Coastal Protection

<h1>Coastal Protection</h1> <p>Singapore's coastal protection programme is the long-horizon defence of a low-lying island city against rising seas, storm surges, and the interaction of high tides with intense rainfall. Around 30% of Singapore's land sits below five metres above mean sea level, and homes, ports, airports, industry, and recreation cluster along the coast (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). PUB, Singapore's national water agency, was appointed the national coastal protection agency in 2020 and leads Whole-of-Government planning through its Coastal Protection Department, while inland drainage upgrades remain part of the same flood-resilience mandate (<a href="https://www.pub.gov.sg/-/media/PUB/PDF/PUB_SR_2022_Final.pdf">PUB sustainability report 2022, accessed Aug 2026</a>). The programme is distinct from <a href="/en/knowledge/article/sgkb.geography-urban-planning.land-reclamation">land reclamation</a> as a land-creation tool: coastal protection may use reclamation, but its purpose is flood defence and shoreline resilience, not expanding territory for development alone.</p> <h2>Sea-level rise and coastal flood risk</h2> <p>The climate science that drives Singapore's coastal protection planning comes from the Third National Climate Change Study (V3), released in January 2024 by the Centre for Climate Research Singapore under the Meteorological Service Singapore. V3 projects that mean sea level around Singapore could rise by 0.23–0.74 m by 2100 under a low-emissions pathway (SSP1-2.6), 0.34–0.88 m under a medium pathway (SSP2-4.5), and 0.54–1.15 m under a high-emissions pathway (SSP5-8.5), relative to the 1995–2014 baseline; by 2150, projections under the high pathway reach up to around 2 m (<a href="https://www.nea.gov.sg/media/news/news/index/latest-climate-projections-for-singapore-show-intensifying-urban-heat-and-more-wet-dry-extremes">NEA V3 release, accessed Aug 2026</a>). The upper bound for 2100 exceeds the previous V2 estimate of about 1 m, largely because of improved understanding of Antarctic ice-sheet melt (<a href="https://www.nea.gov.sg/media/news/news/index/latest-climate-projections-for-singapore-show-intensifying-urban-heat-and-more-wet-dry-extremes">NEA V3 release, accessed Aug 2026</a>).</p> <p>Coastal flooding in Singapore is not only a slow mean-sea-level problem. Extreme sea levels combine tides, waves, and storm surges; when they coincide with heavy rain and inland drainage under pressure, low areas can flood even before permanent inundation becomes common. East Coast Park already experiences sporadic coastal flooding when high tide coincides with heavy rainfall (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). PUB's Coastal-Inland Flood Model — a computational system simulating inland and coastal flood risks together — was commissioned in 2021 to evaluate infrastructure designs under multiple climate scenarios and to support site-specific studies (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2021/04/PUB-COMMENCES-DEVELOPMENT-OF-COASTAL">PUB, accessed Apr 2021</a>). Singapore's physical setting — flat relief, short rivers, engineered coasts — is summarised in <a href="/en/knowledge/article/sgkb.geography-urban-planning.physical-geography-and-climate">physical geography and climate</a>; coastal protection translates those vulnerabilities into decades-long capital programmes.</p> <h2>PUB's role, funding, and legal framework</h2> <p>PUB coordinates coastal protection across agencies rather than treating each shoreline as an isolated project. Singapore's roughly 300 km of coastline is segmented for site-specific studies (SSS) because geology, land use, and operational needs differ sharply between, for example, a container port, a petrochemical island, a public beach, and a housing estate (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). Construction of recommended measures is expected to ramp up from the 2030s and may stretch over two decades or longer (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>; <a href="https://www.straitstimes.com/singapore/budget-2025-additional-5-billion-injected-into-coastal-and-flood-protection-fund">ST on Budget 2025 fund, accessed Aug 2026</a>).</p> <p>Financing sits in the Coastal and Flood Protection Fund, established in Budget 2020 with an initial S$5 billion injection for coastal protection and drainage infrastructure. Budget 2025 added another S$5 billion; PUB stated the top-up would fund capital and non-recurrent operational expenditure, with use expected to ramp up toward the end of the decade as designs firm up (<a href="https://www.straitstimes.com/singapore/budget-2025-additional-5-billion-injected-into-coastal-and-flood-protection-fund">ST on Budget 2025 fund, accessed Aug 2026</a>). From FY2021 to FY2023, about S$200 million of the fund went mainly to drainage projects such as the Syed Alwi Pumping Station, Alkaff Lake, and Bukit Timah Canal upgrades (<a href="https://www.straitstimes.com/singapore/budget-2025-additional-5-billion-injected-into-coastal-and-flood-protection-fund">ST on Budget 2025 fund, accessed Aug 2026</a>).</p> <p>The legal framework shifted in 2026. The Coastal Protection and Other Amendments Act 2026 amends the Sewerage and Drainage Act 1999, renaming it the Sewerage, Drainage and Coastal Protection Act (SDCPA) and introducing coastal protection obligations alongside existing drainage law (<a href="https://www.mse.gov.sg/latest-news/2nd-reading-of-the-coastal-protection-bill---opening-speech-by-minister-grace-fu/">MSE 2nd-reading speech, accessed 11 Aug 2026</a>; <a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2026/06/New-Code-of-Practice-on-Coastal-Protection-to-strengthen-Singapore-coastal-resilience">PUB CPCOP release, accessed 11 Aug 2026</a>). The Minister for Sustainability and the Environment stated in March 2026 that affected landowners' legal obligations would begin closer to the early 2030s, after Absolute Protection Boundaries and Protection Boundaries are gazetted, though the statutory amendments commence earlier (<a href="https://www.mse.gov.sg/latest-news/2nd-reading-of-the-coastal-protection-bill---opening-speech-by-minister-grace-fu/">MSE, accessed 11 Aug 2026</a>). A capital grant will cover studies, services diversion, and construction of mandated measures, sized to cost norms and paid in tranches after obligations are formally imposed (<a href="https://www.mse.gov.sg/latest-news/2nd-reading-of-the-coastal-protection-bill---opening-speech-by-minister-grace-fu/">MSE, accessed 11 Aug 2026</a>). The programme sits under the <a href="/en/knowledge/article/sgkb.environment-sustainability.green-plan-2030">green plan 2030</a> Resilient Future pillar, which targets completion of coastal protection plans for City-East Coast, the north-west coast, and Jurong Island by 2030 as the planning milestone before heavy engineering.</p> <h2>Engineering measures and the coastal toolkit</h2> <p>Singapore's coastal protection toolkit mixes hard infrastructure, land raising, gated barriers, and reclamation-linked defences rather than a single seawall standard. Common elements include revetments and seawalls (existing walls can be raised where present), tidal gates that close during high tide while staying open by default to preserve sea views and maritime access, pumping stations to discharge stormwater when gates are closed, coastal barriers at shoreline openings, and land reclamation to higher elevations that form a continuous defensive line (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/08/Coastal-Barriers">PUB coastal barriers release, accessed Aug 2026</a>). Polders — diked land below mean sea level with active pumping, as at north-west Pulau Tekong — are another adaptation pattern used where fill savings justify permanent drainage obligations (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/09/Tekong-Polder">PUB Tekong polder release, accessed Aug 2026</a>; see <a href="/en/knowledge/article/sgkb.geography-urban-planning.land-reclamation">land reclamation</a>).</p> <p>Design philosophy emphasises keeping barriers open by default where possible so shipping, port operations, and waterfront recreation continue, rather than building continuous walls along entire coastlines that would block views and consume waterfront land (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/08/Coastal-Barriers">PUB coastal barriers release, accessed Aug 2026</a>). At Changi South, PUB recommends revetments or seawalls, with potential to raise existing structures and to incorporate aesthetic and recreational value (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/08/Coastal-Barriers">PUB coastal barriers release, accessed Aug 2026</a>). Some operational sites — shipyards and ferry terminals among them — may use deployable measures such as sliding gates and raised barriers activated when coastal flooding is forecast, rather than permanent walls alone (<a href="https://www.eco-business.com/news/singapore-unveils-coastal-defence-rules-requiring-long-term-protection-against-rising-seas/">Eco-Business on CPCOP, accessed Aug 2026</a>). Nature-based and hybrid solutions are explored especially where reclamation and protection are integrated, to limit environmental impact (<a href="https://www.ura.gov.sg/land-planning/planning-strategies/urban-resilience/long-island/">URA Long Island, accessed Aug 2026</a>).</p> <h2>Site-specific studies and major shoreline programmes</h2> <p>Coastal protection advances through SSS that recommend segment-specific measures before design and construction in the 2030s. The first completed SSS covers City-East Coast, comprising East Coast–Marina (including Long Island), Changi, and the Greater Southern Waterfront (GSW) (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/08/Coastal-Barriers">PUB, accessed Aug 2026</a>). For GSW, the study recommends coastal barriers protecting a substantial portion of the coastline; for Changi, a mix of raised structures and tidal gates; together with Long Island, these form a continuous line of defence for the City-East Coast segment (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/08/Coastal-Barriers">PUB coastal barriers release, accessed Aug 2026</a>).</p> <p><strong>Long Island</strong> is the flagship integrated project for the East Coast. Announced in 2023, it entails reclaiming about 800 hectares off East Coast Park — potentially as elongated land tracts from Marina East to Tanah Merah — to create a raised continuous defensive line, Singapore's 18th reservoir bordered by the park and new land, two centralised barrages and pumping stations (analogous to <a href="/en/knowledge/article/sgkb.environment-sustainability.water-story">Marina Barrage</a>), and roughly 20 km of new waterfront parks within a longer southern coastal park chain (<a href="https://www.ura.gov.sg/land-planning/planning-strategies/urban-resilience/long-island/">URA Long Island, accessed Aug 2026</a>; <a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). Twelve existing outlet drains along East Coast would drain into the new reservoir; barrages keep seawater out during high tide and discharge stormwater during heavy rain (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). Technical studies began in 2024; preparatory works west of Bedok Jetty are scheduled from end-2026 (<a href="https://www.ura.gov.sg/land-planning/planning-strategies/urban-resilience/long-island/">URA Long Island, accessed Aug 2026</a>). An alternative &quot;seawall plus 12 tidal gates&quot; option along the existing park was studied but rejected as disruptive to park users and permanently limiting waterfront access (<a href="https://www.straitstimes.com/singapore/long-island-to-be-reclaimed-off-east-coast-could-add-800ha-of-land-and-singapore-s-18th-reservoir">ST on Long Island, accessed Aug 2026</a>).</p> <p><strong>Jurong Island</strong> coastal protection is led by JTC with PUB, balancing petrochemical operations, waterfront access, and business continuity (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). <strong>North-west coast</strong> studies are split: Tuas Checkpoint to Lim Chu Kang jetty (commenced 2022) and Lim Chu Kang to Woodlands (launched 2023), covering agri-food zones and military training areas among other uses (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). <strong>Sentosa Island and the south-west coast</strong> were slated for new SSS starting by 2026 (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2025/03/Urgency-to-Strengthen-Coastal-Defences">PUB, accessed Aug 2026</a>). At GSW, options studied include centralised coastal barriers at the eastern and western ends of Sentosa and Brani versus decentralised walls along the full coastline (<a href="https://www.pub.gov.sg/Public/KeyInitiatives/Flood-Resilience/Coastal-Protection/Coastal-Protection-Plan/City-East-Coast">PUB City-East Coast plan, accessed Aug 2026</a>).</p> <h2>Critical perspectives: landowner obligations and the Code of Practice</h2> <p>From 2028, coastal landowners face explicit engineering and maintenance duties under the Code of Practice on Coastal Protection (CPCOP), developed by PUB to operationalise the SDCPA (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2026/06/New-Code-of-Practice-on-Coastal-Protection-to-strengthen-Singapore-coastal-resilience">PUB CPCOP release, accessed Aug 2026</a>). The CPCOP sets planning, design, operations, inspection, and maintenance requirements; measures must meet a stipulated Coastal Protection Level against permanent and transient coastal flooding and be designed with adaptability for future climate projections (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2026/06/New-Code-of-Practice-on-Coastal-Protection-to-strengthen-Singapore-coastal-resilience">PUB CPCOP release, accessed Aug 2026</a>). Implementation can be incremental or single-build, giving flexibility to phase upgrades (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2026/06/New-Code-of-Practice-on-Coastal-Protection-to-strengthen-Singapore-coastal-resilience">PUB CPCOP release, accessed Aug 2026</a>).</p> <p>Obligations attach to owners of prescribed places under the SDCPA — categories include land within an Absolute Protection Boundary, transiently floodable coastal areas, sheltered structures within those areas, and nearshore or offshore structures (<a href="https://www.mse.gov.sg/latest-news/2nd-reading-of-the-coastal-protection-bill---opening-speech-by-minister-grace-fu/">MSE 2nd-reading speech, accessed 11 Aug 2026</a>; <a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2026/06/New-Code-of-Practice-on-Coastal-Protection-to-strengthen-Singapore-coastal-resilience">PUB CPCOP release, accessed 11 Aug 2026</a>). Landowners consult the Coastal Protection Interpretation Plan and engage qualified professionals to meet Protection Boundary requirements (<a href="https://www.pub.gov.sg/Resources/News-Room/PressReleases/2026/06/New-Code-of-Practice-on-Coastal-Protection-to-strengthen-Singapore-coastal-resilience">PUB CPCOP release, accessed 11 Aug 2026</a>). Sea-level planning benchmarks in the CPCOP distinguish lease length: landowners with at least 30 years remaining must plan for up to 2.15 m of sea-level rise by 2150 under worst-case scenarios (with phased builds starting at 0.7 m), while those with less than 30 years plan for 0.7 m; actual defence heights may be higher after adding storm surge, tide, and wave allowances (<a href="https://www.eco-business.com/news/singapore-unveils-coastal-defence-rules-requiring-long-term-protection-against-rising-seas/">Eco-Business on CPCOP, accessed Aug 2026</a>). Measures must remain functional for at least 120 years, with regular inspection and annual compliance declarations to PUB (<a href="https://www.eco-business.com/news/singapore-unveils-coastal-defence-rules-requiring-long-term-protection-against-rising-seas/">Eco-Business on CPCOP, accessed Aug 2026</a>). Owners of transiently floodable areas must submit flood response plans and conduct annual drills (<a href="https://www.eco-business.com/news/singapore-unveils-coastal-defence-rules-requiring-long-term-protection-against-rising-seas/">Eco-Business on CPCOP, accessed Aug 2026</a>).</p> <p>The shift from state-built seawalls to shared responsibility marks a structural change: even as PUB coordinates national shoreline defence, private and agency landowners on the coast become owners and maintainers of protection within their plots, backed by grants and gazetted boundaries. Coastal protection in Singapore is therefore both a civil-engineering megaproject spanning generations and a regulatory regime that binds future redevelopment on the waterfront.</p>

简介

海岸防护

新加坡的海岸防护计划是一项长期防御措施,旨在保护这座低洼岛国城市免受海平面上升、风暴潮,以及高潮与强降雨相互作用的影响。新加坡约 30% 的土地位于平均海平面以上 五米以下,住宅、港口、机场、工业和休闲设施都集中在海岸沿线(PUB,访问于 2026 年八月)。新加坡国家水务机构 PUB 于 2020 年获任国家海岸防护机构,通过其海岸防护署领导全政府规划;内陆排水系统升级也属于同一防洪韧性职责的一部分(PUB 2022 年可持续发展报告,访问于 2026 年八月)。该计划不同于作为土地创造工具的土地填海:海岸防护可以采用填海,但其目的是防洪和增强海岸线韧性,而非单纯为发展扩大领土。

海平面上升与沿海洪灾风险

推动新加坡海岸防护规划的气候科学依据,来自新加坡气象署属下新加坡气候研究中心于 2024 年一月发布的第三次全国气候变化研究(V3)。V3 预测,相对于 1995–2014 年基准期,在低排放路径(SSP1-2.6)下,到 2100 年新加坡周边平均海平面可能上升 0.23–0.74 米;在中排放路径(SSP2-4.5)下上升 0.34–0.88 米;在高排放路径(SSP5-8.5)下上升 0.54–1.15 米;到 2150 年,高排放路径下的预测最高可达约 2 米(NEA V3 发布消息,访问于 2026 年八月)。2100 年预测的上限高于先前 V2 估计的约 1 米,主要是因为对南极冰盖融化的认识有所改进(NEA V3 发布消息,访问于 2026 年八月)。

新加坡的沿海洪灾不只是缓慢的平均海平面上升问题。极端海平面由潮汐、海浪和风暴潮共同形成;当它们与强降雨同时出现、内陆排水系统承压时,低洼地区即使在永久淹没变得普遍之前也可能发生洪灾。东海岸公园在高潮与强降雨同时出现时,已经偶尔发生沿海洪灾(PUB,访问于 2026 年八月)。PUB 的沿海—内陆洪灾模型是一套同时模拟内陆与沿海洪灾风险的计算系统,于 2021 年投入使用,用于评估多种气候情景下的基础设施设计,并支持针对各地点的研究(PUB,访问于 2021 年四月)。新加坡的自然地理条件——地势平坦、河流短、海岸经过工程改造——概述于自然地理与气候;海岸防护则将这些脆弱因素转化为跨越数十年的资本计划。

PUB 的职责、资金与法律框架

PUB 通过跨机构协调海岸防护,而不是把每段海岸线视为孤立项目。新加坡约 300 公里的海岸线被划分为若干区段,分别进行针对各地点的研究(SSS),因为不同区段的地质、土地用途和运营需求差异很大,例如集装箱港口、石化岛屿、公共海滩和住宅区(PUB,访问于 2026 年八月)。预计建议措施的建设将从 2030年代起加快,可能持续二十年或更久(PUB,访问于 2026 年八月;《海峡时报》关于 2025 年财政预算案基金的报道,访问于 2026 年八月)。

资金来自海岸与防洪基金。该基金于 2020 年财政预算案中设立,初始注资 5 十亿新元,用于海岸防护和排水基础设施。2025 年财政预算案又追加 5 十亿新元;PUB 表示,追加资金将用于资本支出和非经常性运营支出,随着设计逐步敲定,预计资金使用将在本十年末前后增加(《海峡时报》关于 2025 年财政预算案基金的报道,访问于 2026 年八月)。从 FY2021 到 FY2023,基金约有 200 百万新元主要用于排水项目,例如 Syed Alwi 抽水站、Alkaff 湖和 Bukit Timah 运河升级工程(《海峡时报》关于 2025 年财政预算案基金的报道,访问于 2026 年八月)。

法律框架于 2026 年发生变化。《2026 年海岸防护及其他修正法令》修订了 1999 年《排污与排水法令》,将其更名为《排污、排水与海岸防护法令》(SDCPA),并在现有排水法规之外加入海岸防护义务(MSE 法案第2读发言稿,访问于 2026 年八月 11 日;PUB 发布 CPCOP,访问于 2026 年八月 11 日)。可持续发展与环境部长于 2026 年三月表示,受影响土地所有者的法定义务将在 2030年代初前后才开始,届时绝对防护边界和防护边界将已刊宪,但相关法令修正案会更早生效(MSE,访问于 2026 年八月 11 日)。资本补助将涵盖研究、服务设施改迁和强制措施的建设,金额按成本标准确定,并在义务正式施加后分期支付(MSE,访问于 2026 年八月 11 日)。该计划属于绿色发展蓝图 2030“韧性未来”支柱;该支柱的目标是在 2030年前完成城市—东海岸、西北海岸和裕廊岛的海岸防护计划,作为大规模工程建设前的规划里程碑。

工程措施与海岸防护工具

新加坡的海岸防护工具组合包括硬质基础设施、土地抬高、闸门式屏障和与填海相关的防护措施,并非采用单一的海堤标准。常见构件包括护岸和海堤(现有海堤可加高)、高潮时关闭而默认保持开放以保留海景和海上通行的潮汐闸门、闸门关闭时排出雨水的抽水站、设于海岸线开口处的沿海屏障,以及通过填海将土地抬高至更高海拔以形成连续防护线(PUB 沿海屏障发布消息,访问于 2026 年八月)。圩田也是一种适应模式,指低于平均海平面的筑堤土地,需主动抽水;新加坡西北部的德光岛北部圩田便是实例。在填土节省足以抵偿永久排水责任时,可以采用这种模式(PUB 乌敏岛圩田发布消息,访问于 2026 年八月;另见土地填海)。

设计理念强调在可行情况下让屏障默认保持开放,使航运、港口运营和滨水休闲活动得以继续;而不是沿整条海岸线筑起连续围墙,以免阻挡景观并占用滨水土地(PUB 沿海屏障发布消息,访问于 2026 年八月)。在樟宜南部,PUB 建议采用护岸或海堤,并可加高现有结构,同时融入美观和休闲价值(PUB 沿海屏障发布消息,访问于 2026 年八月)。一些运营场所(包括船厂和渡轮码头)可能采用可部署的措施,例如滑动闸门和高架屏障,在预报沿海洪灾时启用,而非只依靠永久性围墙(Eco-Business 关于 CPCOP 的报道,访问于 2026 年八月)。尤其在填海与防护相结合的地区,会探索自然为本和混合型方案,以减轻对环境的影响(URA 关于 Long Island 的资料,访问于 2026 年八月)。

针对各地点的研究与主要海岸计划

海岸防护通过针对各地点的研究推进;这些研究会先提出适合各区段的措施,再于 2030 年代进行设计和施工。首个已完成的研究涵盖城市—东海岸,包括东海岸—滨海湾(含 Long Island)、樟宜和大南部滨海区(GSW)(PUB,访问于 2026 年八月)。对于 GSW,研究建议设置沿海屏障以保护海岸线的相当大一部分;对于樟宜,则建议采用高架结构和潮汐闸门组合;连同 Long Island,这些措施将为城市—东海岸区段形成连续防护线(PUB 沿海屏障发布消息,访问于 2026 年八月)。

Long Island 是东海岸的旗舰综合项目。该项目于 2023 年公布,计划在东海岸公园外海填海约 800 公顷,可能形成从滨海东至丹那美拉的狭长陆地,打造一条抬高的连续防护线;建设新加坡第 18座蓄水池,由公园和新土地环绕;建设两座集中式水闸和抽水站(类似滨海湾水闸);并在更长的南部海岸公园链中增建约 20 公里滨水公园(URA 关于 Long Island 的资料,访问于 2026 年八月;PUB,访问于 2026 年八月)。东海岸现有的 十二条排水口将排入新蓄水池;水闸会在高潮时挡住海水,并在强降雨时排出雨水(PUB,访问于 2026 年八月)。技术研究于 2024 年开始;Bedok Jetty 以西的准备工作定于 2026 年底开始(URA 关于 Long Island 的资料,访问于 2026 年八月)。曾研究过沿现有公园设置“海堤加 12 座潮汐闸门”的替代方案,但因会影响公园使用者,并永久限制滨水通道而遭否决(《海峡时报》关于 Long Island 的报道,访问于 2026 年八月)。

裕廊岛的海岸防护由裕廊集团(JTC)与 PUB 共同主导,在石化运营、滨水通道和业务连续性之间取得平衡(PUB,访问于 2026 年八月)。西北海岸研究分为两段:大士关卡至 Lim Chu Kang 码头(2022 年启动),以及 Lim Chu Kang 至兀兰(2023 年启动),涵盖农食品区和军事训练区等用途(PUB,访问于 2026 年八月)。圣淘沙岛和西南海岸计划于 2026 年前后启动新的针对各地点研究(PUB,访问于 2026 年八月)。在 GSW,研究的方案包括在圣淘沙和布拉尼岛东西两端设置集中式沿海屏障,或沿整段海岸线设置分散式海堤(PUB 城市—东海岸计划,访问于 2026 年八月)。

关键观点:土地所有者义务与业务守则

从 2028 年起,沿海土地所有者将根据 PUB 制定、用于落实 SDCPA 的《海岸防护业务守则》(CPCOP),承担明确的工程和维护职责(PUB CPCOP 发布消息,访问于 2026 年八月)。CPCOP 规定规划、设计、运营、检查和维护要求;相关措施必须达到规定的海岸防护水平,以应对永久性和暂时性沿海洪灾,并须按照未来气候预测设计,确保具备适应能力(PUB CPCOP 发布消息,访问于 2026 年八月)。实施可分阶段进行,也可一次建成,因此能够灵活安排升级进度(PUB CPCOP 发布消息,访问于 2026 年八月)。

根据 SDCPA,义务适用于规定地点的所有者——类别包括位于绝对防护边界内的土地、可能暂时遭水淹的沿海地区、这些地区内的有顶结构,以及近岸或离岸结构(MSE 法案第2读发言稿,访问于 2026 年八月 11 日;PUB CPCOP 发布消息,访问于 2026 年八月 11 日)。土地所有者须查阅海岸防护说明图,并聘请合格专业人士,以符合防护边界要求(PUB CPCOP 发布消息,访问于 2026 年八月 11 日)。CPCOP 的海平面规划基准按剩余租期区分:剩余租期至少 30 年的土地所有者,须按最坏情景规划至 2150 年海平面上升最多 2.15 米(分阶段建设时从 0.7 米开始);剩余租期不足 30 年的,则按 0.7 米规划;加入风暴潮、潮汐和海浪预留高度后,实际防护高度可能更高(Eco-Business 关于 CPCOP 的报道,访问于 2026 年八月)。相关措施必须至少 120 年保持有效运作,并须定期检查、每年向 PUB 提交合规声明(Eco-Business 关于 CPCOP 的报道,访问于 2026 年八月)。可能暂时遭水淹地区的所有者必须提交洪灾应对计划,并每年进行演习(Eco-Business 关于 CPCOP 的报道,访问于 2026 年八月)。

从由政府建设海堤转向共同承担责任,标志着结构性变化:尽管 PUB 协调国家海岸防护,沿海的私人土地所有者和机构土地所有者也将负责其地块内防护设施的所有权和维护,并由补助及刊宪边界提供支持。因此,新加坡的海岸防护既是一项跨世代的土木工程大型项目,也是一套会约束未来滨水区再开发的监管制度。