing toward a 6-gigawatt low-carbon import target by 2035 (<a href="https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/launch-of-second-data-centre-call-for-application/Launch%20of%20second%20data%20centre-call%20for%20application.pdf">EDB DC-CFA2 factsheet, accessed Aug 2026</a>; see <a href="/en/knowledge/article/sgkb.environment-sustainability.energy-and-power-grid">energy and power grid</a>). Analysts and industry observers note that hyperscale operators increasingly build bulk capacity in neighbouring Johor (Malaysia), Jakarta, and Bangkok where land and power are cheaper, while retaining Singapore for latency-sensitive, premium-tier workloads — a pattern that preserves Singapore's hub status without unconstrained local growth (<a href="https://www.straitstimes.com/business/edb-imda-launch-second-exercise-to-expand-data-centre-capacity">ST DC-CFA2, accessed Aug 2026</a>). The tension between Singapore's digital-economy ambitions and its <a href="/en/knowledge/article/sgkb.environment-sustainability.green-plan-2030">green plan 2030</a> energy targets is therefore structural: the data centre industry can grow, but only as fast as efficiency gains and green-power supply allow under EDB and IMDA's allocation gatekeeping.</p>

简介

数据中心行业

新加坡的数据中心行业是东南亚最大、连接最密集的数字基础设施集群之一。截至 2024 年,其运营容量超过 1.4 吉瓦,为整个区域的云计算、金融服务和人工智能工作负载提供实体基础设施支撑(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。该行业处于新加坡数字经济雄心与其土地、电力和水资源限制的交汇处;2022 年,数字经济约占国内生产总值的 17%,而新加坡是一个面积紧凑的城邦(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月;另见初创企业生态系统和电信与互联网)。与许多主要由市场推动数据中心增长的国家不同,新加坡通过由经济发展局(EDB)和资讯通信媒体发展局(IMDA)主导的政府管理型申请征集(CFA)程序分配新增容量,并明确将可持续性和战略经济价值列为准入标准;带日期的容量分配结果和 DC-CFA2 门槛汇总于数据中心行业基准数据(经济发展局启动数据中心申请征集,查阅于 2026 年八月)。

新加坡作为区域数据中心枢纽

新加坡的数据中心行业得益于该国作为可信赖商业和数字枢纽的整体地位:密集的海底电缆登陆点、健全的知识产权保护、跨境数据流动协定,以及熟练的科技人才队伍(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。截至 2024 年,新加坡人均数据中心运营容量超过澳大利亚、中国、日本、韩国和英国,以及北京、香港、首尔、悉尼和东京等主要市场(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。2023 年六月启动的《数字连接蓝图》目标是在随后十年内将海底电缆登陆点数量翻倍,进一步巩固将计算设施设于新加坡、而非成本较低的邻近市场的连接优势(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。

该行业包括向企业租户出租机柜空间的托管服务运营商,以及为自有平台建设和运营设施的超大规模云服务商。在新加坡设有业务的主要托管服务和中立运营商包括 Equinix、Digital Realty、Global Switch、Keppel Data Centres、ST Telemedia Global Data Centres、AirTrunk、Princeton Digital Group 和 GDS Holdings;超大规模云区域则由 Amazon Web Services(AWS)、Microsoft Azure 和 Google Cloud 运营(经济发展局公布四个数据中心申请征集优选项目,查阅于 2026 年八月;《商业时报》数据中心申请征集试点报道,查阅于 2026 年八月)。设施主要集中在三条走廊:裕廊和裕廊东、大成,以及靠近樟宜和东部工业区的罗央—大士—樟宜地带。新电信的数据中心部门 Nxera 和 Keppel 持续在这些区域扩展,包括 Nxera 的 58 兆瓦 DC Tuas 设施,目标是在 2026 年底投入运营(《海峡时报》DC-CFA2 报道,查阅于 2026 年八月)。

2019 年暂缓建设与申请征集模式

2019 年,新加坡数据中心行业进入有序增长阶段。当时政府通知运营商暂时暂停新的数据中心开发项目,同时经济发展局和资讯通信媒体发展局审查如何协调数字基础设施需求与《巴黎协定》下的气候承诺(经济发展局启动数据中心申请征集,查阅于 2026 年八月)。暂缓措施实施前已获批的项目仍可继续,但审查结束前不会分配新的容量。贸工部长于 2023 年一月宣布行业审查已完成;经济发展局和资讯通信媒体发展局于 2022 年七月推出试点数据中心申请征集(DC-CFA),作为以审慎、可持续发展优先的方式分配新增容量的主要机制(经济发展局启动数据中心申请征集,查阅于 2026 年八月)。

2022 年七月开放的试点 DC-CFA 邀请运营商提交方案,展示其采用先进能源效率技术、脱碳路径、对新加坡区域连接的贡献以及更广泛经济价值(经济发展局启动数据中心申请征集,查阅于 2026 年八月)。2023 年七月,在收到 20 多份方案后,经济发展局和资讯通信媒体发展局暂定向四个优选项目分配约 80 兆瓦新增关键 IT 负载容量:Equinix、GDS、Microsoft,以及 AirTrunk–ByteDance 联盟(经济发展局公布四个数据中心申请征集优选项目,查阅于 2026 年八月;《商业时报》数据中心申请征集试点报道,查阅于 2026 年八月)。DC-CFA 模式取代了运营商只要拥有土地和电力即可建设的开放市场;自 2022 年起,所有新的绿地项目容量都必须先通过申请征集获得分配,方可推进。

2025 年十二月 1 日,经济发展局和资讯通信媒体发展局启动第二轮申请(DC-CFA2),提供至少 200 兆瓦新增容量,并可能通过创新绿色能源路径提供更多容量;同时,其可持续性门槛也比试点轮次更严格(经济发展局 DC-CFA2 说明书,查阅于 2026 年八月;《海峡时报》DC-CFA2 报道,查阅于 2026 年八月)。DC-CFA2 申请者必须在 IT 负载达到 100% 时实现 1.25 或更低的电能使用效率(PUE),取得建设局—资讯通信媒体发展局 2024 年数据中心绿色标志白金认证,部署符合新加坡标准 SS 715:2025 数据中心 IT 能效要求的设备,并从符合资格的绿色能源路径中取得至少 50% 的设施用电,例如生物甲烷、低碳氨或氢、配备碳捕集技术的新型燃料电池,或建筑一体化光伏(经济发展局 DC-CFA2 说明书,查阅于 2026 年八月)。具有独特差异化战略方案的公司,也可以通过战略数字基础设施计划(SDIS)直接向经济发展局提出申请(经济发展局 DC-CFA2 说明书,查阅于 2026 年八月)。

2026 年 八月 21 日,经济发展局和资讯通信媒体发展局宣布,通过 DC-CFA2 已向四家数据中心运营商暂定分配 200 兆瓦新增容量(经济发展局:DC-CFA2 选出四个数据中心项目,查阅于 2026 年八月 21 日)。这是暂定分配结果,并不代表四座设施都已投入运营;应结合早前 DC-CFA2 提供的容量及其可持续性门槛来理解这项公告。

绿色数据中心路线图与可持续性标准

资讯通信媒体发展局于 2024 年五月 29 日推出《绿色数据中心路线图》,为全行业设定可持续性框架,并由各轮申请征集在实践中落实(资讯通信媒体发展局绿色数据中心路线图新闻稿,查阅于 2026 年八月)。路线图旨在短期内新增至少 300 兆瓦数据中心容量,并可能通过部署绿色能源再释放 200 兆瓦及更多容量,同时在十年内推动所有已安装设施提高效率(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。这与新加坡更广泛的绿色计划 2030及 2050 年净零排放轨迹相契合,也补充了能源市场管理局在能源与电网领域的能源转型规划。

在设施效率方面,资讯通信媒体发展局的目标是,路线图发布后的十年内,新加坡所有数据中心在 IT 负载达到 100% 时实现低于 1.3 的 PUE;目前顶尖设计已能达到这一门槛(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。新加坡率先制定热带数据中心标准,允许设施在较高环境温度和湿度下安全运行,从而减少赤道气候下的制冷能耗;路线图还要求在 2024 年底前更新建设局—资讯通信媒体发展局数据中心绿色标志(GMDC)认证,并在 2025 年前推出 IT 设备标准 SS 715:2025 和液冷应用标准(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。随着人工智能工作负载推动机架密度从 2020 年每机架约 8 千瓦升至每机架 20–100 千瓦,路线图鼓励采用风冷与液冷混合配置,并通过新加坡国立大学的可持续热带数据中心测试平台开展研究(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。

数据中心是重要用水户:2021 年,新加坡大型数据中心(年用水量至少为 60,000 立方米)的中位水资源使用效率(WUE)为每兆瓦时 2.2 立方米;资讯通信媒体发展局与国家水务机构公用事业局的目标是在十年内通过优化冷却塔和回收利用,将行业 WUE 降至每兆瓦时 2.0 立方米或更低(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。经济发展局通过减少排放资源效率津贴和减排投资津贴提供共同资助,以支持现有设施改造;资讯通信媒体发展局的绿色计算资助计划自 2024 年一月起拨出 30 百万新元,支持软件层面的能源效率研究(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。

超大规模投资与裕廊岛扩建

超大规模云服务商是推动新加坡数据中心项目储备需求的重要支柱。AWS 于 2024 年五月宣布计划在 2024 年至 2028 年间,追加投资 12 十亿新元用于现有新加坡云基础设施,使 AWS 亚太地区(新加坡)区域截至 2028 年的计划总投资超过 23 十亿新元;这笔投资是在 2010 年至 2023 年期间已投入的 11.5 十亿新元之外。预计到 2028 年,该投资将为新加坡国内生产总值贡献 23.7 十亿新元,并每年在供应链中支持约 12,300 个全职等值工作岗位(经济发展局 AWS 投资公告,查阅于 2026 年八月)。Microsoft 是试点 DC-CFA 的四个优选项目之一,并继续扩大其在新加坡的 Azure 基础设施,作为更广泛的东南亚云计算和人工智能投资计划的一部分(经济发展局公布四个数据中心申请征集优选项目,查阅于 2026 年八月;《海峡时报》DC-CFA2 报道,查阅于 2026 年八月)。Google Cloud 在新加坡运营成熟的云区域,并与区域同行一道持续扩充容量。

一处值得关注的新址位于裕廊岛。经济发展局已预留约 20 公顷土地,用于建设新加坡最大的低碳数据中心园区,潜在容量高达 700 兆瓦,以满足人工智能驱动的需求;该园区将融入岛上更广泛的氢、氨和可持续航空燃料基础设施转型(经济发展局裕廊岛合作项目,查阅于 2026 年八月)。将超大规模容量设于裕廊岛,可让运营商利用邻近的低碳能源试点项目,包括能源市场管理局正在研究的氨和氢项目,而不必完全依赖能源与电网中所述、以天然气为主的本岛电网。冷却系统供应商 Johnson Controls 以亚太地区数据中心增长为由,于 2025 年扩大其新加坡区域枢纽,反映出该行业所支撑的下游产业生态(经济发展局 Johnson Controls 公告,查阅于 2026 年八月)。

电力需求、限制与区域外溢

数据中心是新加坡电力消耗增长最快的行业之一。截至 2025 年,数据中心估计占全国能源消耗的 7%;随着云计算和人工智能工作负载扩展,预计到 2030 年将升至 12%(经济发展局 Johnson Controls 公告,查阅于 2026 年八月)。在本地资讯与通信行业内部,数据中心约占碳排放量的 82%,因此该行业脱碳对新加坡数字可持续发展目标至关重要(资讯通信媒体发展局绿色数据中心路线图,查阅于 2026 年八月)。能源市场管理局《2025 年电力需求与供应展望》预测,2025 年至 2034 年系统峰值需求的复合年增长率为 2.4%–4.8%;其上限情景明确纳入数据中心和先进制造业新增需求(能源市场管理局《2025 年展望》,查阅于 2026 年八月)。

新加坡土地稀缺、热带气候需要制冷,且本地可再生能源潜力有限,因此申请征集模式有意限制容量增长速度。试点轮次从 20 多份竞标方案中只分配了 80 兆瓦;DC-CFA2 提供至少 200 兆瓦,但对绿色电力来源施加了更严格要求,使扩张速度取决于低碳能源基础设施的建设进度,包括能源市场管理局为 2035 年实现 6 吉瓦低碳电力进口目标而推进的区域电力进口(经济发展局 DC-CFA2 说明书,查阅于 2026 年八月;另见能源与电网)。分析人士和行业观察者指出,超大规模运营商越来越多地在邻近的马来西亚柔佛、新加坡雅加达和曼谷建设大规模容量,因为当地土地和电力更便宜;同时保留新加坡以承载对延迟敏感的高端工作负载。这种模式既维持了新加坡的枢纽地位,也避免本地容量不受限制地增长(《海峡时报》DC-CFA2 报道,查阅于 2026 年八月)。因此,新加坡数字经济雄心与其绿色计划 2030能源目标之间的张力是结构性的:数据中心行业可以增长,但增长速度只能与效率提升和绿色电力供应相匹配,并受经济发展局和资讯通信媒体发展局的分配把关机制约束。